13
MEETING MINUTES 505 5 th Avenue S, Suite 300, Seattle, WA 98104 P 206.436.0515 Page 1 File location: X:\Kingston, Port of\Projects\20190109 - Remote Ferry Holding Lot Feas Study\Project Management\Meeting Minutes\Meeting Minutes - 2020-02-07.docx Client: Port of Kingston Project: 20190109 – Remote Ferry Holding Lot Feas Study Date: February 7. 2020 RE: Partner Meeting #3 1. Introductions – See sign-in sheet for attendees. 2. Schedule Schedule o Partner Meeting 4 – http://whenisgood.net/rzabyjt o Overall Cultural Resources Report – 12/20/19 Survey – updated base file 1/17/2020 Wetlands Report – 1/8/2020 Geotech Report – 1/20/2020 Draft Stormwater Requirements and Traffic Memos - submitted 12/6/19 Updated Fatal Flaw Memo submitted – 1/31/2020 Target Lot Capacity Confirmed – 1/29/2020 3. Site Concepts and Recommended Option Two site options were shared, one linear and one concentrated on the western parcel. The linear one has approximately 1/2/ the wetland impacts and is the recommended option for moving forward with into 30% design. WSDOT did rough calculation and determined that vehicles would exceed capacity about 10 times per year. Standard buffer setbacks from WSDOT ROW may not be required since ROW and remote lot are vehicle/transportation facilities. Confirm with Sean Airs at Kitsap Community Development to understand buffer requirements. Michele said that WSDOT will not accept any detention vaults. A vault is shown in the plans to meet the flow control requirement per the Kitsap County Stormwater manual. A pond would increase impacts to the wetlands. Kitsap County is working on a regional conveyance system upgrade and water quality system that the project may be able to contribute to, but depends on the timing of the two projects. David said he supports the linear lot layout, but recommended considering adjusting north and/or west to minimize wetland impacts; place lot closer to edge of road Curb, gutter, and sidewalk must be completed along Lindvog to fill in gap that development did not build David suggested that the entrance into the remote lot should be more of an off-ramp style than a 90-degree intersection

MEETING MINUTES - portofkingston.org · 2/7/2020  · MEETING MINUTES 505 5 th Avenue S, Suite 300, Seattle, WA 98104 P 206.436.0515 Page 2 File location: X:\Kingston, Port of\Projects\20190109

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MEETING MINUTES - portofkingston.org · 2/7/2020  · MEETING MINUTES 505 5 th Avenue S, Suite 300, Seattle, WA 98104 P 206.436.0515 Page 2 File location: X:\Kingston, Port of\Projects\20190109

MEETING MINUTES

505 5th Avenue S, Suite 300, Seattle, WA 98104 P 206.436.0515

Page 1 File location: X:\Kingston, Port of\Projects\20190109 - Remote Ferry Holding Lot Feas Study\Project Management\Meeting Minutes\Meeting Minutes - 2020-02-07.docx

Client: Port of Kingston Project: 20190109 – Remote Ferry Holding Lot Feas Study Date: February 7. 2020 RE: Partner Meeting #3

1. Introductions – See sign-in sheet for attendees. 2. Schedule

• Schedule o Partner Meeting 4 – http://whenisgood.net/rzabyjt o Overall

Cultural Resources Report – 12/20/19

Survey – updated base file 1/17/2020

Wetlands Report – 1/8/2020

Geotech Report – 1/20/2020

Draft Stormwater Requirements and Traffic Memos - submitted 12/6/19

Updated Fatal Flaw Memo submitted – 1/31/2020

Target Lot Capacity Confirmed – 1/29/2020

3. Site Concepts and Recommended Option

• Two site options were shared, one linear and one concentrated on the western parcel. The linear one has approximately 1/2/ the wetland impacts and is the recommended option for moving forward with into 30% design.

• WSDOT did rough calculation and determined that vehicles would exceed capacity about 10 times per year.

• Standard buffer setbacks from WSDOT ROW may not be required since ROW and remote lot are vehicle/transportation facilities. Confirm with Sean Airs at Kitsap Community Development to understand buffer requirements.

• Michele said that WSDOT will not accept any detention vaults. A vault is shown in the plans to meet the flow control requirement per the Kitsap County Stormwater manual. A pond would increase impacts to the wetlands. Kitsap County is working on a regional conveyance system upgrade and water quality system that the project may be able to contribute to, but depends on the timing of the two projects.

• David said he supports the linear lot layout, but recommended considering adjusting north and/or west to minimize wetland impacts; place lot closer to edge of road

• Curb, gutter, and sidewalk must be completed along Lindvog to fill in gap that development did not build

• David suggested that the entrance into the remote lot should be more of an off-ramp style than a 90-degree intersection

Page 2: MEETING MINUTES - portofkingston.org · 2/7/2020  · MEETING MINUTES 505 5 th Avenue S, Suite 300, Seattle, WA 98104 P 206.436.0515 Page 2 File location: X:\Kingston, Port of\Projects\20190109

MEETING MINUTES

505 5th Avenue S, Suite 300, Seattle, WA 98104 P 206.436.0515

Page 2 File location: X:\Kingston, Port of\Projects\20190109 - Remote Ferry Holding Lot Feas Study\Project Management\Meeting Minutes\Meeting Minutes - 2020-02-07.docx

• Community is concerned about proximity to residences on south. Moving lot to the north would help minimize that impact.

• Wetland impact appears to be substantial. This may turn out to be a fatal flaw. However, more investigation is needed.

4. ATM (Active Traffic Management)

• ATM concepts can range from “high technology” to manual, similar to current ferry operations. The high technology approach was reviewed primarily.

• Agreed left-turn lane did not provide much benefit, outside of very low demand times, and that locals would learn to drive up SR 104 or take Barber Cutoff to enter remote lot. Left turn lane will not be provided.

• David said that the remote lot should always be used, in part to ensure that queuing through Kingston is managed

• Lei said that WSF’s plan is to only operate the remote lot as needed

• David noted some additional signing is necessary including at the remote holding lot itself.

• David suggested that no paper ticket was needed that the short distance between the booth and the lane with arrows should be sufficient.

• David suggested that a sign board with wait times and other information would be good.

• David emphasized that the primary goal of the remote lot should be to manage traffic through Kingston. To that end, the analysis and ATM strategies need to figure out how many and how often to release vehicles at the remote lot. This may include multiple signal points within each remote holding lane. Goal is to store a maximum of 5 to 6 vehicles on 1st Ave not to exceed beyond Ohio St.

• To address internal circulation issues such as a stopped vehicle or broken down vehicle, 1 lanes will remain open when discharging to allow a lane for vehicles behind the stopped vehicle to move around the stopped vehicle.

• Question high-technology or low-technology was not answered. General discussion was focused around the high-technology option and details for that operation.

5. Traffic

• See above notes on ATM.

• The most current designs for the SR 104 project are needed for the VISSIM model.

• The group agreed on limiting the queuing in Kingston to be to Ohio at the longest. Will be a problem if the queue ever extends to the roundabout(s) on SR 104.

• Will evaluate two scenarios with VISSIM: 1) full remote lot operations during a peak time and 2) operations during an hour in which part of the hour does not have the remote lot active and another portion does have it active.

6. Other

• Iowa St between Main and 1st will be reclassified as a minor collector

Page 3: MEETING MINUTES - portofkingston.org · 2/7/2020  · MEETING MINUTES 505 5 th Avenue S, Suite 300, Seattle, WA 98104 P 206.436.0515 Page 2 File location: X:\Kingston, Port of\Projects\20190109

MEETING ACTION ITEMS

505 5th Avenue S, Suite 300, Seattle, WA 98104 P 206.436.0515

Page 3 File location: X:\Kingston, Port of\Projects\20190109 - Remote Ferry Holding Lot Feas Study\Project Management\Meeting Minutes\Meeting Minutes - 2020-02-07.docx

Client: Port of Kingston Project: 20190109 – Remote Ferry Holding Lot Feas Study Date: February 7, 2020 RE: Partner Meeting #3

Action Item Responsibility Due Date

Respond to Partner Meeting #4 WhenisGood ALL 2/21/2020

Check Buffer Ordinance/Requirements with Kitsap County Patty/Giancarlo 2/14/2020

Provide latest SR104 realignment configurations Greg/Andy complete

Page 4: MEETING MINUTES - portofkingston.org · 2/7/2020  · MEETING MINUTES 505 5 th Avenue S, Suite 300, Seattle, WA 98104 P 206.436.0515 Page 2 File location: X:\Kingston, Port of\Projects\20190109
Page 5: MEETING MINUTES - portofkingston.org · 2/7/2020  · MEETING MINUTES 505 5 th Avenue S, Suite 300, Seattle, WA 98104 P 206.436.0515 Page 2 File location: X:\Kingston, Port of\Projects\20190109

B. POWELL

SHEET

OF

SHEETS

ENTERED BY

PROJ. ENGR.

REVISION BY

CONTRACT NO.

JOB NUMBER

WASH10

STATEREGION

NO.

REGIONAL ADM.

DESIGNED BY

FILE NAME

TIME

DATE

LOCATION NO.

FED.AID PROJ.NO.

CHECKED BY

DATE

20190109

\\perteet.com\Files\Clients\Kingston, Port of\Projects\20190109 - Remote Ferry Holding Lot Feas Study\CADD\06 - Design\Proposed Layouts\20190109 PROP_o1 with wetland information.dwg Layout Name: Layout1

Feb 06, 2020

4:50pm

SR 104

KING COUNTY DECEMBER, 2019

LINDVOG HOLDING AREA

MP XX TO MP XX

XX

PLAN REF NO

PLAN

J. RED

GC. DE SIMONE

Washington StateDepartment of Transportation

PRELIMINARY

NOT FOR CONSTRUCTION

P. BUCHANAN

FEBRUARY, 2020FEBRUARY, 2020

AutoCAD SHX Text
%%USITE LEGEND
AutoCAD SHX Text
SUBJECT PROPERTY BOUNDARY STANDARD WETLAND BUFFER EXISTING WETLAND
AutoCAD SHX Text
AVAILABLE AREA FOR BUFFER AVERAGING (1:1 AREA FOR BUFFER REDUCTION) WETLAND MITIGATION REQUIREMENTS: PER UNDER KCC 19.200.230 WETLAND MITIGATION FOR CATEGORY III WETLAND IMPACTS WOULD REQUIRE A 2:1 MITIGATION TO IMPACT RATIO FOR REESTABLISHMENT OR CREATION, A 4:1 RATIO FOR REHABILITATION, 1:1 CREATION AND 4:1 ENHANCEMENT, OR 8:1 RATIO FOR ENHANCEMENT ONLY. REMAINING WETLANDS ON-SITE ARE FORESTED AND NOT VIABLE TO BE ENHANCED AND DEFICIENT IN AREA TO COMPENSATE FOR WETLAND FILL. OFF-SITE MITIGATION WOULD BE NECESSARY.
AutoCAD SHX Text
%%UCONCEPTUAL MITIGATION LEGEND
AutoCAD SHX Text
BUFFER REDUCTION - 13,525 SF WETLAND FILL - 22,115 SF (0.5 ACRES)
AutoCAD SHX Text
%%UIMPACT LEGEND
AutoCAD SHX Text
T
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
HALF
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
U
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
FEET
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
60
AutoCAD SHX Text
60
AutoCAD SHX Text
120
AutoCAD SHX Text
LAYOUT 2
AutoCAD SHX Text
LAYOUT NOTES CAPACITY ESTIMATE: USE 20' AVERAGE VEHICLE LENGTH PER WSF TERMINAL DESIGN MANUAL 520.04.3.b LANE WIDTH - 10' TARGET CAPACITY - 380 VEHICLES TOTAL ESTIMATED CAPACITY- 383 VEHICLES TOLL BOOTH ESTIMATE: USE 150 VEHICLES/HOUR/TOLLBOOTH PER WSF TDM 510.05(2) USE 234 VEHICLES/HOUR PER TRAFFIC ANALYSIS 2030 PROJECTION USE 288 VEHICLES/HOUR PER TRAFFIC ANALYSIS 2040 PROJECTION 234/150 = 1.56-> 2 TOLL BOOTHS 288/150 = 1.92-> 2 TOLL BOOTHS USE 2 TOLL BOOTHS NOTES: VEHICLE TURNING ANALYSIS CONFIRMS THAT WB-62 CAN PASS THROUGH ANY OF THE LANES
AutoCAD SHX Text
MAX. 25% BUFFER REDUCTION LIMIT PER KCC19.200.220B
AutoCAD SHX Text
WETLAND 3 CAT III HABITAT SCORE 6 150' STANDARD BUFFER PER KCC 19.200.220(C)
AutoCAD SHX Text
WETLAND 2 (EXTENDS OFF-SITE) CAT III HABITAT SCORE 6 150' STANDARD BUFFER PER KCC 19.200.220(C)
AutoCAD SHX Text
WETLAND 4 APPROXIMATED OFF-SITE CAT IV FUNCTION SCORE 15 50' STANDARD BUFFER PER KCC 19.200.220(B)
AutoCAD SHX Text
WETLAND 1 CAT III HABITAT SCORE 5 150' STANDARD BUFFER PER KCC 19.200.220(C)
Page 6: MEETING MINUTES - portofkingston.org · 2/7/2020  · MEETING MINUTES 505 5 th Avenue S, Suite 300, Seattle, WA 98104 P 206.436.0515 Page 2 File location: X:\Kingston, Port of\Projects\20190109

B. POWELL

SHEET

OF

SHEETS

ENTERED BY

PROJ. ENGR.

REVISION BY

CONTRACT NO.

JOB NUMBER

WASH10

STATEREGION

NO.

REGIONAL ADM.

DESIGNED BY

FILE NAME

TIME

DATE

LOCATION NO.

FED.AID PROJ.NO.

CHECKED BY

DATE

20190109

\\perteet.com\Files\Clients\Kingston, Port of\Projects\20190109 - Remote Ferry Holding Lot Feas Study\CADD\06 - Design\Proposed Layouts\20190109 PROP_o2 with wetland information.dwg Layout Name: Layout1

Feb 07, 2020

10:05am

SR 104

KING COUNTY DECEMBER, 2019

LINDVOG HOLDING AREA

MP XX TO MP XX

XX

PLAN REF NO

PLAN

J. RED

GC. DE SIMONE

Washington StateDepartment of Transportation

PRELIMINARY

NOT FOR CONSTRUCTION

P. BUCHANAN

FEBRUARY, 2020

AutoCAD SHX Text
T
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
HALF
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
U
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
FEET
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
60
AutoCAD SHX Text
60
AutoCAD SHX Text
120
AutoCAD SHX Text
LAYOUT 1
AutoCAD SHX Text
LAYOUT NOTES CAPACITY ESTIMATE: USE 20' AVERAGE VEHICLE LENGTH PER WSF TERMINAL DESIGN MANUAL 520.04.3.b LANE WIDTH - 10' TARGET CAPACITY - 380 VEHICLES TOTAL ESTIMATED CAPACITY- 385 VEHICLES TOLL BOOTH ESTIMATE: USE 150 VEHICLES/HOUR/TOLLBOOTH PER WSF TDM 510.05(2) USE 234 VEHICLES/HOUR PER TRAFFIC ANALYSIS 2030 PROJECTION USE 288 VEHICLES/HOUR PER TRAFFIC ANALYSIS 2040 PROJECTION 234/150 = 1.56-> 2 TOLL BOOTHS 288/150 = 1.92-> 2 TOLL BOOTHS USE 2 TOLL BOOTHS NOTES: ALL LANES ACCOMMODATE WB-62 TURNING MOVEMENTS BUFFER REDUCTION- 33,073 SF WETLAND FILL- 11,706 SF WETLAND MITIGATION REQUIREMENTS: PER UNDER KCC 19.200.230 WETLAND MITIGATION FOR CATEGORY III WETLAND IMPACTS WOULD REQUIRE A 2:1 MITIGATION TO IMPACT RATIO FOR REESTABLISHMENT OR CREATION, A 4:1 RATIO FOR REHABILITATION, 1:1 CREATION AND 4:1 ENHANCEMENT, OR 8:1 RATIO FOR ENHANCEMENT ONLY. REMAINING WETLANDS ON-SITE ARE FORESTED AND NOT VIABLE TO BE ENHANCED AND DEFICIENT IN AREA TO COMPENSATE FOR WETLAND FILL. OFF-SITE MITIGATION WOULD BE NECESSARY.
AutoCAD SHX Text
WETLAND 3 CAT III HABITAT SCORE 6 150' STANDARD BUFFER PER KCC 19.200.220(C)
AutoCAD SHX Text
WETLAND 2 (EXTENDS OFF-SITE) CAT III HABITAT SCORE 6 150' STANDARD BUFFER PER KCC 19.200.220(C)
AutoCAD SHX Text
WETLAND 4 APPROXIMATED OFF-SITE CAT IV FUNCTION SCORE 15 50' STANDARD BUFFER PER KCC 19.200.220(B)
AutoCAD SHX Text
WETLAND 1 CAT III HABITAT SCORE 5 150' STANDARD BUFFER PER KCC 19.200.220(C)
Page 7: MEETING MINUTES - portofkingston.org · 2/7/2020  · MEETING MINUTES 505 5 th Avenue S, Suite 300, Seattle, WA 98104 P 206.436.0515 Page 2 File location: X:\Kingston, Port of\Projects\20190109

B. POWELL

SHEET

OF

SHEETS

ENTERED BY

PROJ. ENGR.

REVISION BY

CONTRACT NO.

JOB NUMBER

WASH10

STATEREGION

NO.

REGIONAL ADM.

DESIGNED BY

FILE NAME

TIME

DATE

LOCATION NO.

FED.AID PROJ.NO.

CHECKED BY

DATE

20190109

X:\Kingston, Port of\Projects\20190109 - Remote Ferry Holding Lot Feas Study\CADD\05 - Exhibits\Kingston Site Plan Exhibit.dwg Layout Name: Sections Plan View

Feb 06, 2020

6:45pm

SR 104

KING COUNTY DECEMBER, 2019

LINDVOG HOLDING AREA

MP XX TO MP XX

XX

PLAN REF NO

J. RED

GC. DE SIMONE

Washington StateDepartment of Transportation

PRELIMINARY

NOT FOR CONSTRUCTION

P. BUCHANAN

EXHIBIT

FEBRUARY, 2020

AutoCAD SHX Text
FEET
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
50
AutoCAD SHX Text
50
AutoCAD SHX Text
100
AutoCAD SHX Text
NE STATE HWY 104
AutoCAD SHX Text
T
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
HALF
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
U
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
LAYOUT NOTES CAPACITY ESTIMATE: USE 20' AVERAGE VEHICLE LENGTH PER WSF TERMINAL DESIGN MANUAL 520.04.3.b LANE WIDTH - 10' PROJECTED TARGET CAPACITY - 380 VEHICLES TOTAL ESTIMATED CAPACITY- 385 VEHICLES TOLL BOOTH ESTIMATE: USE 150 VEHICLES/HOUR/TOLLBOOTH PER WSF TDM 510.05(2) USE 234 VEHICLES/HOUR PER TRAFFIC ANALYSIS 2030 PROJECTION USE 288 VEHICLES/HOUR PER TRAFFIC ANALYSIS 2040 PROJECTION 234/150 = 1.56-> 2 TOLL BOOTHS 288/150 = 1.92-> 2 TOLL BOOTHS USE 2 TOLL BOOTHS NOTES: ALL LANES ACCOMMODATE WB-62 TURNING MOVEMENTS
AutoCAD SHX Text
CUSTOMER RESTROOMS/CONCESSIONS
AutoCAD SHX Text
BUS STOP
AutoCAD SHX Text
RECREATION/PET AREA
AutoCAD SHX Text
EMPLOYEE PARKING
AutoCAD SHX Text
EMPLOYEE SPACE
AutoCAD SHX Text
TICKET DISTRIBUTION
AutoCAD SHX Text
ATTENDANT BOOTH
AutoCAD SHX Text
R/W
Page 8: MEETING MINUTES - portofkingston.org · 2/7/2020  · MEETING MINUTES 505 5 th Avenue S, Suite 300, Seattle, WA 98104 P 206.436.0515 Page 2 File location: X:\Kingston, Port of\Projects\20190109

B. POWELL

SHEET

OF

SHEETS

ENTERED BY

PROJ. ENGR.

REVISION BY

CONTRACT NO.

JOB NUMBER

WASH10

STATEREGION

NO.

REGIONAL ADM.

DESIGNED BY

FILE NAME

TIME

DATE

LOCATION NO.

FED.AID PROJ.NO.

CHECKED BY

DATE

20190109

X:\Kingston, Port of\Projects\20190109 - Remote Ferry Holding Lot Feas Study\CADD\05 - Exhibits\Kingston Site Plan Exhibit.dwg Layout Name: Sections Plan View

Feb 06, 2020

6:47pm

SR 104

KING COUNTY DECEMBER, 2019

LINDVOG HOLDING AREA

MP XX TO MP XX

XX

PLAN REF NO

J. RED

GC. DE SIMONE

Washington StateDepartment of Transportation

PRELIMINARY

NOT FOR CONSTRUCTION

P. BUCHANAN

EXHIBIT

FEBRUARY, 2020

AutoCAD SHX Text
E
AutoCAD SHX Text
W
AutoCAD SHX Text
E
AutoCAD SHX Text
CV
AutoCAD SHX Text
W
AutoCAD SHX Text
CV
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
MARKER POST
AutoCAD SHX Text
MARKER POST
AutoCAD SHX Text
MARKER POST
AutoCAD SHX Text
SIGN "LINDVOG RD"
AutoCAD SHX Text
MARKER POST
AutoCAD SHX Text
SIGN "YIELD"
AutoCAD SHX Text
SIGN "ADOPT A HIGHWAY"
AutoCAD SHX Text
NE HWY 104
AutoCAD SHX Text
LINDVOG RD NE
AutoCAD SHX Text
SIGN "BUS STOP"
AutoCAD SHX Text
FEET
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
50
AutoCAD SHX Text
50
AutoCAD SHX Text
100
AutoCAD SHX Text
NE STATE HWY 104
AutoCAD SHX Text
T
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
HALF
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
U
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
LAYOUT NOTES CAPACITY ESTIMATE: USE 20' AVERAGE VEHICLE LENGTH PER WSF TERMINAL DESIGN MANUAL 520.04.3.b LANE WIDTH - 10' PROJECTED TARGET CAPACITY - 380 VEHICLES TOTAL ESTIMATED CAPACITY- 385 VEHICLES TOLL BOOTH ESTIMATE: USE 150 VEHICLES/HOUR/TOLLBOOTH PER WSF TDM 510.05(2) USE 234 VEHICLES/HOUR PER TRAFFIC ANALYSIS 2030 PROJECTION USE 288 VEHICLES/HOUR PER TRAFFIC ANALYSIS 2040 PROJECTION 234/150 = 1.56-> 2 TOLL BOOTHS 288/150 = 1.92-> 2 TOLL BOOTHS USE 2 TOLL BOOTHS NOTES: ALL LANES ACCOMMODATE WB-62 TURNING MOVEMENTS
AutoCAD SHX Text
CUSTOMER RESTROOMS/CONCESSIONS
AutoCAD SHX Text
BUS STOP
AutoCAD SHX Text
RECREATION/PET AREA
AutoCAD SHX Text
EMPLOYEE PARKING
AutoCAD SHX Text
EMPLOYEE SPACE
AutoCAD SHX Text
TICKET DISTRIBUTION
AutoCAD SHX Text
ATTENDANT BOOTH
AutoCAD SHX Text
R/W
Page 9: MEETING MINUTES - portofkingston.org · 2/7/2020  · MEETING MINUTES 505 5 th Avenue S, Suite 300, Seattle, WA 98104 P 206.436.0515 Page 2 File location: X:\Kingston, Port of\Projects\20190109

B. POWELL

SHEET

OF

SHEETS

ENTERED BY

PROJ. ENGR.

REVISION BY

CONTRACT NO.

JOB NUMBER

WASH10

STATEREGION

NO.

REGIONAL ADM.

DESIGNED BY

FILE NAME

TIME

DATE

LOCATION NO.

FED.AID PROJ.NO.

CHECKED BY

DATE

20190109

X:\Kingston, Port of\Projects\20190109 - Remote Ferry Holding Lot Feas Study\CADD\05 - Exhibits\Kingston Site Plan Exhibit.dwg Layout Name: Sections

Feb 06, 2020

6:10pm

SR 104

KING COUNTY DECEMBER, 2019

LINDVOG HOLDING AREA

MP XX TO MP XX

XX

PLAN REF NO

J. RED

GC. DE SIMONE

Washington StateDepartment of Transportation

PRELIMINARY

NOT FOR CONSTRUCTION

P. BUCHANAN

EXHIBIT

FEBRUARY, 2020

AutoCAD SHX Text
R/W
AutoCAD SHX Text
R/W
AutoCAD SHX Text
R/W
AutoCAD SHX Text
R/W
AutoCAD SHX Text
2.0%
AutoCAD SHX Text
2.0%
AutoCAD SHX Text
2.0%
AutoCAD SHX Text
2.0%
AutoCAD SHX Text
EXISTING GRADE
AutoCAD SHX Text
PROPOSED GRADE
AutoCAD SHX Text
EXISTING GRADE
AutoCAD SHX Text
PROPOSED GRADE
AutoCAD SHX Text
EXISTING GRADE
AutoCAD SHX Text
PROPOSED GRADE
AutoCAD SHX Text
EXISTING GRADE
AutoCAD SHX Text
PROPOSED GRADE
AutoCAD SHX Text
2.0%
AutoCAD SHX Text
FEET
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
40
AutoCAD SHX Text
T
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
HALF
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
U
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
R
Page 10: MEETING MINUTES - portofkingston.org · 2/7/2020  · MEETING MINUTES 505 5 th Avenue S, Suite 300, Seattle, WA 98104 P 206.436.0515 Page 2 File location: X:\Kingston, Port of\Projects\20190109

B. POWELL

SHEET

OF

SHEETS

ENTERED BY

PROJ. ENGR.

REVISION BY

CONTRACT NO.

JOB NUMBER

WASH10

STATEREGION

NO.

REGIONAL ADM.

DESIGNED BY

FILE NAME

TIME

DATE

LOCATION NO.

FED.AID PROJ.NO.

CHECKED BY

DATE

20190109

X:\Kingston, Port of\Projects\20190109 - Remote Ferry Holding Lot Feas Study\CADD\05 - Exhibits\Kingston Site Plan Exhibit.dwg Layout Name: EXHIBIT 1-50

Feb 06, 2020

5:15pm

SR 104

KING COUNTY DECEMBER, 2019

LINDVOG HOLDING AREA

MP XX TO MP XX

XX

PLAN REF NO

J. RED

GC. DE SIMONE

Washington StateDepartment of Transportation

PRELIMINARY

NOT FOR CONSTRUCTION

P. BUCHANAN

EXHIBIT

CB-1

WQ-1

FLOW SPLITTER 1

CB-2

WQ-2

FLOW SPLITTER 2

CB-3

WQ-3

FLOW SPLITTER 3

CB-4

WQ-4

FLOW SPLITTER 4

CB-5

WQ-5

FLOW SPLITTER 5

CB-6

WQ-6

FLOW SPLITTER 6

DETENTION

VAULT

FLOW ARROW

LEGEND

FEBRUARY, 2020

AutoCAD SHX Text
FEET
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
50
AutoCAD SHX Text
50
AutoCAD SHX Text
100
AutoCAD SHX Text
NE STATE HWY 104
AutoCAD SHX Text
T
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
HALF
AutoCAD SHX Text
H
AutoCAD SHX Text
T
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
P
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
R
AutoCAD SHX Text
U
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
R
Page 11: MEETING MINUTES - portofkingston.org · 2/7/2020  · MEETING MINUTES 505 5 th Avenue S, Suite 300, Seattle, WA 98104 P 206.436.0515 Page 2 File location: X:\Kingston, Port of\Projects\20190109
Page 12: MEETING MINUTES - portofkingston.org · 2/7/2020  · MEETING MINUTES 505 5 th Avenue S, Suite 300, Seattle, WA 98104 P 206.436.0515 Page 2 File location: X:\Kingston, Port of\Projects\20190109
Page 13: MEETING MINUTES - portofkingston.org · 2/7/2020  · MEETING MINUTES 505 5 th Avenue S, Suite 300, Seattle, WA 98104 P 206.436.0515 Page 2 File location: X:\Kingston, Port of\Projects\20190109