2
Use this drawing when: Deploying a new compute, network, and/or storage cabinet or rack Upgrading or adding devices Expanding the network Addressing moves, adds, and changes maintenance issues D C B A 4 3 2 1 D C B A 4 3 2 1 Micro Data Center Layout, Cable Management, Grounding/Bonding, Power and ID Micro Data Center Reference Design Panduit TM Wyr-Grid TM IN-ROOM PCD007-AUG16-ENG Front View UPS B A 1 RU Space for Fiber Shelf UPS Rear View B A Thermal Blanking panels optimize airflow and improve appearance. Perforated and solid blanking panels shown. Servers Storage Array Heavy Light Cable Management Standard patching using a 24 Port Patch Panel with D-Ring (open) or NetManager (hidden) Horizontal Manager Cable Management Standard patching using a 24-port patch panel with D-ring (open) or NetManager TM (hidden) horizontal manager. Power Verticle Power Outlet Unit (POU) powers devices. Some units have power and environmental monitoring and connected to UPS. A second POU can be added for redundant power. Thermal Blanking panels optimize airflow and improve appearance. Perforated and solid blanking panels shown. Grounding/Bonding Grounding cable attaches to grounding bar. Jumpers attach to ground bar and equipment Network Switch Cable Management 1RU Fiber enclosure with termination management, bend radius control, and protection. Inside Cabinet Strain Relief Strain relief bar and clip securely hold horizontal cable preventing disconnect. To Core Switch To Integrated Network Zone Systems or Switches Panduit Small Diameter Patch Cord Panduit Multimode Fiber Patch Cord Panduit Multimode Dielectric Conduited Fiber (Uplink) Panduit CAT 6 Industrial Cable Identification Label cords with FROM and TO location. Panduit TurnTell labels makes it easy to view. Uninterruptible Power Supply Cable Management High Density patching using a 48-port angled patch panel. Horizontal managers not needed. Layout Switches turned around to have ports on same side. Network Monitoring IntraVUE Network Monitoring Software

Micro Data Center Layout, Cable Management, … · 2020-02-22 · Micro Data Center Layout featuring Cable Management, Grounding/Bonding, Power and ID Keywords: micro data center,popular

  • Upload
    others

  • View
    7

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Micro Data Center Layout, Cable Management, … · 2020-02-22 · Micro Data Center Layout featuring Cable Management, Grounding/Bonding, Power and ID Keywords: micro data center,popular

Use this drawing when:

Deploying a new compute, network, and/or

storage cabinet or rack

Upgrading or adding devices

Expanding the network

Addressing moves, adds, and changes

maintenance issues

D

C

B

A

4 3 2 1

D

C

B

A

4 3 2 1

Micro Data Center Layout, Cable Management, Grounding/Bonding, Power and ID

Micro Data Center

Reference Design

PanduitTM Wyr-GridTM

IN-ROOM

PCD007-AUG16-ENG

PANDUIT

WGSDWL

Front View

UPS

PCI

1

2

PCI

3

4

AC

DC

ATTENTIONPower supply filler is

required for system coolingRemove only when

installing 2nd power supply

0 X4

01

23

1 X4

2 3 4 5

1 GbEiSCSI TOE

B

6Gb SAS

01

23

0 X4

01

23

1 X4

2 3 4 5

1 GbEiSCSI TOE

6Gb SAS

01

23

A

#

#

#

#

1 RU Space for Fiber Shelf

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

45 46 47 4841 42 43 4437 38 39 4033 34 35 3629 30 31 3225 26 27 28

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

45 46 47 4841 42 43 4437 38 39 4033 34 35 3629 30 31 3225 26 27 28

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

45 46 47 4841 42 43 4437 38 39 4033 34 35 3629 30 31 3225 26 27 28

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

45 46 47 4841 42 43 4437 38 39 4033 34 35 3629 30 31 3225 26 27 28

UPS

PCI

1

2

PCI

3

4

AC

DC

ATTENTIONPower supply filler is

required for system coolingRemove only when

installing 2nd power supply

PCI

1

2

PCI

3

4

AC

DC

ATTENTIONPower supply filler is

required for system coolingRemove only when

installing 2nd power supply

PCI

1

2

PCI

3

4

AC

DC

ATTENTIONPower supply filler is

required for system coolingRemove only when

installing 2nd power supply

MODE

Catalyst 3750-X Series

BLANK

MODULE1X

2X

11X

12X

13X

14X

23X

24X

25X

26X

35X

36X

37X

38X

FN

SYSTCONSOLE XPS STAT SPEED DUPLX

S-PWR MAST STACK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

NETWORK

MODULE

G1 G2/TE1 G3 G4/TE2

C3KX-NM-10G

MODE

Catalyst 3750-X Series

BLANK

MODULE1X

2X

11X

12X

13X

14X

23X

24X

25X

26X

35X

36X

37X

38X

FN

SYSTCONSOLE XPS STAT SPEED DUPLX

S-PWR MAST STACK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

NETWORK

MODULE

G1 G2/TE1 G3 G4/TE2

C3KX-NM-10G

MODE

Catalyst 3750-X Series

BLANK

MODULE1X

2X

11X

12X

13X

14X

23X

24X

25X

26X

35X

36X

37X

38X

FN

SYSTCONSOLE XPS STAT SPEED DUPLX

S-PWR MAST STACK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

NETWORK

MODULE

G1 G2/TE1 G3 G4/TE2

C3KX-NM-10G

Rear View

PCI

1

2

PCI

3

4

AC

DC

ATTENTIONPower supply filler is

required for system coolingRemove only when

installing 2nd power supply

0 X4

01

23

1 X4

2 3 4 5

1 GbEiSCSI TOE

B

6Gb SAS

01

23

0 X4

01

23

1 X4

2 3 4 5

1 GbEiSCSI TOE

6Gb SAS

01

23

A

#

#

#

#

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

45 46 47 4841 42 43 4437 38 39 4033 34 35 3629 30 31 3225 26 27 28

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

45 46 47 4841 42 43 4437 38 39 4033 34 35 3629 30 31 3225 26 27 28

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

45 46 47 4841 42 43 4437 38 39 4033 34 35 3629 30 31 3225 26 27 28

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

45 46 47 4841 42 43 4437 38 39 4033 34 35 3629 30 31 3225 26 27 28

MODE

Catalyst 3750-X Series

BLANK

MODULE1X

2X

11X

12X

13X

14X

23X

24X

25X

26X

35X

36X

37X

38X

FN

SYSTCONSOLE XPS STAT SPEED DUPLX

S-PWR MAST STACK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

NETWORK

MODULE

G1 G2/TE1 G3 G4/TE2

C3KX-NM-10G

PCI

1

2

PCI

3

4

AC

DC

ATTENTIONPower supply filler is

required for system coolingRemove only when

installing 2nd power supply

PCI

1

2

PCI

3

4

AC

DC

ATTENTIONPower supply filler is

required for system coolingRemove only when

installing 2nd power supply

PCI

1

2

PCI

3

4

AC

DC

ATTENTIONPower supply filler is

required for system coolingRemove only when

installing 2nd power supply

MODE

Catalyst 3750-X Series

BLANK

MODULE1X

2X

11X

12X

13X

14X

23X

24X

25X

26X

35X

36X

37X

38X

FN

SYSTCONSOLE XPS STAT SPEED DUPLX

S-PWR MAST STACK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

NETWORK

MODULE

G1 G2/TE1 G3 G4/TE2

C3KX-NM-10G

MODE

Catalyst 3750-X Series

BLANK

MODULE1X

2X

11X

12X

13X

14X

23X

24X

25X

26X

35X

36X

37X

38X

FN

SYSTCONSOLE XPS STAT SPEED DUPLX

S-PWR MAST STACK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

NETWORK

MODULE

G1 G2/TE1 G3 G4/TE2

C3KX-NM-10G

MODE

Catalyst 3750-X Series

BLANK

MODULE1X

2X

11X

12X

13X

14X

23X

24X

25X

26X

35X

36X

37X

38X

FN

SYSTCONSOLE XPS STAT SPEED DUPLX

S-PWR MAST STACK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

NETWORK

MODULE

G1 G2/TE1 G3 G4/TE2

C3KX-NM-10G

ThermalBlanking panels optimize airflow and improve appearance. Perforated and solid blanking panels shown.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 241 24

Servers

Storage Array

Heavy

Light

Cable ManagementStandard patching using a 24 Port Patch Panel with D-Ring (open) or NetManager (hidden) Horizontal Manager

Cable ManagementStandard patching using a 24-port patch panel with D-ring (open) or NetManagerTM (hidden) horizontal manager.

PowerVerticle Power Outlet Unit (POU) powers devices. Some units have power and environmental monitoring and connected to UPS. A second POU can be added for redundant power.

ThermalBlanking panels optimize airflow and improve appearance. Perforated and solid blanking panels shown.

Grounding/BondingGrounding cable attaches to grounding bar. Jumpers attach to ground bar and equipment

Network Switch

Cable Management1RU Fiber enclosure with termination management, bend radius control, and protection.

Inside Cabinet

Strain ReliefStrain relief bar and clip securely hold horizontal cable preventing disconnect.

PANDUIT

WGSDWL

PANDUIT

WGSDWL

PANDUIT

WGSDWLPANDUIT

WGSDWL

PANDUIT

WGSDWLPANDUIT

WGSDWL

PANDUIT

WGSDWL

To Core SwitchTo Integrated Network Zone

Systems or Switches

Panduit Small Diameter Patch Cord

Panduit Multimode Fiber Patch Cord

Panduit Multimode Dielectric Conduited Fiber (Uplink)

Panduit CAT 6 Industrial Cable

IdentificationLabel cords with FROM and TO location. Panduit TurnTell labels makes it easy to view.

Uninterruptible Power Supply

Cable ManagementHigh Density patching using a 48-port angled patch panel. Horizontal managers not needed.

LayoutSwitches turned around to have ports on same side.

Network MonitoringIntraVUE Network Monitoring Software

Page 2: Micro Data Center Layout, Cable Management, … · 2020-02-22 · Micro Data Center Layout featuring Cable Management, Grounding/Bonding, Power and ID Keywords: micro data center,popular

Server, Switch, Storage, etc. LayoutFor best stability, heavier equipment like server, UPS, and storage should be

mounted towards the bottom of a cabinet or rack with lighter components like

switch, firewall, and patch panel towards the top. Reliable and efficient cabling is

best with all equipment ports facing backwards. Equipment like switches may

need to be turned around with their port side facing backwards. Cabinet rails

may need to be moved forward to line up devices on the front. Ensure cabinet or

rack RU holes are compatible with equipment rails and brackets.

Cable ManagementFollow best practices to route and protect cabling to achieve the highest

reliability and ease moves, adds, and changes. Reduce interference with ports

by placing rack mounted horizontal cable managers like D-Rings and

NetManagers above and below equipment or flat patch panels to route cables

away from port. Use angled patch panels for high density patching. A fiber

enclosure protects exposed fiber cable, termination management (e.g. fusion

splice), and bend radius control. Select patch cord lengths that have minimal

slack between connections. Use slack spools to take up slack. Bundle cables

using Hook & Loop cable ties for easy cable additions and removal. Horizontal

cable should have strain relief to prevent jack connection damage like a strain

relief bar.

IdentificationClear and intuitive identification eases installation along with moves, adds, and

changes. This includes labeling cables on both ends following TIA -606-B

standards. Color coding such as cables, color bands, and labels can be used to

identify VLANs, areas, and media type.

Grounding & BondingGrounding and bonding is essential for reliable communication and equipment

protection. A solid copper grounding conductor is terminated to a lug and then

landed on a grounding bar. Jumper cables are attached to equipment ground

terminal and then routed to the grounding bar terminated with a lug that is

attached to the grounding bar with a screw.

PowerReliable power is achieved with redundant power sources via UPS or dual,

independent power lines to a Power Outlet Unit (POU). The POU should have a

current rating and outlets sized to support current and future equipment. POUs

can also come with power and environmental monitoring to provide critical alerts .

Bill of Materials

Part Number Description

PSL-DCJB Jack module block-out device

CPPL24M6BLY24-port patch panel supplied with 4 factory-installed

CFPLM6BL snap-in faceplates

TLBP1R-V Tool-less blanking panel for 1RU

UTP28SP5GRCat 6 performance, 28 AWG UTP patch cord with TX6

modular plugs on each end, green, 5 feet length

FX2ERLNLNSNM002 OM3 2-fiber patch cord, riser rated, LC duplex to LC

duplex with 1.6mm jacket, 2 meter length

FAP6WBLDLC

LC OM2 FAP loaded with 6 LC duplex multimode fiber

optic adapters (black) with phosphor bronze split

sleeves

FCE1UAHolds up to 5 QuickNet cassettes, FAP adapter panels,

or FOSM splice modules

MDC79D42 RU pre-configured industrial micro data center,

78.1'' (1984mm) height, network cabling, 4 casters, and

shock pallet

CPPA48FMWBLYAngled 48-port flush mount patch panel supplied with

rear-mounted faceplates

S8222B

Net-access S-type cabinet frame. Single hinge

perforated front door. Split perforated rear doors.

79.8" H x 31.5" W x 48.0" D

CJ688TGBL Cat 6, 8-position, 8-wire universal module

CMPHF1 D-rings installed on panel

Q1L2B3J2M24AFA0Vertical power strip, 32A, 18 IEC C-13 and 6 IEC C-19

locking receptacles, and IEC-60309-6H 2P+E plug

RGRB19CN

RGEJ660PF

R100X150V1T

SRBBRWC-KIT

Grounding busbar kit, 19" long, 20 holes

#6 AWG jumper, 60" long, 45° bent lug

TurnTellThermal transfer, vinyl, 1.00" W x 1.50" H, 0.50"

POA, clear/white, 3" core

Strain relief bar with integrated adjustable clips and pair

of quick release brackets

IUC6C04ABL-CEG

FSPD508-050M

IABDIN4

Industrial copper cable, Cat 6, 4-pair, 24/7 AWG stranded,

U/UTP, CM, black, 1000ft/305m reel

8-fiber OM2 dielectric conduited, low-smoke zero halogen

(LSZH) riser (OFNR) rated, (MM) indoor distribution

cable, 50 meters length

4 RU din-rail conversion kit

Network MonitoringIntraVUETM real-time industrial network monitoring software for assessment and

troubleshoot. 128 node license: SNMS-0128

About this Configuration

For More Information For more information, contact your local distributor, Panduit Sales

Representative, or Rockwell Automation Sales Representative.

www.panduit.com/ia

[email protected]