Page 1: Metropolitan Council Wastewater Utility Overview

Metropolitan Council

Wastewater Utility Overview

Page 2: Metropolitan Council Wastewater Utility Overview

Minneapolis Milling District: Early 1900s

Page 3: Metropolitan Council Wastewater Utility Overview

Lock & Dam No. 1: April 5, 1917

Page 4: Metropolitan Council Wastewater Utility Overview

Sewage Mats on the Mississippi:

June 1933

Page 5: Metropolitan Council Wastewater Utility Overview

5

Mississippi River Fish Survey: 1926

1

0

1 1

0

2

4

6

8

10

12

UM 839 UM 835 UM 832-816 UM 820 UM 797

St. Paul Metro WWTP Newport-Hastings Spring Lake Red Wing Dam

To

tal F

ish

Ta

xa

SticklebackShort-nosed

GarCommon

Shiner

Page 6: Metropolitan Council Wastewater Utility Overview

Metropolitan Wastewater Treatment

Plant: 1938

Page 7: Metropolitan Council Wastewater Utility Overview

Becoming a Regional Utility:

1969; 66th legislature

Page 8: Metropolitan Council Wastewater Utility Overview

8

MCES Service Area and Facilities

Page 9: Metropolitan Council Wastewater Utility Overview

Metropolitan Plant

Page 10: Metropolitan Council Wastewater Utility Overview

Blue Lake Plant

Page 11: Metropolitan Council Wastewater Utility Overview

Seneca Plant

Page 12: Metropolitan Council Wastewater Utility Overview

Eagles Point Plant

Hastings Plant

Page 13: Metropolitan Council Wastewater Utility Overview

East Bethel Plant

St. Croix Plant

Page 14: Metropolitan Council Wastewater Utility Overview

Wastewater Generation

8 wastewater treatment plants

610 miles of sewer pipe

60 pump stations

A $6-$7B System…

With ~130M per year

in capital investments

Page 15: Metropolitan Council Wastewater Utility Overview

15

• Averages 250 million gallons day

– Could fill the Empire State Building in 1 day

Wastewater Output

Page 16: Metropolitan Council Wastewater Utility Overview

16

Wastewater Treatment

Page 17: Metropolitan Council Wastewater Utility Overview

17

Washed/compacted screenings (to landfill)

Page 18: Metropolitan Council Wastewater Utility Overview

18

Page 19: Metropolitan Council Wastewater Utility Overview

19

“Mixed Liquor” (waste plus bacteria)

Page 20: Metropolitan Council Wastewater Utility Overview

20

Air diffusers

Page 21: Metropolitan Council Wastewater Utility Overview

21

Page 22: Metropolitan Council Wastewater Utility Overview

22

220 dry tons per day (660 wet tons)

Page 23: Metropolitan Council Wastewater Utility Overview

23

Solids Management Building

Page 24: Metropolitan Council Wastewater Utility Overview

24

Sludge Incineration

Page 25: Metropolitan Council Wastewater Utility Overview

Operations

Page 26: Metropolitan Council Wastewater Utility Overview

26

Page 27: Metropolitan Council Wastewater Utility Overview

Industrial Monitoring

Page 28: Metropolitan Council Wastewater Utility Overview

Processing Industrial Samples

Page 29: Metropolitan Council Wastewater Utility Overview

Compliance Performance

24 23

14

9 97

0

5

10

15

20

25

Hastings St. CroixValley

Seneca Blue Lake EaglesPoint

Empire

National NACWA Platinum Level Compliance

Page 30: Metropolitan Council Wastewater Utility Overview

30

0

50

100

150

200

250

1942 1947 1952 1957 1962 1967 1972 1977 1982 1987 1992 1997 2002 2007 2012

Me

tro

Flo

ws

(M

GD

) o

r T

SS

/TB

OD

(m

g/L

)

Metro Flows (MGD) TSS (mg/L) TBOD (mg/L)

Primary Treatment Advanced Secondary Treatment

(added 1985)

Secondary Treatment

(added 1966)

Metro Plant Performance:

1942-2012

Page 31: Metropolitan Council Wastewater Utility Overview

31

0

1000

2000

3000

4000

5000

6000

Bac

teri

a C

ou

nts

(N

o. o

f b

ac

teri

a/1

00

mL

wa

ter)

Mean August Bacteria Counts

UM 839.1 UM 826.7

Mississippi River Bacteria Counts:

1976-2012

Page 32: Metropolitan Council Wastewater Utility Overview

32

Mississippi River Dissolved Oxygen

Concentrations: 1935-2012Mean August Dissolved Oxygen Concentration at Grey

Cloud Island (UM 826.7)

0

2

4

6

8

10

12

1935 1940 1945 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 2010

Disso

lve

d O

xyg

en

(m

g/L

)

Dissolved Oxygen

Dissolved Oxygen Guideline orStandard

Water Quality Guideline (1928)

MN State Dissolved Oxygen Standard

Page 33: Metropolitan Council Wastewater Utility Overview

33

Walleye Return to the Mississippi

Page 34: Metropolitan Council Wastewater Utility Overview

MCES Infrastructure Age

Page 35: Metropolitan Council Wastewater Utility Overview

MCES Infrastructure Condition

40 mi 75 mi 183 mi 80 mi

6 mi

Page 36: Metropolitan Council Wastewater Utility Overview
Page 37: Metropolitan Council Wastewater Utility Overview

37

Excessive I/I

Increases costs to communities

Limits growth capacity

Reduces groundwater

recharge

Endangers public, environmental

health

Sources

Public

Private

Inflow and Infiltration – I/I

Page 38: Metropolitan Council Wastewater Utility Overview

• July 1987 superstorm

– 16” of rainfall over one week in region

• 1990 MCES system evaluation

– 20% of annual flow from I/I

• 2002 MCES interceptor master plan

– Future flow will exceed capacity; not sustainable

– More cost effective to address sources than build capacity

• 2004 I/I Task Force of communities

– Begin MCES I/I Program

– Incentive and resources for communities

– Revised 2010, 2016

I/I Program timeline

Page 39: Metropolitan Council Wastewater Utility Overview

Energy Reduction, Cost Savings• From 2008-2015, MCES has reduced energy

consumption 23%, savings of $4M annually

• The goal is to reduce energy consumption by 10% by

2020, saving an additional $1M annually.

Through other grants, rebates, etc., MCES has saved $7M

on energy costs.

Page 40: Metropolitan Council Wastewater Utility Overview

40

Met Council’s Wastewater Treatment

is 100% Funded by User Fees

Monthly Wastewater

Charge80%

SAC15%

Industrial Charge

5%

Other<1%

Sources (2017 Budget* = $267M)

40

• Wastewater utility fees are

not a tax; it is a fee for users

of the service

• No state funds are used to

operate the system

• All MCES revenue is used

strictly for MCES: it does not

subsidize any other Met

Council divisions

*- excludes pass through grants

Page 41: Metropolitan Council Wastewater Utility Overview

$1

46

$1

60

$1

85

$2

06

$2

39

$2

40

$2

42

$2

44

$3

12

$3

22

$3

35

$3

35

$3

35

$3

77

$3

92

$4

00

$4

26

$4

51

$4

55

$4

77

$4

92

$5

27

$5

77

$8

50

$1

,29

7

$0

$200

$400

$600

$800

$1,000

$1,200

$1,400

LA

Co

un

ty

Ro

ch

este

r, N

Y

San

Ju

an

Den

ver

Vir

gin

ia B

eac

h

Ph

oe

nix

Tw

in C

itie

s

Ch

ica

go

Sacra

me

nto

San

An

ton

io

Mia

mi

Ph

ilad

elp

hia

Wa

sh

ing

ton

D.C

.

St.

Lo

uis

Fo

un

tain

Va

lle

y

Dallas

Au

sti

n

Cle

vela

nd

Lo

uis

vil

le

Seatt

le

Mil

wa

uk

ee

Co

lum

bu

s

Flu

sh

ing

, N

Y

MW

RA

Atl

an

ta

Retail Sewer Rate Per Household

2013 Rates (per 2014 NACWA survey)

Peer

Average

Comparative Information25 peer city average retail sewer rate per household = $404

Page 42: Metropolitan Council Wastewater Utility Overview

Water Supply

Page 43: Metropolitan Council Wastewater Utility Overview

43

Water Supply Planning – Minn. Stat. 473.1565

2005 Legislation

– “Carry out planning activities addressing the

water supply needs of the metropolitan area”

– Twin Cities Metropolitan Area Master Water

Supply Plan- 2010

Metro Area Water Supply Advisory committee

– Municipalities/utilities

– Counties

– State agencies

Purpose

– Assist and Guide Council water supply planning

– Approve Master Water Supply Plan (2015)

– Appoint Technical Advisory Committee (2015)

Page 44: Metropolitan Council Wastewater Utility Overview

44

• Adequate water supplies are essential for

our region’s growth, livability and

prosperity.

• Met Council Role in Regional Water Supply

Planning – A regional water supply plan

– Support Local government units making informed and

effective decisions

– Assistance to communities in developing and

implementing local plans

– Identify approaches for emerging issues, and

– Strong collaborative relationship with stakeholders.

Planning Objectives for Regional Water Supply

The Metropolitan Council is

not a water supplier. Our

intent is not to take over

local water supply

systems. The regional

planning process has been

designed and applied to

ensure local water

suppliers have control of

and responsibility for their

water supply systems.

Page 45: Metropolitan Council Wastewater Utility Overview

45

Page 46: Metropolitan Council Wastewater Utility Overview

46

SUMMER

2.3x

Brooklyn Center

WINTER

SUMMER

3.8x

WINTER

Eden Prairie

SUMMER

2.4x

WINTER

White Bear Lake

SUMMER

3.3x

Eagan

WINTER

SUMMER

1.9x

St. Paul Regional

Water Services

WINTER

SUMMER

3.7x

Woodbury

WINTER

Summer Water Use Compared to Winter Water Use

Page 47: Metropolitan Council Wastewater Utility Overview

47

Aquifers & Surface Waters Do Interact

PDCJ: Prairie Du Chien-Jordan Aquifer

MTSH: Mount Simon Hinckley Aquifer

Page 48: Metropolitan Council Wastewater Utility Overview

48

Page 49: Metropolitan Council Wastewater Utility Overview

49

Page 50: Metropolitan Council Wastewater Utility Overview

State and Federal Agency PartnersMAWSAC MembersJeffrey Berg: MDARandy Ellingboe: MDHJeanne Daniels: MDNRCatherine Neuschler: MPCATAC MembersLih-in Rezania: MDHJamie Wallerstedt: MPCAJames Stark: USGS

MAWSAC ChairSandy Rummel: Council District 11

Consulting IndustryTAC MembersJohn Dustman: Summit EnvirosolutionsRay Wuolo Barr Engineering

University of MinnesotaTAC MemberCrystal Ng: Dept. of Earth Sciences

MAWSAC County RepresentativesMetroJamie Schurbon: Anoka CountyGeorg Fischer: Dakota CountyGreater Metro AreaMichael Robinson: Chisago CountySusan Morris: Isanti CountyLisa Vollbrecht: Sherburne CountyMark Daleiden: Wright County

Community RepresentativesMAWSAC LGUsPatty Acomb: MinnetonkaTodd Gerhardt: ChanhassenPhil Klein: HugoDean Lotter: New BrightonBarry Stock: SavageMAWSAC Water SuppliersGlen Gerads: MinneapolisSteve Schneider: St. Paul RWSTACBruce Westby: RamseyChris Petree: LakevilleDale Folen: MinneapolisJennifer Levitt: Cottage GroveKlayton Eckles: WoodburyKristin Asher: RichfieldRobert Cockriel: BloomingtonLon Schemel: ShakopeeMark Maloney: Shoreview (MAWSAC liason)

MAWSAC Representation

TAC Representation

Counties and Council Districts Represented by MAWSAC

Metropolitan Council MAWSAC and TAC

Metropolitan Council Water Supply Planning Area

Page 51: Metropolitan Council Wastewater Utility Overview

51

Existing Water

Supply Sub-Regional

Workgroups

“Groundwater doesn’t

know community

boundaries. We can have

a greater impact if we

work together on water

supply sustainability.”

Russ Matthys, Public Work Director, Eagan

Member of Southeast Work group

Page 52: Metropolitan Council Wastewater Utility Overview

52

MAWSAC

& TAC

Coordinati

on &

Support

State General Fund

$ 200,000 per year(FY 16-17 only)

• Master Water Supply Plan• Regional framework for Water

Supply

• Response to members

requests• Policy & technical

recommendation analysis

• Meetings > 12 per year• Policy and technical Guidelines

• Committees coordination

Water Supply

Sustainability,

Collaboration

& Efficiency

Support

Clean Water Fund

$ 1,225,000 per year

Local

Water

Supply

Planning

Support

Met Council Fund

$ 100,000 per year

• Local Water Supply

Planning • 50 Plans in 2016

• 55 Plans in 2017

• 62 Plans in 2018

• Well Head

Protection

• Comp Plan

Amendments and

ER documents

• Improved Water Use Efficiency• Tools: Conservation Tool Box

• Grants and Projects• Water Saved annually: 220 million gallons

• Subregional Collaboration: Better Together• 7 active workgroup; 62 member cities

• Subregional water supply alternatives and opportunities

• Technical information Supporting Good

Decisions• Metro Model

• Stormwater Reuse Guide

• Water Rates tool

• Council Requested $1,435,000 per yearfor FY

18 - 19

Page 53: Metropolitan Council Wastewater Utility Overview

53

Outcomes of Water Supply Sustainability and

Efficiency Programs

STATUS as of Jan. 17, 2017

• Industrial Water Conservation Program (started 2012)• 15 projects

• 135 Million Gallons of water saved annually– enough water for 4,000 people

for a year

• Industries saved $1.1 Million a year in water and energy cost

• Municipal Water efficiency Grant Program (started 2016)• 19 recipients

• 85 Million Gallons of water Saved – enough water for 2,500 people for a year

Page 54: Metropolitan Council Wastewater Utility Overview

54

Groundwater Use2011-2015 average is less than 2007-2010 average by 17 MGD

Page 55: Metropolitan Council Wastewater Utility Overview

55

Workplan to Achieve Sustainability by 2040

• Target: Master Water Supply

Plan

– 125 to 100 gpd per capita

• Outcome: Accommodate growth

– Reducing water use by 78 MGD (28

BGY)

– Financial Saving $ 92 M

• Average Cost of pumping and

treating 28 BGY is $ 92 M

• Resources:

– Total Cost of this program is $125 -

150 M

Level of

Funding

(annually)

Estimated

Water Saved

per Day

(Million

Gallons)

Years to

Achieve

Target

$ 700,000

(current)

0.44 177

$ 1,400,000 0.9 88

$ 3,250,000 2.2 34

Page 56: Metropolitan Council Wastewater Utility Overview

56

What do Stakeholders say?

• The Metropolitan Council's Water Conservation Toolbox includes information and an extensive list of resources for residents who want to use their water efficiently. (City of St Louis Park)

• Being Able to start from Metro Model to construct the groundwater model used for the New Brighton WHPA delineation made the work more efficient and cost lower. (Grant Wyffels, Former Director of Public Works, New Brighton)

• The public awareness that the Program- efficiency Grant Program-creates is a benefit as we work to educate the public on the importance of conserving water, even In Minnesota.(Mark Burch, Director of Public Works, White Bear Lake)

• The Metropolitan Council plays a valuable facilitating role in the discussions and provides a regional perspective for the group. Council funding of Southeast study was important because it isn’t always easy to get local city councils to commit funds to something that reaches beyond their borders” Steve Albrecht .(Steve Albrecht, Director of Public Works, Burnsville)

Page 57: Metropolitan Council Wastewater Utility Overview

Sewer Availability

Charge (SAC) Overview

Page 58: Metropolitan Council Wastewater Utility Overview

58

• The Sewer Availability Charge, or SAC, is a one-time fee

charged to local governments. (Some local governments also

add additional fees to the SAC.)

What is SAC?

• One single family home = 1 SAC unit

• Non-residential properties require a

determination (or calculation) of the maximum

potential wastewater capacity needed for the

site.

• The Council charges SAC to local

governments, who pass it on to business or

property owners.

Metropolitan Council

Local Government

Business or Property Owners

Page 59: Metropolitan Council Wastewater Utility Overview

SAC is a critical revenue source

Monthly Wastewater

Charge80%

SAC15%

($39M)

Industrial Charge5% Other

<1%

Sources (2017 Budget)

• A material component

of waste water fees

• Elimination would

increase monthly fees

by ~20%

• Accrued benefits over

44 years

Page 60: Metropolitan Council Wastewater Utility Overview

2042

1982

• MCES builds pipes in

anticipation of future growth,

but distributes the cost over

time and generations.

• SAC future-proofs our

system, allowing all

communities to grow

SAC allows MCES to

build for the future, &

charge in the future

What was built in 1982

What was paid for in 1982

2012

What was paid for in 2012

Page 61: Metropolitan Council Wastewater Utility Overview

SAC serves the community

• Acts as a savings program: capacity built up front, users only pay

when additional capacity is needed

• Promotes regional growth: development can occur anywhere in the

region

• Frequent meetings with stakeholders to verify the program serves its

constituents

1992 2002 2012 2022 2032

Page 62: Metropolitan Council Wastewater Utility Overview

2016-2017 Task Force MembersChair

Wendy Wulff, Metropolitan Council Member

Community Government

James Dickenson, Andover City Administrator

Ron Hedberg, Apple Valley Finance Director

Sue Virnig, Golden Valley Finance Director

Merrill King, Minnetonka Finance Director

Katrina Kessler, Minneapolis Public Works Director

Kyle Klatke, Brooklyn Park Plans Examiner

Loren Olson, Minneapolis Government Relations

Kevin Schmieg, Eden Prairie Building Official

Brian Hoffman, St Louis Park Building Official

Bob LaBrossee, Cottage Grove Building Official

David Englund, Roseville Building Official

Steve Ubl, St Paul Building Official

Patricia Nauman, Executive Director of Metro Cities

Business Groups

Dan McElroy, MN Hospitality representative (MN

Restaurant Association)

Tom Thomasser, MN Chamber of Commerce

representative (Summit Brewing)

Page 63: Metropolitan Council Wastewater Utility Overview

63

SAC is about providing capacity for

the busiest day of the yearTCF Stadium

• Capacity (pipe size) needed for average flow VS.

• Capacity needed during a Gophers-Badger game

Result: 526 SACAverage Flow

Gophers-

Badgers

game

Page 64: Metropolitan Council Wastewater Utility Overview

64

Irish Pub

• Capacity (pipe size) needed for average flow VS.

• Capacity needed on St. Patrick’s Day

Result: 41 SAC

St.

Patrick’s

Day

Average Flow

SAC is about providing capacity for

the busiest day of the year

Page 65: Metropolitan Council Wastewater Utility Overview

SAC is only for increased

capacity• SAC is only charged when a new or

existing business increases the

capacity demand on the system

• New construction

• Remodel adds more seats

• Remodel changes use to higher

demand (e.g., bookstore to

restaurant)

• There are programs to help small to

medium businesses defer the cost

of SAC

Page 66: Metropolitan Council Wastewater Utility Overview

Questions?