Organic Growth Project 1 (OGP1)Head of Project
Minera Escondida Limitada
Abril 2012
Secuencia Minera
Crusher # 5
Crusher # 3
Crusher # 2
Escondida North
Escondida
LS Conc. 142.500 tpd
OGP1 Conc. 152.000 tpd
Shuttle/transfer point
Ore Been
CV103CV102
CV104
CV2C
9.600 tph (existent)
12.550 tph (OGP1)
8.800 tph (existent - relocated)
Stockpile OGP1 146.000 ton live
Stockpile LS 110.000 ton live
Sistema de Correas y Chancados
Crusher # 1
OGP1 Alcance
Red - OGP1Yellow - LSDBlue - Laguna Seca
8 Alimentadores1.500 tph
Nuevo Stock pile OGP1
Circuito Molienda
rea de Molienda
1 Molino SAG 40x2624 MW
4 Molinos de Bolas26x41.5
15.7 MW
Pebbles Circuit
Pebble Plant2 MP 1000
OGP1 - DPS Slide 8
Circuito de Flotacin
3 Rows21 Scavenger Cells300 m3
Flotation Circuit
7 Rows49 Rougher Cells300 m3
3 Molinos Verticales3.000 hp
rea de Remolienda
12 celdas Columnares de 4.5m de dimetro
2 distribuidores
rea Segunda Limpieza
Espesadores de Relaves
OGP1 - DPSSlide 13
3 Thickeners(125 m diameter)
Back
Almacenamineto y Espesadores de Concnetrado
New 2 Concentrate ThickenersDiameter 42.5 m
New 1 ClarifierDiameter 35 m
New 4 Holding TanksDiameter 15 m
New 3 Positive Displacement Pumps
Slide 14