5
ME 280 Lab Final Project Begins March 26 th for sections 4 and 5, and March 30 th for sections 2 and 3 Due April 21 st for sections 4 and 5 and April 22 nd for sections 2 and 3

ME 280 Lab Final Project - egr.msu.edu … · ME 280 Lab Final Project Begins March 26th for sections 4 and 5, and March 30th for sections 2 and 3 Due April 21st for sections 4 and

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ME 280 Lab Final Project - egr.msu.edu … · ME 280 Lab Final Project Begins March 26th for sections 4 and 5, and March 30th for sections 2 and 3 Due April 21st for sections 4 and

ME 280 Lab Final Project

Begins March 26th for sections 4 and 5,

and March 30th for sections 2 and 3

Due April 21st for sections 4 and 5 and

April 22nd for sections 2 and 3

Page 2: ME 280 Lab Final Project - egr.msu.edu … · ME 280 Lab Final Project Begins March 26th for sections 4 and 5, and March 30th for sections 2 and 3 Due April 21st for sections 4 and

100 points total

15 points Return project

assembled and functioning

15 points Freehand sketches of all

components

30 points Project presentation

40 points Assembly modeling

Page 3: ME 280 Lab Final Project - egr.msu.edu … · ME 280 Lab Final Project Begins March 26th for sections 4 and 5, and March 30th for sections 2 and 3 Due April 21st for sections 4 and

Group Grading: Each member will grade

the other members contribution to the

project. You can lower a grade as much

as 25 points but you cannot raise it.

Page 4: ME 280 Lab Final Project - egr.msu.edu … · ME 280 Lab Final Project Begins March 26th for sections 4 and 5, and March 30th for sections 2 and 3 Due April 21st for sections 4 and

Each student will model their own

components and save them in their team

folder

Each group will have about 8 minutes to present their project

This is a formal presentation

DO NOT wait for a group member

Page 5: ME 280 Lab Final Project - egr.msu.edu … · ME 280 Lab Final Project Begins March 26th for sections 4 and 5, and March 30th for sections 2 and 3 Due April 21st for sections 4 and

You must turn in a complete, functioning assembly to receive the 15 points

Assembly constraints will be tested during the presentation

Each group will present at least one exploded view, with trace lines, of their project