1P 1 POLE (2P, 3P, 4P, ETC.)
A AMPEREAC ABOVE COUNTER OR AIR
CONDITIONERACLG ABOVE CEILINGADO AUTOMATIC DOOR OPENERAF AMP FRAMEAFF ABOVE FINISHED FLOORAFG ABOVE FINISHED GRADEAFI ARC FAULT CIRCUIT
INTERRUPTERAHU AIR HANDLING UNITAL ALUMINUMALT ALTERNATEAMP AMPEREAMPL AMPLIFIERANNUN ANNUNCIATORAPPROX APPROXIMATELYAQ-STAT AQUASTATARCH ARCHITECT, ARCHITECTURALAS AMP SWITCHAT AMP TRIPATS AUTOMATIC TRANSFER SWITCHAUTO AUTOMATICAUX AUXILIARYAV AUDIO VISUALAWG AMERICAN WIRE GAUGE
BATT BATTERYBD BOARDBLDG BUILDINGBMS BUILDING MANAGEMENT
SYSTEM
C CONDUITCAB CABINETCAT CATALOGCATV CABLE TELEVISIONCB CIRCUIT BREAKERCCTV CLOSED CIRCUIT TELEVISIONCKT CIRCUITCLG CEILINGCOMB COMBINATIONCMPR COMPRESSORCONN CONNECTIONCONST CONSTRUCTIONCONT CONTINUATION OR
CONTINUOUSCONTR CONTRACTORCONV CONVECTORCP CIRCULATING PUMPCRT CATHODE-RAY TUBECT CURRENT TRANSFORMERCTR CENTERCU COPPER
DCP DOMESTIC WATERCIRCULATING PUMP
DEPT DEPARTMENTDET DETAILDIA DIAMETERDISC DISCONNECTDIST DISTRIBUTIONDN DOWNDPR DAMPERDS SAFETY DISCONNECT SWITCHDT DOUBLE THROWDWG DRAWING
EC ELECTRICAL CONTRACTORELEC ELECTRIC, ELECTRICALELEV ELEVATOREM EMERGENCYEMS ENERGY MANAGEMENT SYSTEMEMT ELECTRICAL METALLIC TUBINGEP ELECTRIC PNEUMATICEQUIP EQUIPMENTEWC ELECTRIC WATER COOLEREXIST EXISTINGEXH EXHAUSTEXP EXPLOSION PROOF
FA FIRE ALARMFABP FIRE ALARM BOOSTER POWER
SUPPLY PANELFACP FIRE ALARM CONTROL PANELFCU FAN COIL UNITFIXT FIXTUREFLR FLOORFLUOR FLUORESCENTFU FUSEFUDS FUSED SAFETY DISCONNECT
SWITCH
GA GAUGEGAL GALLONGALV GALVANIZEDGC GENERAL CONTRACTORGEN GENERATORGFI GROUND FAULT CIRCUIT
INTERRUPTERGFP GROUND FAULT PROTECTORGND GROUNDGRS GALVANIZED RIGID STEEL
(CONDUIT)GYP BD GYPSUM BOARD
HOA HANDS-OFF-AUTOMATICSWITCH
HORIZ HORIZONTALHP HORSEPOWERHPF HIGH POWER FACTOR
HT HEIGHTHTG HEATINGHTR HEATERHV HIGH VOLTAGEHVAC HEATING, VENTILATING AND
AIR CONDITIONINGHWP HYDRONIC WATER PUMP
IC INTERRUPTING CAPACITYIG ISOLATED GROUNDIMC INTERMEDIATE METAL CONDUITINCAND INCANDESCENTIR INFRAREDI/W INTERLOCK WITH
J-BOX JUNCTION BOX
KV KILOVOLTKVA KILOVOLT-AMPEREKVAR KILOVOLT-AMPERE REACTIVEKW KILOWATTKWH KILOWATT HOUR
LOC LOCATE OR LOCATIONLT LIGHTLTG LIGHTINGLTNG LIGHTNINGLV LOW VOLTAGE
MAX MAXIMUMMAG.S MAGNETIC STARTERM/C MOMENTARY CONTACTMC MECHANICAL CONTRACTORMCB MAIN CIRCUIT BREAKERMCC MOTOR CONTROL CENTERMDC MAIN DISTRIBUTION CENTERMDP MAIN DISTRIBUTION PANELMFR MANUFACTURERMFS MAIN FUSED DISCONNECT
SWITCHMH MANHOLEMIC MICROPHONEMIN MINIMUMMISC MISCELLANEOUSMLO MAIN LUGS ONLYMMS MANUAL MOTOR STARTERMOA MULTIOUTLET ASSEMBLYMSP MOTOR STARTER PANELBOARDMSBD MAIN SWITCHBOARDMT MOUNTMT.C EMPTY CONDUITMTS MANUAL TRANSFER SWITCHMTR MOTOR, MOTORIZED
N.C. NORMALLY CLOSEDNEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICALMANUFACTURER'SASSOCIATION
NFDS NON-FUSED SAFETYDISCONNECT SWITCH
NIC NOT IN CONTRACTNL NIGHT LIGHTN.O. NORMALLY OPENNPF NORMAL POWER FACTORNTS NOT TO SCALE
OH OVERHEADOL OVERLOADS
PA PUBLIC ADDRESSPB PULL BOX OR PUSHBUTTONPE PNEUMATIC ELECTRICPED PEDESTALPF POWER FACTORPH PHASEPIV POST INDICATING VALVEPNL PANELPP POWER POLEPR PAIRPRI PRIMARYPROJ PROJECTIONPRV POWER ROOF VENTILATORPT POTENTIAL TRANSFORMERPVC POLYVINYL CHLORIDE
(CONDUIT)PWR POWER
QUAN QUANTITY
RCPT RECEPTACLEREQD REQUIREDRM ROOMRSC RIGID STEEL CONDUITRTU ROOF TOP UNIT
SC SURFACE CONDUITSEC SECONDARYSHT SHEETSIM SIMILARS/N SOLID NEUTRALSPEC SPECIFICATIONSPKR SPEAKERSP SPARESR SURFACE RACEWAYSS STAINLESS STEELSSW SELECTOR SWITCHS/S STOP/START PUSHBUTTONSSTA STATIONSTD STANDARDSURF SURFACE MOUNTEDSW SWITCH
ELECTRICAL ABBREVIATIONS LISTSWBD SWITCHBOARDSYM SYMMETRICALSYS SYSTEMTEL TELEPHONETEL/DATA TELEPHONE/DATATERM TERMINALTL TWIST LOCKTR TAMPER RESISTANTT-STAT THERMOSTATTTC TELEPHONE TERMINAL
CABINETTV TELEVISIONTVTC TELEVISION TERMINAL
CABINETTYP TYPICAL
UC UNDER COUNTERUE UNDERGROUND ELECTRICALUG UNDERGROUNDUH UNIT HEATERUT UNDERGROUND TELEPHONEUTIL UTILITYUV UNIT VENTILATOR OR
ULTRAVIOLET
V VOLTVA VOLT-AMPERESVDT VIDEO DISPLAY TERMINALVERT VERTICALVFD VARIABLE FREQUENCY DRIVEVOL VOLUME
W WATTW/ WITHWG WIRE GUARDWH WATER HEATERW/O WITHOUTWP WEATHERPROOF
XFMR TRANSFORMERXFR TRANSFER
ANGLE@ AT
DELTA' FEET" INCHES# NUMBERØ PHASEC CENTER LINEP PLATE
L
L
EMERGENCY LIGHT FIXTURE
SYMBOL
*** DISTANCE TO HIGHEST OPERABLE PART OF EQUIPMENT
72"** CIRCUIT BREAKER PANEL
SINGLE POLE SW.
DIMMER SWITCH
OCCUPANCY SENSOR SWITCH
PUSH BUTTON
SINGLE RECEPT.
FAN SPEED CONTROL
SPLIT DUPLEX RECEPT/SWITCHED
FOURPLEX RECEPT.
DUPLEX RECEPT.
RECEPT ON EMERGENCY CKT (DUPLEX SHOWN)
ISOLATED GROUND RECEPT (DUPLEX SHOWN)
EQUIPMENT PLUG
RECEPT ON DROP CORD (DUPLEX SHOWN)
RECEPT ON CORD REEL (DUPLEX SHOWN)
FLOOR RECEPT. (DUPLEX SHOWN)
ALL DISTANCES ARE TO CENTER OF DEVICE OR EQUIPMENT UNLESS OTHERWISE NOTED. DEVICES INDICATED AT 48" MAY NOT BE INSTALLED WITH ANY OPERABLE PART HIGHER THAN 48". DEVICES MAY BE INSTALLED IN CONCRETE MASONRY UNITS WITH THE TOP OFTHE DEVICE AT 48".
AS NOTED
* DISTANCE ABOVE TOP OF DOOR FRAME
J
TIMER SWITCH
AS NOTED
48"
3
KEYED SW.
SW. W/PILOT
3-WAY SW.
4-WAY SW.
PER SCHED WALL HEATER (TYPE DENOTED)
** DISTANCE TO TOP OF EQUIPMENT OR DEVICE
PER SCHED D1
H2
HATCHED SYMBOL INDICATES REMOVED
HAND OR HAIR DRYER (TYPE DENOTED)
DASHED SYMBOL INDICATES EXISTING
SOLENOID VALVE AS NOTED
AS NOTED
48"
48"
PER SCHED
48"
AS NOTED
H
T
H1
TC
72"**
72"**
OS
R
72"**
72"**
72"**
72"**
72"**
72"**
72"**
SF-1
T
LIGHT LEVEL SENSOR - TYPE DENOTED
TIME CONTROL SWITCH (TIME SWITCH)
BASEBOARD HEATER (TYPE DENOTED)
HUMIDISTAT
THERMOSTAT
PHOTOCELL
ENCLOSED CIRCUIT BREAKER
RELAY
48"
84"
84"
COMB. MOTOR STARTER (NON-FUSED)
MAG. MOTOR STARTER OR CONTACTOR
SAFETY DISC. SW. (FUSED)
SAFETY DISC. SW. (NON-FUSED)
COMB. MOTOR STARTER (FUSED)
POWER OR DISTRIBUTION PANEL
MOTOR (SEE SCHEDULE)
TRANSFORMER (TYPE DENOTED)
MOTOR HORSEPOWER RATED SWITCH
SPECIAL CABINET (TYPE DENOTED)
48"***
18"
48"
18"
DESCRIPTION
WALL MOUNTED EXTERIOR LIGHT (TYPE DENOTED)
POLE MOUNTED LIGHT (TYPE DENOTED)
RECESSED LIGHT (TYPE DENOTED)
SURFACE OR WALL MTD LIGHT (TYPE DENOTED)
EXIT SIGN (TYPE DENOTED)
SUSPENDED OR PENDANT LIGHT (TYPE DENOTED)
TRACK AND TRACK LIGHT (TYPES DENOTED)
SURFACE LIGHT (TYPE DENOTED)
STRIP LIGHT (TYPE DENOTED)
EMERGENCY BATTERY LIGHT (TYPE DENOTED)
RECESSED LIGHT (TYPE DENOTED)
PER SCHED
AS NOTED
12"*
96"
P2P1
TR1T1T1
E E
EM
H
G
AA
R
HT AFF
AS NOTED
SYMBOL
AS NOTED
AS NOTED
J J
84" A
P
HT AFF
18"
18"
SYMBOL
A
SPECIAL RECEPT. OR CONN. (SEE SCHEDULE)
JUNCTION BOX
PULL BOX
GROUND ROD (PLAN VIEW)
CLOCK (TYPE DENOTED)
POWER POLE (OPEN OFFICE STYLE)
MULTIOUTLET ASSEMBLY (TYPE DENOTED)
MULTIOUTLET ASSEMBLY (TYPE DENOTED)
DESCRIPTION HT AFF
PROJECTOR CONTROL OUTLET
CCTV CAMERA WITH PAN/TILT DRIVE
**** DISTANCE BELOW CEILING
ANTENNA
CCTV CAMERA
***** DISTANCE TO BOTTOM OF DEVICE
144"*
DOOR SIGNAL - APT. UNIT
SPEAKER (WALL OR CEILING MT.)S
MICROPHONE OUTLET
VOLUME CONTROLV
BUZZER
D
BELL
INFORMATION OUTLET (TYPE DENOTED)
WALL TELEPHONE OUTLET (TYPE DENOTED)
INTERCOM OUTLET LOCATION
TELEPHONE OUTLET (TYPE DENOTED)
MULTIPLE SERVICE OUTLET (TYPE DENOTED)
TELEVISION OUTLET
W
CARD READER
ELECTRIC STRIKE
MOTION DETECTOR (TYPE DENOTED)MD
ES
KEYPAD
HEAT DETECTOR (TYPE & TEMP DENOTED)
CONDUIT/WIRE
DESCRIPTION
SMOKE DETECTOR (TYPE DENOTED)
DUCT SMOKE DETECTOR (TYPE DENOTED)R/F135
P
R/F135
F
ELECTRICAL SYMBOL LEGEND
AS NOTED
48"
48"
48"
48"
48"
48"
48"
48"
48"
48"
18"
18"
18"
18"
18"
18"
FOURPLEX RECEPTACLE ON EMERGENCY CIRCUIT18"
4
K
D
OS
T
SP
M
B
PB
VARIABLE FREQUENCY DRIVE
ALS
CP
OCCUPANCY SENSOR - TYPE DENOTED
IC
18"
18"
48"***
84"
18"
18"
OUTLET IN FLOOR (MICROPHONE SHOWN)M
MULTIPLE SERVICE FLR OUTLET (TYPE DENOTED)
CHIME
S
M
P
48"***
48"***
P
P
72"** FIRE ALARM REMOTE ANNUNCIATORFA ANNUN
CR
MAGNETIC LOCKML
IR
CONDUIT SLEEVE (SIZE DENOTED)
1 KEYED NOTE (SEE SCHEDULE)
WIRELESS ACCESS POINTWAP
AS NOTED
DOOR HOLDER
DOOR POWER ASSIST
DC
A2
12b
14E
16c
d
D600
e
1,3,51
SF-1
2,4,6
7,9H1
T1
LPN-102
1
#10
ELECTRICAL SYMBOL NOTESTHE LIGHTING FIXTURE TYPE IS INDICATED BY AN UPPER CASE LETTER.THE CIRCUIT DESIGNATION IS INDICATED BY A NUMBER.THE SWITCH DESIGNATION IS INDICATED BY A LOWER CASE LETTER.
EXAMPLE 1: LIGHTING FIXTURE TYPE "A" IS CONNECTED TO CIRCUIT 12 AND CONTROLLEDBY SWITCH "b".
EXAMPLE 2: THE FIXTURE TYPE SHOWN AS A NUMERATOR INDICATES ALL LIGHTINGFIXTURES IN THE ROOM OR SPACE ARE THE SAME TYPE. THE CIRCUIT NUMBER ANDSWITCH DESIGNATION SHOWN AS A DENOMINATOR INDICATES ALL LIGHTING FIXTURES INTHE ROOM OR SPACE ARE CONNECTED TO THE SAME CIRCUIT, CONTROLLED BY THE SAMESWITCHES, CENTER/OUTBOARD MULTILEVEL SWITCHING.
EXIT LIGHTS. STEM INDICATES WALL MOUNTING. NO STEM INDICATES CEILING MOUNTING.SHADED AREA INDICATES ILLUMINATED FACE(S). ARROW INDICATES DIRECTIONAL ARROWON ILLUMINATED FACE(S). THE CIRCUIT DESIGNATION IS INDICATED BY A NUMBER.EXAMPLE: THE WALL MOUNTED EXIT LIGHT TYPE "E" WITH SINGLE FACE AND DIRECTIONALARROW IS CONNECTED TO CIRCUIT 14.
DEVICES. THE CIRCUIT DESIGNATION IS INDICATED BY A NUMBER. THE SWITCHDESIGNATION IS INDICATED BY A LOWER CASE LETTER. EXAMPLE: SPLIT DUPLEXRECEPTACLE IS CONNECTED TO CIRCUIT 16 AND ONE RECEPTACLE OUTLET ISCONTROLLED BY SWITCH "c".THE CONTROL DEVICE DESIGNATION IS INDICATED BY A LOWER CASE LETTER. EXAMPLE:SINGLE POLE SWITCH "d" TO CONTROL LIGHTING FIXTURES INDICATED BY "d".
WALL BOX DIMMER WITH SIZE AS INDICATED AT DEVICE. EXAMPLE: 600 WATT WALL BOXDIMMER TO CONTROL LIGHTING FIXTURES INDICATED BY "e". SEE SPECIFICATIONS FORWATTAGE IF NOT INDICATED.
SPECIAL CONNECTIONS. THE EQUIPMENT IS INDICATED BY A NUMBER IN A CIRCLE. SEETHE MOTOR AND EQUIPMENT SCHEDULE FOR THE LOAD DESCRIPTION AND TYPE OFCONNECTION. THE CIRCUIT DESIGNATION IS INDICATED BY A NUMBER(S) ADJACENT TOTHE SYMBOL. EXAMPLE: EQUIPMENT NO. 1; 3 PHASE CONNECTION TO CIRCUITS 1, 3, 5.
MOTOR CONNECTIONS. THE MOTOR IS INDICATED BY A NUMBER WITHIN ORCHARACTERS ADJACENT TO THE MOTOR SYMBOL. SEE THE MOTOR AND EQUIPMENTSCHEDULE FOR THE MOTOR DESCRIPTION AND ELECTRICAL REQUIREMENTS. THECIRCUIT DESIGNATION IS INDICATED BY A NUMBER(S) ADJACENT TO THE SYMBOL.EXAMPLE: MOTOR SF-1; 3 PHASE CONNECTION TO CIRCUITS 2, 4, 6.
ELECTRIC HEATER CONNECTIONS. THE HEATER TYPE IS INDICATED BY A NUMBERFOLLOWING THE UPPER CASE LETTER "H". SEE THE HEATER SCHEDULE FORELECTRICAL REQUIREMENTS. THE CIRCUIT DESIGNATION IS INDICATED BY ANUMBER(S) ADJACENT TO THE HEATER. EXAMPLE: ELECTRIC BASEBOARD HEATERTYPE "H1" CONNECTED TO CIRCUITS 7, 9.
TRANSFORMERS. THE TRANSFORMER TYPE IS INDICATED BY A NUMBER FOLLOWINGTHE UPPER CASE LETTER "T". SEE THE TRANSFORMER SCHEDULE OR THE SINGLE LINEDIAGRAM FOR THE TRANSFORMER DESCRIPTION AND REQUIREMENTS. EXAMPLE:TRANSFORMER TYPE "T1".
PANELBOARDS. PANELBOARD DOORS MAY BE SHOWN TO INDICATE OPENING SIDE OFRECESSED PANELBOARDS. SEE PANELBOARD IDENTIFICATION FOR DESIGNATIONCODES.
SPECIAL NOTE. SEE THE SPECIAL NOTES ON THAT SHEET FOR THE NOTE NUMBERINDICATED IN THE HEXAGON.
CONDUIT SHOWN WITHOUT SLASH MARKS SHALL CONTAIN 2 # 12 CONDUCTORS IN 3/4"CONDUIT UNLESS SPECIFIC EQUIPMENT REQUIRES A DIFFERENT SIZE.
CONDUIT SHOWN WITH SLASH MARKS SHALL CONTAIN 1 # 12 CONDUCTOR PER SLASHMARK IN 3/4" CONDUIT UNLESS A CONDUCTOR AND CONDUIT SIZE IS SHOWN ADJACENTTO THE SLASH MARKS. SLASH MARK INDICATORS ARE: SHORT STRAIGHT=PHASECONDUCTOR, LONG STRAIGHT=NEUTRAL CONDUCTOR, SHORT BENT ENDED=SWITCHLEGS, LONG STRAIGHT WITH A DOT=GROUND CONDUCTOR, CHEVRON=CATEGORY 6,HALF CHEVRON=CATEGORY 3, TWIST=SHIELDED TWISTED PAIR, CONCENTRIC CIRCLEAND DOT=COAX CABLE.
HOME RUN TO BRANCH CIRCUIT PANELBOARD. THE PANELBOARD DESIGNATION ISSHOWN ADJACENT TO THE HOME RUN ARROW AS A NUMERATOR AND THE CIRCUITDESIGNATION IS SHOWN AS THE DENOMINATOR. CIRCUIT BREAKER SIZES(AMPS/NUMBER OF POLES) ARE SHOWN IN THE PANELBOARD SCHEDULE WITH THECORRESPONDING PANELBOARD AND CIRCUIT DESIGNATION. EXAMPLE: HOME RUN TOPANELBOARD LPN-102; CIRCUITS 1, 3, 5.
SYMBOL NOTATIONS: UPPER CASE LETTERS ADJACENT TO SYMBOLS INDICATE A UNITTYPE. SEE APPROPRIATE SCHEDULE OR SPECIFICATIONS.
* P2D/I *2aba
LPN-1021,3,5
FIRE PROTECTION REQUIREMENTS
A. PENETRATIONS IN WALLS REQUIRING PROTECTED OPENINGS MUST BE FIRESTOPPED WITH AN APPROVED MATERIAL.
1. CONDUITS MAY PENETRATE WALLS OR PARTITIONS, PROVIDED THEY ARE FIRE-STOPPED.
2. OPENINGS FOR STEEL ELECTRICAL BOXES NOT EXCEEDING 16 SQUARE INCHES ARE PERMITTED PROVIDEDOPENINGS DO NOT AGGREGATE MORE THAN 100 SQUARE INCHES FOR ANY 100 SQUARE FEET OF WALL ORPARTITION.
3. OUTLET BOXES ON OPPOSITE SIDES OF WALLS OR PARTITIONS MUST BE SEPARATED BY A HORIZONTALDISTANCE OF 24 INCHES.
B. LIGHT FIXTURES AND OTHER APPARATUS SUPPORTED BY THE ACOUSTICAL CEILING GRID MUST MEET THEREQUIREMENTS OF NEC SECTION 410.16, MEANS OF SUPPORT.
C. RECESSED LIGHTING FIXTURES INSTALLED IN FIRE RATED CEILING ASSEMBLIES SHALL BE FIRE RATED FIXTURESBEARING THE UL FIRE RATED LABEL. FIXTURES SHALL BE INSTALLED IN ACCORDANCE WITH THE UL FIRE RESISTANCEDIRECTORY, AND SHALL INCLUDE A FIRE RATED ENCLOSURE INSTALLED OVER THE FIXTURE THAT MEETS THEREQUIREMENTS OF THE UL FIRE RESISTANCE DIRECTORY.
SPECIFIC CODE NOTES
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
11:5
9:3
7A
M
E1.01
ABBREVIATIONS,SYMBOLS, NOTES, &SHEET INDEX
Electrical Drawing Index Shell Construction Sheets
Sheet Number Sheet Name
E1.01 ABBREVIATIONS, SYMBOLS, NOTES, & SHEET INDEX
E1.02 OVERALL PLANT ISOMETRIC VIEW
E1.03 ELECTRICAL OVERALL SITE PLAN
E1.04 ELECTRICAL SITE LIGHTING SOUTH PARKING LOTS
E1.05 ELECTRICAL SITE LIGHTING NORTH PARKING LOT
E1.06 ELECTRICAL LIGHTING OVERALL LAYOUT
E2.01 ELECTRICAL LIGHTING & POWER AREA 1 LB
E2.02 ELECTRICAL LIGHTING & POWER AREA 2LC
E2.03 ELECTRICAL LIGHTING & POWER AREA 3 LT
E2.04 ELECTRICAL LIGHTING & POWER AREA 4 CB
E2.05 ELECTRICAL LIGHTING & POWER AREA 5 CC
E2.06 ELECTRICAL LIGHTING & POWER AREA 6 CT
E2.07 ELECTRICAL LIGHTING & POWER AREA 7 RB
E2.08 ELECTRICAL LIGHTING & POWER AREA 8 RC
E2.09 ELECTRICAL LIGHTING & POWER AREA 9 RT
E3.01 ELECTRICAL & WATER TREATMENT ROOMS ENLARGED VIEWS
E3.01A WATER TREATMENT ROOM MEZZANINE LEVEL
E3.02 OFICE AREA LIGHTING 1/4" VIEW
E3.03 OFFICE AREA POWER 1/4" VIEW
E3.04 SHIPPING OFFICE & MID PLANT BATHROOMS 1/ 4" VIEW
E3.05 BALER ROOM 1/ 4" VIEW
E3.06 COMPRESSOR, BOILER & FIRE PUMP ROOMS 1/4" VIEWS
E3.07 ENLARGED BACKFLOW PREVENTOR BUILDING
E3.08 ENLARGED MAINTENANCE ROOM ELECTRICAL POWER PLAN
E4.01 ELECTRICAL MAIN SWITCHBOARD (MSB) ELEVATIONS
E4.02 ELECTRICAL DISTRIBUTION MCC & BSSB ELEVATIONS
E5.01 ELECTRICAL MAIN SWITCHBOARD PANEL SCHEDULE
E5.02 ELECTRICAL SWITCHBOARD PANEL SCHEDULES
E5.02A ELECTRICAL SWITCHBOARD PANEL SCHEDULES
E5.03 ELECTRICAL LV PANELBOARD SCHEDULES
E5.04 ELECTRICAL LV PANELBOARD SCHEDULES
E5.05 ELECTRICAL LV PANELBOARD SCHEDULES
E5.06 ELECTRICAL LV PANELBOARD SCHEDULES
E5.07 ELECTRICAL LV & LP PANELBOARD SCHEDULES
E5.08 ELECTRICAL LP PANELBOARD SCHEDULES
E5.08A 480V PANEL SCHEDULES
E5.09 EQUIPMENT SCHEDULES
E5.10 LIGHT FIXTURE & EQUIPMENT SCHEDULES
E5.11 ELECTRICAL EXTERIOR LIGHT FIXTURE SCHEDULE
E6.01 EMBEDDED CONDUIT ENDING LOCATIONS
E6.02 ELECTRICAL EMBEDDED CONDUITS
E6.03 EMBEDDED CONDUIT SCHEDULE
E6.04 ADDITIONAL ELECTRICAL EMBEDDED CONDUITS
E6.05 ADDITIONAL EMBEDDED CONDUIT SCHEDULE
E7.01 CABLE TRAY OVERALL ISOMETRIC VIEW
E7.02 CABLE TRAY SYSTEM OVERVIEW
E7.03 CABLE TRAY SCHEDULES
E7.04 CABLE TRAY SECTIONS
E8.01 ELECTRIC SERVICE ENTRANCE LAYOUT
E8.01A ELECTRICAL UNDERGROUND UTLITY CONDUITS
E8.02 1-LINE DIAGRAM SHEET 1 OF 2
E8.03 1-LINE DIAGRAM SHEET 2 OF 2
E9.01 ELECTRICAL DETAILS
E9.02 GROUNDING DETAILS
E9.03 GROUNDING CONNECTION DETAILS
E9.04 GROUND BAR DETAILS
E9.05 GROUNDING OVERALL LAYOUT PLAN
Electrical Drawing Index Process Equipment Sheets
Sheet Number Sheet Name
PE2.10 PROCESS EQUIPMENT OVERALL VIEW
PE2.11 ELECTRICAL PROCESS EQUIPMENT AREA 1 LB
PE2.12 ELECTRICAL PROCESS EQUIPMENT AREA 2 LC
PE2.13 ELECTRICAL PROCESS EQUIPMENT AREA 3 LT
PE2.14 ELECTRICAL PROCESS EQUIPMENT AREA 4 CB
PE2.15 ELECTRICAL PROCESS EQUIPMENT AREA 5 CC
PE2.16 ELECTRICAL PROCESS EQUIPMENT AREA 6 CT
PE2.17 ELECTRICAL PROCESS EQUIPMENT AREA 7 RB
PE2.18 ELECTRICAL PROCESS EQUIPMENT AREA 8 RC
PE2.19 ELECTRICAL PROCESS EQUIPMENT AREA 9 RT
PE4.03 MCC ELEVATIONS
PE4.04 ELECTRICAL DISTRIBUTION PANELBOARD ELEVATIONS
PE5.12 ELECTRICAL SWITCHBOARD PANEL SCHEDULES
PE5.13 ELECTIRCAL SWITCHBOARD PANEL SCHEDULES
PE5.13A ELECTRICAL MCC PANEL SCHEDULES
PE5.14 ELECTRICAL MCC PANEL SCHEDULES
PE5.15 PROCESS PANELBOARD SCHEDULES & TRANSFORMER SCHEDULE
PE5.16 EQUIPMENT SCHEDULES (PHASE 3 PROCESS CONSTRUCTION)
PE8.04 PROCESS EQUIPMENT 1-LINE DIAGRAM SHEET 1 OF 2
PE8.05 PROCESS EQUIPMENT 1-LINE DIAGRAM SHEET 2 OF 2
PE9.06 GROUNDING DETAILS
NO DATE REVISION
2 2019.06.18 ASI005 General Elect
6 2019.9.6 Schmitt Add Work #1
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
11:5
9:5
2A
M
E1.02
OVERALL PLANTISOMETRIC VIEW
13D View Overall Plant
NO DATE REVISION
2 2019.06.18 ASI005 General Elect
(E)FO
(E)FO
(E)FO
(E)FO
(E)FO
(E)SIGNSTREET
(E)SIGNCOR
T
(E)XFMR
(E)XFMR
(E)P(E)P
(E)P
(E)P
(E)P
(E)P
(E)P
(E)P
(E)P
(E)P
(E)P
(E)P
(E)P
(E)P
(E)P
(E)P
GV
4"IR
SLV
SLV
SLV
SLV
SLV
SLV
SLV
SLV
SLV
SLV
SLV
SLVSLV
SLV
SLV
SLV
SLV
SLV
SLV
SLV
FP
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
FH
WV
WV
WV
V19
V19
V19
J
J
J
J
J
J
J
-
1
ELECTRICAL GENERAL NOTES
A. OVERVIEW: ELECTRICAL CONTRACTOR TO PROVIDE 1POWER CONDUIT WITH CONDUCTORS FROM LV-18 TO J-BOXAT SIGNAGE LOCATION AND 1 LOW VOLTAGE 2" CONDUITFROM ADJACENT LV-18 TO J-BOX AT SIGNAGE LOCATION.
B. ELECTRICAL CONTRACTOR TO INSTALL 1 POWER CONDUITWITH CONDUCTORS FROM LV-01 IN ELECTRICAL ROOM TOLV-18 AND ONE 2" CONDUIT FROM IT BACKBOARD INELECTRICAL ROOM TO ADJACENT TO LV-18 AND ADJACENTTO 2" CONDUIT TO SIGNAGE.
ELECTRICAL KEYED NOTES 1
1. ELECTRICAL CONTRACTOR TO PROVIDE 4' POST WITH J-BOXAT END OF (2) 2" CONDUITS. COORDINATE WITH OWNER'SREPRESENTATIVE PRIOR TO ROUGH-IN.
2. ELECTRICAL CONTRACTOR TO PROVIDE ONE (1) 2" CONDUITFROM PANEL LV-18 TO KINGSGATE WAY WITH (4) #10 + (2) #12FROM (2) 20A/1P BREAKERS IN LV-18.
3. ELECTRICAL CONTRACTOR TO PROVIDE ONE (1) 2" CONDUITFROM ADJACENT TO LV-18 TO 4' POST (SEE NOTE 1 ABOVE).
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
0:0
0P
M
E1.03
ELECTRICAL OVERALLSITE PLAN
1" = 50'-0"1
Electrical Site Plan Overall View
NO DATE REVISION
2 2019.06.18 ASI005 General Elect
4 2019.8.9 Misc Electrical
6 2019.9.6 Schmitt Add Work #1
SLV
SLV
SLV
SLV
SLV
SLV
SLV
SLV
SLV
SLV
SLV
SLVSLV
SLV
SLV
SLV
SLV
SLV
FP
SIGN
SIGN
SIGN
SIGN
SIGN
SIGN
WV
(E)SIGNCOR
SLV
V19J
J
PX-04
PX-04
PX-04PX-04
PX-01
PX-01PX-01PX-01PX-01 PX-05PX-05PX-05
PX-11
<unnamed>
ELECTRICAL GENERAL NOTESSCOPE:A. OVERALL SCOPE OF ELECTRICAL WORK CONSISTS OF 3
PHASES.
B. PHASE 1 SHALL BE THE INSTALLATION OF UNDERGROUNDCONDUITS AND SLEEVES DURING FOUNDATION PHASE OFGENERAL CONSTRUCTION.
C. PHASE 2 SHALL BE THE INSTALLATION OF ELECTRICALEQUIPMENT RELATING TO THE BUILDING SHELL ANDPREPARATORY WORK FOR THE INSTALLATION OF THEPROCESS EQUIPMENT. THIS SHALL INCLUDE THEUNDERFLOOR CONDUITS FOR BOTH FACILITY POWER &PROCESS ELECTRICAL, LIGHTING, CABLE TRAY, ELECTRICALSWITCHGEAR AND ASSOCIATED DISTRIBUTIONSWITCHBOARDS, TRANSFORMERS & PANELBOARDS ASSHOWN ON THE SHELL PHASE DRAWINGS.
D. PHASE 3 SHALL BE THE INSTALLATION OF ELECTRICALPOWER DIRECTLY RELATED TO THE ELECTRICAL POWERREQUIRED FOR THE PROCESS EQUIPMENT.
PX-04
PX-04
PX-04
PX-01
PX-01
PX-01
PX-01
PX-01
PX-04
PX-04
PX-07
PX-07
PX-09
PX-09
PX-09
PX-10
PX-11
PX-13
PX-08
PX-08
PX-08
PX-08
PX-08
LP-06/ 10LP-06/ 11
PX-10
PX-10
PX-13
PX-13
PX-16
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
0:0
5P
M
E1.04
ELECTRICAL SITELIGHTING SOUTHPARKING LOTS
1" = 30'-0"1
Site Lighting South West Parking Lot1" = 30'-0"
2Site Lighting South East Parking Lot
1" = 30'-0"3
Site Lighting South Roadway
NO DATE REVISION
2 2019.06.18 ASI005 General Elect
4 2019.8.9 Misc Electrical
SIGN
WV
PX-12PX-12
PX-13
PX-13
PX-16
LP-04/ 10
LP-04/ 11
<unnamed>
ELECTRICAL GENERAL NOTESSCOPE:A. OVERALL SCOPE OF ELECTRICAL WORK CONSISTS OF 3
PHASES.
B. PHASE 1 SHALL BE THE INSTALLATION OF UNDERGROUNDCONDUITS AND SLEEVES DURING FOUNDATION PHASE OFGENERAL CONSTRUCTION.
C. PHASE 2 SHALL BE THE INSTALLATION OF ELECTRICALEQUIPMENT RELATING TO THE BUILDING SHELL ANDPREPARATORY WORK FOR THE INSTALLATION OF THEPROCESS EQUIPMENT. THIS SHALL INCLUDE THEUNDERFLOOR CONDUITS FOR BOTH FACILITY POWER &PROCESS ELECTRICAL, LIGHTING, CABLE TRAY, ELECTRICALSWITCHGEAR AND ASSOCIATED DISTRIBUTIONSWITCHBOARDS, TRANSFORMERS & PANELBOARDS ASSHOWN ON THE SHELL PHASE DRAWINGS.
D. PHASE 3 SHALL BE THE INSTALLATION OF ELECTRICALPOWER DIRECTLY RELATED TO THE ELECTRICAL POWERREQUIRED FOR THE PROCESS EQUIPMENT.
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
0:1
0P
M
E1.05
ELECTRICAL SITELIGHTING NORTHPARKING LOT1" = 30'-0"
1Site Lighting North Parking Lot
NO DATE REVISION
2 2019.06.18 ASI005 General Elect
OS
OSD
OSD
OSD
OS
OS
OS
OS
OSD
OS
OSOSD
OS
OS
OS
OS
OSD
OS
OS
OSOS
OS
OS
OS
OS
OS
LV-03
LV-03
BSSB1
LV-05
LV-03
?
LV-03
LV-03
LV-03
BOILER ROOM106
SCRAP/BALER ROOM 105 WATER TREATMENT ROOM 104
ELECTRICAL ROOM 108
FIRE 107 COMPRESSOR 109
COVERED DECK 111
WAREHOUSE AREA 1 101
AREHOUSE AREA 101
MANUFACTURING AREA 100
WAREHOUSE AREA 3 102
PALLET STORAGE 110
WAREHOUSE AREA 2 103
MSB-
MCC-
B2 C2 D2 E2 F2 H2 J2 K2 L2M2
B3 C3 D3 E3 F3 G3 H3 J3 K3 L3 M3
B4 C4 D4 E4 F4 G4 H4 J4 K4 L4 M4
B5 C5 D5 E5 F5 G5 H5 J5 L5K5
M5
B6 C6 D6 E6 F6G6 H6 J6 K6 L6
M6
B7C7 D7 E7 F7 G7 H7 J7 K7
L7 M7
B8C8 D8 E8 F8 G8
H8 J8 K8 L8M8
G9 H9 J9K9 L9 M9
F10 G10 H10 J10 K10 L10M10
H11J11
LV-11/ 22LV-11
LV-11/ 23
AA A A
A1
A A
A A1
A
A1
A
A A1 A A1 AA1 A1 A
A
A
AA
A1
AA
AA
AAA1A1
A1 A1
AAA
A A A
A A1 A A A1 A A
AA1
A
A1
A
A1
A1
AA A
A
A1A
AA
A1A
A
A
LV-05/ 19
A
A
A
LV-06/ 19
PO6-EM P-06 P-06 P-06 P02-EM P02 P02 P02 P02-EM P02 P02 P02 P02 P02-EM P02 P02 P02 P02 P02 P02 P02 P02P02-EM
PO6-EM P-06 P-06 P-06 P02-EM P02 P02 P02 P02-EM P02 P02 P02 P02 P02-EM P02-EM P02-EM P02 P02-EM P02-EM P02-EM P02 P02-EM P02
PO6-EM P-06 P-06 P01 P01-EM P01 P01-EM P02 P02-EM P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02
PO6-EM P-06 P-06 P01 P01-EM P01 P01-EM P02 P02-EM P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02
PO6-EM P-06 P-06 P01 P01-EM P01 P01-EM P02 P02-EM P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02
P02-EM
P02
P02
P02
P02
P02-EM
P02-EM
P02
PO6-EM P-06 P-06 P01 P01-EM P01 P01-EM P02 P02-EM P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02-EM
PO6-EM P-06 P-06 P01 P01-EM P01 P01-EM P02 P02-EM P02 P01-EM P01 P01-EM P01 P02-EM P02 P02 P02 P02 P02 P02 P02 P02 P02-EM
PO6-EM P-06 P-06 P01 P01-EM P01 P01-EM P02 P02-EM P02 P01 P01 P01 P01 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02-EM
PO6-EM P-06 P01-EM P01 P01-EM P02 P02-EM P02 P01-EM P01 P01-EM P01 P01-EM P01 P01 P02 P02 P02 P02 P02 P02 P02-EM
PO6-EM P-06 PO6-EM P01 P01 P01-EM P02 P02-EM P02 P01 P01 P01 P01 P01 P01 P01 P02 P02 P02 P02 P02 P02 P02-EM
PO6-EM P-06 PO6-EM P01 P01 P01-EM P02 P02-EM P02 P01-EM P01 P01-EM P01 P01-EM P01 P01-EM P02 P02 P02 P02 P02 P02 P02-EM
PO6-EM P-06 PO6-EM P01 P01 P01-EM P02 P02-EM P02 P01 P01 P01 P01 P01 P01 P01 P02 P02 P02 P02 P02 P02 P02-EM
P02-EM P02 P02-EM P01 P01 P01-EM P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02-EM
P02-EM P02 P02-EM P01 P01 P01-EM P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02-EM
P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02-EM
P02-EM
P04 P04-EM P05 P05-EM P05 P05 P05 P05 P05-EM
P04 P04-EM P05 P05 P05 P05 P05 P05 P05
P04-EMP04 P05 P05-EM P05-EM P05 P05-EM P05 P05-EM
P07
P07
P07P07 P-06 P-06
PO6-EMPO6-EMP07-EMP07
PO6-EM PO6-EM
P-06P-06
PO6-EMPO6-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
PO6-EM P01
P01
P01
P01
P01
P01
P03 P03 P03
P03 P03-EM P03
P03 P03-EM P03-EM
P02 P02 P02P02-EM P02-EM P02-EM P02-EM P02-EM P02-EMP02 P02 P02
EX EX1
EX EX1
EX EX1
EX EX1
EX EX1
EX EX1
EX
EX1
EX
EX1
EX
EX1
EX
EX1
EX
EX1
EX
EX1
EXEX1
EXEX1
EXEX1
EX
EX1
EX
EX1
EX
EX1
EX
EX1
EX
EX1
EX
EX1
EX
EX1
EX
EX1
EX EX1
EX
EXEX1
EX1
A A
A
A
PX-05PX-05PX-05PX-01PX-01 PX-01
PX-01 PX-01PX-01
PX-01 PX-01 PX-01
P10P10
P10P10
P10P10
PX-01
PX-05
PX-01
PX-01
PX-05
PX-01PX-01
PX-01EX1
PX-01
PX-01
PX-01
PX-01
EX1PX-01
PX-01
PX-01PX-01
PX-011
E7.04
ELECTRICAL LIGHTING REVISION NOTESSCOPE:A. ALL LIGHT FIXTURES TO BE PROVIDED BY PCA.
B. LIGHTING PLANS ARE CURRENTLY BASED ON THE LASTEST REVISION SUPPLIED BY THELIGHTING VENDOR. BASIC LIGHT LAYOUT IS FUNDAMENTALLY COMPLETE. EMERGENCYLIGHTS ARE SUBJECT TO FINAL REVIEW AND COORDINATION WITH BUILDING EGRESSPLANS. ALL EMEGENCY AND EXIT LIGHTS SHALL BE CIRCUITED TO THE NEAREST AMBIENTLIGHT CIRCUIT ON AN UNSWITCHED WIRED WITH THE LIGHTS.
C. ALL EXTERIOR, BUILDING MOUNTED LIGHTS TO BE CIRCUITED TO THE NEAREST LIGHTINGPANEL. CIRCUIT LOADING SHALL NOT EXCEED 50% OF CIRCUIT RATING. ALL LIGHTINGBREAKERS SHALL BE 20A/2P/277V BREAKERS IN THE LP SERIES PANELS.
D. ALL EXTERIOR, POLE MOUNTED FIXTURES SHALL BE CIRCUITED ON 277V/2P/20ABREAKERS. CIRCUIT LOADING SHALL BE NO MORE THAN 50% OF CIRCUIT CAPACITY.CIRCUIT CONDUCTORS SHALL HAVE NO MORE THAN 3% VOLTAGE DROP TO THEFURTHEST FIXTURE. FORMAL CIRCUIT PLANS WILL BE PROVIDED PRIOR TO INSTALLATION.
E. ELECTRICAL CONTRACTOR SHALL INSTALL 2 SPARE EMPTY 2" PVC CONDUITS PARALLELWITH EACH LIGHT CIRCUIT CONDUIT FOR FUTURE SECURITY, DATA, OR CAMERAS. EMPTYCONDUITS SHALL HAVE A PULL CORD AND LABELED AT EACH END WITH OPPOSITE ENDDESIGNATION. CONDUITS SHALL BE BROUGHT UP TO 36" ABOVE GRADE AND TERMINATEIN A WEATHERPROOF 4"X4" JUNCTION BOX ATTACHED TO BASE OF POLE OR LIGHT POLE.
F. POLE BASES SHALL BE COORDINATED WITH STRUCTURAL FOR SPECIFIC REQUIREMENTS.
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
0:2
3P
M
E1.06
ELECTRICAL LIGHTINGOVERALL LAYOUT
3/64" = 1'-0"1
Lighting Overall View
NO DATE REVISION
2 2019.06.18 ASI005 General Elect
/1 E2.02
AAA A.5 B B.5 C DAA.6
7.5
8
8.5
9
9.5
8.1
A.1 C.6C.3AA.1
LV-03/ 1
DL-07DL-08 DL-09 DL-10
BSSB-1A/ 7BSSB-1B/ 6BSSB-1A/ 5BSSB-1B/ 4
/1 E2.04
B8 C8 D8
EF-2
/1 E2.04
/1 E2.02
1
P02-EM P02P02-EM
P01 P01 P01-EM P02
P02-EM P02 P02-EM P01 P01 P01-EM
P02
P09 P08 PO8-EM
P09 P08 PO8-EM
P01
P01
LV-03/ 12LV-03/ 13
LV-03/ 14 LV-03/ 15
11 1 1
EX1
EX
EX1
EX
EF-3 EF-4EF-5
EF-6
FP/ 1FP/ 3
FP/ 4
FP/ 2
BSSB-1A/ 16
CS-01
BSSB-1A/ 18
CS-02
PX-05PX-05PX-06
PX-01 PX-01 PX-04PX-01 PX-05
LP-01/ 13
SP
ELECTRICAL GENERAL NOTES
1. MOUNT OUTLETS IN PRODUCTION/PROCESS AREA 3'-0"ABOVE FINISHED FLOOR.
2. VERIFY SPECIFIC LOCATION OF ALL EXIT LIGHTS ANDEXTERIOR LIGHTS WITH ARCHITECTURAL PLANS. VERIFYLOCATIONS OF ANY QUESTIONABLE WITH OWNER'SREPRESENTATIVE PRIOR TO ROUGH-IN.
ELECTRICAL KEYED NOTES #
1. Dock Levelers (typical of 4). Install 480V/3P/#10 to dock levelcontroller. Coordinate location with dock level installer. Installdedicated 120V/20A circuit to dock level retainer. Coordinate locationwith dock level installer.
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
0:3
1P
M
E2.01
ELECTRICAL LIGHTING &POWER AREA 1 LB
3/32" = 1'-0"1
Lighting & Power AREA 1 - DV-LB
KEYPLAN
N
NO DATE REVISION
1 2019.5.10 Elect Serv & HVAC
2 2019.06.18 ASI005 General Elect
GF
CI
GF
CI
GF
CI
LV-04
/1 E2.03
AREHOUSE AREA 101
MANUFACTURING AREA 100
/1 E2.01
AAA A.5 B B.5 C DAA.6
4
4.5
5
5.5
6
6.5
7
7.5
A.1 C.6C.3AA.1
LV-04/ 2
LV-04/ 1
<unnamed>
LV-04/ 4
LV-04/ 5
LV-04/ 6
LV-04/ 7
LV-03/ 5
/1 E2.04
/1 E2.01
/1 E2.05
B4
C4D4
B5 C5 D5
B6 C6D6
B7 C7 D7
OHF-2
COVERED DOCK111
WAREHOUSEAREA 1
101
TS-04
PO6-EMP-06 P-06
P01 P01-EM P01 P01-EM P02
PO6-EM
P-06 P-06P01 P01-EM P01 P01-EM P02
PO6-EM P-06P01-EM P01 P01-EM P02
PO6-EM P-06 PO6-EMP01 P01 P01-EM P02
PO6-EM P-06 PO6-EMP01 P01 P01-EM P02
PO6-EM P-06 PO6-EMP01 P01 P01-EM P02
P02-EM P02P02-EM
P01 P01 P01-EM P02
P09 P08 PO8-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
PO6-EMP01
P01
P01
P01
P01
/1 E2.01
LV-04/ 8,10
LV-04/ 9,11
LP-01
TL-01
TL-02
LP-02
LP-01/ 1
LP-01/ 1 LP-01/ 2 LP-01/ 3 LP-01/ 4 LP-01/ 5
LP-01/ 6
LP-01/ 11LP-01/ 10
LP-01/ 8LP-01/ 9
LP-01/ 7
LP-02/ 5LP-02/ 6
LP-02/ 8LP-02/ 9
LP-02/ 10
LP-02/ 11LP-02/ 12
EXEX1
EX
EX1
BSSB-2B/ 5
LP-01/ 12
LV-04/ 3
ELECTRICAL GENERAL NOTES
1. MOUNT OUTLETS IN PRODUCTION/PROCESS AREA 3'-0"ABOVE FINISHED FLOOR.
2. VERIFY SPECIFIC LOCATION OF ALL EXIT LIGHTS ANDEXTERIOR LIGHTS WITH ARCHITECTURAL PLANS. VERIFYLOCATIONS OF ANY QUESTIONABLE WITH OWNER'SREPRESENTATIVE PRIOR TO ROUGH-IN.
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
0:3
9P
M
E2.02
ELECTRICAL LIGHTING &POWER AREA 2LC
3/32" = 1'-0"1
Lighting & Power AREA 2 - DV-LC
KEYPLAN
N
NO DATE REVISION
2 2019.06.18 ASI005 General Elect
3 2019.07.17 Misc Updates
GF
CI
GF
CI
LV-07
/1 E2.02
/1 E2.06
AREHOUSE AREA 101
MAU-1
LV-07/ 1
1
AAA A.5 B B.5 C DAA.6
2
1.5
2.5
3
3.5
4
1.1
A.1 C.6C.3AA.1
LV-07/ 5
LV-07/ 4
LV-07/ 3
LV-07/ 2
LV-07/ 6
LV-07/ 7
LV-04/ 4
LV-06/ 9
B2 C2 D2
B3 C3 D3
B4
C4D4
EF-1
TS-07
PO6-EMP-06 P-06 P-06
P02-EM P02 P02 P02
PO6-EM P-06 P-06 P-06P02-EM P02 P02 P02
PO6-EM P-06 P-06P01 P01-EM P01 P01-EM P02
PO6-EM P-06 P-06P01 P01-EM P01 P01-EM P02
PO6-EM P-06 P-06P01 P01-EM P01 P01-EM P02
PO6-EM P-06 P-06P01 P01-EM P01 P01-EM P02
P09 P08 PO8-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
P09 P08 PO8-EM
BSSB-2B/ 3
BSSB-2A/ 5
TL-02
LP-02
LP-02/ 1 LP-02/ 2 LP-02/ 3
LP-02/ 4
LP-02/ 5LP-02/ 6
EX1
EX
EX1
EX
EXEX1
BSSB-2B/ 5
PX-04PX-01PX-04
PX-04PX-01
LP-01/ 4
LP-01/ 14
ELECTRICAL GENERAL NOTES
1. MOUNT OUTLETS IN PRODUCTION/PROCESS AREA 3'-0"ABOVE FINISHED FLOOR.
2. VERIFY SPECIFIC LOCATION OF ALL EXIT LIGHTS ANDEXTERIOR LIGHTS WITH ARCHITECTURAL PLANS. VERIFYLOCATIONS OF ANY QUESTIONABLE WITH OWNER'SREPRESENTATIVE PRIOR TO ROUGH-IN.
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
1:4
7P
M
E2.03
ELECTRICAL LIGHTING &POWER AREA 3 LT
3/32" = 1'-0"1
Lighting & Power AREA 3 - DV-LT
KEYPLAN
N
NO DATE REVISION
2 2019.06.18 ASI005 General Elect
GF
CI
OS
OS
OSOS
OS
OS
OS
OS
OS
OS
J
J
LV-03
1A
1B
1C
1D
/1 E2.05
/1 E2.07
1E
1F
1G
WATER TREATMENT ROOM 104
LV-10
BSSB-1A
MAU-4
D.5 E E.5 F F.5 G G.5 H H.5
7.5
8
8.5
9
9.5
10
10.5
8.1
9.9
E.9
10.4
10.2
H.1
LV-12
LV-12/ 3
LV-12/ 2
LV-12/ 1
LV-10/ 1
LV-10/ 6
LV-10/ 7
LV-10/ 8
LV-01/ 2
LV-01/ 1
LV-01/ 4
LV-19/ 1
LV-10/ 5
LV-10/ 9
LV-03/ 2
LV-19/ 2
LV-03/ 10
DL-11 DL-12
DL-13
/1 E2.07
D8 E8F8
G8 H8
G9
H9
F10 G10H10
H11
MSB
MCC
ITBACKBOARD
LV-01/ 3
EF-2
EF-7
FC-2
1 2 3 4 5 6
ELECTRICAL108
BOILER ROOM106
SCRAP/BALERROOM
105
2
LV-01/ 5 TS-01
TS-10
P02 P02 P02 P02 P02 P02 P02 P02
P02
P02
P02
P02 P02 P02 P02 P02 P02 P02 P02 P02
P02 P02 P02 P02 P02 P02
P02-EM
P04 P04-EM P05 P05-EM P05 P05 P05 P05
P04 P04-EM P05 P05 P05 P05 P05 P05 P05
P04-EM P04 P05 P05-EM P05-EM P05P05-EM
P05
P07
P07
P07
P07
P07-EM
P07
TS-03
/1 E2.01
/1 E2.01
EUH-1
TF-2
EF-8
TF-4
CU-2 CU-1
EUH-2
OHF-9
LV-02/ 13,15
BSSB-1B/ 10BSSB-1A/ 9
BSSB-1B/ 8
LV-10/ 2
LV-10/ 3LV-10/ 4
1 1 1
FP/ 5
FP/ 6
FP/ 8
FP/ 10
BSSB-1A/ 14
BSSB-1B
LP-06
TL-06
LP-05/ 8
LP-05/ 13
LP-05/ 9
LP-05/ 9,10
LP-06/ 4
LP-06/ 3
EX
EX1
EX
EX1
EX1EX
EX
EX1
EX1
EX
BSSB-1B/ 3
LV-01/ 6,8 LV-01/ 22,24
LP-06/ 2
BSSB-1B/ 17
TF-1 TF-3
EF-14LV-01/ 13
LV-01/ 1
FP/ 7
FP/ 9
FC-1
P07
LV-12/ 1
LV-12/ 4,6,8
P02 P02-EM P02 P02-EM
P02
EX1EX
PX-04
PX-04
PX-01PX-04
PX-02PX-01
PX-01
LP-06/ 8
LP-06/ 9
LV-12
1H
<unnamed>
1
E7.04
K-01
K-02
FP
ELECTRICAL KEYED NOTES 1
1. DOCK LEVELERS (TYPICAL OF 3). INSTALL 480V/3P/#10 TODOCK LEVEL CONTROLLER. COORDINATE LOCATION WITHDOCK LEVEL INSTALLER. INSTALL DEDICATED 120V/20ACIRCUIT TO DOCK LEVEL RETAINER. COORDINATE LOCATIONWITH DOCK LEVEL INSTALLER.
2. IT BACKBOARD. TWO (2) 3" CONDUITS TO IT ROOM 205 WITHPULL CORDS IN BOTH. RISE TO 2" ABOVE BOTTOM OF ITBACKBOARD, CAP WITH PROTECTIVE RING TO PROTECTCABLES. LABEL BOTH ENDS OF CONDUITS. TWO ADDITIONAL4" CONDUITS EXITING BUILDING AND CONTINUING TO EDGEOF SITE FOR CONNECTION TO LOW VOLTAGE PROVIDERS.COORDINATE LOCATION WITH SITE PLAN. PROVIDE PULLCABLES AND LABEL EACH END OF CONDUITS. SEE DETAILSFOR SPECIFICS ON BURIED CONDUITS.
ELECTRICAL GENERAL NOTES
1. MOUNT OUTLETS IN PRODUCTION/PROCESS AREA 3'-0"ABOVE FINISHED FLOOR.
2. VERIFY SPECIFIC LOCATION OF ALL EXIT LIGHTS ANDEXTERIOR LIGHTS WITH ARCHITECTURAL PLANS. VERIFYLOCATIONS OF ANY QUESTIONABLE WITH OWNER'SREPRESENTATIVE PRIOR TO ROUGH-IN.
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
1:5
5P
M
E2.04
ELECTRICAL LIGHTING &POWER AREA 4 CB
3/32" = 1'-0"1
Lighting & Power AREA 4 - DV-CBKEYPLAN
N
NO DATE REVISION
1 2019.5.10 Elect Serv & HVAC
2 2019.06.18 ASI005 General Elect
3 2019.07.17 Misc Updates
/1 E2.04
WAREHOUSE AREA 3 102
D.5 E E.5 F F.5 G G.5 H H.5
4.5
5
5.5
6
6.5
7
7.5
LV-03/ 5
LV-03/ 6
LV-03/ 7
LV-03/ 8LV-03/ 9
/1 E2.04
/1 E2.02/1 E2.08
D5 E5 F5 G5H5
D6 E6F6
G6 H6
D7 E7 F7
G7H7
P02 P02-EM P02 P01-EM P01 P01-EM P01 P02-EM P02 P02
P02 P02-EM P02 P01 P01 P01 P01 P02 P02 P02
P02 P02-EM P02 P01-EM P01 P01-EM P01 P01-EM P01 P01
P02 P02-EM P02 P01 P01 P01 P01 P01 P01 P01
P02 P02-EM P02 P01-EM P01 P01-EM P01 P01-EM P01 P01-EM
P02 P02-EM P02 P01 P01 P01 P01 P01 P01 P01
P02 P02 P02 P02 P02 P02 P02 P02
P02
P02
/1 E2.01
OHF-10
OHF-7
OHF-11
LV-09/ 11,13
LV-02/ 9,11
LV-04/ 9,11
TL-05LP-05
LP-02/ 12
LP-02/ 13
LP-02/ 14
LP-03/ 9LP-03/ 7
LP-03/ 10 LP-03/ 11
LP-03/ 12
LP-03/ 13
LP-03/ 8 LP-03/ 6
LP-05/ 1
LP-05/ 4
LP-05/ 5
LP-05/ 6LP-05/ 3
LP-05/ 8
BSSB-1B/ 17
ELECTRICAL GENERAL NOTES
1. MOUNT OUTLETS IN PRODUCTION/PROCESS AREA 3'-0"ABOVE FINISHED FLOOR.
2. VERIFY SPECIFIC LOCATION OF ALL EXIT LIGHTS ANDEXTERIOR LIGHTS WITH ARCHITECTURAL PLANS. VERIFYLOCATIONS OF ANY QUESTIONABLE WITH OWNER'SREPRESENTATIVE PRIOR TO ROUGH-IN.
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
2:0
1P
M
E2.05
ELECTRICAL LIGHTING &POWER AREA 5 CC
3/32" = 1'-0"1
Lighting & Power AREA 5 - DV-CC
KEYPLAN
N
NO DATE REVISION
2 2019.06.18 ASI005 General Elect
GF
CI
GF
CIGF
CI
OS
OS
BSSB-2A
LV-06
/1 E2.03
/1 E2.05
/1 E2.09
WAREHOUSE AREA 2 103
1
D.5 E E.5 F F.5 G G.5 H H.5
2
1.5
2.5
3
3.5
4
1.1
LV-06/ 4
LV-06/ 3
LV-06/ 2
LV-06/ 14
LV-05/ 2
LV-06/ 6
LV-06/ 5
LV-05/ 8
LV-06/ 7
LV-06/ 8
LV-06/ 9LV-06/ 10
LV-06/ 11
LV-06/ 12
D2 E2 F2 H2
D3 E3
F3
G3 H3
E4F4
G4
H4
LV-06/ 13
OHF-3
OHF-1
TF-7
RESTROOM112
RESTROOM113
TS-06
P02 P02-EM P02 P02 P02 P02 P02-EM P02 P02 P02 P02
P02 P02-EM P02 P02 P02 P02 P02-EM P02-EM P02-EM P02 P02-EM
P02 P02-EM P02 P02 P02 P02 P02 P02 P02 P02 P02
P02 P02-EM P02 P02 P02 P02 P02 P02 P02 P02
P02 P02-EM P02 P02 P02 P02 P02 P02 P02 P02
P02 P02-EM P02 P02 P02 P02 P02 P02 P02 P02
A
A
EF-11
EWH-3
TF-8
GUH-1
LV-06/ 1
LV-06/ 15,17
LV-05/ 26,28
BSSB-2B/ 1
BSSB-2A/ 19BSSB-2A/ 18
BSSB-2A/ 5
BSSB-2B
TL-03
LP-03
TL-04 LP-04
LP-02/ 5LP-02/ 6
LP-02/ 7
LP-04/ 1LP-04/ 4
LP-04/2,<unnamed>
<unnamed>
LP-04/ 6LP-04/ 8
LP-04/ 7LP-04/ 5
LP-03/ 2
LP-03/ 1
LP-03/ 3
LP-03/ 4
LP-03/ 8 LP-03/ 6
EX1
EX
EX1
EX
BSSB-2B/ 6
BSSB-2A/ 2
BSSB-2B/ 7LV-06/ 20
BSSB-2B/ 5
EWH-4
LV-06/21,23,25
LV-06/21,23,25
PX-04PX-04PX-01PX-04PX-01PX-04 LP-04/ 9
LV-06/ 16
ELECTRICAL GENERAL NOTES
1. MOUNT OUTLETS IN PRODUCTION/PROCESS AREA 3'-0"ABOVE FINISHED FLOOR.
2. VERIFY SPECIFIC LOCATION OF ALL EXIT LIGHTS ANDEXTERIOR LIGHTS WITH ARCHITECTURAL PLANS. VERIFYLOCATIONS OF ANY QUESTIONABLE WITH OWNER'SREPRESENTATIVE PRIOR TO ROUGH-IN.
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
2:0
8P
M
E2.06
ELECTRICAL LIGHTING &POWER AREA 6 CT
3/32" = 1'-0"1
Lighting & Power AREA 6 - DV-CT
KEYPLAN
N
NO DATE REVISION
2 2019.06.18 ASI005 General Elect
3 2019.07.17 Misc Updates
GF
CI
GF
CI
GF
CI
GFCI
GF
CI
GF
CI
GFCI
GF
CI
GFCIGFCI
OS
OSD
OSD
OSD
OS
OS
OS
OS
JJ
OS
OSOS
VS
VS
VS VS
VS
VS
OS
OS
OS
OS
OSD
OSOS
GFCIGFCI
J J
LV-01
LV-02
1A
1B
1C
1D
/1 E2.08
1E
1F
1G
WATER TREATMENT ROOM 104
LV-08
LV-10
LV-11
BSSB-1A
MG.5 H H.5 J J.5 K K.5 L L.5
7.5
8
8.5
9
9.5
10
10.5
8.1
9.9
L.9
M.5
10.4
10.2
H.1 J.3J.4
0.13
0.150.16 0.17
LV-15
LV-14
LV-10/ 6
LV-10/ 7
LV-15/ 2
LV-10/ 8
LV-01/ 2
LV-01/ 1
LV-01/ 4LV-15/ 8
LV-15/ 3
LV-15/ 4
LV-19/ 1
LV-10/ 5
LV-10/ 9
LV-08/ 2 LV-08/ 1
LV-11/ 1
LV-11/ 9
LV-11/ 10
LV-11/ 11
<unnamed>
<unnamed>LV-11/ 2
LV-11/ 4
LV-11/ 3LV-11/ 15
LV-11/ 5
LV-11/ 6
LV-11/ 8
LV-11/ 7
LV-11/ 18
LV-11/ 19
LV-11/ 20
LV-11/ 21
LV-15/ 1
LV-02/ 2
LV-02/ 1
LV-02/ 6
DL-11 DL-12
DL-13
/1 E2.04
LV-14/ 2
LV-14/ 1
G8 H8 J8
K8
L8
M8
G9
H9 J9K9
L9 M9
G10H10
J10 K10
L10
M10
H11 J11
MSB
MCC
ITBACKBOARD
LV-01/ 3
<unnamed>LV-11/ 14
FC-2
FC-6
FC-7
FC-8
ERV-1
LV-08/ 3
1 2 3 4 5 6
BATHROOM207
OFFICE204
Space10
JANITOR210
OFFICE206
WAITING200
HALL208
OFFICE203
BREAK/TRAININGROOM
209CONFERENCE
202
IT ROOM205
WOMEN211
MEN213
ELECTRICAL108
Space31
M LOCKER214
OPEN OFFICE201
SCRAP/BALERROOM
105
FP-1
2
LV-13
1
2
3
4
LV-01/ 5 TS-01
TS-10
TS-08
TS-02
P02 P02
P02
P02 P02 P02 P02 P02 P02 P02 P02-EM
P02 P02 P02 P02 P02 P02 P02 P02 P02 P02 P02-EM
P02 P02 P02 P02 P02 P02 P02 P02
P02
P02 P02-EM
P02
P05 P05 P05 P05 P05-EM
P05 P05 P05 P05 P05
P05-EM P05P05-EM
P05 P05-EM
P07
P07
P07
P07 P-06 P-06
PO6-EMPO6-EMP07-EM
P07
P03 P03 P03
P03 P03-EM P03
P03 P03-EM P03-EM
A A A A
A1
A A
A A1
A
A1
A
A A1 A A1 A
A1 A1 A
A
A
AA
A1
AA
AA
AAA1A1
A1 A1
AAA
A
A1
A
A1
A1
AA A
A
A1
A
AA
A1A
A
TF-2 TF-4TF-5
FC-9
FC-10 FC-11
FC-12
CU-4
EUH-3
CU-2 CU-1
EUH-5
EUH-4
LV-11/ 26,28
LV-11/ 29,31
LV-11/30,32,34
EUH-2
BC-1
OHF-8OHF-9
LV-02/ 12,14
LV-02/ 13,15
BSSB-1B/ 10BSSB-1A/ 9
BSSB-1B/ 8
LV-10/ 2
LV-10/ 3LV-10/ 4
1 1 1
FP/ 8
FP/ 10
FP/ 11
BSSB-1B/ 11
LV-15/ 2
BSSB-1B
LP-06
TL-06
LP-05/ 8LP-05/ 7
LP-05/ 13
LP-05/ 9
LP-05/ 9,10
LP-06/ 4
LP-06/ 3
EX EX1
EX EX1
EX1
EX
EX
EX1
EX1
EX
EX1
EX EX
EX1
LV-01/ 6,8 LV-01/ 22,24
LP-06/ 2
BSSB-1B/ 17
BSSB-1B/ 9
BSSB-1A/ 10
EWH-1 EWH-2
LP-06/ 5
TF-3 TF-6
EF-14LV-01/ 13
LV-01/ 1
FP/ 7
FP/ 9
FP/ 12
FC-1
P07
LV-15/10,12,14
LV-14/ 3,5,7
P02
P02
<unnamed>
P02-EMP02-EM
P02
P02-EMP02-EM P02 P02-EM
P02
P02-EM
BSSB-1A/ 20
BSSB-1A/ 4
CS-07 CS-06
PX-04
PX-02PX-01
PX-01
PX-02
PX-01
EX
EX1 PX-04PX-04
PX-04
PX-01
PX-01
PX-01
PX-01
PX-01
LP-06/ 8
LP-06/ 9
LP-05/ 14
PX-04
1H
1
E7.04
FP
ELECTRICAL GENERAL NOTES
1. MOUNT OUTLETS IN PRODUCTION/PROCESS AREA 3'-0"ABOVE FINISHED FLOOR.
2. VERIFY SPECIFIC LOCATION OF ALL EXIT LIGHTS ANDEXTERIOR LIGHTS WITH ARCHITECTURAL PLANS. VERIFYLOCATIONS OF ANY QUESTIONABLE WITH OWNER'SREPRESENTATIVE PRIOR TO ROUGH-IN.
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
2:1
9P
M
E2.07
ELECTRICAL LIGHTING &POWER AREA 7 RB
3/32" = 1'-0"1
Lighting & Power AREA 7 - DV-RB
KEYPLAN
N
NO DATE REVISION
1 2019.5.10 Elect Serv & HVAC
2 2019.06.18 ASI005 General Elect
/1 E2.07
/1 E2.09
PALLET STORAGE 110
MJ J.5 K K.5 L L.5
4.5
5
5.5
6
6.5
7
L.9
M.5 NM.9
5.4
7.1
LV-09/ 9
LV-09/ 8
LV-02/ 5
LV-02/ 3LV-02/ 4
DL-03
DL-04
DL-05
DL-06
BSSB-2A/ 13
BSSB-2A/ 14
BSSB-2A/ 15
BSSB-2A/ 16
/1 E2.05
J4K4 L4
M4
J5L5
K5
M5
J6 K6 L6M6
J7 K7 L7
M7
PALLET STORAGE110
P02 P02 P02 P02 P02 P02 P02 P02-EM
P02 P02 P02 P02 P02 P02 P02 P02-EM
P01 P02 P02 P02 P02 P02 P02 P02-EM
P01 P02 P02 P02 P02 P02 P02 P02-EM
P01-EM P02 P02 P02 P02 P02 P02 P02-EM
P01 P02 P02 P02 P02 P02 P02 P02-EM
P02 P02 P02 P02 P02 P02 P02 P02-EM
PO6-EM PO6-EM
P-06P-06
PO6-EM PO6-EM
GUH-3
OHF-9
OHF-6
LV-09/ 10,12
LV-09/ 11,13
LV-02/ 8,10
LV-02/ 9,11
LV-09/ 4
LV-09/ 6
LV-09/ 14
LV-09/ 15
LV-09/ 16
LV-09/ 17
1
1
1
1
1
LV-02/ 7
<unnamed>
LP-03/ 11
LP-03/ 13
LP-05/ 4
LP-05/ 5
LP-05/ 6
EX1
EX
EX1EX
EX1
EX
PX-01
PX-01
PX-04
PX-04
PX-01
PX-03
PX-01
PX-05
LP-05/ 12
SUPERVISOR'S OFFICE
4
ELECTRICAL GENERAL NOTES
1. MOUNT OUTLETS IN PRODUCTION/PROCESS AREA 3'-0"ABOVE FINISHED FLOOR.
2. VERIFY SPECIFIC LOCATION OF ALL EXIT LIGHTS ANDEXTERIOR LIGHTS WITH ARCHITECTURAL PLANS. VERIFYLOCATIONS OF ANY QUESTIONABLE WITH OWNER'SREPRESENTATIVE PRIOR TO ROUGH-IN.
ELECTRICAL KEYED NOTES
1. DOCK LEVELERS (TYPICAL OF 6). INSTALL 480V/3P/#10 TODOCK LEVEL CONTROLLER. COORDINATE LOCATION WITHDOCK LEVEL INSTALLER. INSTALL DEDICATED 120V/20ACIRCUIT TO DOCK LEVEL RETAINER. COORDINATE LOCATIONWITH DOCK LEVEL INSTALLER.
#
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
2:2
6P
M
E2.08
ELECTRICAL LIGHTING &POWER AREA 8 RC
3/32" = 1'-0"1
Lighting & Power AREA 8 - DV-RC
KEYPLAN
N
NO DATE REVISION
2 2019.06.18 ASI005 General Elect
GF
CI GFCI
GF
CI
GF
CI
OSD
OS
OS
OSD
LV-05
LV-09
/1 E2.06
/1 E2.08
1
MJ J.5 K K.5 L L.5
2
1.5
2.5
3
3.5
4
1.1
L.9
LV-09/ 3
LV-09/ 2
LV-05/ 1LV-05/ 3
LV-05/ 4
LV-05/ 5
LV-05/ 6
LV-05/ 7
LV-05/ 8
LV-05/ 9
LV-05/ 11
LV-05/ 10
LV-09/ 5
LV-09/ 7
LV-05/ 17
LV-05/ 12
LV-05/ 13
LV-05/ 14
LV-05/ 15
LV-05/ 18LV-05/ 16
DL-01
DL-02BSSB-2A/ 12
BSSB-2A/ 13
J2 K2 L2
M2
J3 K3 L3
M3
J4K4 L4
M4
MAU-3
OHF-4
ERV-2GUH-2CLOSET
301
DRIVER'SLOUNGE
302
SHIPPING OFFICE300
RESTROOM303
1
TS-05
TS-09
P02 P02 P02 P02 P02 P02-EM
P02-EM P02-EM P02-EM P02 P02-EM P02
P02 P02 P02 P02 P02 P02
P02 P02 P02 P02 P02 P02
P02 P02 P02 P02 P02 P02 P02 P02
P02-EM
P02
P02
P02
P02
P02-EM
P02-EM
P02
P02 P02 P02 P02 P02 P02 P02 P02-EM
A AA
A A1 A A A1 A A
AA1
A
CU-3
EF-10
LV-05/ 21,23
LV-05/ 22
LV-05/ 24
LV-05/ 25,27
LV-09/ 10,12
LV-09/ 1
LV-09/ 4
LV-09/ 6
1
1
1
BSSB-2A/ 6
BSSB-2A/ 21
LP-04/ 8
LP-04/ 7
BSSB-2A/ 11
<unnamed>
EX1EX
EX1EX
EX
EX1
EX
EX1
EF-9
LV-05/ 20
BSSB-2A/ 8
CS-03
BSSB-2A/ 9
CS-04 CS-05
BSSB-2A/ 10
EX1EX
PX-01
PX-01
PX-05
PX-01
PX-01PX-04PX-04PX-01
LP-04/ 3
LV-09/ 18,20
SUPERVISOR'S OFFICE
4
ELECTRICAL GENERAL NOTES
1. MOUNT OUTLETS IN PRODUCTION/PROCESS AREA 3'-0"ABOVE FINISHED FLOOR.
2. VERIFY SPECIFIC LOCATION OF ALL EXIT LIGHTS ANDEXTERIOR LIGHTS WITH ARCHITECTURAL PLANS. VERIFYLOCATIONS OF ANY QUESTIONABLE WITH OWNER'SREPRESENTATIVE PRIOR TO ROUGH-IN.
ELECTRICAL KEYED NOTES
1. DOCK LEVELERS (TYPICAL OF 6). INSTALL 480V/3P/#10 TODOCK LEVEL CONTROLLER. COORDINATE LOCATION WITHDOCK LEVEL INSTALLER. INSTALL DEDICATED 120V/20ACIRCUIT TO DOCK LEVEL RETAINER. COORDINATE LOCATIONWITH DOCK LEVEL INSTALLER.
2. N/A3. 2" DATA CONDUIT FROM IT ROOM 205. RISE TO 2" ABOVE
BOTTOM OF IT BACKBOARD. CAP WITH PROTECTIVE RING TOPROTECT CABLES. PROVIDE PULL CORD AND LABLE BOTHENDS OF CONDUIT.
4. PROVIDE 200A DISCONNECT AND CIRCUIT FROM PANEL LV-09WITH 1 1/2"C,(3) #1 THHN + #6 GND. MOUNT DISCONNECT TOCOLUMN J4. PROVIDE FEED FROM DISCONNECT TOSUPERVISOR'S OFFICE 125A PANEL.
#
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
2:3
3P
M
E2.09
ELECTRICAL LIGHTING &POWER AREA 9 RT
3/32" = 1'-0"1
Lighting & Power AREA 9 - DV-RT
KEYPLAN
N
NO DATE REVISION
1 2019.5.10 Elect Serv & HVAC
2 2019.06.18 ASI005 General Elect
6 2019.9.6 Schmitt Add Work #1
LV-08
LV-15
LV-15/ 2
LV-15/ 3
LV-15/ 4
LV-15/ 1
P03
P03
P03-EMP03
P03-EM
P03-EMP03
P03P03
EX1
EX
BSSB-1A/ 19
SUP-2
LV-15/ 6
3
P11P11
P11
P11
P11
P11
P11
P11
LP-06/ 14
LV-01
1A1B1C1D1E1F1GBSSB-1A
LV-10/ 7
LV-01/ 2
LV-01/ 1
LV-01/ 4
MSB
DL-13
FC-2
LV-01/ 5LV-01/ 3
P07P07
P07-EM
P07P07 P07
TS-01
IT BACKBOARD
MSB-1A MSB-1B MSB-1C MSB-1D MSB-1E MSB-1F MSB-1G
MCC-1 1110
CU-2 CU-1
EUH-2
SHELLBETTER CABINET
UTILITY TRANSFORMERWITH VAULT BENEATH
LP-06/ 2
LP-06/ 7
1
1
1
UTILITY TRANSFORMERVAULT FOR FUTURETRANSFORMER
EX
EX1
LV-01/ 6,8
LV-01/ 22,24
BSSB-1A/ 1
LV-01/ 13
LV-01/ 25,27
FC-1
22
2
PLC
CA
BIN
ET
SC
RA
PS
YS
TE
M
1
E7.04
FP
LP-06
1H
VFD-1
VFD-2
MSB-1C/ 2
MSB-1F/ 5
1. PROVIDE 4" HOUSE KEEPING PAD FOR EQUIPMENTS ASSHOWN ON PLAN. EQUIPMENT PAD TO EXTEND 6" BEYONDEACH END OF EQUIPMENT AND EXTEND 3" BEYOND FRONTOF EQUIPMENT. CONTRACTOR TO VERIFY EXACT LOCATIONAND DIMENSIONS OF EQUIPMENT PRIOR TO INSTALLATIONOF THE EQUIPMENT PADS. WHERE EQUIPMENT IS LOCATEDAWAY FROM A WALL THE PAD SHALL EXTEND 3" BEYONDFRONT AND REAR OF EQUIPMENT.
2. SEE CIVIL ENGINEERING PLANS FOR EXTENSION OFELECTRICAL UTILITY, DATA, AND SIGNAGE CONDUITEXTENDED TO THE STREET. CONTRACTOR TO INSTALLELECTRIAL VAULT IN UTILITY CONDUITS AT EXIT TO PARKINGLOT PER CIVIL PLANS. ELECTRICAL CONDUITS TO BE IN DUCTBANK WHEN PASSING UNDER DRIVE OR VEHICLE PATH.
3. INK KITCHEN CONTROL CONSOLE RECEPTACLES.COORDINATE WITH INK KITCHEN CONTRACTOR FORSPECIFIC LOCATION OF RECEPTACLES. PROVIDE 4X4 J-BOXWITH CONDUIT BACK TO IT ROOM IN MAIN OFFICE AREA.
ELECTRICAL KEYED NOTES # ELECTRICAL GENERAL NOTES
1. LIGHTING FOR THE WATER TREATMENT ROOM SHALL BECIRCUITED FROM THE OVERALL PRODUCTION AREALIGHTING PANELS AND SHALL BE SWITCHED WITH THEOVERALL PRODUCTION AREA LIGHTING.
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
2:4
8P
M
E3.01
ELECTRICAL & WATERTREATMENT ROOMSENLARGED VIEWS
1/4" = 1'-0"1
Water Treatment Room Enlarged View
MCC
1/4" = 1'-0"2
Electrical Room Enlarged View
KEYPLAN
N
NO DATE REVISION
1 2019.5.10 Elect Serv & HVAC
2 2019.06.18 ASI005 General Elect
4 2019.8.9 Misc Electrical
5 2019 Misc Electrical
6 2019.9.6 Schmitt Add Work #1
J J.5 K
9
9.5
10
9.9
J.3J.4
J KJ.5
9
10
9.5
9.9
K.1J.4
J J.5 K
9
9.5
109.9
J.6J.3J.4J J.5 K
9
9.5
109.9
J.6J.3J.4
P03
P03
P03-EM P03-EM
P03P03-EM
P03P03
P03
LV-15/ 11
LV-15/ 13
ELECTRICAL GENERAL NOTES
1. LIGHTING FOR THE MEZZANINE AREA IS SHOWN ON SHEETE3.07 AND IS PART OF THE GENERAL PRODUCTION AREALIGHTING. CIRCUITING AND SWITCHING FOR THE MEZZANINEAREA SHALL BE BASED ON THE OVERALL PRODUCTION AREAWITH NO SPECIFIC CIRCUITING OR SWITCHING FOR THEMEZZANINE AREA.
2. RECEPTACLES FOR THE MEZZANINE AREA SHALL BE ASSHOWN ON THIS PLAN.
3. FRAMING FOR THE FLOOR OF THE MEZZANINE IS SHOWNFOR REFERANCE ONLY AND HAS NO RELATIONSHIP TOLIGHTING LAYOUT.
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
2:4
9P
M
E3.01A
WATER TREATMENTROOM MEZZANINELEVEL
1/8" = 1'-0"1
Water Treatment area mezzanine
NO DATE REVISION
6 2019.9.6 Schmitt Add Work #1
OS
OSD
OSD
OSD
OS
OS
OS
OS
OS
OSOS
VS
VS
VS VS
VS
VS
OS OS
OS
OS
OSD
OSOS
MK K.5 L L.5
9
9.5
10
9.9
L.9
K L MK.5 L.5
9
10
9.5
L.9
9.9
K.1
BREAK/TRAININGROOM
209CONFERENCE
202
OPEN OFFICE201
BATHROOM207IT ROOM
205
OFFICE204
OFFICE206
WOMEN211
MEN213
M LOCKER214
HALL208
JANITOR210
A A A A
A1
A A
A A1
A
A1
A
A A1 A A1A
A1 A1 A
A
A
AA
A1
AA
AA
A
AA1A1
A1 A1
AAA
A
A1
A
A1
A1
A
A A
A
A1
A
AA
A1A
A
LV-11/ 22
LV-11/ 23
LV-11/ 25LV-11/ 24
EX
EX1
201.2
EX
A
1. LIGHT FIXTURES LOCATED OVER RESTROOMS, LOCKERROOMSAND JANITOR CLOSETS TO BE RECESSED MOUNTEDIN HARD GWB CEILING. PROVIDE HARDWARE AS REQUIREDFOR FLUSH MOUNTING.
2. BATHROOMS AND LOCKER ROOMS SHALL HAVE A DRYWALLCEILING. OWNER WILL PROVIDE AN ADAPTER KIT TO ALLOWDESIGNATED FIXTURES TO BE DRYWALL MOUNTED.COORDINATE SPECIFIC KIT REQUIREMENTS WITH FIXTUREMANUFACTURER TO ASSURE FIT.
ELECTRICAL LIGHTING GENERAL NOTES
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
2:5
3P
M
E3.02
OFICE AREA LIGHTING1/4" VIEW
KEYPLAN
N
1/4" = 1'-0"1
Electrical Lighting Plant Office Area 1/4" View
NO DATE REVISION
2 2019.06.18 ASI005 General Elect
7 2019.10.7 Misc Electrical
GF
CI
GF
CI
GF
CI
GFCI
GF
CI
GF
CI
GFCI
GF
CI
J J
GFCIGFCI
JJ
1. TOTAL OF 3 CONDUITS TO RISE AT BOTTOM OF IT BACKBOARD TO 12" AFF. CAP WITHPROTECTIVE RING TO PROTECT CABLES. TWO (2) 3" CONDUITS, WITH PULL CORDS FROM ITBACKBOARD IN ELECTRICAL ROOM. ONE (1) 2" CONDUIT TO CLOSET IN SHIPPING OFFICES.PROVIDE PULL CORD.
2. PROVIDE TWO (2) 4"X4" J-BOXS WITH 3/4" CONDUIT TO PANEL LV-18. PROVIDE FOUR (4) #10THHN CU CONDUCTORS + #10 GND IN EACH & LABEL EACH AT EACH END. PROVIDE ENOUGHEXCESS TO TERMINATE TO ANY BREAKER IN LV-18 AND FOR CONNECTION TO WHIP FORPOWER TO SERVER CABINET.
3. IT RACK BY OTHERS.4. PROVIDE IN-FLOOR LOW VOLTAGE BOX. PROVIDE 1" CONDUIT UNDERFLOOR TO RISE AT
BASE OF IT BACK BOARD IN IT ROOM.5. PROVIDE DUPLEX RECEPTACLE AND LOW VOLTAGE RECEPTACLE AT 60" AFF. COORDINATE
LOCATION WITH OWNER'S REPRESENTATIVE PRIOR TO ROUGH IN.6. PROVIDE J-BOX ABOVE CEILING WITH 3/4" CONDUIT TO CEILING ABOVE IT ROOM 205.
COORDINATE LOCATION IN IT ROOM WITH OWNER'S REPRESENTATIVE. PROVIDE J-BOXABOVE CEILING WITH 1"C & (6) #10 THHN CU (3 BLK + 3 WHITE) PLUS (2) #10 GND BACK TO 3PBREAKER IN PANEL LV-11. COORDINATE WITH FURNITURE PROVIDER.
ELECTRICAL KEYED NOTES #
MK K.5 L L.5
9
9.5
10
9.9
L.9
K L MK.5 L.5
9
10
9.5
L.9
9.9
K.1
LV-11
LV-11/ 1
LV-11/ 9
LV-11/ 10
LV-11/ 11
LV-11/ 2
LV-11/ 4
LV-11/ 3
LV-11/ 15
LV-11/ 5
LV-11/ 6
LV-11/ 8
LV-11/ 7
LV-11/ 18
LV-11/ 19
LV-11/ 20
LV-11/ 21
LV-11/ 27
LV-11/ 14
BREAK/TRAININGROOM
209
CONFERENCE202
OPEN OFFICE201
BATHROOM207
IT ROOM205
OFFICE204
OFFICE206
WOMEN211MEN
213
M LOCKER214
HALL208
JANITOR210
FC-6
FC-7
FC-8
LV-13
1
2
3
4
1
25
IT RACK
6
FC-10
FC-11
FC-12FC-9
ERV-1
BC-1
4 4
3
55
LV-11/ 16
LV-11/ 26,28
LV-11/ 29,31
4 4 4
LV-11/ 33
LV-11/ 35
LV-11/ 37
FC-3
EWH-2
EWH-1
LV-11/36,38,40
LV-11/30,32,34
LV-11/ 39
LV-11/ 41
LV-11/ 12
11
12
7,9 8,10
LV-11/ 17
LV-11/ 13
LV-11/ 42
LV-11/43,45,47
LV-11/44,46,48
6 6
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
2:5
6P
M
E3.03
OFFICE AREA POWER1/4" VIEW
1/4" = 1'-0"1
Electrical Power Plan Office Area 1/4" View
KEYPLAN
N
NO DATE REVISION
2 2019.06.18 ASI005 General Elect
3 2019.07.17 Misc Updates
4 2019.8.9 Misc Electrical
OSD
OS
OS
OSD
OS
OS
GF
CI
GF
CI
GF
CI
GF
CI
GFCI
GF
CI
GF
CI
DRIVER'SLOUNGE
302
RESTROOM303
CLOSET301
SHIPPING OFFICE300
A A
A
A A1 A A A1 A A
A
A1
A
LV-05/ 19
RESTROOM112
RESTROOM113
LV-06/ 19
A
A
LV-06/ 13
<unnamed>
EWH-3
EF-11
LV-06/ 1
LV-05/ 17
LV-05/ 14
LV-05/ 16
LV-05/ 15
LV-05/ 12
LV-05/ 13
LV-05/ 18
LV-05/ 2919382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
3:0
2P
M
E3.04
SHIPPING OFFICE & MIDPLANT BATHROOMS 1/ 4"VIEW
1/4" = 1'-0"1
Elect lighting Enlarged Shipping Office Area 1/4" View1/4" = 1'-0"
2Elect Lighting Enlarged Mid Plant Restrooms 1/4" View
1/4" = 1'-0"3
Mid Plant Restrooms Enlarged Power Plan1/4" = 1'-0"
4Shipping Office Enlarged Power Plan
NO DATE REVISION
3 2019.07.17 Misc Updates
LV-10
LV-10/ 1
LV-10/ 6
LV-10/ 7
LV-10/ 8
LV-19/ 1
LV-10/ 5
LV-10/ 9
DL-11 DL-12
DL-13
P05-EM P05 P05 P05 P05 P05-EM
P05 P05 P05 P05 P05 P05 P05
P05 P05-EM P05-EM P05 P05-EM P05 P05-EM
P05
EUH-2
LP-06/ 3
LP-06/ 4 LP-06/ 2
LV-10/ 2
LV-10/ 3
LV-10/ 4LV-10/
10,12,14
1
TF-2TF-4
BSSB-1B/ 18
SUP-1
LV-19
TS-11
MRP/ 1,3,5
LV-19/ 1
LV-19/ 11
LV-19/ 15LV-19/ 17
BEAD BLASTSOLVENTTANK
1 1
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
3:1
5P
M
E3.05
BALER ROOM 1/ 4" VIEW
1/4" = 1'-0"1
Baler Room Enlarged View
KEYPLAN
N
NO DATE REVISION
5 2019 Misc Electrical
LV-14
LV-15/ 8
LV-15/ 2
FP-1
LV-14/ 1
LV-14/ 2
P-06P-06
PO6-EMPO6-EM
LP-06/ 5LP-06/ 6
EUH-4EUH-5
EX
EX1 EX1
EX
LV-15/10,12,14
LV-14/ 3,5,7
2
JP-1
1
2
2
1
1
E7.04
LV-12
LV-12/ 3
LV-12/ 2
LV-12/ 1
P04 P04-EM
P04 P04-EM
P04-EM P04
LP-06/ 1
EUH-1
EX
EX1
WEF-01
ELECTRICAL KEYED NOTES #
1. ELECTRICAL CONTRACTOR TO WIRE FROM BSSB-1B TOJOCKEY PUMP CONTROLLER AND FROM CONTROLLER TOJOCKEY PUMP.
2. ELECTRICAL CONTRACTOR TO WIRE FROM SHELLBETTERCABINET TO FIRE PUMP CONTROLLER AND FROMCONTROLLER TO FIRE PUMP.
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
3:2
7P
M
E3.06
COMPRESSOR, BOILER& FIRE PUMP ROOMS1/4" VIEWS
1/4" = 1'-0"1
Compressor & Fire Pump Rooms Enlarged View1/4" = 1'-0"
2Boiler Room Enlarged View
KEYPLAN
N
NO DATE REVISION
3 2019.07.17 Misc Updates
OS
GFCI
GFCI
GF
CI
GFCI GFCI
A
A
2 2
LV-18/ 1
LV-18/ 2
LV-18
1
LV-18/ 3
H-01 H-02
LV-18/ 5
3 3
LV-18/ 4
ELECTRICAL KEYED NOTES #
1. ELECTRICAL CONTRACTOR TO INSTALL FULL BUILDINGGROUND INCLUDING BONDING TO WATER LINE, TYING TOREBAR IN FOOTING OR PAD, & 10' GROUND ROD.
2. CONTRACTOR TO SUPPLY 1X4 LENSED LED STRIP LIGHTS.COLLUMBIA CSL4-4035 4' LED STRIPLIGHT, 4,000 LUMENS,3500K 40W OR EQUAL AND APPROVED.
3. INSTALL DEDICATED GFCI RECEPTACLE FOR CONNECTIONTO HEATERS. HANG HEATERS ON FACTORY PROVIDED PLATEAND PLUG INTO GFCI RECEPTACLE.
ELECTRICAL GENERAL NOTES1. ELECTRICAL CONDUCTORS TO BE (4) 1/0 COPPER WITH #2
EGC FEEDING PANEL LV-18.2. ELECTRICAL CONTRACTOR TO GOUND PER NEC 250 WITH
SPECIFIC ATTENTION TO REQUIREMENTS FOR EGCCONNECTION AT THE BUILDING. SPECIFIC QUESTIONSREGARDING GROUNDING SHALL BE DIRECTED TO THE SITEELECTRICAL ENGINEER.
3. ELECTRICAL CONTRACTOR TO RUN DEDICATED 2" PVCCONDUIT IN UTILITY TRENCH FROM PANEL LV-01 WITH NEW60A BREAKER IN ELECTRICAL ROOM TO BACKFLOWPREVENTER CABINET ELECTRICAL PANEL LV-18. PANEL LV-18TO BE MOUNTED ON FREE STANDING UNISTRUT FRAMEAPPROXIMATELY 18" ADJACENT TO DOGHOUSE. ELECTRICALCONDUITS FROM PANEL LV-18 TO DOGHOUSE SHALL BEUNDERGROUND FROM THE PANEL TO THE DOGHOUSE, RISEOUTSIDE THE DOGHOUSE AND PENETRATE THE DOGHOUSEWALL AT APPROXIMATELY 12" ABOVE GRADE. ELECTRICALCONDUITS TO BE 3/4" MINIMUM.
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
3:3
0P
M
E3.07
ENLARGED BACKFLOWPREVENTOR BUILDING
1/2" = 1'-0"1
Backflow Preventer Cabnet Enlarged Electrical Lighting Plan
Notes:
Lighting 200 VA 100.00% 200 VA Total Est. Demand: 15 A
Power 1000 VA 100.00% 1000 VA Total Conn.: 15 A
Receptacle 900 VA 100.00% 900 VA Total Est. Demand: 5428 VA
Other 0 VA 0.00% 0 VA Total Conn. Load: 5428 VA
Heating 3600 VA 100.00% 3600 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 9 A 19 A 21 A
Total Load: 1060 VA 2099 VA 2379 VA
23 24
21 22
19 20
17 18
15 16
13 14
11 12
9 10
7 SIGNAGE 20 A 1 500 VA 8
5 H-01 Electric Heater 20 A 1 1947... 500 VA 1 20 A SIGNAGE 6
3 Receptacle 20 A 1 180 VA 1947... 1 20 A H-02 Electric Heater 4
1 Lighting 20 A 1 200 VA 360 VA 1 20 A Receptacle 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: NEMA 4 MCB Rating: 60 A
Mounting: Surface Wires: 4 Mains Rating: 60 A
Supply From: LV-01 Phases: 3 Mains Type: MCB
Location: Backflow Preventer Building Volts: 120/208 Wye A.I.C. Rating: 22 KAIC
Branch Panel: LV-18
BACKFLOW PREVENTER CABINET ELECTRICAL EQUIPMENT SCHEDULE
ID DESCRIPTIONSERVED
FROM VOLT PHASEMaximumCurrent BREAKER WIRE SIZE
DISCONNECT CONNECTED BY
NOTES
H-01 ELECTRIC HEATER LV-18 120 V 1 15 A 20 A 3/4"C,(2) #10 + GND 30 Elect Contractor
H-02 ELECTRIC HEATER LV-18 120 V 1 15 A 20 A 3/4"C,(2) #10 + GND 30 Elect Contractor
1/2" = 1'-0"2
Backflow Preventer Cabinet Enlarged Electrical Power Plan
NO DATE REVISION
4 2019.8.9 Misc Electrical
/1 E2.04
LV-12
BSSB-1B/ 18
EF-8
LV-03/ 10
TS-11
LV-19/ 1
LV-19/ 2
LV-19/ 3
LV-19/ 4
LV-19/ 5
LV-19/ 6LV-19/ 7LV-19/ 8
LV-19/ 10
MRP/ 7,9,11
LV-19/ 11LV-19/12,14,16
DRILL PRESS
BAND SAW
GRINDER
WE;LDING AREA
LV-19/ 15LV-19/ 17
BEAD BLASTSOLVENTTANK
LV-19/ 18,20
LV-19/ 19,21
1
1
1
1 1
1
22 2
2 2
2
2
2
2
2
3
3
WEF-01
LV-19/23,25,27
MRP/ 2,4,6
MRP/8,10,12
K-01
K-02
MRP
LV-19
MRP/ 1,3,5
4
4
ELECTRICAL KEYED NOTES #
1. SPECIAL EQUIPMENT RECEPTACLE. PROVIDE 4"X4" J-BOXWITH 3 HOTS AND 1 NEUTRAL REGARDLESS OF SPECIFICRECEPTACLE REQUIREMENT. COORDINATE RECEPTACLEWITH OWNER'S REPRESENTATIVE PRIOR TO ORDERING.
2. INSTALL RECEPTACLES IN 4"X4" J-BOX WITH 3/4" CONDUITBETWEEN. INSTALL AT 9" ABOVE WORK BENCH, OR ASINSTRUCTED BY OWNER'S REPRESENTATIVE . COORDINATEWITH OWNER'S REPRESENTATIVE PRIOR TO ROUGH-IN.
3. PROVIDE 100A FUSED DISCONNECT WITH FUSES. AMPERAGEOF FUSES TO BE DETERMINED BY OWNER. PROVIDE 1"CONDUIT BACK TO PANEL WITH (4) #3 THHN + #8 GND.
4. PROVIDE A 480V/3P/30 DISCONNECT MOUNTED AT 48' AFF.CORDINATE EXACT LOCATION WITH OWNER'SREPRESENTATIVE PRIOR TO ROUGH-IN.
ELECTRICAL GENERAL NOTES
1. INSTALL A DEDICATED GROUND FOR EACH CIRCUIT BACK TOELECTRICAL PANEL. CONDUIT IS NOT TO BE RELIED UPONFOR GROUND.
2. MINIMUM SIZE CONDUIT FOR POWER RUNS IN MAINTENANCEROOM SHALL BE 1" UNLESS SPECIFICALLY AUTHORIZED.
3. PROVIDE 12 SPARE 20A/1P BREAKERS IN PANEL LV-19.4. FOR ELECTRICAL LOADS ON SOUTH AND WEST WALLS OF
THE MAINTENANCE AREA THE CONTRACTOR SHALL ROUTECONDUITS FROM PANELS "MRP" AND "LV-19" UP AND ALONGTHE WALL IMMEDIATELY BENEATH THE PIPE RACK,DROPPING SURFACE DOWN THE WALL TO THE LOCATION OFTHE ELECTRICAL DEVICE. CONDUIT SHALL BE SUPPORTEDBY UNISTRUT. JUNCTION BOXES, DISCONNECTS ANDDEVICES SHALL BE RIGIDLY ATTACHED TO THE WALL TOWITHSTAND TYPICAL MAINTENANCE AREA USE. CONDUITSMAY BE RUN HORIZONTALLY ALONG WALL BETWEENADJACENT DEVICES. 480V AND 208V CONDUCTORS SHALLNOT BE INCORPORATED IN THE SAME CONDUIT.
5. FOR ELECTRICAL LOADS ON THE NORTH EAST AND NORTHAREAS OF THE MAINTENANCE AREA THE CONTRACTORSHALL ROUTE
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
3:3
9P
M
E3.08
ENLARGEDMAINTENANCE ROOMELECTRICAL POWERPLAN
1/4" = 1'-0"2
Maintenance Room Electrical Power Enlarged View
Notes:
Total Est. Demand: 21 A
Total Conn.: 20 A
MTR 1801 VA 125.00% 2252 VA Total Est. Demand: 7681 VA
Receptacle 5760 VA 100.00% 5760 VA Total Conn. Load: 7282 VA
Other 0 VA 0.00% 0 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 21 A 19 A 21 A
Total Load: 2487 VA 2309 VA 2487 VA
41 42
39 40
37 38
35 36
33 34
31 32
29 30
27 600 VA 28
25 600 VA 26
23
WEF-01 WELDING EXHAUST FAN 30 A 3
600 VA 24
21 0 VA 22
19Receptacle Grinder 20 A 2
180 VA 0 VA 20
17 Receptacle S Solvent Tank 20 A 1 180 VA 180 VA2 20 A Receptacle Drill Press
18
15 Receptacle S Bead Blast 20 A 1 180 VA 0 VA 16
13 0 VA 14
11 Receptacle ES 20 A 1 180 VA 0 VA
3 100 A Receptacle Welding Area
12
9 Lighting Maintenace Room 20 A 1 0 VA 180 VA 1 20 A Receptacle 10
7 Receptacles Work Bench NW 20 A 1 540 VA 360 VA 1 20 A Receptacles NE corner 8
5 Receptacles Work Bench NE corner 20 A 1 720 VA 720 VA 1 20 A Receptacles Work Bench NC 6
3 Receptacles Work Bench ES 20 A 1 720 VA 720 VA 1 20 A Receptacles EC 4
1 Receptacle S Wall 20 A 1 720 VA 180 VA 1 20 A Receptacle Band Saw 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure: 1 MCB Rating: 200 A
Mounting: Surface Wires: 4 Mains Rating: 200 A
Supply From: TS-11 Phases: 3 Mains Type: MLO
Location: PRODUCTION AREA 100 Volts: 120/208 Wye A.I.C. Rating: 22 KIA
Branch Panel: LV-19
NO DATE REVISION
6 2019.9.6 Schmitt Add Work #1
7 2019.10.7 Misc Electrical
MSB-1
SECTION A SECTION B SECTION C SECTION D SECTION E SECTION F SECTION G
4'-
0"
3' - 2 1/2"
2'-
8"
3' - 3"0' - 6"
1'-
0"
MSB TOP VIEWREAR
FRONT
BSSB-1A400A
DBL BKR600A
W.E.CORR 1
800A
W.E.CORR 2
800A
W. CONV400A
AIR COMP#1
400A(250A)
BSSB-1B800A
SPARE400A
EASTCONV
400A
AIR COMP#2
400A(250A)
BSSB-2A & B
800A
EVOL 1800A
3' - 9" 3' - 9" 3' - 9" 3' - 9" 3' - 9" 3' - 6" 4' - 0"
26' - 3"
7'-
6"
UTILMCC
800A
SPARE800A
D.E.CORR
800A RDC800A
1600A SPARE
SPARE400A
EVO L 2800A
EVOL-3FUTURE
BKR 1101
BKR 1101UTILITY TIE T1
BKR 1102
BKR 1103
BKR 1104
BKR 1105
BKR 1106
BKR 1107
BKR 1108
BKR 1109
BKR 1110
BKR 1111
BKR 1112
BKR 1113
BKR 2107
BKR 2108
BKR 2109
BKR 2110
BKR 2102
BKR 2103
BKR 2104
BKR 2105
BKR 2106
BKR 2101
BUS TIE
SPARE4000A
800A
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
3:4
0P
M
E4.01
ELECTRICAL MAINSWITCHBOARD (MSB)ELEVATIONS
NO DATE REVISION
7'-
71
/2"
4' - 0"
TS-01
TS-02
TS-03
TS-04
TS-08
100A
100A
100A
100A
100A
BSSB-1A
TS-10
DL-07
DL-08
DL-09
DL-10
100A
30A
30A
30A
30A
CS-02
CS-07
EF-3
EF-4
50A
50A
20A
20A
EF-520A
EF-620A
-
DL-11
DL-12
DL-13
30A
30A
30A
4' - 0"
EF-7
EF-8
TL-05
TL-0640A
30A
30A
40A
BSSB-1B
-
EF-230A
TF-120A
TF-220A
TF-320A
BFWP100A
TF-420A
TF-520A
TF-620A
CU-480A
CS-0650A
30A
BO-1 Boiler150A
MAU-4200A
DEA-1
400A Panel SP
WTP-130A
200A SPARE
SPARE30A
SPARE20A
400A SPARE
150A SPARE
800A SPARE
40A SPARE
20A SUP-1
20A SUP-2
7'-
71
/2"
4' - 0"
100A
100A
100A
100A
30A
BSSB-2A
30A
30A
30A
30A
30A
150A
200A
50A
20A
-
50A
50A
50A
4' - 0"
TL-02
TL-03
40A
40A
40A
BSSB-2B
-
TL-0140ATS-05
TS-06
TS-07
TS-09
DL-01
T-04DL-02
DL-03
DL-04
DL-05
DL-06
CS-03
CS-04
CS-05
MAU-2
MAU-1
MAU-3
TF-7
TF-8
EF-8
EF-10
20A
20A
20A
TL-04
EF-1100A
00A SPARE
50A SPARE
40A SPARE
30A SPARE
200A SPARE
40A SPARE
40A SPARE
19382
PRO
F E S S I ONAL ENG I NE
ER
E R EDE G I SR
ST
OF
ATEWASHINGTON
EXEA.DIVAD
T
FILE:
DRAWN BY:
CHECKED BY:
PROJ. NO:
DATE:
PACKAGING CORPORATION OF AMERICA
3003 KINGSGATE WAYRICHLAND, WA 99354
BOX MANUFACTURING PLANT
18810
COPYRIGHT 2019 BY INDUSTRIAL ENGINEERING, INC. ALL RIGHTS RESERVED.
INDUSTRIAL
ENGINEERING, INC
MECHANICAL-ELECTRICALCONSULTANTS
3210 23RD AVE SERIO RANCHO, NM 87124
DRAWING NO:
FEB 20, 2020
18810
DAE
DAE
ELECTRICAL PERMIT PLAN SETASI 002 2019.5.10
FEB 20, 2020
ELECTRICAL CONSTRUCTION PLAN SETREV 3 ASI 11 2019.11.4
FINAL AS-BUILT PLAN SETFEBRUARY 20, 2020
BIM
36
0://1
88
10
PC
AR
ich
land
WA
Bo
xP
lant/1
88
10
PC
AR
ich
lan
d-E
-V1
9.r
vt
2/2
1/2
020
12:0
3:4
3P
M
E4.02
ELECTRICALDISTRIBUTION MCC &BSSB ELEVATIONS
NO DATE REVISION
1 2019.5.10 Elect Serv & HVAC
2 2019.06.18 ASI005 General Elect
3 2019.07.17 Misc Updates