9
MAY 28, 2013 Eric Winkler, Ph.D. PROJECT MANAGER, DEMAND RESOURCES Schedule 24 Amendment to Incorporate North American Energy Standards Board Standards for Wholesale Demand Response and Energy Efficiency

May 28, 2013

  • Upload
    kapono

  • View
    23

  • Download
    0

Embed Size (px)

DESCRIPTION

May 28, 2013. Eric Winkler, Ph.D. Project Manager, Demand Resources. Schedule 24 Amendment to Incorporate North American Energy Standards Board Standards for Wholesale Demand Response and Energy Efficiency. Overview. - PowerPoint PPT Presentation

Citation preview

Page 1: May 28, 2013

MAY 28, 2013

Eric Winkler, Ph.D.PROJECT MANAGER, DEMAND RESOURCES

Schedule 24 Amendment to Incorporate North American Energy Standards Board Standards for Wholesale Demand Response and Energy Efficiency

Page 2: May 28, 2013

Overview

• FERC Order No. 676-G adopting NAESB Standard for Wholesale Demand Response (Phase II) and Energy Efficiency (February 21, 2013)

• Summary of WEQ 015 and 021

• ISO-NE Compliance with Order

• Schedule for stakeholder review of Schedule 24 revision

2

Page 3: May 28, 2013

Order No. 676-G• FERC NOPR RM05-5-020 (April 19, 2012)

• Requires ISO/RTOs to revise their OATTs to incorporate by reference the NAESB Phase II Demand Response and Energy Efficiency Measurement and Verification (M&V) Standards

• M&V Standards became effective May 6, 2013

• OATT revisions incorporating M&V Standards can be included as part of an unrelated tariff filing– ISO-NE will be incorporating the M&V Standards in Schedule 24– Revision will be included in filing this summer– No waiver filing required

3

Page 4: May 28, 2013

Summary of Demand Response M&V Standards WEQ-015*IntroductionApplicabilityOverviewPerformance Evaluation Methodology

Definition of Terms (see NAESB WEQ Business Practice Standards WEQ-000,Abbreviations, Acronyms, and Definition of Terms)

Provision of Wholesale Electric Demand Response Energy ProductsApplicabilityPurpose015-1.0 General

Provision of Wholesale Electric Demand Response Capacity ProductsApplicabilityPurpose015-1.4 General

* Standards numbering is confusing

4

Page 5: May 28, 2013

Summary of Demand Response M&V WEQ-015 (cont)Provision of Wholesale Electric Demand Response Reserve ProductsApplicabilityPurpose015-1.8 General

Provision of Wholesale Electric Demand Response Regulation ProductsApplicabilityPurpose015-1.12 General

015-1.16 Maximum Base Load Evaluation015-1.19 Meter Before / Meter After015-1.22 Baseline Type-I (Interval Meter)015-1.25 Baseline Type-II (Non-Interval Meter)015-1.28 Metering Generator Output

5

Page 6: May 28, 2013

Summary of Energy Efficiency M&V WEQ-021

WEQ-000 Definition of Terms

021-1 Introduction (which was not incorporated by the Commission)

021-2 Applicability (which was not incorporated by the Commission)

021-3 Business Practice Standards

021-3.1 Energy Efficiency Resource Use Criteria in Wholesale Markets

021-3.2 General Measurement and Verification Plan Requirements

021-3.3 Post Installation M&V Report Components*

021-3.4 Performance Reporting

021-3.5 M&V Supporting Documents

021-3.6 M&V Methodologies

021-3.7 Energy Efficiency Baseline Conditions

021-3.8 Statistical Significance

021-3.9 Nominated Energy Efficiency Value Calculations / Demand Reduction Value Calculations

021-3.10 Measurement and Monitoring

021-3.11 Measurement Equipment Specification

021-3.12 Data Validation

6

Page 7: May 28, 2013

ISO Compliance With Order

• Completed review of compliance with both standards

• Revision to Schedule 24 of the OATT as follows:

Measurement and Verification of Wholesale Electricity Demand Response (WEQ-015, 2010 Annual Plan Items 4(a) and 4(b), March 21, 2011); and

Measurement and Verification of Wholesale Electricity Efficiency (WEQ-021 2010 Annual Plan Item 4(d), July 16, 2012; and excluding

021-1 through 021-1.1; and021-2 through 021-2.1.3.

7

Page 8: May 28, 2013

Schedule for Stakeholder Review

• May 28, 2013 TC Meeting – ISO-NE’s initial presentation of revision to Schedule 24 to comply with Order No. 676-G

• Next TC Meeting – ISO-NE’s second presentation of revision to Schedule 24, and TC action

• July 2013 PC Meeting – PC action on Schedule 24 revision

8

Page 9: May 28, 2013

Contact Information

Eric Winkler, Ph.D.Resource Analysis and AdministrationISO New EnglandEmail: [email protected]

9