MechanisedMechanised mining at 12 shaftmining at 12 shaft
Investor visit
1 Dec 2004
2
8
67A
7
1214
4
1110
5
2
9
1
IMPALA PLATINUM LIMITEDLEASE AREA SHOWING DECLINES
1 SD
14 D11 D
10 D
12 ND12 SD
Current Lease AreaThird Bafokeng AreaStoped out MerenskyDeclines in ProgressDeclines Planned
Operational ShaftsSurface Boreholes
N
E&F
Boschkoppies
2
3
SAFETYSAFETY
4
Safety resultsSafety results
0
5
10
15
20
Jan
Feb
Mar
Apr
May Jun
Jul
Aug
Sep
Oct
Nov
Target YTD Month
`
3
5
BUSINESS OVERVIEWBUSINESS OVERVIEW
6
Impala Impala vsvs mechanisedmechanised productionproduction
44%48%46%Cash margin (excl cap.)
4 3004 0004 023Cash cost/Pt oz (R)
307347280Cost/tonne (R)
Unit costs:
8%4%Contribution to production
MechanisedConventionalImpala
FY2005 – year to dateFY2004
4
7
Actual Actual vsvs plan 2005 plan 2005 -- TonnesTonnes profileprofile
50,000
250,000
450,000
650,000
850,000
1,050,000Ju
l
Aug
Sep Oct
Nov
Dec Jan
Feb
Mar
Apr
May
Jun
Act B/Plan
8
PGM gradePGM grade
0
1
2
3
4
5
Jul
Aug
Sep
Oct
Nov
Dec Jan
Feb
Mar Ap
r
May
Jun
Act B/Plan
5
9
FiveFive--year PGM profile: 12 Shaftyear PGM profile: 12 Shaft
01000200030004000
5000600070008000
3796 5998 6767 7128 7117
FY05 FY06 FY07 FY08 FY09
10
FiveFive--year year tonnestonnes profile:12 and 14 Shaftsprofile:12 and 14 Shafts
12%13%14%11%8%% of Impala
0
500000
1000000
1500000
2000000
2500000
1,023,608 1,859,000 2,200,000 2,103,000 1,920,000
FY05 FY06 FY07 FY08 FY09
7
13
Schematic Schematic –– 12 Shaft South Decline12 Shaft South Decline
15 L
16 L
17 L
18 L
19 L
20 L
LBConveyor C3
19L-20L Silos
No. 12 SHAFT
No. 12 Vent UC
On-Reef Conveyor
20 L
19 L
South
14
Schematic Schematic –– 12 North12 North Shaft DeclineShaft Decline
Silos
No. 12 North Shaft
20 L
19 L
North
No. 12 Shaft
15 L
16 L
17 L
18 L
19 L
20 L
LB
8
15
LAYOUTSLAYOUTS
16
BordBord--andand--pillar mining layoutpillar mining layout
22
44
12m6m
12m
4m
6m
18m6m
6m
DownDownDipDip
Main D
ipCo nvey or
Ma in D
ipCo nvey or
Strike Belt 1Strike Belt 1
11
33
South I ntak e Air w
aySo uth I ntak e A
ir way
No rth I ntake A
ir way
No rth I ntake A
ir way
9
17
MechanisedMechanised equipmentequipment
18
Slinging of equipment down 12 ShaftSlinging of equipment down 12 Shaft
10
19
LP singleLP single--boom boom drill rig drilling drill rig drilling a 12a 12--metre metre bordbord
Narrow reef equipmentNarrow reef equipment
20
Narrow reef equipmentNarrow reef equipment
LP Load haul LP Load haul dumper (LHD) dumper (LHD) cleaning a cleaning a 1212--metre metre bordbord