T 604.687.1800www.integralgroup.com
Vancouver BC Canada V6C 1S4Suite 180 - 200 Granville Street
Project Reference No: 151366.000
MECHANICAL LEGEND
LIST OF ABBREVIATIONS AND CONTROLS
COMPLETE WITH
EXHAUST AIRE/A
C/W
NOT TO SCALENTS
OUTSIDE AIRO/A
RETURN AIRR/A
RAIN WATER LEADERRWL
SUPPLY AIRS/A
TOP OF DUCTT.O.D.
TOP OF PIPET.O.P.
UNDERSIDE OF DUCTU.O.D.
UNDERSIDE OF PIPEU.O.P.
UNDERSIDEU/S
ABOVE FINISHED FLOORAFF
FROM ABOVE, TO ABOVEF/A, T/A
FROM BELOW, TO BELOWF/B, T/B
DOWNDN
FIRE RESISTANCE RATEDFRR
UNLESS NOTED OTHERWISEU.N.O.
CONNECT TO EXISTINGCTE
PLUMBING FIXTURE TAG
SANITARY DRAIN
STORM DRAIN
VENT PIPE
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RECIRC
FLOOR/ ROOF/ HUB/ AREA DRAIN
CLEAN OUT CO
?
?
RETURN LINE
EXISTING SERVICE
SUPPLY LINE
REMOVED SERVICE
RELOCATED ITEM
LIST OF SYMBOLS AND SERVICES
REMOVE ITEM
XXXS
STW
SAN
V
XXXR
P & T RELIEF VALVE
SHUT OFF VALVE
CHECK VALVE
UNION OR FLANGE
STRAINER -Y OR BASKET
AUTOMATIC AIR VENT
PIPE ELBOW RISER / DROP
CAP OR PLUG
BALANCING VALVE
PLUG VALVE
3-WAY CONTROL VALVE PRESSURE REDUCING VALVE
AUTOFLOW CONTROL VALVE
PRESSURE GAUGE
THERMOMETER
FLEXIBLE CONNECTION
REDUCED PRESSURE BACKFLOWASSEMBLY
PUMP
PIPE ANCHOR
PIPE GUIDE
GLOBE VALVE
SUPERVISED VALVE
2-WAY CONTROL VALVEM
S
DOUBLE CHECK VALVE ASSEMBLY
M
STACK UP/ DOWN
PIPE TEE DOWN
AAV
RPBADCVA
EQUIPMENT TAG
BALANCING DAMPER
SUPPLY OUTLET
RETURN OR EXHAUST INLET
STANDARD BRANCH
-
DUCTWORK
S/A OR O/A DUCTTO OR FROM ABOVE
S/A OR O/A DUCTTO OR FROM BELOW
R/A OR E/A DUCTTO OR FROM ABOVE
R/A OR E/A DUCTTO OR FROM BELOW
BD
ROUND DUCT DROP
ROUND DUCT RISERSINGLE LINE BRANCH
HEATING/COOLING COIL +/-
GENERAL DEMOLITION NOTES:
1. PATCH AND MAKE GOOD (TO BASE BUILDING STANDARDS) MECHANICAL COMPONENTS AND
FINISHES DAMAGED DURING THE RENOVATION. PROVIDE INSULATED CAPPED CURBS EQUAL
TO OR BETTER THAN ROOF R-VALUE FOR FANS, GOOSE NECK OPENINGS AND VENTS BEING
ADDED AND REMOVED.
2. MECHANICAL TRADES BIDDING DEMOLITION WORK SHALL ALLOW FOR A FULL DAY ON SITE TO
REVIEW EXISTING MECHANICAL SERVICES AND EQUIPMENT IN DEMOLITION AND RENOVATED
AREAS. ACCESS WILL BE GIVEN TO ROOF AND EXISTING MECHANICAL AND ELECTRICAL
ROOMS AS REQUIRED. SEE TENDER FORM FOR DATE OF MANDATORY SITE MEETING.
3. INCLUDE FOR DISPOSAL (FROM SITE) OF ALL REMOVED EQUIPMENT AND SERVICES,
DUCTWORK, PIPING, PLUMBING, ETC. INCLUDING INSULATION AND HANGERS.
4. DEMOLISHED WORK SHALL INCLUDE FOR TEMPORARY AND PERMANENT WORK (I.E. SERVICE
DIMENSIONS) REQUIRED TO KEEP ACTIVE PREMISES IN OPERATION. COORDINATE TIMES,
ACCESS, TEMPORARY HOARDING, TEMPORARY SCAFFOLDING, TOOL/LIGHT POWER
REQUIREMENTS AND OTHER MISCELLANEOUS ITEMS NEEDED TO COMPLETE WORK WITH
GENERAL CONTRACTOR IN OCCUPIED AREA AT NIGHT OR IN ACCORDANCE WITH THE OWNER
APPROVED SCHEDULE.
5. DEMOLITION OF EXTERIOR AND INTERIOR WALLS, ROOF CEILING AND FLOORS TO BE
SEQUENCED WITH THE OWNER. IN AREAS WHERE ADJACENT OCCUPANCIES ARE NOT IN THE
DEMOLITION AREA BUT AFFECTED BY NOISE OF DEMOLITION, OR WHERE TRADE REQUIRES
ACCESS TO EXISTING OCCUPIED SPACES, CONTRACTOR SHALL COORDINATE TIMES OF WORK
THROUGH THE OWNER.
6. SUPPLY AIR DUCTWORK AND PIPING NOT SHOWN HATCHED IS TO BE RETAINED, ANY DAMAGE
TO EXISTING INSULATION AND DUCTS TO BE REPAIRED TO MATCH EXISTING.
7. INSULATE NEW DUCT AND PIPE CAPS.
8. DURING DEMOLITION WORK, ALL MECHANICAL SYSTEMS AND BUILDING SERVICES SERVING
OCCUPIED AREAS. SHALL BE MAINTAINED OPERATIONAL. WHERE SYSTEM OR SERVICE
INTERRUPTIONS ARE REQUIRED, COORDINATE AFTER HOUR ACCESS REQUIREMENTS AND
SECURITY EXECUTE WORK WITH CONSTRUCTION MANAGER.
9. CONTRACTOR CONSTRUCTION SCHEDULE TO BE WITHIN SUMMER MONTHS. IF CONSTRUCTION
CARRIES INTO HEATING SEASON, CONTRACTOR SHALL PROVIDE TEMPORARY HEAT AS PART
OF PROJECT SCOPE.
10. ALL ELECTRICAL WORK REQUIRED AS PART OF THIS PROJECT, INCLUDING PERMITS, SHALL BE
INCLUDED IN MECHANICAL SCOPE OF WORK.
DWG. NO. TITLE SCALE
M-01 TITLE PAGE NTS
M-02 HYDRONIC PLANT ROOM PLAN - DEMO & NEW 1/4"=1'-0"
M-03 HVAC PLANT ROOM PLAN - DEMO & NEW 1/4"=1'-0"
M-04 AHU-2 PLANT ROOM PLAN - DEMO & NEW 1/4"=1'-0"
M-05 HYDRONIC SCHEMATIC - DEMO NTS
M-06 HYDRONIC SCHEMATIC - NEW NTS
M-07 SCHEDULES NTS
M-08 DETAILS NTS
XB1-2
XB1-1
XT3-1
XP2-4
XH
WS
XHWR
XRPBP
XG
XGM
F/S
XT2-1
XP2-1
EXISTING HWR F/AXHWR
XHWS
XP2-2
MXP2-3
XP2-5
XHWR
XHWR
+XAHU-1
1
2
3
4
5
5
6
(RELOCATE) XG
RPBP
XG
M
ET2
P2-1
EXISTING HWR F/AXHWR
XHWS
P2-2
MP2-3
P2-5
XHWR
+XAHU-1
B-1
B-2
B-3
DHWT-1
P3-4
VERTICAL LOW
LOSS HEADERP3-1
P3-2
P3-3
1
1
1
1
2
2
2
3
3
M
M
S
4
5
5
5
5
5
5
5
5
5
5
5
DHWT-2
1
DEMOLITION NOTES:
REMOVE EXISTING DOMESTIC HOT WATER TANK, XT3-1, AND ALL
ASSOCIATED DCW, DHW, AND DHWR PIPING/EQUIPMENT AS SHOWN.
CAP AND MAKE GOOD FOR RECONNECTION. MECHANICAL
CONTRACTOR RESPONSIBLE TO ENSURE TEMPORARY DOMESTIC HOT
WATER HEATING IS INSTALLED AND IN PLACE DURING THE ENTIRETY OF
THE CONSTRUCTION SCHEDULE.
2 REMOVE EXISTING GAS FIRED BOILER XB1-2 AND ALL ASSOCIATED
HEATING PIPING, PUMP, AND VALVES SERVING EXISTING DOMESTIC
HOT WATER TANK. CAP AND MAKE GOOD FOR RECONNECTION.
CONTRACTOR TO DE-REGISTER BOILER WITH BC SAFETY AUTHORITY.
3 REMOVE EXISTING GAS PIPING GAS SHOWN. CAP AND MAKE GOOD
FOR RECONNECTION.
4 REMOVE EXISTING BOILER, XB1-1, AND ALL ASSOCIATED HEATING
SUPPLY AND RETURN PIPING, PUMPS, AND VALVES AS SHOWN.
CAPPED AND MAKE GOOD FOR RECONNECTION.
5 COMPLETELY REMOVE EXISTING 3-WAY VALVE AND REPLACE WITH
NEW. 3-WAY VALVE TO BE WIRED TO DDC.
6 REMOVE AND REPLACE EXISTING RPBP WITH NEW.
1
CONSTRUCTION NOTES:
CONNECT NEW PUMP AND ASSOCIATED PIPING/VALVES TO EXISTING
PIPING. ENSURE ALL NEW PUMP TRIM AND VALVES ARE INSTALLED AS
SHOWN ON MECHANICAL DRAWINGS. RE-BALANCE NEW PUMP
2 CONNECT NEW PIPING TO EXISTING.
3 CONNECT GAS TO EXISTING. PIPE NEW 12"ø GAS PIPE TO EACH BOILER
COMPLETE WITH SHUTOFF VALVE AND REGULATOR.
4 PROVIDE NEW GAS SOLENOID WIRED TO EMERGENCY GAS SHUTOFF
BUTTON TO DE-ACTIVATE BOILERS AND GAS SUPPLY TO BOILERS.
5 ALL NEW ELECTRICAL WORK IS THE RESPONSIBILITY OF THE
CONTRACTOR TO DESIGN AND APPLY FOR THE REQUIRED PERMITS.
T 604.687.1800www.integralgroup.com
Vancouver BC Canada V6C 1S4Suite 180 - 200 Granville Street
Project Reference No: 151366.000
21 80 4
SCALE: 14" = 1'-0"
HYDRONIC PLANT ROOM - DEMO21 80 4
SCALE: 14" = 1'-0"
HYDRONIC PLANT ROOM - NEW
XB1-2
XB1-1
XFIF-1 3
1
2
3@ NEW 4"ø BOILER FLUES UP THROUGH ROOF.
ENSURE TERMINATIONS AND MINIMUM DISTANCES
FROM FLUE EXHAUST ARE INSTALLED AS PER CSA
AND MANUFACTURER'S REQUIREMENTS.
3@ NEW 6"ø BOILER COMBUSTION AIR DUCTS
UP THROUGH ROOF. ENSURE TERMINATIONS
AND MINIMUM DISTANCES FROM FLUE EXHAUST
ARE INSTALLED AS PER CSA AND
MANUFACTURER'S REQUIREMENTS.
1
1
2
2
1
DEMOLITION NOTES:
COMPLETELY REMOVE EXISTING XB1-1 BOILER FLUE UP THROUGH
ROOF. CONTRACTOR TO PATCH AND MAKE GOOD ALL EXISTING BASE
BUILDING WALLS AND ROOF TO MATCH BASE BUILDING AS REQUIRED
FOR DEMOLITION OF DUCTWORK.
2 COMPLETELY REMOVE EXISTING XB1-2 BOILER FLUE UP THROUGH
ROOF. CONTRACTOR TO PATCH AND MAKE GOOD ALL EXISTING BASE
BUILDING WALLS AND ROOF TO MATCH BASE BUILDING AS REQUIRED
FOR DEMOLITION OF DUCTWORK.
3 COMPLETELY REMOVE EXISTING XFIF-1 BOILER COMBUSTION AIR FAN
AND ALL ASSOCIATED DUCTWORK UP THROUGH ROOF. CONTRACTOR
TO PATCH AND MAKE GOOD ALL EXISTING BASE BUILDING WALLS AND
ROOF TO MATCH BASE BUILDING AS REQUIRED FOR DEMOLITION OF
DUCTWORK.
1
CONSTRUCTION NOTES:
CONTRACTOR TO ALLOW FOR ALL DEMOLITION, NEW DRYWALL, AND ALL
OTHER ASSOCIATED WORK WITH INSTALLATION OF NEW BOILER FLUES
AND COMBUSTION AIR AS EXISTING FLUES ARE INSTALLED IN A FIRE
RATED DRYWALL ENCLOSURE UP THROUGH THE ROOF. NEW WALL TO
MATCH EXISTING.
2 TERMINATE BOILER FLUES AND COMBUSTION AIR DUCTS UP THROUGH
ROOF COMPLETE WITH WATER PROOF FLASHING. PATCH AND MAKE
GOOD EXISTING ROOF TO ACCOMMODATE NEW BOILER FLUES AND
COMBUSTION AIR INTAKES.
T 604.687.1800www.integralgroup.com
Vancouver BC Canada V6C 1S4Suite 180 - 200 Granville Street
Project Reference No: 151366.000
21 80 4
SCALE: 14" = 1'-0"
HVAC PLANT ROOM - DEMO21 80 4
SCALE: 14" = 1'-0"
HVAC PLANT ROOM - NEW
M
MEXIST. LOUVRE
24"X32"
EXIST. 14"x32"
EXIST. FILTER /
MIX BOX
EXIST. FLEX
CONNECTION
EXIST. HEATING
COIL SECTION
EXIST. AIR HANDLING
UNIT AHU-2 ON 4"
CONCRETE PAD C/W
VIBRATION ISOLATORS
EXIST. 16"x24"
EXIST. 12"x10"
SUPPLY
EXIST.
24"x18"
900 CFM
EXIST. 10"x18"
EXIST.
24"x18"
900 CFM
21 80 4
SCALE: 14" = 1'-0"
AHU-2 - DEMOLITION
1
CONSTRUCTION NOTES:
COMPLETELY REMOVE EXISTING AHU-2. CAP AND MAKE GOOD EXISTING
DUCTWORK CONNECTIONS AND MAKE GOOD FOR RE-CONNECTION.
CONTRACTOR TO COORDINATE DOWN TIME OF AHU WITH CLIENT ON
SITE AND PROVIDE TEMPORARY VENTILATION AS REQUIRED.
CONTRACTOR TO REVISE DISCONNECT ELECTRICAL CONNECTION TO
AHU-2 AS REQUIRED.
2 CUT AND CAP EXISTING HEATING WATER SUPPLY AND RETURN PIPING
AND MAKE GOOD FOR RECONNECTION.
1
MNC C
NO
3 COMPLETELY REMOVE EXISTING 3-WAY VALVE AND REPLACE WITH
NEW. 3-WAY VALVE TO BE WIRED TO EXISTING DDC. UPDATE ALL
BMS GRAPHICS AND CONTROLS AS REQUIRED FOR CONTROL VALVES.
3XP2-6
XAHU-2
M
MEXIST. LOUVRE
24"X32"
EXIST. 14"x32"
EXIST. 16"x24"
EXIST. 12"x10"
SUPPLY
EXIST.
24"x18"
900 CFM
EXIST. 10"x18"
EXIST.
24"x18"
900 CFM
21 80 4
SCALE: 14" = 1'-0"
AHU-2 - NEW
1
CONSTRUCTION NOTES:
INSTALL NEW AHU-2 AS PER MECHANICAL SCHEDULE AND
SPECIFICATIONS. ADJUST EXISTING DUCTWORK AND HYDRONIC PIPING
TO SUIT NEW AHU-2 CONFIGURATION. CONTRACTOR TO REVISE WORKS
RELATED TO ELECTRICAL CONNECTION TO AHU-2 AS REQUIRED
INCLUDING PERMITS, COORDINATION, AND INSTALLATION.
2 CONNECT NEW 1"ø HWS/HWR TO EXISTING C/W NEW INSULATION.
AHU-21
3 CONNECT NEW DUCTWORK TO MATCH TO EXISTING.
4 MODIFY EXISTING CONCRETE HOUSEKEEPING PAD TO SUIT NEW
CONFIGURATION OF AHU-2.
4
3
3
3
MNC C
NO
+
2
2
P2-6
T 604.687.1800www.integralgroup.com
Vancouver BC Canada V6C 1S4Suite 180 - 200 Granville Street
Project Reference No: 151366.000
XB1-1 XB1-2
XT3-1
EX
PA
NS
ION
TA
NK
XT2-1
M
XP2-1
NONO
NC
XP2-2
XP2-3
MNONC
NO
XP2-5
MNONC
NO
XP2-4
XP1
XHWR
XHWS
XHWR
XHWR
XHWR
XHWR
XHWS
XHWS
XHWS
XHWS
XH
WR
XH
WS
XH
WR
XH
WR
XH
WR
XH
WR
XH
WR
XH
WS
XH
WS
XH
WS
XH
WS
12
2
2
1 1
3
3
3
3
3
3
3
4
4
4
(RELOCATE)
5
EXIST. HWS/R
(22 GPM)
EXIST. HWS/R
(40 GPM)
EXIST. HWS/R
(30 GPM)
5
1
DEMOLITION NOTES:
REMOVE EXISTING DOMESTIC HOT WATER TANK, XT3-1, AND ALL
ASSOCIATED DCW, DHW, AND DHWR PIPING/EQUIPMENT AS SHOWN.
CAP AND MAKE GOOD FOR RECONNECTION. MECHANICAL
CONTRACTOR RESPONSIBLE TO ENSURE TEMPORARY DOMESTIC HOT
WATER HEATING IS INSTALLED AND IN PLACE DURING THE ENTIRETY OF
THE CONSTRUCTION SCHEDULE.
2 REMOVE EXISTING GAS FIRED BOILER XB1-2 AND ALL ASSOCIATED
HEATING PIPING, PUMP, AND VALVES SERVING EXISTING DOMESTIC
HOT WATER TANK. CAP AND MAKE GOOD FOR RECONNECTION.
3 REMOVE EXISTING BOILER, XB1-1, AND ALL ASSOCIATED HEATING
WATER SUPPLY AND RETURN PIPING, PUMPS, AND VALVES AS
SHOWN. CAPPED AND MAKE GOOD FOR RECONNECTION.
4 COMPLETELY REMOVE EXISTING 3-WAY VALVE AND REPLACE WITH
NEW. 3-WAY VALVE TO BE WIRED TO EXISTING DDC. UPDATE ALL
BMS GRAPHICS AND CONTROLS AS REQUIRED.
5 CONFIRM EXISTING FLOW AND STATIC PRESSURE OF EXISTING PUMP PRIOR
TO REMOVAL. CONTRACTOR SHALL ISSUE BALANCING REPORT OF PUMP, TO
INTEGRAL FOR REVIEW, PRIOR TO COMMENCEMENT OF DEMOLITION WORK.
T 604.687.1800www.integralgroup.com
Vancouver BC Canada V6C 1S4Suite 180 - 200 Granville Street
Project Reference No: 151366.000SCALE: N.T.S.
HYDRONIC SCHEMATIC - DEMO
S R S R S R
T
T
B-1 B-2 B-3
P3-1 P3-2 P3-3
DHWT-2
P1
T
T
T
T
EX
PA
NS
ION
TA
NK
ET-1
MNONO
NC
P2-1
P2-2
M NONC
NO
P2-5
MNONC
NO
XH
WS
XH
WS
XH
WS
XH
WS
P3-4
HW
R
HWS
HW
S
HW
R
HW
R
HW
R
AIR/DIRT
SEPARATOR
EX
PA
NS
ION
TA
NK
ET-2
1
1
1
1
2
22 2 2 2 2
2
2
2
2
2M
M
S
GGG
4
33 3
CHEMICAL
POT FEEDER
FIL
TE
R
TEST COUPON
FLOW
INDICATOR
CORROSION
P2-3 1
TO EXISTING
HEATING SYSTEM
TO EXISTING
HEATING SYSTEM
TO EXISTING
HEATING SYSTEM
TO EXISTING
HEATING SYSTEMXHWR
XHWR
XHWR
XHWR
XHWS
XHWS
XHWS
XHWS
M
DHWT-1
T
T
6M
1-12"ø HWR(24 GPM)
185°F
1-12"ø HWR(24 GPM)
165°F
2-12"ø HWS(48 GPM)
2-12"ø HWR(48 GPM)
185°F
165°F
EXIST. HWS/R
(22 GPM)
EXIST. HWS/R
(40 GPM)
EXIST. HWS/R
(30 GPM)
7 6 7
T 99 99 9
8
7
RPBP
4"ø HWS
HEADER
4"ø HWR
HEADER
DPS
4"ø HWS
(150 GPM)
4"ø HWS
(150 GPM)2-12 "ø HWS(50 GPM)
2-12 "ø HWS(50 GPM)
2-12 "ø HWS(50 GPM)
T
T
T
T
T
T
T
T
1
CONSTRUCTION NOTES:
CONNECT NEW PUMP AND ASSOCIATED PIPING/VALVES TO EXISTING
PIPING. ENSURE ALL NEW PUMP TRIM AND VALVES ARE INSTALLED AS
SHOWN ON MECHANICAL DRAWINGS. RE-BALANCE EXISTING PUMP TO
EXISTING FLOW NOTED ON MECHANICAL PUMP SCHEDULE. UPDATE ALL
BMS GRAPHICS AND CONTROLS AS REQUIRED FOR NEW PUMPS.
2 CONNECT NEW PIPING TO EXISTING AND MATCH EXISTING PIPE SIZE.
CONTRACTOR TO CONFIRM EXACT PIPE SIZE ON SITE.
3 CONNECT GAS TO EXISTING. PIPE NEW 12"ø GAS PIPE TO EACH BOILER
COMPLETE WITH SHUTOFF VALVE AND REGULATOR.
4 PROVIDE NEW GAS SOLENOID WIRED TO EMERGENCY GAS SHUTOFF
BUTTON TO DE-ACTIVATE BOILERS AND GAS SUPPLY TO BOILERS.
5 NEW VIESSMANN LOW LOSS HEADER MODEL 300/200.
6 UPDATE ALL BMS AND GRAPHICS CONTROLS AS REQUIRED FOR NEW
DHWT-1.
7 PIPE NEW RPBP DRAIN, C/W AIR GAP, TO EXISTING FLOOR DRAIN.
8 PROVIDE NEW VIESSMANN TYPE 300/200 LOW LOSS HEADER FOR
MINIMUM 150 GPM FLOW.
9 MECHANICAL CONTRACTOR SHALL PROVIDE NEW 4" HOUSEKEEPING
PAD FOR NEW/RELOCATED EQUIPMENT.
T 604.687.1800www.integralgroup.com
Vancouver BC Canada V6C 1S4Suite 180 - 200 Granville Street
Project Reference No: 151366.000
SCALE: N.T.S.
HYDRONIC SCHEMATIC - NEW
T 604.687.1800www.integralgroup.com
Vancouver BC Canada V6C 1S4Suite 180 - 200 Granville Street
Project Reference No: 151366.000
AHU-2
Supply Air Fan
Manufacturer Engineered Air - LM3/C
Design Air Volume (cfm) 2850 Fan Speed * (RPM) 1750
Ductwork Leakage (%) 10 Absorbed Power * (BHP) 1.5
Total AHU Volume (cfm) 3135 Motor Rating * (HP) 2
Design External Static ("wg) 1.25 Motor Starting Method SD
Static Pressure Spare Capacity (%) 21 Full Load Current * (Amps)
Total External Static ("wg) 1.51 Starting Current * (Amps)
AHU Internal Static ("wg) 0.50 Electrical Supply
Total Static ("wg) 2.01 Fan Type Centrifugal
Inverter Driven (Yes/No) No Total Fan Efficiency * (%) 65
Mixing Section
Fresh Air Volume (cfm) 1097 Outside Winter Temperature DB (°F) 15.8
Return Air Volume (cfm) 2038 Room Temperature DB (°F) 71.6
Percentqage of Air Recirculated (%) 65.0 Room Temperature WB (°F) 60.0
Mixed Winter Temperature DB (°F) 52.1
Supply Filtration
Panel Filter Grade MERV 8
Heating Coil
Air On Coil Temperature (°F) 52.1 Flow Water Temperature (°F) 180.0
Air Off Coil Temperature (°F) 78.0 Return Water Temperature (°F) 150.0
Duty (Btuh) 87794 Glycol Content (%) 0
Water Flow Rate (gpm) 5.85 Water Pressure Drop (ft) 5.0
Supply Fan Sound Power Levels Total 63Hz 125Hz 250Hz 500Hz 1kHz 2kHz 4kHz 8kHz
Case Breakout * (dB(A))
Intake * (dB(A))
Discharge * (dB(A))
Notes
Unit to come complete with:
1) - Constant Volume Fan
PUMP SCHEDULE
TAG No. Description Location
Electrical Details Motor Details
NotesDesign
Capacity
(gpm)
Selected
Capacity
(gpm)
Design
Head
(ft w.g.)
Selected
Head
(ft w.g.)
Electrical
Voltage
(V)
Electrical
Supply
Phase
(1 or 3)
Frequency
(Hz)
Motor
Starting
Method
Total
Minimum
Efficiency
(%)
Absorbed
Power
(BHP)
Motor
Rating
(BHP)
Motor
Speed
(RPM)
Manufacturer Model
P-1 Domestic Hot Water Reirculation Mechanical Room 5.0 5.0 5.0 6.1 120 1 60 DOL 60 0.01 FRAC 1750 Grundfos Magna3 1, 3
P2-1 Secondary Heating Loop #1 Mechanical Room 22.0 24.2 19.0 23.0 120 1 60 INV 60 0.2 3/4 1750 Grundfos Magna3 1, 2
P2-2 Secondary Heating Loop #2 Mechanical Room N/A N/A N/A N/A 120 1 60 INV 60 N/A 1/2 1750 Grundfos Magna3 1, 2, 4
P2-3 Secondary Heating Loop #2 Mechanical Room 40.0 44.0 52.9 64.0 230 1 60 INV 60 1.2 2 1750 Grundfos Magna3 1, 2
P2-5 AHU-1 Heating Pump Mechanical Room 30.0 33.0 17.1 20.7 120 1 60 INV 60 0.3 1/2 1750 Grundfos Magna3 1, 2
P2-6 AHU-2 Heating Pump Mechanical Room 5.9 6.4 9.6 11.6 120 1 60 INV 60 0.03 FRAC 1750 Grundfos Magna3 1, 2
P3-1 B-1 Boiler Pump Main Floor 49.6 54.6 20.0 24.2 120 1 60 INV 60 0.6 3/4 1750 Grundfos Magna3 1, 2
P3-2 B-2 Boiler Pump Main Floor 49.6 54.6 20.0 24.2 120 1 60 INV 60 0.6 3/4 1750 Grundfos Magna3 1, 2
P3-3 B-3 Boiler Pump Main Floor 49.6 54.6 20.0 24.2 120 1 60 INV 60 0.6 3/4 1750 Grundfos Magna3 1, 2
P3-4 DHW Heating Pump Main Floor 48.0 52.8 16.5 20.0 208 1 60 INV 60 0.4 3/4 1750 Grundfos Magna3 2, 5
Notes
1) Constant speed pumping control c/w BACNET output/input
2) Complete with Magna3 Integrated Variable Speed Drive (VFD)
3) All stainless steel construction
4) Existing flow rate not available. Contractor engage balancing contractor prior to demolition to confirm flows and pressures of existing pump. Existing Pump model is Grundofs Model UPS 26-99FC. Contractor to carry costs for that supply and installation of a new Grundfos Magna pump that is equipavelent to the existing pump.
5) Variable speed pump c/w BACNET output/input
Expansion Tank Schedule
Bladder Expansion Tank Information ET-1 ET-2
Location Mechanical Room Mechanical Room
Service Heating WaterDomestic Hot
Water
Manufacturer Amtrol Amtrol
Model Extrol 300-L ST-60VC
Orientation Vertical Vertical
Material Steel Steel
Working Pressure (PSI) 40.0 80.0
Maximum Working Pressure (PSI) 125.0 150.0
Selected Tank Volume (Gal) 80 25
Acceptance (Gal) 80 11
Dimensions (øxH) (in) 24"øx52" 16"øx32"
Weight (Lbs) 230 85
Note:
1) All expansion tanks to be Bladder type.
DOMESTIC HOT WATER STORAGE TANK SCHEDULE
TAG No.
Tank Information Heat Exchanger Tank Connections
Notes
Description Location Manufacturer Model Storage
Capacity
(GAL)
MaximumPressure
(PSI)
Approx Weight
(Lbs)
Dimesnions
(mm)
Model Type Heating
Capacity
(MBH)
Tank EWT
(oF)
Tank LWT
(oF)H/X EWT
(oF)
H/X LWT
(oF)
Flow
(gpm)
Presure Drop
(ft)
Length
(mm)Top Outlet
(mm)
Bottom Inlet
(mm)
HeatExchanger
Outlet
(mm)
HeatExchanger
Inlet
(mm)
DHWT-1 Domestic Hot Water Storage Tank L1 Mechanical Room AO Smith HD-24-150 150 125 ø = 24" H= 75" DW8-30 Double Wall Copper Tube 240 40.0 145.0 185.0 165.0 24.00 1.0 1, 2, 3, 4, 5
DHWT-2 Domestic Hot Water Storage Tank L1 Mechanical Room AO Smith HD-24-150 150 125 ø = 24" H= 75" DW8-30 Double Wall Copper Tube 240 40.0 145.0 185.0 165.0 24.00 1.0 1, 2, 3, 4, 5
Notes
1) Factory installed tank insulation to meet ASHRAE 90.1 requirements
2) Complete with T&P
3) Complete with upper and lower tank temperature sensor port.
4) Double wall copper tube heat exchanger complete with leak detection.
5) Manhole access
BOILER B-1, B-2, B-3
Boiler Information
Location Mechanical Room
Manufacturer Viessmann
Model Vitodens B2HA 150
Type Wall Mounted Gas Condensing Boiler
Design Information
Input Gas Requirement MBH 530
Boiler Output Capacity MBH 495
Thermal Efficiency (%) 93.4
Water Flow (gpm) 24.8
Maximum Water Pressure Drop (ft) 8.00
Maximum Operating Pressure (psig) 80.0
Operating Weight (lbs) 332
Burner stages Fully Modulating
Fuel type Natural Gas
Boiler Dimensions (WxDxH) (in) 24x28x45
Boiler Connections
Boiler Supply Connection (in) 2
Boiler Return Connection (in) 2
Safety Valve Connection (in) 3/4
Boiler Drain (in) 3/4
Gas connection (in) 1
Electrical Requirements
Burner Motor MOCP 15 Amps
Electrical Requirements 120/1/60
Notes
1. CPVC flue gas system installed to manufacturer's recommnedations. Flue material is to be certified together with boiler as a constructedunit.
2. Complete with boiler control with cascade and/or DDC interface.
3. Complete with Viessmann acid neaturalization system.
4. Multiple boiler installation requires detached boiler native cascade control (Vitotronic 300-K MW2C Cascade Control)
5. Vitotronic 200 HO1B Controller
6. Separate 120V/1PH required for boiler and controllers.
7. Viessmann boiler mounting bracket and frame.
8. Contractor resopnsible to register boiler with BC Safety Authority prior to substantial completion.
T 604.687.1800www.integralgroup.com
Vancouver BC Canada V6C 1S4Suite 180 - 200 Granville Street
Project Reference No: 151366.000
P
VERTICAL IN LINE PUMP INSTALLATION
SUPPORT FOOT BOLTED
TO PUMP FLANGE
SUPPORT FOOT
CONSTRUCTED FROM 10mm
[3/8"] THICK STEEL PLATE.
VIBRATION ISOLATORS
AS SPECIFIED.
SEISMIC SPRING
ISOLATORS
PIPE SIZE AS
SHOWN ON PLAN
GATE VALVE
COMBINATION BALANCING/
CHECK VALVE OR LONG
SWEEP ELBOW &
INDIVIDUAL CHECK W/
BALANCE VALVES.
MAX. 250mm [10"]
100mm [4"]CONC. PAD
VIBRATION ISOLATORS
(SEE SPECIFICATION)
SUCTION GUIDE
STRAINER
GATE VALVE
SUPPORT FOOT TO BE BOLTED TO THE FLOOR SLAB, THROUGH THE
CONC. PAD USING NEOPRENE WASHERS AND BUSHINGS ON THE BOLTS
(MIN. 2 BOLTS).
NOTES:
FRONT VIEW
SCALE NTS
END VIEW
PUMP
CHEMICAL
POT FEEDER
CHEMICAL POT FEEDER
DRAIN VALVE
ISOLATION BALL
VALVEUNION
ISOLATION
BALL VALVE
BALANCE LINE
UNION
ISOLATION
BALL VALVE
300 Min.
SCALE NTS
HANGER ROD
CLEVIS HANGER
REFER TO SPEC.
VAPOUR SEAL
PREFORMED PIPE
INSULATION. REFER TO
SPEC.
CLEVIS HANGER
REFER TO SPEC.
PREFORMED PIPE
INSULATION IF
REQ''D. REFER TO
SPEC.
HANGER DETAIL FOR PIPING WITH VAPOUR SEALED INSULATION
(FOR COLD PIPING 10°C [50°F] OR LESS)
HANGER DETAIL FOR INSULATED HOT PIPING UP TO NPS
3 (75mm) OR ALL SIZES OF BARE PIPE
PIPE HANGERS
FOR NPS 2-1/2 PIPE AND
LARGER. REFER TO SPEC.
FOR INSERTS OR HIGH
DENSITY INSULATION AT
INSULATION PROTECTION
SHIELDS. LOCKING NUT
SUPPORT NUT
PIPE
INSULATION
PROTECTION SHIELD AT
HANGER. REFER TO
SPEC.
HANGER ROD
LOCKING NUT
SUPPORT NUT
PIPE
SCALE NTS