Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
MINERAL GREEN TERRAMESH®
Ufficio Tecnico OMI2018
Mineral Green Terramesh®
TERRAMESH® VERDE MINERALE2
Terramesh® Verde Minerale 65° – 70° – 80° – 90° inclinazione
Il Terramesh® VerdeMinerale è un Sistemamodulare conparamento in pietra perle terre rinforzate .
TERRAMESH® VERDE MINERALE2
É stato costruito per la primavolta in Belgio, Via Brugge, nel2013, per una (falsa) spalla diponte.Permette un rivestimento inpietra inclinata continuasenza i passaggi tipici delsistema Terramesh.
Terramesh® Verde Minerale 70° – 80° – 87° inclinazione
TERRAMESH® VERDE MINERALE2
Terramesh® Verde Minerale
Terramesh System
3 TERRAMESH® VERDE MINERALE
Vantaggi principali
Pietrame di diametroinferiore rispetto al tms
Facile da installare
Miglior rapportocosti/benefici
Flessibile + Modulare
TERRAMESH® VERDE MINERALE3
Mineral Green Terramesh®
70° – 80° - 87° face inclination α
Inclinazione standard 80°
Il Terramesh Verde Minerale è marcato CE
TERRAMESH® VERDE MINERALE3
Mineral Green Terramesh®
70° – 80° - 87°face inclination α
Gli elementi sono realizzati con rete DT in maglia 8x10, rivestita Polimac, pannello in
rete elttrosaldata zincate, 2 staffe zincate e 7 tiranti zincati da installare in sito
WELDED PANEL FOR MINERAL GTM3
99 mm x 30 meshes = 2970 mm
50 mm x 59 meshes = 2950 mm
PANNELLO ELETTROSALDATO 3
PANNELLO ESTERNO
BRACKETS AND TIES3
INSTALLATION DETAILS4
AA = RETE DT BB = barrette
CC = GeotessileDD = barrette
EE = tirantiFF = Riempimento
Strutturale GG = Punti SpenaxHH = riempimento
in pietrame
The folded units shall be taken out from the bundle and placed on a hard flat surface.Units shall be opened, unfolded and pressed out to their original shape.
Il pannello frontale va sollevato e portato nella posizione finale e agganciato con le staffe e I tiranti. Il geotessile è impiegato per separare il pietrame dal terreno
Stone and soil fillingPlacing of a new unit
L = LONG
70° facing inclination
S = SHORT
TIE POSITIONING4
Each unit having a width of 3m is provided with 2 steel triangular brackets (loose) and 7 steel ties (4 shorts + 3 long) whose function is to assure the required facing inclination.
650
80° facing inclination
650
87° facing inclination
70° / 80° INCLINATION TIE POSITIONING4
zinc coated welded mesh panel 50x50 mm Φ5
zinc coated welded mesh panel 99x100 mm Φ6
2970
2950
L = LONG S = SHORT
87° INCLINATION TIE POSITIONING4
L = LONG S = SHORT
zinc coated welded mesh panel 50x100 mm Φ5
2,95 m x 0,65 m
TIE POSITIONING4
Pannello in rete elettrosaldata zincata
50x50 mm Φ5
INSTALLATION OF THE STONES ON THE FACING4
The front face is filled with approximately 60 cm of granular materialAfter the rock has been placed and before the structural backfill compaction, a geotextile shall be placed at the facing
Place the structural backfill in approximately 200 mm lifts and compact it to the required level.
The required stones for each Mineral Green Terramesh unit is 0,5 cubic meter for each squared meter of facing.
The required geotextile for Mineral GTM unit is 2,5 squared meter for each squared meter of facing
Compaction shall be performed to 95% of Standard Proctor, by use of conventional compaction equipment. Chiusura unità e livello
AFTER STONES INSTALLATION4
Belgium, Via Brugge
AFTER STONES INSTALLATION4
Belgium, Via Brugge
INSTALLATION PRODUCTIVITY4
Senza rilevato, considerando scarico, stoccaggio e posa elementi
Con pietrame e rilevato compattato
Mineral Green Terramesh®
Belgium, Via Brugge, Bridge Abutment
Mineral Green Terramesh®
Belgium, Via Brugge, Bridge Abutment
Mineral Green Terramesh®
Belgium, Via Brugge, Bridge Abutment
Mineral Green Terramesh®
Germany, Oberstdorf, Ski Jump
Mineral Green Terramesh®
Germany, Oberstdorf, Ski Jump
Mineral Green Terramesh®
Germany, Oberstdorf, Ski Jump
Mineral Green Terramesh®
France, Montagnac, Arch Culvert
Mineral Green Terramesh®
France, Montagnac, Arch Culvert
Mineral Green Terramesh®
Romania, Embankment & Bridge Abutment