The PowerPoint document gives a detail information about the KPK Government initiative to build community based Mini-Micro Hydro Power Units in KPK..
Citation preview
Process flowchart for MHP Schemes under E & P Deptt
u Feasibility not established
u Scheme Proposal Rejected
uu u
uu
uu
uu
u
uu
uu
uu
Identification and Prioritization by community
Submission of MHP Resolution by the Community
uTechnical and Social Feasibility Survey by Field /District Engineers
uPreparation of Project digest based on survey
uApproval of the Project by head office Engineer
u Signing agreement between SRSP & Community for MHP .
uSupplies and Services to be provided by Contractors
uEstablishment of Project, Audit and Operation & Maintenance Committees
uImplementation of the Scheme uOn -Job Training to the Committees
uSRSP & Community- Based Monitoring.
uScheme CompletionuHanding over of MHP to
Community Establishment of Operation
& Maintenance company
Classification of Hydropower Plant
The challenge is to electrification rural area to achieve basic development objectives such as combating poverty and climate changes, while promoting gender equality, economic growth, environment protection and private sector development.
Off-grid systems should be considered when grid extension is not feasible.
Challenges in Construction of Rural Electrification projects
The Chief Minister Government of KP is interested to provide power-generation addition through Micro Hydel power plants (MHPP) with a maximum capacity up to 500 KW.
To tap each and every watt through utilizing indigenous hydel resources
To develop micro power projects within shortest possible time.
To reduce the burden on national grid. To generate employment opportunities.
Objectives of constructing M ini & M icro Hydel Project
Topography (Mountainous or plan)The viability of each potential project is very site specific.
Power output depends on the flow of water and the height of the drop of available water
Power Generation Capacity Environmental impactProximity to a loadLand ownership issuesSize of PopulationHousehold to be ServedOwnership of the ProjectParticipation by community in shape of Cash or Kind
Factors to be considered for setting up micro hydro systems include:
Districts Included in first Phase Construction of mini & Micro Hydel ( The Numbers in districts may vary
as we are finalizing the list with MPAs from these districts)S. No District Capacity MW Sites
1 Abbot Abad 4 50
2 Manasehra 3 26
3 Batagram 2 39
4 Kala Dhaka 2 20
5 Kohistan 4 35
6 Malakand 2 9
7 Buneer 1.5 13
8 Swat 2 45
9 Shangla 3 25
10 Lower Dir 4 11
11 Upper Dir 4 44
12 Chitral 4 39
Total 35.5 356
What do Mini & Micro hydro systems provide?
Electricity for
Isolated-grids
Remote power supplies…but also…
Reliability
Very low operating costs
Reduced exposure to energy price volatility
Detail of MHPs (Capacity wise): S.No. Plant Capacity Total No of Units Total capacity
1 5 to 15 kW 80 1.08 MW
2 20kW 35 0.60 MW
3 30 kW 35 0.90 MW
4 40 kW 25 0.60 MW
5 50 kW 40 1.75 MW
6 75kW 30 1.87 MW
7 100 kW 20 1.50 MW
8 150 kW 25 2.70 MW
9 200 kW 15 3.00 MW
10 250 kW 15 3.75 MW
11 300 kW 10 3.00 MW
12 400 kW 08 3.20 MW
13 500 kW 18 3.00 MW
Total 356 35.5 MW
Estimated Cost of the Project:
S.No ItemsEstimated cost in Pak Rupees
(Million)
1 Cost of MHPs 3952.5
2 PMU 84.84
3 Administrative Cost 592.88
4 Training Cost 0.5% 19.76
Total Cost 4220.80
Management cost 2% 79.05
Maintenance Cost 1.5% 69.75
Grand Total 4719.73
Quantifiable Output of the Project:
Installation of 356 MHP plants.
Provision of electricity to 300 villages.
Electrification of 120,833 rural households.
Provision of electricity / shaft power for small/medium scale industrial activities.
• Meeting with PCRET
• Dialogue with SRSP
uCompleted
• Dialogue with AKRSP
uCompleted
•Identification of Sites
uAll by 31 Dec
• PDWP APPROVAL
uBy JAN 2014
• Placement of Order of E&M Equipment
• Civil work on site
uBy Mar 2014
• Installation of Turbine and generators etc
uJuly 2014 • Commissioning
uAug 2014
Timelines for Distributed/ Off-grid M icro and M ini Hydro Power Projects
uFeasibility StudyuCSO Agreement
Feb 2014
Proposals implementation and operation of M icro and M ini Hydro Power Projects
PHYDO may be allowed to award/execute the mini /micro Hydel through NGOs( like SRSP/ AKRSP etc.) as a special case;
Funds be considered as grant and the revenue generated be spent on O&M of respective projects
PHYDO may disburse the funds to concerned NGO as per following schedule
10% on mobilization. 20% on completion of 25% of work. 20% on completion of 50% of work. 30% on completion of 75% of work. 20% on completion of 100% of work.
Payment to NGO after verification of work by Management Consultant
The hydel stations after its completion will be handed over to the concerned NGO and Community for O&M through concern district administration
Employment generation:
• Direct: A total of 300 personnel will be provided with jobs on
contractual basis.
• Indirect:
(a) A total of 1,800 local inhabitants will be imparted training on post installation O&M of MHP plants. Thus 1,800 local people will be provided jobs on these plants. A total of 30,000 labor jobs during construction period.
(b) About 3,500 local inhabitants is envisaged to get jobs in small scale industrial/commercial units running on MHP plants.