Architectural design is not the application of
discrete knowledge bases, but the integration of
cumulative sequences of knowledge into a designincluding social, programmatic, technical and
aesthetical issues.
----, Programming Cultures: Art and Architecture in the Age of Software, Architectural Design, July/August 2006
8/11/2019 Metoda Survey Paa 62
4/42
Design decisions can be the easier based on
judicious steps the more parameters are already
fixed and thus the less complex
a decision becomes.
----, Programming Cultures: Art and Architecture in the Age of Software, Architectural Design, July/August 2006
8/11/2019 Metoda Survey Paa 62
5/42
Tangible
The product design wheel
G. Tunstall, Managing the Building Design Process, Elsevier Ltd., 2006
8/11/2019 Metoda Survey Paa 62
6/42
IntangibleThe product design wheel
G. Tunstall, Managing the Building Design Process, Elsevier Ltd., 2006
8/11/2019 Metoda Survey Paa 62
7/42
D A T A
Kualitatif!datayang tidak dapat diukur atau
dihitung dengan angka, tetapimenunjukkan kualitas suatu
keadaan melalui penilaian
subyektif ( kesan visual,
kesan tutur kalimat/kata,
kesan perilaku, kesan
komunitas, dll)
Kuantitatif!
data
yang berupa angka-angka
sehingga dapat ditukar,
dihitung dan disajikan dalambentuk tabel dan uraian yang
menyebutkan jumlah secara
nominal
Surveiprimer
yaitu pencarian data dan
informasi secara langsung dariresponden di lapangan.
Metode survei ini dapatberupa
Observasi (pengukuran,
pemotretan), wawancara,maupun kuesioner.
Surveisekunder
dilakukan untuk memperoleh data-data
sekunder, baik data numerik maupundata-data dokumen dan dilakukan
secara instansional.
8/11/2019 Metoda Survey Paa 62
8/42
8/11/2019 Metoda Survey Paa 62
9/42
adapted from Moughtin (1999)
8/11/2019 Metoda Survey Paa 62
10/42
adapted from Moughtin (1999)
8/11/2019 Metoda Survey Paa 62
11/42
adapted from Moughtin (1999)
8/11/2019 Metoda Survey Paa 62
12/42
The site in the context ofthe city
The site in the contextof its locality. The site itself.
scale 1:5000 scale 1:1250
G. Tunstall, Managing the Building Design Process, Elsevier Ltd., 2006
8/11/2019 Metoda Survey Paa 62
13/42
!"#$%&"' %%% ) $*&"+,&"' -"*&". /0+" 1*#"&"'2
'0#0& 34 +".,' 5633 +*'+"'2
&*'7"'" +"+" &,"'2 8%!"9". /0+"
1*#"&"'2 +".,' 5633 56:3
8"!%/0+" 1*#"&"'2
.; 10*#" .1
8/11/2019 Metoda Survey Paa 62
14/42
!"#$%&"' % ) $*&"+,&"' -"*&". /0+" 1*#"&"'2
'0#0& 34 +".,' 5633 +*'+"'2
&*'7"'" +"+" &,"'2 8%!"9". /0+"
1*#"&"'2 +".,' 5633 56:3
8"!%/0+" 1*#"&"'2
.; 10*#" .1
8/11/2019 Metoda Survey Paa 62
15/42
8/11/2019 Metoda Survey Paa 62
16/42
8/11/2019 Metoda Survey Paa 62
17/42
8/11/2019 Metoda Survey Paa 62
18/42
8/11/2019 Metoda Survey Paa 62
19/42
8/11/2019 Metoda Survey Paa 62
20/42
Conventional Survey
Topography map
Kawasan Sigandu - Ujungnegoro
8/11/2019 Metoda Survey Paa 62
21/42
Tematik
Tabel/ Diagram/ Chart
Kawasan Sigandu - Ujungnegoro
Data Kunjungan Wisatawan MancanegaraBulanan Tahun 2012
http://www.budpar.go.id/budpar/
Data Usaha AkomodasiTahun 2007 - 2011
8/11/2019 Metoda Survey Paa 62
22/42
The main purpose of the initial
inspection, or walkover, is to gain an
overall impression of the site and
its surroundings,noting down theissues which may have a bearing on
subsequent design proposals.
G. Tunstall, Managing the Building Design Process, Elsevier Ltd., 2006
8/11/2019 Metoda Survey Paa 62
23/42
Measuring the size, shape and levelsof the land, andthe dimensions and
position of all relevant features,
including elements on and
immediately around the boundary,and to produce an accurate, scaled
drawing.
minimum scale 1:500
G. Tunstall, Managing the Building Design Process, Elsevier Ltd., 2006
8/11/2019 Metoda Survey Paa 62
24/42
8/11/2019 Metoda Survey Paa 62
25/42
8/11/2019 Metoda Survey Paa 62
26/42
Digital survey
Topography map
Kawasan Sigandu - Ujungnegoro
8/11/2019 Metoda Survey Paa 62
27/42
11I _ 1 . (i
1 1il r i l i i k I _ 1 . (i . r hi
Digital survey
GPSReal Time Kinematic
Kawasan Ujungnegoro
Topography map
8/11/2019 Metoda Survey Paa 62
28/42
8/11/2019 Metoda Survey Paa 62
29/42
Site Information Data:1. Boundaries !in urban context
2. Neighborhoods !in urban context
3.Access; existing and potential !in urban context
4.
Orientation5. Vegetation
6. Topography
7. Overshadowing
8/11/2019 Metoda Survey Paa 62
30/42
Collected survey information
1. Sketches2. Scale and proportion
3. The use of lines
4. Dimensions
5.Geometry6. Concentration
7. Calculations
8. Photographs
G. Tunstall, Managing the Building Design Process, Elsevier Ltd., 2006
8/11/2019 Metoda Survey Paa 62
31/42
"#$%&'$( )*%*'
+*,*$- *'$&$
./(,*$(- '*/*',&/($0'
1/2%&/0 &'$($0#3- '&%&4(5('*#
6&7&5- '2#8($( ,*#*9- :05(,*$
;*4* '&3*3*5*# $,/:',:/
Putuskan secara tepat dan cermat apa yang akan
dipelajari dari keberadaan tapak
8/11/2019 Metoda Survey Paa 62
32/42
?2,242#,*3&
$%&%'( %& ) 8@#*4(A %/2A&$$ *#8
%& *'+,'&-. B2,9 C27&*5 *#8
,-/%,0-/)1428&$ 2C $&&(#3!"#$%&'() +,- &$-) ./012
D(,& %5*##(#3 C2/ 6*'& )*92& E
?/*#' 6@2@8 F/(39,
8/11/2019 Metoda Survey Paa 62
33/42
8/11/2019 Metoda Survey Paa 62
34/42
8/11/2019 Metoda Survey Paa 62
35/42
?2,242#,*3&
G. Tunstall, Managing the Building Design Process, Elsevier Ltd., 2006
8/11/2019 Metoda Survey Paa 62
36/42
?2,242#,*3&?2,242#,*3&G. Tunstall, Managing the Building Design Process, Elsevier Ltd., 2006
8/11/2019 Metoda Survey Paa 62
37/42
?2,242#,*3&
8/11/2019 Metoda Survey Paa 62
38/42
?2,242#,*3& @Fachbereich Architektur, FH. Kln, 2005
8/11/2019 Metoda Survey Paa 62
39/42
@Fachbereich Architektur, FH. Kln, 2005
8/11/2019 Metoda Survey Paa 62
40/42
@Fachbereich Architektur, FH. Kln, 2005
8/11/2019 Metoda Survey Paa 62
41/42
Produk minimalyang harus ada dalam laporan survey:
PETA
1. Peta RTRW (Rencana Tata Ruang &
Wilayah)
!Bappeda Kota
2. Figure Ground Plan !Analisis mandiri
3. Peta Topografi Kawasan / tapak !Bappeda / DTK
4. Pola Transportasi Kota / kawasan !Bappeda /Analisis mandiri
5. Peta Tapak!misal KRK !Bappeda / DTK G hasil survey lapangan
TABEL / DIAGRAM
5. Iklim setempat (3 5 tahun terakhir) !BMG
6. Profil data tematik (sesuai kasus proyek) !Dinas Setempat/ Pihak Swasta
FOTO
7. Situasi/ kondisi Kawasan (panorama) H&'*4*# $:/7&@ 5*%*#3*#
8. Situasi/ kondisi Tapak (panorama) H&'*4*# $:/7&@ 5*%*#3*#
9. Situasi/ kondisi bangunan eksisting H&'*4*# $:/7&@ 5*%*#3*#
8/11/2019 Metoda Survey Paa 62
42/42
Produk minimalyang harus ada dalam laporan survey:
CATATAN / DESKRIPSI/ IMPRESI ARSITEK!3+4&5 ,+5,&5% 678+9) (#$&9:9&5 (+5%&5 ;&'& $%&'( &)* (# ,+