59
May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC 20005-4128 Dear Cliff: Certified Mail Tracking Number: 70993400000905153054 Fax: (202) 842-4285 This is to inform you of the Postal Service's decision to consolidate all originating mail processing operations at the following Pacific Area location: Industry (CA) Processing & Distribution Center (P&DC) into Santa Ana (CA) P&DC After review, it was decided that this consolidation is in the best interest of the Postal Service. Implementation of this AMP is expected to be completed by April 2012. Enclosed, per your request is a copy of the completed study. The Postal Service must continually look to improve productivity and increase efficiency while maintaining excellent service. The decline in mail volume and revenues due to the economic downturn has only heightened the need for such improvements. These consolidations will allow us to accomplish this goal by making better use of excess space, staffing, and equipment, and to process mail more efficiently. We have redacted information from the study in accordance with our standard practice. We have also redacted mailer names, companies, and titles that were notified of the study. The mailer names, companies, and titles do not appear to be relevant to the Union's representational responsibilities. Volume numbers associated with service standard changes have also been redacted. This data is commercially sensitive and could be advantageous to our competitors. In order to protect market share, the Postal Service must protect the confidentiality of this information. It is projected that this consolidation will result in significant savings for the Postal Service. Some affected career employees may be reassigned to the gaining facility or to other vacant positions. Reassignments will be made in accordance with the collective bargaining agreement. If you have questions, or need additional information, please contact Barry Carpenter at (202) 268-6892. John W. Dockins Manager Contract Administration Enclosure (CA2011-425)

May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

May 18, 2011

Mr. Cliff GuffeyPresidentAmerican Postal Workers

Union (APWU), AFL-CIO1300 L Street, NWWashington, DC 20005-4128

Dear Cliff:

Certified Mail Tracking Number:70993400000905153054

Fax: (202) 842-4285

This is to inform you of the Postal Service's decision to consolidate all originating mail processing operationsat the following Pacific Area location:

• Industry (CA) Processing & Distribution Center (P&DC) into Santa Ana (CA) P&DC

After review, it was decided that this consolidation is in the best interest of the Postal Service.Implementation of this AMP is expected to be completed by April 2012. Enclosed, per your request is acopy of the completed study.

The Postal Service must continually look to improve productivity and increase efficiency while maintainingexcellent service. The decline in mail volume and revenues due to the economic downturn has onlyheightened the need for such improvements. These consolidations will allow us to accomplish this goal bymaking better use of excess space, staffing, and equipment, and to process mail more efficiently.

We have redacted information from the study in accordance with our standard practice. We have alsoredacted mailer names, companies, and titles that were notified of the study. The mailer names, companies,and titles do not appear to be relevant to the Union's representational responsibilities. Volume numbersassociated with service standard changes have also been redacted. This data is commercially sensitive andcould be advantageous to our competitors. In order to protect market share, the Postal Service must protectthe confidentiality of this information.

It is projected that this consolidation will result in significant savings for the Postal Service. Some affectedcareer employees may be reassigned to the gaining facility or to other vacant positions. Reassignments willbe made in accordance with the collective bargaining agreement.

If you have questions, or need additional information, please contact Barry Carpenter at(202) 268-6892.

John W. DockinsManagerContract Administration

Enclosure

(CA2011-425)

Page 2: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Type of Distribution to Consolidate: OriginatingFacility Name & Type: Industry P&DC

Street Address: 15421 E Gale AveCity: City of Industry

State: CA50 Facility ZIP Code:! 91715

District: Santa AnaArea:, Pacific

Finance Number:Current 3D ZIP Code(s): 917,918

Miles to Gaining Facility:, 34.2EXFC office:: Yes

Plant Manager:! Steven M. WorleySenior Plant Manager: James N. Clausen

District Manager: j Gerard K. AhemFacility Type after AMP:' P&DC/F

Facility Name & Type:: Santa Ana P&DCStreet Address:! 3101 W Sunflower Ave

City:1 Santa AnaState:l CA

50 Facility ZIP Code:' 92799District: i Santa Ana

Area:; PacificFinance Number:

Current 3D ZIP Code(s):: 926-928EXFC office: I Yes

Plant Manager: i James N. ClausenSenior Plant Manager: ' James N. Clausen

District Manager: i Gerard K. Ahern

MODS/BPI Office

5/1212011 22:12

Start of Study:: 09/24/10Date Range of Data: Jul-01-2009 : Jun-30-2010

Processing Days per Year: 310Bargaining Unit Hours per Year: 1,742

EAS Hours per Year: 1,819Date of HQ memo, DAR Factors/Cost of Borrowing! New

Facility Start-up Costs Update t- M_a_Y_7_'2_0_1_0 -1

Date & Time this workbook was last saved:

Area Vice President:! Drew T. AlipertoVice President, Network Operations:! David E. Williams

Area AMP Coordinator:1 Steven M. MummyHQ AMP Coordinator: i Barbara Brewington

Package Page 1 AMP Data Entry Page

Page 3: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Approval Signaturesluls-d ~Iil 2010

losing Facility Name and Type: !r.dI.;$~P&OC-,-. _S~~~; 15421 L~Ave

City: C!l1E1ftOdU~ .-Slaw: CA

F~i!lty ZIP Code; '!i ii 1:'::""-,---Flo.arn:;eN

Current 30 lJP Code($l:

Type. of Oisttril.>l.:tion to Conscllde'te: Or"i.!l131Ir>g=';;;L--_

Gaining Facflitf Harr.e and Type: Sanla Ana P&QCStreet Aol'll'e$S: 31(}1 W Son/II!wef Ave

CJty: santii.M3StlW/; c:r .. -'

F.cltity ZIP CoOt: \l2?iZilfrlnancQ HUlTl~.r J...••....-. . ' __._. _.__.

CulTltm 30 ZiP Co4e{iif}: ~lf6:\+.1aJ~6-9089rts.. M'.:.;·u~I _

W:!fit~@:~~A1%'r::~t:;:rniJ!!"~\Y'{':fri'r"\Vi/~{f\~~~':;;:;;i~*"M1''ffl'~j;'j.tbwiM;,,+.+;;;¥v,:~~~¢t{~.:~;:nrrlll<I'I:'J;*iali~~;4Y:;ij;:US'( ..J4""...Mt~'AIIl',i#%:j/A,altq*M1?;m'$~ j;.... g;"',l!iI!J~_.~. nt.Hill: ~,w~}

AC1QlOWl~',F -r ',..:; lITAl'l:UTY· I~!hat ; am~'or~W IUppOItiIlg lhB 1tJt~ d lIII otIlcilIl POSlBI~~. ,n.:Jud~ 'lrtneial J1IP'.YIS llIld ll1QM ~a!I"Q to~ wtlh~~It. Of~ etrttls~ 1M1lVItIl:men! and_'&lurecl~. as~ 116 al!,~ lG $l:!f"tIca 10 OUt CUSIOmelS.

tQ§1i'lir~;

Post:nwIstGi' or Piant M41nager.

Steven M. Worleyn'.~i.1tM4 ~~;:;""----

Senior Plant Manager:Janres N. Clausen

--- ---P;;;;;;;; Ni.m.·----

District Mana~r:

Gerard K. Ahem

~.EM;H,!rr;

Plant Manager:James N. Clausen

Senior Plant (vtaMger:

James N. Clausen

Y"J-I/

1f!fllJ£1:fCi, .. "'~'w=.""_""',""=_"'.""""'""'''''.''''''''__,_''''''"'''''''' ~'"'''' ,.,,,..~,==~__--"""~-==""""--

Area Vicft Prc:ddent:

Drew T. AliperlD-------

Senior Vke President Operations:

Steven J. FortePTii~t;1 N. '"

I

~TJf '/CO<1lm&nls· _

-_.--,~----------------------------

Package Page 2

Page 4: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Miles to Gaining Facility: 34.2

Executive SummaryLast Saved: April 18, 2011

Losing Facility Name and Type: Industry P&DC

Street Address: 15421 E Gale Ave

City, State: City of Industry, CA

Current 3D ZIP Code(s): 917,918

Type of Distribution to Consolidate: Originating

Gaining Facility Name and Type: Santa Ana P&DC

Current 3D ZIP Code(s): 926-928

$1,321,651

Savings/CostsMail Processing Craft Workhour Savings = $1,632,220 from Worl<hour Costs - PropoSfJd

Non-MP CrafllEAS + Shared LDCs Workhour SaVings (less MainVTrans) = ($0) from Other Curr vs Prop------PCES/EAS Supervisory Workhour SaVings = $357,225 from OtherCurrvs Prop

Transportation SaVings = ($980,290) from Transportation (HCR and PVSj

Maintenance Savings = $312,496 from Maintenance

Space Savings = $0 from Space Evaluation and Other Costs

Total Annual SaVings =

Total One-Time Costs = $202,968 from Space Evaluation and Other Costs

$1,118,683Total First Year Savings =-=.....................=

Staffing Positions

from Staffing - Craft21Craft Position Loss =---.::..;---

from Staffing - PCESIEAS(4)PCES/EAS Position Loss =__--'-.t....-__

Volume

Total FHP to be Transferred (Average Daily Volume) = 542,507 from Worl<hour Costs - Current

Current FHP at Gaining Facility (Average Daily Volume) = 5,076,570 from Worl<hour Costs - Current

Losing Facility Cancellation Volume (Average Daily Volume) = 361,096 (= Total TPH / Operating Days)

Service

Service Standard ImpactsbyADV

First-Class Mail®Priority Mail®

Package Services

Periodicals

Standard MailCode to destination 3-dlg:t ZIP Code volume IS not

available

rev 1011512009

Package Page 3 AMP Executive Summary

Page 5: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Summary NarrativeLast Saved: May 12, 2011

Losing Facility Name and Type: Industry P&DCCurrent 3D ZIP Code(s): 917, 918

Type of Distribution to Consolidate: Originating

Gaining Facility Name and Type: Santa Ana P&DCCurrent 3D ZIP Code(s): 926-928

Background:The Santa Ana Performance Cluster with assistance from the Pacific Area office has completed an AreaMail Processing (AMP) study to determine the feasibility of relocating the Industry P&DC outgoing letterand flat mail volumes processing to the Santa Ana, CA P&DC. (Priority, First Class Packages, Expressand Registry mail will remain) The proposal encompasses mail processing for ZIP Code ranges 917 and918.

Currently, the Industry P&DC is an owned facility that processes all outgoing and incoming mail in the917-918 ZIP range. Outgoing mail is processed Monday through Friday at the Industry P&DC and isprocessed at the Santa Ana P&DC on Saturday. Incoming mail is processed at the Industry P&DCMonday through Saturday. With the approved AMP, Industry's 917-918 outgoing letter and flat mailprocessing will transfer to the Santa Ana P&DC. Along with processing operations, the Industry facilityhouses administrative offices, a Business Mail Entry Unit (BMEU) and a retail unit. The Industry facility isapproximately 34 miles from the Santa Ana P&DC. The total FHP (average daily volume) to betransferred to Santa Ana is 542,507 pieces.

Financial Summary:Annual baseline data came from July 1, 2009 - June 30, 2010. Financial savings proposed for thisconsolidation of originating operations are:

Total Annual SavingsTotal First Year Savings

$1,321,651$ 1,118,683

Customer Service Considerations:The hours of business mail acceptance within the Industry P&DC will remain the same. Retail hours atthe Industry P&DC will remain the same. The originating 2-day service commitment for FCM to SanDiego, CA (919-921) would be upgraded to overnight. Santa Ana will adjust their operating plan tosupport current Industry service standards.

Transportation Changes:The transportation impact for the proposed AMP adds an additional $980,290 per year in HCRtransportation costs. There are no PVS changes proposed.

HCR 91713: Changed Frequency from K67 to K7 to Trips 17/18, 35-38 and 43/44; Changed theDeparture/Arrival times to Trips 43/44 and 53/54.

HCR 91732: Added fourteen (14) two round trips from the Santa Ana P&DC to Various Associate Officesto the Santa Ana P&DC (First Class Letters and Flats to meet CET 19:00).

The Santa Ana P&DC transportation impact for the AMP adds $93,329 per year in transportation costs.

HCR 926L2: Added three (3) round trips and eliminated ONT THS enroute stop to Trip 103. Fourteenadditional 1000 CU vans with liftgates are required on HCR 91732 to support the AMP.

Package Page 4 AMP Summary Narrative

Page 6: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Summary Narrative (continued)Summary Narrative Page 2

917 offices that do make the 1900 CET:

HCR 917MT: Trips 42 & 104; San Dimas and La VerneHCR 91730: Trips 40 & 44; Alhambra and Monterey ParkHCR 91733: Trip 34; La PuenteHCR 91735: Trip 20; GlendoraHCR 91737: Trips 30 & 32; PomonaHCR 91738: Trip 12; Diamond Bar RanchHCR 91739: Trips 14, 16 & 18; Rancho CucamongaHCR 91740: Trip 26; Chino HillsHCR 91762: Trips 32; Upland

Staffing Impacts:Current projections from the AMP study indicate a net reduction of 21 craft employees. There will be anet reduction of 5 EAS employees under current on rolls staffing at the Industry P&DC and 6 less EASpositions than currently authorized at the Santa Ana P&DC, with a net of 16 positions less thanauthorized complement, and 4 positions over current on rolls complement.

, Craft =FTR+PTR+PTF +Casuals

2 Crall=F1 + F" at Losing; F1 only at Gaining

As a matter of policy, the Postal Service follows the Worker Adjustment and Retraining Notification Act's('WARN'') notification requirements when the number of employees experiencing an employment losswithin the meaning of WARN would trigger WARN's requirements. Some or all of the impactedemployees described above may not experience an employment loss within the meaning of WARN dueto transfers or reassignments.

rev 06/1012009

Package Page 5 AMP Summary Narrative

Page 7: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Summary Narrative (continued)Summary Narrative Page 3

Equipment Relocation and Maintenance Impacts:Originating letter mail is cancelled in Industry on five (5) advanced facer canceller systems (AFCS).Approximately 24% of the cancellation volume was the Industry 910 mail that moved to Santa Clarita, CAP&OC on July 25, 2009. The Ventilation and Filtration System and BOS systems at Industry could berelocated from Industry to support the new AFCSs in Santa Ana. In addition, Industry has five (5) OIOSS,thirty-seven (37) OBCS and three (3) AFSM machines. The barcode sorting equipment and AFSMswould remain to process incoming volumes to the carrier and delivery point levels.

Space Impacts:The total interior footage of the Industry P&OC is 459,542 sq. ft. With the approved AMP, the expectedgain of 16,756 sq. ft. will be utilized for Phase I OBCS replacements with Phase 2-6 OBCSs.

Other Concurrent Initiatives:The Long Beach AMP of Originating volumes to the Santa Ana P&OC was implemented on September 9,2009. AFCS 200 deployments are scheduled for June of 2011 and Santa Ana is in the preliminarystages of several material handling requests involving the removal of Robotics and addition of tray linesortation and loose mail systems (LMS) upgrades which will be considered when setting the AMPimplementation timeline.

Package Page 6 AMP Summary Narrative

Page 8: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

24 Hour ClockLast Saved: April 18, 2011

Losing Facility Name and Type: Industry P&DCCurrent 3D ZIP Code(s): 917,918

Type of Distribution to Consolidate: Originating

Gaining Facility Name and Type: Santa Ana P&DCCurrent 3D ZIP Code(s): 926-928

24 Hour Indicator Re rt 80% 100% 100"'<' 100% Millions 100% 100% 86.9%

§~8

~§ ~§ ~§ ~§N~ ~~ ~~ ~~ !~

i;' li'w~~ 1~ ~ . ~~'g j'

~jLL

~j d §i ~i.!'l ~~I!! ~

24 Hcur Indicator Re ort 80% 100% 100% 100% MilUons 100% 100% 86.9%

(j)

~§ ~§ ~§ h hI h u~§ .1=

.ie' li'~ li'~ a ~~ H H ni ji

] , ] . ]. 8 ' Iii H £•LL

~I §j ~I H oj! a.! ! ~ ~s H~ ~

Package Page 7 AMP 24 Hour Clock

Page 9: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Lo

sing

Fa

cilityN

ame

an

dT

ype

:Industry

P&

DC

Cu

rren

t3D

ZlP

Co

de

(s):9

17

,91

8

Mile

sto

Ga

inin

gF

acility:

34

,2

Ga

inin

gF

acility

Nam

ea

nd

Typ

e:

Santa

Ana

P&

DC

Cu

rren

t3DZ

IPC

od

e(s):

92

6-9

28

MAPLastS

avedA

pril16,2011

Package

Page

8A

MP

MA

P

Page 10: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Service

Stan

dard

Imp

actsLast

Saved:

April

18,2011

Lo

sing

Facility:

_In-.,;d-.,;.u:..-st~ry~P_&..;;...D...:;.C_

Lo

singFacili~3DZIPCode(s):~9~1~7,~9~1~8~~~~~~~~~~~~~~~~~~~~~~~~~

GainingFacili~3DZIPCode(s):~9=2~6-~9=2~8~~~~~~~~~~~~~~~~~~~~~~~~~

Based

onreport

preparedby

Netw

orkIntegration

Su

pp

ort

dated:2/3/2011

Ind

ustry,

CA

917-918O

rigin

ating

AM

PR

epo

rtF

inal

UP

GR

AD

E

DO

WN

GR

AD

E

TO

TA

L

NE

TU

P+

NO

CH

NG

VO

LUM

ET

OT

AL

0.0%

0.8%

0.7%

*-

Periodicaland

Standard

mailorigin

3-digitZIPC~de

todestination

3-digitZIPC

odevolum

eis

notavailable[

Selected

summ

aryfields

aretransferred

tothe

Executive

Su

mm

ary

._--_

.-----

AL

LC

LAS

SE

S

Total

%C

hangeA

ll%

Change

All

%C

hangeA

ll%

Change

All

%C

hangeA

ll%

Change

~

UP

GR

AD

E6

2.5%0

0.0%6

0.1%6

0.1%10

0.1%6

0.1%4

0.1%32

0.1%

DO

WN

GR

AD

E0

0.0%0

0.0%0

0.0%0

0.0%4

0.1%4

0.1%4

0.1%12

0.0%

TO

TA

L6

2.5%0

0.0%6

0.1%6

0.1%14

0.2%10

0.1%8

0.1%4

40.1%

NE

T6

2.5%0

0.0%6

0.1%6

0.1%6

0.1%2

0.0%0

0.0%20

0.1%

Package

Page

9A

MP

Service

Standard

Imp

acts

Page 11: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Stakeholders Notification(WorkBook Tab Notification - 1)

Losing Facility: P&DC

st~.I1~ newsbreakiVf;thod

Last Saved: April 18, 2011

NPMHU

APWU{TlUe-fUne)!')

Stakeholder Notification Page 1

AMP Event: Start of

10106/2010

10106/2010

10106/2010

10/0612010

Dianne Feinstein(Cont.act PerSCl1,

Barbara Boxer--------------(CO!'t8Ct Pf)fSon)

Grace Napolitanoe:ontaet Person)

Judy Chu

David Dreier

Adam Schiff

David Perez

SenatortTite/Offlce)

Senator

Congress(TitiefCfflce\

Congress

Congress:'1"'it:B/Cft,Cr.':)

CongressfTitiSi(;tfice;

Mayor, City of Industry CA

10106/2010[);-Jte

10106/2010-,-'"",~,-----,~,~-~ '"~--_._-,-~,---

10106/2010

.!_01_06_/2_0_1~ _U;;k

10106/2010

10106/2010

10/06/2010

Package Page 10

10106/2010-----------------C\2k

10/06/2010Date

10106/2010

10106/2010

10106/2010

AMP Stakeholders Notification

Page 12: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Stakeholder Notification Page 2

AMP Event: Start of Study

Stakeholders Notification (continued)(WorkBook Tab Notification· 1)

Losing Facility: Industry P&DC.

Package Page 11

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/0612010

10/06/2010

10/06/2010

10/06/2010

10/0612010

10/06/2010Date

10/0612010

10/06/2010

10/0612010• ~,_ M __·~~__~_'_'~ _

10/06/2010

10/0612010

10/06/2010----~--

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/06/2010~__~_uu~~__u~ ~,_~_. _

10/06/2010

10/06/2010

._10_/06_/2_0~ ... _D·3ie

10/06/2010

10/06/2010

10/06/2010

rev 07/16/2008

AMP Stakeholders Notification

Page 13: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Stakeholder Notification Page 3

AMP Event: Start of

10/06/2010

10/06/2010

10/0612010

10/0612010

[.'8\,e;

Dat0

10/06/2010

Date

Date

10/06/2010

10/0612010

10/06/2010

10/0612010

10/06/2010

10/06/2010

10/0612010

10/06/2010

D3te

10/0612010

Date

1010612010

10/06/2010

Date

10/06/2010

10/0612010

10106/2010

10/0612010

10/06/2010

10106/2010

10/06/2010

.!QIi16/2010 -_.__.--_.-Dote

10/06/2010

Stakeholders Notification (continued)(WorkBook Tab Notification - 1)

Losing Facility: ~::_:<::<==«::«'.<_<:._=:::••:= .•• _.~.•

Package Page 12

rev 07/16/2008

AMP Stakeholders Notification

Page 14: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Stakeholder Notification Page 4

AMP Event: Start of

Stakeholders Notification (continued)(WorkBook Tab Notification - 1)

losing Facility:ln~dlJ~tl)'F'e.[)c::.

Package Page 13

10/06/~20_1_0__CD!+'

10/06/2010

10/06/2010Date

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/06/2010Date

10/06/2010

10/06/2010

_10_/06_/2_01_0__. _

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/06/2010------_._-,----------

10/06/2010

10/06/2010

10/06/2010---_._-"- -- ."------

10/06/2010

10/06/2010

10/06/2010

rev 07/1612008

AMP Stakeholders Notification

Page 15: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Stakeholder Notification Page 5

AMP Event: Start of

Stakeholders Notification (continued)(WorkBook Tab Notification .. 1)

Losing Facility:

Package Page 14

10/06/2010C)ale

10/0612010

10/06/2010

10/0612010

10/06/2010

10�06�20,.:..10"-- _D&F:

10/06/2010

10/06/2010Date

10/0612010Date

10/06/2010Dc<1e

10/06/2010Dote

10/0612010Date

10/06/2010Date

10/06/2010Date

10/06/2010Date

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/06/2:0:..1.;..:0'-- _Dall:::

~_06_1_20_1_0 , _D8t3

10/06/2010

10/0612010

10/06/201008te

10/06/2010

10/06/2010

10/06/2010

rev 07/1612008

AMP Stakeholders Notification

Page 16: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

1010612010

10/0612010

1010612010

10/06/2010

10106/2010

10106/2010

10106/2010-~----~--,~-~-,-

1010612010

10106/2010

10/0612010

1010612010

10106/2010

10106/2010

10/06/2010

10/06/2010~"~----------

1010612010

1010612010

1010612010, _D3te

10106/2010 _rime

Dste

1010612010Dote

10/0612010

10106/2010

1010612010--~---,-"',"--_., ,---~~~--~-

10/0612010-::';-,;t<-:---~-----~.--~~---,,- •.~-------

------~-----DaH

10/0612010

Stakeholder Notification Page 6

AMP Event: Start of Study

Stakeholders Notification (continued)(WorkBook Tab Notification - 1)

Losing Facility: .. '_:_~." ~ .

Package Page 15

rev 07/1612008

AMP Stakeholders Notification

Page 17: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Stakeholder Notification Page 7

AMP Event: Start of

10/06/2010

Oat':.'

10/06/2010

10/06/2010

10/06/.::.20~1:..:0,-- _G8te

Date10/06/2010

Date

10/06/2010

10/06/2010Date

10/06/2010

10/06/2010

10/06/2010

0318

Date

Date

10/06/2010

Date

10/06/2010

10106/2010

10106/2010

Date

10/06/2010

10/06/2010

D3tC

10/06/2010

10/06/2010

10/06/2010

10/0612010

10/06/2010

[)'.'lte

10/0612010

10106/2010

10/06/2010

10/06/2010

10/06/2010

10/0612010

10/06/2010

Stakeholders Notification (continued)(WorkBook Tab Notification -1)

Losing Facility: Industry

Package Page 16

rev 07/1612008

AMP Stakeholders Notification

Page 18: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

(WorkBook Tab Notification - 1)

Losing Facility:

Package Page 17

Stakeholders Notification (continued)Stakeholder Notification Page 8

AMP Event: Start of Study

10/06/2010

10/06/2010

10/0612010

10/06/2010-----~---,--~

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/06/2010Dste

10/06/2010

10/0612010---------"~-"'--------

10/06/2010

rev 07/1612008

AMP Stakeholders Notification

Page 19: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Stakeholders Notification(WorkBook Tab Notification - 2)

Losing Facility: P&DC

Package Page 18

Last Saved: April 18, 2011 Stakeholder Notification Page 1

AMP Event: Start of

10/06/2010:...- _G,,,te

10106/2010Date

10106/2010

10/0612010

10/06/2010

10106/2010

10/0612010

10/06/2010D::ne

10/0612010, _Date

10/06/2010D8te

10/06/2010Date

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10106/2010

10/06/2010----_.•" at;;:

10/06/2010

10/06/2010---,~---------_._--

10/06/2010

10/06/2010

10/0612010Date

10/06/2010

10/06/2010

10/06/2010

AMP Stakeholders Notification

Page 20: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Stakeholder Notification Page 2

AMP Event: Start of Study

Stakeholders Notification (continued)(WorkBook Tab Notification - 2)

Losing Facility: Industry P&DC

Package Page 19

10/06/2010

10106/2010.----------[;[1te

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10106/2010

10/0612010----,-----,,"

10/06/2010 _Date

10106/2010'Date--------~

10/0612010

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10106/2010

10/0612010D2\t:.·

10/06/2010

10/06/2010

10/06/2010

1.qJ06/2010

10106/2010

10/06/2010

AMP Stakeholders Notification

Page 21: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Stakeholder Notification Page 3

AMP Event: Start of

Stakeholders Notification (continued)(WorkBook Tab Notification - 2)

Losing Facility:

Package Page 20

10/06/2010------"----~~----

10106/2010

10/0612010

10/06/2010

10/06/2010

10/06/2010Date

10106/2010

10/06/2010

10/0612010

10/06/2010

10/06/2010Date

_10_1_06_/~J.9 _Date

10/06/2010Date

10/0612010

10/06/2010

10/06/2010D3te

10/06/2010

10/06/2010

10/06/2010

10/06/2010

_10_/06__/2_01_0_. _D~H<;

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/06/2010Date

10/06/2010

AMP Stakeholders Notification

Page 22: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Stakeholder Notification Page 4

AMP Event: Start of Study

Stakeholders Notification (continued)(WorkBook Tab Notification - 2)

Losing Facility: Industry P&DC

Package Page 21

10/06/2010";:;t<-

10/0612010---~--

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/06/2010DBte

10/0612010D8te

.1_0_/06_1_20_10 _U3\l:

10/0612010

10/06/2010

10/06/2010Date

10/0612010

10/06/2010

10/06/2010

10/06/2010

10/06/2010Date

10/06/2010

10/06/2010[>al'''<'

10/06/2010

10/06/2010::...... _i'?'L'

10/06/2010__~~__.__-'__~ __ ~_·uuu_,,_,_,_~~~_~

:"-"'O11<'!

10/06/2010

10/06/2010

10/06/2010

10/06/2010Cafe

10/06/2010Date

10/06/2010

rev 07/1612008

AMP Stakeholders Notification

Page 23: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Stakeholder Notification Page 5

AMP Event: Start of

Stakeholders Notification (continued)(WorkBook Tab Notification - 2)

Losing Facility: ..... '.CC.C.'·L .'.;c ..c....

Package Page 22

10/06/2010Date -----------

10/06/2010

10/0612010Date

10106/2.=..01.;..:0'--- _DGle

10/06/2010DGte

10/0612010Dote

10/06/2010

10/06/2010

10/0612010

10/06/2010D:~te

10/0612010Date

10/06/2010Date

10/06/2010Date

10/0612010

10/06/2010

10/06/2010Date

10/06/2010

10/06/2010

10/0612010

10/06/2010

10/06/2010

10/06/2010

10/0612010-~.'~-----"-_._--~-~--------

10/06/2010Ddte

10/06/2010

10/06/2010

10/06/2010OBte

10/06/2010Date

10/06/2010Ome

AMP Stakeholders Notification

Page 24: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Stakeholder Notification Page 6

AMP Event: Start of

Stakeholders Notification (continued)(WorkBook Tab Notification - 2)

Losing Facility:

Package Page 23

10/06/2010-_.__._---"--~---"---

10/06/2010

10/06/2010

10/06/2010---"~----~------'"~--

10/06/2010

10/06/2010L)B-k

10/06/2010

10/06/2010

10/06/2010~--"--,,--_.~."-_._------

'··,H'

10/06/2010

10/06/2010--"-"---_._.._-

10/06/2010

10/06/2010[)3tC

10/06/2010

10/06/2010

10/0612010

10/06/2010

10/06/2010

10/06/2010

10/0612010

10/06/2010

10/06/2010_._~---,..,"",_..__._---'-'- . -'-'-'-"-"'--'~-'~-~-'-

10/06/2010--,--~~,-~----

10/06/2010--~---"---~-----'-

',!,...,

10/06/2010

10/06/2010

10/06/2010Gaie

10/06/2010

AMP Stakeholders Notification

Page 25: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Stakeholder Notification Page 7

AMP Event: Start of

Stakeholders Notification (continued)(WorkBook Tab Notification - 2)

Losing Facility:

Package Page 24

10/06/201,_0 _D8tB

10/06/,::.20::.,1:.:0'-- _Ddt,-"

10/0612010

10/06/2010-------------

10/06/2010

10/06/2010Date

10/06/2010[)O't0

10/06/2010

10/06/2010Date

10/06/2010

10/06/2010

10/06/2010,--------------Date

10/06/2010Date

10/06/2010Date

10/06/2010

10/06/2010Date

10/06/2010Date

10/06/2010

10/0612010

10/06/2010Date

10/06/2010

10/06/2010

10/06/2010~~-~~,-----~------------'

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/06/2010

AMP Stakeholders Notification

Page 26: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Date

Date

10/0612010

10/06/2010

10/06/2010

10/06/2010~u_, uu , u .••_u_~~ ~_

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/0612010

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/0612010

10106/2010

Date

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/06/2010

10/0612010

10/06/2010

10/06/2010---,----------,'~~-------~

Stakeholder Notification Page 8

AMP Event: Start of

Stakeholders Notification (continued)(WorkBook Tab Notification - 2)

losing Facility:

Package Page 25 AMP Stakeholders Notification

Page 27: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Lo

sing

Fa

cility:P&O

C

Wo

rkho

urC

osts

·C

urre

nt

Last

Sav

ed:

April

18,2011

Ga

inin

gF

acility:

Santa

Ana

P&OC

Date

Ran

ge

of

Data

__

.__~1109_.~~~?_~~10

.__

~__

,,~~

l.osin

gC

urre

ntW

orkh

ou

rR

ateby

l.DC

lbC

Fu

nctio

n1

U>C

Fu

nctio

n4

11$46.55

41$0.00

12$38.03

42$0.00

13$42.19

43$0.00

14$38.51

44$0.00

15$31.81

4S$0.00

16$0.00

46$0.00

17$42.08

47$0.00

18$39.14

48$0.00

Ga

inin

gC

urre

ntW

orkh

ou

rRate

byLO

C

U>C

Fu

nctio

n1

Fu

nctio

n4

lbC

11$44.29

41$0.00

12$43.93

42$0.00

13$42.35

43$0.00

14$41.61

44$0.00

15$45.35

4S$O~OO

16$0.00

48$0.00

17$40.83

47$0.00

18$43.24

48$0.00

(1)

(2)(1

)(14)

Cu

rren

tC

urrentC

urrentO

peration%

Mo

ved

toA

nnualA

nnualN

um

be

rsG

ain

ing

Wo

rkho

ur

Co

stsW

orkh

ou

rC

osts

009100.0%

$31,560I

009$41

010100.0%

$5

74

85

I010

$948,489012

100.0%$8,921

I012

$24,955015

1oo.0"A.$281.469

I015

$1,157,850016

100.0%$48,421

I468

$0017

100.0%$577,700

I017

$310,488018

100.0%$

18

51

I017du

020100.0%

$3

94

62

I020

$688,287021

100.0%$261

I021

$0022

100.0%$0

I022

$0030

100.0%$837,040

I030

$2,679,638040

100.0%$172,321

I040

$209,282060

100.0%$207,478

I060

$469,622066

100.0%$181

I066

$445067

100.0%$0

I067

$274070

100.0%$25,384

I070

$14,336116

100.0%$8

I110

$87,669120

100.0%$81,024

I120

$460,932124

100.0%$656,725

I124

$499,757140

11.4%$2,134,142

I140

$4,564,334141

100.0%$196,984

I141

$263,734142

100.0%$1,016

I142

$1,854209

100.0%$388,915

I628

$1,122,904210

20.8%$2,217

249I

210$1,430,036

22919.5%

$2,580252I

229$2,272,842

23032.0%

$550,197I

230$556,481

261100.0%

$3

80

52

I261

$1,679271

100.0%$244

512I

271$1,254,455

281100.0%

$431,749I

281$607,774

291100.0%

$126I

291$1,506

292100.0%

$228I

291du332

100.0%$475

I142du

468100.0%

$0

I468du

55410.4%

$436,383I

554891

100.0%$150,185

I891

892100.0%

$68,261I

892961

100.0%$866

I961

962100.0%

$43,745I

961du

Pack

age

Pag

e2

6A

MP

Wo

rkh

ou

rC

osts

-C

urren

t

Page 28: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Pa

ckag

eP

ag

e2

7A

MP

Wo

rkho

ur

Co

sts-

Cu

rren

t

Page 29: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Pa

ckag

eP

ag

e2

8A

MP

Wo

rkho

ur

Costs

-C

urrent

Page 30: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

(1)C

urre

nt

Op

eration

Nu

mb

ers

(2)

%M

OV

<ldto

Ga

inin

g

(3)

Cu

rren

tA

nn

uo

lFH

PV

olum

e

(4)C

urre

nt

An

nu

alT

PH

or

NA

TP

HV

olu

me

(5)C

urren

tA

nnualW

ork

ho

urs

(6)C

urre

nt

Productivity

ItT

PH

or

NA

TP

HI

(7)C

urrentA

nn

ual

Wo

rkh

ou

rC

os

ts

(8)

(9)

(10

)(1

1)

(12)(13)

(14)

Cu

rren

t0/0

Mo

ved

toC

urren

tC

urre

nt

Cu

rrent

Cu

rren

tC

urrentO

peratio

nL

osin

gA

nn

uo

lFH

PA

nn

ual

TP

Ho

rA

nnualP

rod

uctivity

An

nu

alN

um

be

rsV

olu

me

NA

TP

HV

olu

me

Wo

rkho

urs

(TP

Ho

rN

AT

PH

IW

ork

ho

ur

Co

sts

I

I-----t

II

II

II

I

Pa

ckag

eP

ag

e29

AM

PW

orkh

ou

rC

osts

-C

urre

nt

Page 31: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

(1)(2)

(3)(4)

(5)(6)

(7)C

urren

t%

Mo

ved

toC

urren

tC

urren

tC

urren

tC

urren

tC

urren

tO

peratio

nG

ainin

gA

nn

ua

lF

HP

An

nu

al

TP

Ho

rA

nnualP

rod

uctivity

Annual

Num

bersV

olu

me

NA

TP

HV

olu

me

Wo

rkh

ou

rs/T

PH

or

NA

TP

H)

Wo

rkh

ou

rC

os

ts

Pa

ckag

eP

ag

e30

(8)(9)

(10)(11)

(12)(13)

(14)C

urren

t%

Mo

ved

toC

urren

tC

urren

tC

urren

tC

urre

nt

Cu

rrent

Op

eration

Lo

sing

An

nu

alF

HP

An

nu

alT

PH

or

Annual

Pro

du

ctivityA

nn

ua

lN

um

be

rsV

olu

me

NA

TP

HV

olu

me

Wo

rkho

urs

/TP

Ho

rNA

TP

HI

Wo

rkho

ur

Co

sts

AM

PW

orkh

ou

rC

osts-

Cu

rren

t

Page 32: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

(1)(2

)(3

)(4

)(5

)(6

)(7

)C

UrT

en

t%

Mo

ved

toC

urrentC

urre

nt

Cu

rren

tC

urre

nt

Current

Operation

AnnualFH

PA

nn

ua

lT

PH

or

Annual

Pro

du

ctivityA

nn

ua

lN

um

be

rsG

ain

ing

Vo

lum

eN

ATP

HV

olume

Wo

rkho

urs

(TPH

orN

ATP

HI

Wo

rkho

urC

osts

I..,m

m4

75

21

42

53

298881159O

$1

25

10

62

9

To

ta

ls'

16

81

7727~

°°

No

Ca

lc$0

47

52

14

25

3298881

15

90

$1

25

10

62

9723.982\

2.916H

nR

iQU

Q

",:,m!!:,:,:,1

10

12

03

97

92

58

6542

39011

02

28

63

12,529

$43,329978

I

(8)

(9)

(10)(1

1)

(12

)(1

3)

(14

)

Cu

rren

t%

Mo

ved

toC

urre

nt

Current

Cu

rren

tC

urrentC

urrentO

perationL

osin

gA

nnualFHP

An

nu

al

TP

Ho

rA

nnualP

rod

uctivity

Annual

Nu

mb

ers

Vo

lum

eN

ATP

HV

olume

Workhours.

(TPH

or

NA

TPH

IW

orkh

ou

rC

osts

591,230,7151,601,798,426

517,2003,097

$21,526,981

°°

°N

oC

alc

$0

To

tals

591230,7151,601

798,4265

17

20

03,097

$21,526,981848,063,048

2,765,400,625797,908

3,466$34,151,985

134,442,883137,125,784

38,1853,591

$1,632,4361

57

37

36

64

64

50

43

24

83

51

35

32

93

33

28

$5

73

11

40

2

To

talF

HP

tob

eT

ran

sferre

d(A

vera

ge

Da

llyV

olu

me

):

542,507(This

number

iscanied

forward

toA

MP

Wol1<sheetE

xecutiveS

um

ma

ry)

Cu

rren

tF

HP

atG

ain

ing

Fa

cility

(Ave

rag

eD

ally

Vo

lum

e)

:5,076,570

(Thisnum

beris

carriedfO

lWard

toA

MP

WorksheetE

xecutiveS

umm

ary)

Co

mb

in&

<!

Cu

rren

tWo

rkh

ou

rA

nn

ua

lW

ork

ho

ur

Co

sts

:$100,641,380

(Thisnum

beris

carriedforw

ardto

the

bottomofA

MP

Worksheet

WorkhourC

osfs-ProposecJ)

Pack

age

Pag

e31

759,407,9932,077,012,679

816,0802,545

$34,037,610

°°

°N

oC

alc

$0

759,407,9932,077,012,679

816,0802,545

$34,037,6101,781,089,749

4,876,728,7621,521,890

3,204$64,971,334

134,442,883137,125,784

38,1853,591

$1,632,4362,674,940,625

7,090,867,2252,376,156

2,984$100,641,380

AM

PW

orkh

ou

rC

osts-

Current

Page 33: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Lo

sing

Facility:

P&

DC

Workhour

Costs

-Proposed

last

Saved:

Ap

nl1

8,2

01

1

Gain

ing

Facility:

San

taA

na

P&

DC

00

90

10

01

20150160170

18

02

00210

22

0300

40

0600660

67

0701

16

12

01

24

1401411

42

20

92102292302612712812912

92

33

24

68

5548918

92

961

Package

Page

32

(6)

Pro

po

sed

An

nu

al

Wor1<hour

Co

sts$0$

0$

0$0

$0$0$0$0

$0

$0

$0

$0

$0

$0$0

$0

$0

$0

$0

$1,890,850$

0$0

$0

$1,756,061$2,077,103

$374,134$

0$

0$0

$0

$0$0

$0

$390,999$

0$0

$0

00

90

10

01

20

15

46

80

17

01

7d

u0

20

0210

22

03

00

40

06

00660

67

07

01

10

12

01

24

14

01411

42

62

82

10

22

92

30

261271281291

291du142du4

68

du

5548918

92

961

(12)P

rop

ose

dA

nn

ua

lW

orkh

ou

rC

osts$

0$1,004,266

$33,611$1,381,885

$0$872,824

$0

$726,577$

25

3$0

$3,359,355$373,952$515,124

$621$

27

4$23,951$87,669

$539,549$1,136,974$4,666,376

$339,254$3,027

$1,346,854$1,711,899$2,749,832

$723,391$37,885

$1,487,107$724,737

$1,506$

0$0$

0$557,814

$1,267,060$118,479$199,948

AM

PW

orkhourC

osts-

Proposed

Page 34: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Package

Page

33A

MP

Workhour

Costs

-P

roposed

Page 35: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

oooooooooooooooooooooooooooooooo

No

Calc

No

Calc

No

Calc

No

Calc

No

Ca

lcN

oC

alcN

oC

alc

No

Ca

lcN

oC

alcN

oC

alc

No

Ca

lcN

oC

alc

No

Calc

No

Ca

lcN

oC

alc

No

Ca

lcN

oC

alc

No

Ca

lcN

oC

alc

No

Ca

lcN

oC

alc

No

Ca

lcN

oC

alcN

oC

alc

No

Calc

No

Calc

No

Calc

No

Calc

No

Calc

No

Calc

No

Calc

No

Ca

lc

ooooooooooooooooo

No

Calc

No

Calc

No

Calc

No

Calc

No

Calc

No

Calc

No

Calc

No

Calc

No

Calc

No

Calc

No

Calc

No

Calc

No

Calc

No

Calc

No

Calc

No

Calc

No

Calc

Package

Pa

ge

34A

MP

Workhour

Costs

-P

roposed

Page 36: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

(1)(2)

(3)

(4)(5

)(6

)P

roposedP

roposedP

roposedP

roposedP

roposedP

roposedO

perationA

nnualFH

PA

nnualTPHor

Annual

Productivity

Annual

Num

bersV

olume

NA

TPH

Volum

eW

orkhoursITP

Hor

NA

TPH

IW

orkhourCosts

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

alc0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Calc

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

alc0

Ne

Ca

le0

Ne

Ca

le0

No

Calc

0N

eC

ale

0N

oC

alc0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

No

Calc

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

Package

Page

35

(7)(8

)(9

)(10)

(11)(12)

Proposed

Proposed

Proposed

Proposed

Proposed

Proposed

Operation

AnnualFH

PA

nnualTPHor

Annual

Productivity

Annual

Num

bersV

olume

NA

TPH

Volum

eW

orkhoursITP

Hor

NA

TPH

IW

orkhourC

osts0

Ne

Ca

le0

Ne

Calc

0N

eC

ale

0N

oC

alc0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

No

Calc

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

alc0

Ne

Ca

le0

Ne

Calc

0N

eC

ale

0N

eC

alc0

Ne

Ca

le0

Ne

Calc

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

alc0

Ne

Calc

0N

eC

alc0

No

Calc

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

alc0

Ne

Calc

0N

eC

alc0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le

AM

PW

orkh

ou

rCosts

-P

roposed

Page 37: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

(1)(2)

(3)(4)

(5)(6)

Pro

po

sed

Pro

po

sed

Pro

po

sed

Pro

po

sed

Pro

po

sed

Pro

po

sed

Op

era

tion

An

nu

alF

HP

An

nu

alT

PH

or

An

nu

al

Pro

du

ctivityA

nn

ua

lN

um

be

rsV

olu

me

NA

TP

HV

olu

me

Wo

rkho

urs

(TP

Ho

rN

AT

PH

IW

orkh

ou

rC

osts

0N

oC

alc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Ca

lc0

No

Ca

lc0

No

Ca

lc0

No

Ca

lc0

No

Calc

0N

oC

alc

0N

oC

alc

0N

oC

alc0

No

Ca

lc0

No

Calc

0N

oC

alc

0N

oC

alc0

No

Calc

0N

oC

alc

0N

oC

alc0

No

Calc

0N

oC

alc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Ca

lc0

No

Calc

0N

oC

alc

0N

oC

alc

0N

oC

alc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

Package

Pa

ge

36

(7)(8)

(9)(10)

(11)(12)

Pro

po

sed

Pro

po

sed

Pro

po

sed

Pro

po

sed

Pro

po

sed

Pro

po

sed

Op

era

tion

An

nu

alF

HP

An

nu

alT

PH

or

An

nu

al

Pro

du

ctivityA

nn

ua

lN

um

be

rsV

olu

me

NA

TP

HV

olu

me

Wo

rkho

urs

ITP

Ho

rN

AT

PH

IW

orkh

ou

rC

osts

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc0

No

Calc

0N

oC

alc

AM

PW

orkhourC

osts-

Proposed

Page 38: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

(1)

(2)(3)

(4)(5)

(6)P

roposedP

roposedP

roposedP

roposedP

roposedP

roposedO

perationA

nnuelFH

PA

nnualTPHor

Annual

Productivity

Annual

Num

bersV

olume

NA

TPH

Volum

eW

orkhoursITP

Hor

NA

TPH

IW

orkhourCosts

0N

eC

ale

aN

eC

alca

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

lea

Ne

Ca

lea

Ne

Ca

le0

Ne

Ca

le0

Ne

Calc

0N

eC

ale

0N

eC

alc0

Ne

Ca

le0

Ne

Ca

lea

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Ca

le0

Ne

Calc

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

aN

eC

ale

aN

eC

ale

0N

eC

ale

0N

eC

ale

aN

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

aN

eC

ale

.'

92,223,223154,758

596$6,489,147

00

0N

eC

alc

$00

92,223,223154,758

596$6,489,147

2.111~.",H

'723,321

2,915"~n

""A?~

..

isiiiJiJiJii!iiiiNi"y@,

933,026,7012,203,551

360878,080

2,510$37,283,386

Package

Page

37

(7)(8)

(9)(1

0)

(11)(12)

Proposed

Proposed

Proposed

Proposed

Proposed

Proposed

Operation

AnnualFH

PA

nnualTPHor

Annual

Productivity

Annual

Num

bersV

olume

NA

TPH

Volum

eW

orkhoursITP

Hor

NA

TPH

IW

orkhourC

osts0

Ne

Calc

0N

eC

ale

0N

eC

alc0

Ne

Calc

0N

eC

ale

0N

eC

ale

aN

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

aN

eC

ale

aN

eC

ale

aN

eC

ale

0N

oC

alc0

Ne

Ca

lea

No

Calc

aN

eC

ale

0N

eC

ale

0N

eC

ale

aN

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

aN

eC

ale

aN

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

alc0

No

Calc

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

ale

0N

eC

alc0

Ne

Ca

le0

Ne

Calc

0N

eC

alc0

Ne

Ca

le759,407,993

1,984,789,456624,601

3,178$25,992,053

•0

00

No

Ca

lc$0

759,407,9931,984,7$11,456

624,6013,178

$25,992,053848,063,048

2,765,400,625797,908

3,466$34,151,985

134,442,883137,125,784

38,1763,592

$1,632,0351,741,913,924

4,887315,8651,460,685

3,346$61,776,074

AM

PW

orkh

ou

rC

osts-

Proposed

Page 39: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

11

2I

0I

0I

95I

No

Ca

lcl$3,879

(1)

(2)(3)

(4)(5)

(6)P

ropos&<

!P

ropos&<

!P

ropos&<!

Pro

po

sed

Propos&

<!

Pro

po

sed

Op

era

tion

An

nu

al

FH

PA

nn

ua

lT

PH

or

An

nu

al

Pro

du

ctivityA

nn

ua

lN

um

be

rsV

olu

me

NA

TP

HV

olu

me

Wo

rkho

urs

ITP

Ho

rN

AT

PH

)W

orkh

ou

rC

osts

(7)(8)

(9)(10)

(11)(12)

Propos&

<!

Pro

po

sed

Propos&

<!P

rop

ose

dP

ropos&<

!P

rop

ose

dO

pe

ratio

nA

nn

ua

lFH

PA

nn

ua

lT

PH

or

An

nu

al

Pro

du

ctivityA

nn

ua

lN

um

be

rsV

olu

me

NA

TP

HV

olu

me

Wo

rkho

urs

ITP

Ho

rN

AT

PH

IW

orkh

ou

rC

osts

141I

0I

0I

1,151I

No

Ca

lcl$

50

,56

51

85

I0

I0

I130

IN

oC

alcl$5,308

46

8I

0I

0I

11,151)1N

oC

alcl($

46

99

55

54

I0

I0

I11,142)1

No

Calcl

($4

93

79

Totals

oo

oN

oC

alc$0

Totals

oo

11252N

oC

alc($

50

,30

0'

Co

mb

ine

dC

urre

ntA

nn

ua

lWo

rkho

urC

ost:

$100,641,380(T

hisnum

berbroughtfO

lWard

fromW

orkhourC

osts-

Cu

rren

t)

Pro

po

sed

An

nu

alW

orkh

ou

rC

ost:

$9

9,0

09

,16

0(T

otalofC

olumns

6and

12on

thispage)

Min

imu

mF

un

ction

1W

orkh

ou

rS

avin

gs:

$5

4,4

93

(This

number

representsproposed

workhour

savingsw

ithn

oproductivity

improvem

ent,applied

tooperations

atth

egaining

facmty)

Fu

nctio

n1

Wo

rkho

ur

Sa

ving

s:$

1,6

32

,22

0(T

hisnum

berequals

thedifference

inthe

currentand

proposedw

orkhourcost,

aboveand

iscarried

forward

tothe

Executive

Su

mm

ary)

Package

Page

38

2,674,940,6252,674,940,625o

0.0%

7,090,867,2257,090,867,225o

0.0%

AM

PW

orkh

ou

rC

osts-

Proposed

Page 40: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

IO

ther

Wo

rkho

ur

Mo

veA

nalysis

ILast

Saved:

April

18,2011

LosingF

acilityIndustry

P&

DC

Pa

ckag

eP

age39

Gaining

Facility:

Santa

An

aP

&D

CD

ale

Range

ofD

ata:07101/09

to~06=/3",0,-,/l",0,---

_

AM

PO

the

rC

urr

vsP

rop

Page 41: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

III

mill m lliili",I

illTIT

~H+t-tI ttt ~ lll1

IIII

tilmtt~ 11m TI ttIT ]I

ffiiI -

III

-+++-+++- -+-+-+-t--1--+-t-+-+- -+-++-+-+-l-+-++-+-+-l ~g,a.

-H-++++++-H-H-++++++-H-+++-H fa.

Page 42: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Ops-R

ooucif1\l1

14

72

1$

56

00

66

4

Totals

Ops-lncreasif1\l

0$0

Ops-S

taylng1

59

15

8$

66

80

91

6A

IOperations

2738

80

$1

22

81

58

1

Op

s-Ro

ou

clng

0$

0

Totals

Ops-Increasing

17

71

01

$8

06

92

17

Ops-S

taylng2

05

51

9$

88

93

21

0A

IO

pe

fallo

ns

38

26

20

$1

69

62

,42

7

Oos-R

od1

05

31

4$

51

41

41

0C

ps-In

c0

$0O

ps-Sta

15

91

58

$6

68

09

16

AIIO

p.264

47

3$

11

82

23

26

Oo.-R

ed0

$0

()ns-Inc1

82

10

3$

82

97

11

6O

ns-Sta v

20

55

19

$8

89

32

10

AIiO

n.3

87

62

2$

17

19

03

26

$8

40

77

5(l

$(I

$110.855$

$9

.69

3$123.7U

$8

»$137592

14

44

70

$(I

10

.44

5

$386,460

$587

$764,746H

74

)64

$2

03

,90

5

$166.258$

19

0,1

80

$<,002,110

Pro

po

sed

Annual

'Mll1dlourC

ost($)

Pack.age

Pa

ge

41A

MP

Oth

er

Cu

rrvs

Pro

p

Page 43: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

nnm

tmtI"I

I.

I

1m.

::

:I

ill

Page 44: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Op

s-Re

du

clng

63

76

6$3

431532

Totals

Ops-lne<

easlng0

$0O

ps-S

layin

g2

00

74

$1

06

52

99

AI

Operations

83

84

0$

45

16

83

1

Op

s-Re

du

cing

0$

0

Totals

Ops-lne<

easing6

92

36

$3

76

6856

Op

s-Sta

ytng

35

35

4$

19

75

79

9A

IO

pe

ratio

ns

1045

90

$5

74

46

55

On

s-Re

d5

71

37

$3

07

43

07

OD..lnc

0$

0O

os-Sta

20

07

4$

10

85

29

9A

llOns

77

21

1$4

15

96

06

Oos-Red

0$

0o;;..ln

c6

92

36

$3

76

88

56

On

S-S

tav

35

35

4$

19

75

79

9A

lIOD

s104

590$

5744

65

5

Cu

rren

tWorkhours

forLD

Cs

Co

mm

on

to&

Shared

between

Su

pv

&C

raft

Ops..R

educlng

ITo

tals

$0

Totals

Ops-Ine<

easlng$

0O

p$

-Sta

ying

$217065

AI

Op

era

tlon

s$217

065

IG

roupedS

ubtotalsfor

Transportation,

Maintenance,

Supervision

&F

lowA

djustments,

alongw

ithF

acilityand

Com

binedS

umm

ariesI

....

Su

bM

tfOf

Ttl.'l.,...pvs

Tab

Of*

61

7,6

7S

l,76

4(3

11 _$01

0""

765,7eo,3<4)

$979,193

SU

be

etfo

rT

ram

-PY

ST

ab

cun

en

tAnnuoI

WorltIlourC

ost($)$79,822$

0$

0$3,025,068

$4

99

0$3,109,879

QP

86

17

,67

9,7

64

(3

1l_

$1

54

9\

0""

765,7eo

(34)$3,025,068

Op

lS1

7,6

79

.76

4(1

)_

$0I0

""765.766

(34)$979

193

Pro

po

sed

An

nu

al

~rCoot($)

$79,822$0

$0

$3.025,068$

49

90

$3,109.879

0p

06

17

.6

79

,7

64

(3

1)_

$1

54

9\

Cp

o765.

766(34)

$3,025,068

Pa

ckag

eP

age43

AM

PO

the

rC

urr

vsP

rop

Page 45: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

$559.383

$5.744.655

$0

$6

73

39

2$0

$123.729$0

$1.406.724

$1.350.250$0

$3.545.035

$2.227.050

$62

97

11

6

$108.084

$166.258 $0

$0

$0

$12.712.366

Proposed

Annual

W>

rkhourCost

($)

Proposed

Annual

lM>rldlour

Co

st($)

Su

pe

rvisory

Maintenance

$0$0

$0 $0

$0

$0

$0

$144.506

$370.279

$4.159.606

$1.132.029$

0$

0

$559.383

$5.744.655

$0

$166.258$0

$3.545.035$0

$123.729$0

$1,350.250

$108.08412.484.467

$673392

$1.406.724$2,227.050

$80

69

21

7

C\lr

ren

t_W

orllh

ou

rC

ost

($)

CurrentA

nn

ulII

W_

Co

ol

($)

Maintenance

SupervisorS

umrnal'Y

$0

$0

$0

$0

$0$0

$0

$144.506

$370.279

4.516.831

$1.224,605

IS

umm

aryby

Sub-G

roupC

urrent-C

ombined

SpecialA

dju

stme

nts

Proposed

+S

pecialAd

justm

en

tsC

hangeC

om

bin

ed

--

Co

mb

ine

d-

Annual\/IIortm

ours.A

nnulllDoIIl~

An

nu

alW

orkh<>u<>A

nnualO

otIarsA

nnuailNono:hoors

Annual

DoII!fS

Wo

fkho

ur

Ch

an

ge

-AtCh

an

ge

DoIara

Ch

allj}$

Pe

rcen

tCh

an

ge

'Oth

er

Craft'ep..

(no

te')

50

65

3$

24

48

56

50

$0

50

65

3$

24

48

56

50

0.0'%$

0T

,MtS

pOttatioo

Ops.(note:

2)9

63

30

$4

00

5810

°$

09

63

30

$4

00

5,8

10

0SO

M.tn~

op

$(not&

3)5

13

83

0$

22

95

64

41

0$

0509

425$

22

72

50

85

(4,405)-0.9'10

$2313561S

upormo,y

Cp

s1

88

43

0$

10

26

14

86

0$

01

81

80

1$

99

04

26

16

62

9'

-3.5'%$357.2251

Su

pW

Cra

ftJoIntO

pt.

(no

te4)

60

43

1$347225}°

$06

04

3($

34

72

25

)0

DO

%SO

Total

85

52

86

$3

93

25

07

70

$0

844251

$387

36

49

6(I'

034~1.3%

S588

581)·1

,5%$0

$22789&

$2

31

52

04

6$22.924.147

$23,152.046498.097

5,002

493.0954

98

09

7

p"'-"-lP

roposedA

nn

uo

l-..

Wo

rIlho

urC

ost

($)

Pro

po

sedI

IM

OO

SP

rop

oM

dA

nn

ulII

Pro

p<

>M

d-

Operation

Wo

rldlo

uts

W_

rC

_N

umber

($)

To

t.IAd

'

Notes:

1)Ie.

.O

p&

go

ing

to'T

ftlfll&-.f'V

S'&

'Maint~an<:.·

Ta

bs

2)g

oin

gto

Tra

m..f'V

Sta

b

3)g

oin

gto

Mairrtenanoe

tab

4)leu

Ope.

go

ing

toM

aintenance'Tabs-

o$

0T

ota

lAd

'a

$0

Pa

ckag

eP

ag

e4

4A

MP

Other

CU

ffvsP

rop

Page 46: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Staffing - ManagementLast Saved: April 18. 2011

Losing Facility: _In.-,;d;..:.u..:.s.:.;.try::...-P_&_D.....C =-:-__:-:---:-----:

Data Extraction Date: 10/08/10 Finance Number:_

Management Positions(1 ) (2) (3) (4) (5) (6)

Position Title LevelCurrent Au1h Current Proposed

DifferenceLine Staffing On-Rolls Staffing

1 PLANT MANAGER (3) PCES-01 1 1 1 0

2 MGR MAINTENANCE EA8-24 1 1 1 0

3 MGR IN-PLANT SUPPORT EA8-23 1 1 1 0

4 MGR DISTRIBUTION OPERATIONS EAS-22 2 2 1 -1

5 MGR MAINTENANCE OPERATIONS EAS-21 2 2 2 0

6 OPERATIONS INDUSTRIAL ENGINEER (FI EAS-21 2 1 1 0

7 MGR DISTRIBUTION OPERATIONS EAS-20 2 2 2 0

8 OPERATIONS SUPPORT SPECIALIST EAS-20 1 1 1 0

9 MGR MAINTENANCE OPERATIONS SUPPT EA8-19 1 1 1 0

10 MGR FIELD MAINTENANCE OPERATIONS EAS-18 0 1 1 0

11 MGR TRANSPORTATION/NETWORKS EAS-18 1 1 1 0

12 OPERATIONS SUPPORT SPECIALIST EA8-18 1 1 1 0

13 EMPLOYEE IN MODIFIED ASSIGNT (ES) EAS-17 1 1 1 0

14 OPERATIONS SUPPORT SPECIALIST EA8-17 1 1 1 0

15 SUPV DISTRIBUTION OPERATIONS EA8-17 27 23 20 -3

16 SUPV MAINTENANCE OPERATIONS EA8-17 8 6 5 -1

17 NETWORKS SPECIALIST EA8-16 2 2 2 0

18 SECRETARY (FLD) EAS-12 1 1 1 0

1920212223242526272829303132333435363738394041424344

Package Page 45 AMP Staffing - PCES/EAS

Page 47: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

4546474849505152535455565758596061626364656667686970717273747576777879

Totals 55 49 44 (5)

Retirement Eligibles:

Package Page 46

15 Position LOSS:I...__5_......

AMP Staffing - PCES/EAS

Page 48: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Gaining Facility: Santa Ana P&DCData Extraction Date: 10/08/10 Finance Number:_

Management Positions(12) (13) (14) (15) (16) (17)

Position Title LevelCurrent Auth Current Proposed

DifferenceLine Staffing On-Rolls Staffing

1 SR PLANT MANAGER (1) PCES-01 1 1 1 0

2 MGR IN-PLANT SUPPORT EAS-25 1 1 1 0

3 SR MGR DISTRIBUTION OPERATIONS EAS-25 1 1 1 0

4 MGR DISTRIBUTION OPERATIONS EA8-24 3 2 2 0

5 MGR MAINTENANCE (LEAD) EAS-24 1 0 1 1

6 MGR DISTRIBUTION OPERATIONS EA8-22 2 2 2 0

7 OPERATIONS INDUSTRIAL ENGINEER (FI EA8-22 3 2 3 1

8 MGR MAINTENANCE OPERATIONS EA8-21 2 2 2 0

9 MGR DISTRIBUTION OPERATIONS EAS-20 1 1 1 0

10 MGR MAlNT ENGINEERING SUPPORT EA8-20 1 0 1 1

11 MGR TRANSPORTATION/NETWORKS EAS-20 1 1 1 0

12 OPERATIONS SUPPORT SPECIALIST EAS-20 1 1 1 0

13 MAINTENANCE ENGINEERING SPECIALIST EAS-19 2 0 2 2

14 MGR FIELD MAINT OPRNS (LEAD) EAS-19 1 0 1 1

15 MGR MAINTENANCE OPERATIONS SUPPT EA8-19 1 1 1 0

16 MGR FIELD MAINTENANCE OPERATIONS EA8-18 0 1 0 -1

17 OPERATIONS SUPPORT SPECIALIST EA8-18 1 1 1 0

18 OPERATIONS SUPPORT SPECIALIST EA8-17 6 5 5 0

19 SUPV DISTRIBUTION OPERATIONS EA8-17 36 31 32 1

20 SUPV MAINTENANCE OPERATIONS EAS-17 10 7 10 3

21 SUPV TRANSPORTATION OPERATIONS EAS-17 3 3 3 0

22 NETWORKS SPECIALIST EAS-16 2 2 2 0

23 SECRETARY (FLD) EA8-12 1 1 1 0

242526272829303132333435363738394041424344454647

Package Page 47 AMP Staffing - PCES/EAS

Page 49: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

PosItion Loss:I_-,1:..;;.9,-)_22Retirement Eligibles:

484950515253545556575859606162636465666768

7172737475

176177

7879

Total 81 66 75 9.. ..

Total PCES/EAS Position Loss:======14=:)=== (This number carried forward to theExecutive Summary)

Package Page 48 AMP Staffing - PCES/EAS

Page 50: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Staffin

g-

Craft

La

stS

ave

d:

April

18.2011

Lo

sing

Fa

cility:Industry

P&

DC

Fin

an

ceN

um

be

r:_

Data

Extra

ction

Date:

10/08/10

(1)(2)

(3)(4)

(5)(6)

Craft

Positions

Casuals

PartT

ime

FullT

ime

Total

Total

Difference

On-R

ollsO

n-Rolls

On-R

ollsO

n-Rolls

Proposed

Function

1-

Clerk

101

345356

322{34}

Function

4-

Clerk

00

0F

unction1

-M

ailHandler

024

188212

164(48)

Function

4-

MailH

andler0

00

Fu

nctio

n1

&4

Su

b-T

ota

l10

25533

568486

{lP\

Function

3A-

Vehicle

Service

30

1114

14F

unction3

8-

Maintenance

00

129129

129F

unctions67-69

-Lm

td/RehablW

C0

99

9O

therF

unctions0

07

77

To

tal

1325

689727

645{S2:

Re

tirem

en

tE

ligib

les:

250

??iii'?!??«

<%

':!!!~/_ff

Ga

inin

gF

acility:

Santa

Ana

P&

DC

Fin

an

ceN

um

be

r:

Data

Extra

ction

Date:

10/08/10

(7)(8)

(9)(1

0)

(11

)(12)

Craft

Positions

Casuals

PartT

ime

FullT

ime

Total

Total

Difference

On-R

ollsO

n-Rolls

On-R

ollsO

n-Rolls

Proposed

Function

1-

Clerk

06

427433

466F

unction1

-M

ailHandler

043

255298

326F

un

ction

1S

ub

-To

tal

049

682731

792F

unction3A

-V

ehicleS

ervice0

732

3939

Function

38

-M

aintenance0

0158

158158

Functions

67-69-

Lmtd/R

ehablWC

010

1010

Other

Functions

00

66

6

To

tal

056

888944

1,00561

Re

tirem

en

tE

ligib

les:

283

To

talC

raftP

ositio

nL

oss:

21(This

numbercarried

forward

tothe

Executive

Su

mm

ary)

(13)N

otes:

rev11!()512008

Package

Page

49A

MP

Staffing

-C

raft

Page 51: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Main

tenan

ceL

ast

Saved:

April

18,2011

Lo

sing

Fa

cility:Industry

P&

DC

Date

Ra

ng

eo

fD

ata:Ju

l-01

-20

09

:Jun-30-2010

Ga

inin

gF

acility:

Santa

Ana

P&

DC

Wo

rkho

ur

Activity

(1)

Cu

rren

tC

ost

(2)P

rop

ose

dC

ost

(3)

Diffe

ren

ceW

orkh

ou

rActivity

(4)

Cu

rren

tCo

st

(5)

Pro

po

sed

Co

st

(6)

Diffe

ren

ce

Ma

ilPro

cessin

g$

5,600,664$

5,141,410$

ILD

C36

Ma

ilPro

cessin

g$

8,069,217$

8,297,116$

Eq

uip

me

nt

Eq

uip

me

nt

Bu

ildin

gE

qu

ipm

en

t$

1,669,246$

1,669,246$

ILD

C37

Bu

ildin

gE

qu

ipm

en

t$

1,406,724$

1,406,724$

Bu

ildin

gS

ervice

s$

2,463,909$

2,463,909$

Bu

ildin

gS

ervice

s$

2,227,050$

2,227,050$

(Cus/odialC

leaning)(C

ustodialCleaning)

Ma

inte

na

nce

$679,431

$679,431

$M

ain

ten

an

ce$

673,392$

673,392$

Op

era

tion

sS

up

po

rtO

pe

ratio

ns

Su

pp

ort

---

58,723$

58,723$

108,084$

108,084$

$10,471,973

$10,012,719

$$

12,484,467$

12,712,366$

Otlle

rRelated

Maintenance

&F

acility

Costs

ID

iffere

nce

Io

the

rR

elatedM

aintenance&

Facility

Co

stsD

iffere

nce

To

tal

Ma

inte

na

nce

Parts,

Su

pp

lies

&$

Fa

cilityU

tilities1,873,776

$$

1,779,173$

o

To

tal

Ma

inte

na

nce

Parts,

Su

pp

lies

&$

Faellity

Utilities

1,991,519$$

2,004,982$

o

Grand

Total

$12,345,749

$11,791,892

$G

randT

otal$

14,475,986$

14,717,348$

An

nu

alM

ain

ten

an

ceS

avin

gs:

(This

number

carriedforw

ardto

theE

xecutiveS

umm

aty)

(7)

Noles:

AF

CS

spareparts

cost=

$3,155.U

tilitycostfo

r3

AF

CS

s=

$10,308iyear.

rev04/1312009

Package

Page

50A

MP

Maintenance

Page 52: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Tran

spo

rtation

-P

VS

LastS

aved:A

pril18,2011

Lo

sing

Facility:

IndustP

&D

CF

inan

ceN

um

ber:

Date

Ran

ge

ofD

ata:07/01109

-to

-06/30/10

Gain

ing

Facility:

Santa

Ana

P&

DC

Fin

ance

Nu

mb

er:

PY

SO

wn

edE

auip

men

tS

evenT

onT

rucks

Eleven

Ton

Tru

cks

Slnole

Axle

Tractors

Tandem

Axle

Tractors

Spotters

(1)C

urren

t

73oo

(2)P

rop

osed73oo

(3)D

ifferenceooooo

PY

SO

wn

edE

auip

men

tS

eve

nT

oo

Tru

cks

Eleven

To

oT

rucks

Single

Axle

Tractors

Ta

nd

em

Axle

Tra

do

rs

Spotters

(4)C

urren

t

5109

(5)P

rop

osed5109

(6)D

ifferenceooooo

PY

ST

ransp

ortatio

nT

otalNu

mb

er

of

Schedules

Total

Annual

To

talM

ileage

Co

sts

PY

SL

easeslo

talV

ehtclesLeased

To

talL

easeC

osts

12

312,555

$2

81

,30

0

$5

,20

0

12

31

2,5

55

$2

81

,30

0

$5

,20

0

ooo$0

PY

ST

ransp

ortatio

nT

otalN

um

oo

rofS

chedules

TotalA

nn

ua

lfvtileage

To

talMileag

eC

osts

PY

SL

easesT

otalVe

hicle

sL

ea

sed

To

ta'L

easeC

osts

55

740,451

55

740,451

oo$0o$0

PY

SW

orkh

ou

rC

osts

LD

C31

(617,6

79

,76

4)

I$

1,5

49

LOC

34{7

6

PY

SW

orkh

ou

rC

osts

LD

C31

(61

7,6

19

,76

4

LD

C34

76

6)

$1,549I

$0$3,025,068$0

$3

,02

6,6

17

PY

ST

ransp

ortatio

nS

aving

s(L

osin

gF

acility):1$0I

PV

ST

ransp

ortatio

nS

aVin

gs

(Gain

ing

Facility):I

$0IT

otal

PV

ST

ransp

ortatio

nS

aving

s:$0

«=

(Thisnum

beris

SUfTIIllEldw

ithT

otalfrom'T

rans-HC

R'and

carriedfbfw

srdto

theE

xecutiveS

um

ma

ryas

Transportation

Sa

ving

s}

(7)N

ote

s:-====

rev0411312009

Packag

eP

age51

AM

PTransportation

-P

VS

Page 53: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Tra

nsp

orta

tion

-H

eR

LastS

aved:A

pril18,

2011

Lo

sing

Fa

cility:In

du

stryP

&D

CG

ain

ing

Fa

cility:S

an

taA

na

P&

DC

Ty

pe

of

Distrib

utio

nto

Co

nso

lidate:

Orig

ina

ting

CE

Tfor

cancellations:1

CE

Tfo

rOG

P:

22:00

Data

Ex

traction

Date:

10/15/1

0C

Tfor

Ou

tbo

un

dD

ock:2:00

1I

23

48

910

11C

urren

tC

urren

tC

urrentC

urren

tC

urren

tC

urrentR

outeA

nnualA

nnualC

ost

per

Route

Annual

Annual

Co

stp

erN

umbers

Milea

eC

ost

Mile

Num

bersM

ileageC

ost

Mile

91730165,587.00

$575,434.44$3.48

926L1

25,081150,536

$6.0091732-A

77,858.00$250,570.60

$3.22926L

23

33

76

3541,526

$1.6291732-8

25,766.00$139,044.67

$5.40926L

5327,440

609,229$1.86

9173341,878.00

$285,019.38$6.81

926L6

33,64185,899

$2.5591734

65,196.00$330,822.22

$5.07926L

732,150

33,924$1.06

91735120,153.00

$193,160.11$1.61

926L8

180,437255,240

$1.4191737

213,294.30$463,939.34

$2.18926L

95

96

12

50,991$0.86

9173843,833.60

$112,829.86$2.57

926M1

34550

62,974$1.82

91739140,476.60

$323,188.78$2.30

92611530,563

665,696$1.25

91740238837.00

$605990.00$2.54

92616275,333

496,189$1.80

91762207326.80

$513,309.85$2.48

926172

75

68

7248,569

$0.90917M

T195,611.60

$498,530.81$2.55

9263141,959

205,299$4.89

917AG

-A18,560.50

$63,143.00$3.40

92635A330,922

529,610$1.60

9178G109,420.00

$216740.66$1.98

92635876,986

129,021$1.681

9171282,520.50

$161234.33

$1.9592637A

114,5122

02

02

4$1.76

91713196,571.00

$475614.76$2.42

92637B1

02

25

6175,821

$1.7291714

519,742.80$903,339.01

$1.7492641

46,299133,709

$2.89917L

V155,282.80

$286,750.00$1.85

926NV

34,078134,900

$3.961917L

1205,573.20

$412,688.95$2.01

926MO

26,42838,704

$1.461917A

G-8

29,475.40$88,128.97

$2.99

Package

Page

52A

MP

Transportation

-H

eR

Page 54: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

12

34

56

78

910

1112

1314

Cu

rren

tC

urre

nt

Cu

rren

tP

rop

ose

dP

rop

ose

dP

rop

ose

dC

urre

nt

Cu

rren

tC

urre

nt

Pro

po

sed

Pro

po

sed

Pro

po

sed

Route

An

nu

al

An

nu

al

Co

stp

er

An

nu

al

An

nu

al

Co

stpe

rR

ou

teA

nn

ua

lA

nn

ua

lC

ostp

er

An

nu

al

An

nu

al

Co

stp

er

Num

bersM

ileageC

ost

Mile

Mileage

Co

stM

ileN

um

be

rsM

ileageC

ost

Mile

Mileaae

Co

stM

ile

Package

Pa

ge

53A

MP

Transportation

-H

eR

Page 55: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

12

34

56

7C

urren

tC

urren

tC

urren

tP

rop

osed

Pro

po

sedP

rop

osed

Ro

ute

An

nu

alA

nn

ual

Co

stp

erA

nn

ual

An

nu

alC

ost

per

Nu

mb

ersM

ileaaeC

ost

Mile

MileaQ

eC

ost

Mile

89

1011

1213

14C

urren

tC

urren

tC

urren

tP

rop

osed

Pro

po

sedP

rop

osed

Ro

ute

An

nu

alA

nn

ual

Co

stp

erA

nn

ual

An

nu

alC

ostp

er

Nu

mb

ersM

ileaaeC

ost

Mile

MileaQ

eC

ost

Mile

Current

Losing

169,293

Moving

toG

ain(-)

o

Other

Changes

+/-

o

Trips

fromG

aining

o

Proposed

Result

169,293

Current

Gaining

184,824

Moving

toLose

Ho

Other

Changes(+

/-

o

Trips

fromLosing

o

Proposed

Result

184,824

HC

RA

nn

ual

Savin

gs

(Lo

sing

Facility):

($886,961)

To

talH

CR

Tran

spo

rtation

Savin

gs:

($9

80

,29

0)

Package

Page

54

HC

RA

nn

ual

Savin

gs

(Gain

ing

Facility):

(93,329)

«=

=(T

hisn

um

be

rIs

summ

edw

ithT

otalfrom'T

rans-PV

S'and

ea

nie

dforw

ardto

theE

xecutiveS

um

ma

ryas

Transportation

Sa

ving

s)

AM

PTransportation

-H

eR

Page 56: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Distribution ChangesLast Saved: April 18, 2011

Losing Facillty:.::ln:::d::.::u::::s.::.tryL.:..P~&c:::DC~ _Type of Distribution to Consolidate ..;O"'n"'g"'i"'n.=a.=ti'-'n...g _

Indicate each DMM labeling list affected by placingan "J(" to the left of the list

If revisions to DMM tOO5 or DMM L201 are needed, Indicateproposed DMM label change below,

(1) (2) DMM Labeling List LOO5 • 3·Dlglt ZIP Code Prefix Groups - SCF Sortatlon

Column C • Label to

Column B • Label to

Column B • Label to

To:

From:

dion Code· Corumn A • 3·0 It ZIP Code Prefix Group

Action Code· Column A • 3-0

JrnpQI1aO! Note; Section 2 & 3 illustrate possible changes to DMM labeling lists. Section 2 relates to consolidation of DestinationOperations, Section 3 pertains to OrltJinatlng Operations. The Area Distribution Net'NorX group wiD submtt appropriate requests forDMM changes after AMP approval.

*Action Codes: A=add D=delete CF..change from CT=change to

Column B - 3~D It ZIP Code Destinations

DMM LOOl DMM LOll

DMM LOO2 X DMM L20l

DMM LOD3 DMM LS01

DMMLO~ DMM LS02

DMM LOO5 DMM LS03

DMM LOOS DMMLS~

DMM LOD7 DMM LS05

DMM LODS DMM LSOS

DMMLOO9 DMM LS07

DMM L010 DMM LS01

ActionCode'" Column A • Ent ZIP Codes

(3) DMM Labelln List L201 - Periodicals Orl in S

D 917,91859C>-599, 750-754, 800-816, 82C>-838, 840-847, 85C>-853, 855-857,859,860,863-865, 87C>-875, 877-879,881-884,869-891,893-895,

7,898, 9OC>-908, 91C>-928, 93C>-966, 97C>-986, 988-994, 998, 999

59C>-599, 75C>-754, 800-816, 82C>-838, 84C>-847, 85C>-853, 855-857,859,860,863-865, 87C>-875, 877-879, 881-884, 889-891, 893-895,97,898, 9OC>-908, 91C>-928, 93C>-966, 97C>-986, 988-994, 998, 999

Column B· 3·0· It lIP Code Destinations

59C>-599, 750-754, 80C>-816, 820-838, 840-847, 85C>-853, 855-857,859,860,863-865, 87C>-875, 877-879, 881·884,889-891,893-895,897,898, 9OC>-908, 91C>-928, 93C>-966 , 97C>-986, 988-994, 998, 999

Column B • 3·0· 11 ZIP Code DestinaUons

OMX INDUSTRY CA 917

(4) Drop Shipments for Destination Ent V Discounts - FAST Appointment Summary Repe rtMonth LOllnWGalning

NASSFacility Name

Total No-Show Late Arrival 01 n Cfosed UnschdCode SchdAwls Count % Count % Count % Count % Count

Auo Loslna Facllltv 917 Industry P&DC 692 140 20% 241 35% 0 0% 552 80% 53

Seot Losing Facllltv 917 Industry P&DC 763 154 20% 278 38% 0 0% 608 80% 54

Auo Gaining Facllltv 926 Santa Ana P&DC 836 196 23% 236 28% 0 0% 840 77% 72

Seot Gaining Facility 926 Santa Ana P&DC 935 215 23% 330 35% 0 0% 719 77% 52

(5) Notes

rev 511-412009

Package Page 55 AMP Distr bution Changes

Page 57: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

10108/10

MP

EIn

vento

ryL

ast

Saved:

Ap

ril18,

2011L

osin

gF

acility:In

du

stryP

&D

CG

ainin

gF

acility:_S....a....n....ta....A....n....a_P_&........D....C_

Data

Extractio

nD

ate"---_

-:...:;;;.;;;.;................_

---(1

)(2)

(3)

Eq

uip

men

tC

urren

tP

rop

osed

Differen

ceT

ype

Nu

mb

er

Nu

mb

er

AF

CS

50

(5)

AF

SM

-AL

L3

30

AP

PS

0(J

0

ClO

SS

22

0

CS

BC

S0

00

DB

CS

3737

0

DB

CS

-OS

S0

00

DIO

SS

53

(2)

FS

S(J

00

SP

BS

33

0U

FS

M(J

00

NE

C/F

C/M

MA

RK

20

(2)

RO

BO

TG

AN

TR

Y(J

00

HS

TS

/HS

US

00

0

LC

TS

ILC

US

22

0

LIPS

00

0M

LOC

R-IS

S0

00

MP

BC

S-O

SS

0(J

0

TA

BB

ER

00

0

PO

WE

RE

DIN

DU

ST

RIA

L0

EQ

UIP

ME

NT

(4)(5)

(6)(7)

(8)

Eq

uip

me

nt

Cu

rrent

Pro

po

sedD

ifference

Excess

Relo

cation

Typ

eN

um

be

rN

um

be

rE

qu

ipm

ent

Co

sts

AF

CS

1114

3(2)

$140,715

AF

SM

1004

40

0

AP

PS

0(J

00

ClO

SS

22

00

CS

BC

S0

00

0

DB

CS

4444

00

DB

CS

-OS

S[)

[)0

0

DIO

SS

810

20

$13,650

FS

S0

00

0

SP

BS

00

00

UF

SM

00

00

NE

C/F

C/M

MA

RK

33

0(2)

RO

BO

TG

AN

TR

Y3

30

0

HS

TS

IH

SU

S0

()0

0

LCT

SI

LCU

S0

00

0

LIPS

00

00

MLO

CR

-ISS

00

00

MP

BC

S-O

SS

()()

00

TA

BB

ER

11

00

PO

WE

RE

DIN

DU

ST

RIA

L0

0E

QU

IPM

EN

T

Mail

Pro

cessing

Eq

uip

me

nt

Relo

cation

Co

stsfro

mL

osin

gto

Gain

ing

Facility:

$1

54

,36

5(T

hisnum

beris

carriedforw

ardto

Space

Evaluation

andO

the

rCo

sts)

(9)N

ote

s:M

ovefro

mIndustry

toS

antaA

na:3

AF

CS

s($46,905

x3

=$

14

0,7

15

),2D

IOS

Ss

($6,825x

2=

$13,650)

Excess

AF

CS

s(2)

-deactivate

inplace.

Neither

Industryo

rS

antaA

nahave

MicroM

arks.T

heyboth

haveN

EC

Cancellers.

Pa

ckag

eP

ag

e5

6A

MP

MP

EIn

ven

tory

Page 58: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Cu

stom

er

Se

rviceIssu

es

LastS

aved:A

pril18,

2011

Lo

sing

Facllity:_I..;.nd:;,;u::.:;s.;.try"'--'-P..:&..:D;..cC'--_

5-D

lgltZ

IPC

ode:91715

Data

Extra

ctionDate:-::1"'O/7.:0~9/"'"170------

[·-O

J2.

Ho

wm

anyco

llectio

nb

oxe

sare

de

sign

ate

dfo

r"lo

cald

elive

ry"?

1.C

olle

ction

Po

ints

""-p~oo

'"oow

.,p

.m

...I

II

II

II

IN

umberpicked

upbetw

een1-5

p,m.

7886

v_

v~

__

,~"=.:~::.:::~:d9~.

,,:"

7:

7:.

0-

0"

O.

0

3.H

owm

any"lo

cald

elive

ry"boxes

will

be

removed

asa

resu

ltofA

MP

?[~NiD

4.D

eliveryP

erformance

Re

po

rt

%C

arriersreturning

before5

p,m.

QuarterlF

YP

ercent

Gov

03

201083.6%

Gov

02

201084,2%

Go

v0

12

01

082.6%

Go

v0

42

00

977.3%

5.R

etailUn

itInsid

eL

osin

gF

acility

(Win

do

wS

ervice

Tim

es)6.

Bu

sine

ss(B

ulk)

MailA

ccep

tan

ceH

ou

rs

Start

End

Start

End

Monday

8:30A

M6:00

PM

8:30A

M6:00

PM

Tuesday

8:30A

M6:00

PM

8:30A

M6:00

PM

Wednesday

8:30A

M6:00

PM

8:30A

M6:00

PM

Thursday

8:30A

M6:00

PM

8:30A

M6:00

PM

Frida

8:30A

M6:00

PM

8:30A

M6:00

PM

Saturday

9:00A

M5:00

PM

9:00A

M5:00

PM

Start

End

Monday

9:3

0A

M5:00

PM

Tuesday

9:3

0A

M5:00

PM

Wednesday

9:3

0A

M5:00

PM

Thursday

9:3

0A

M5:00

PM

Frida

9:3

0A

M5:00

PM

Saturday

closedclosed

Start

9:3

0A

M

9:3

0A

M

9:3

0A

M

9:3

0A

M

9:30A

M

closed

End

50

0P

M

50

0P

M

5:00P

M

5:00P

M

50

0P

M

closed

7.C

ancu

stom

ers

ob

tain

alo

calp

ostm

ark

Ina

ccord

an

cew

itha

pp

licab

lep

olicie

sin

theP

osta

lOp

era

tion

sM

an

ua

l?yes

8.N

otes:Ga

inin

gF

acility:

Santa

Ana

P&

DC

9.W

hatp

ostm

ark

will

be

prin

ted

on

colle

ction

ma

il?Lin

e1

SA

NT

AA

NA

926

Lin

e2

DA

TE

ITIM

E"'"

61181:2008

Package

Page

57A

MP

Custom

erS

erviceIssues

Page 59: May 18, 2011 Certified Mail Tracking Number: President ... · May 18, 2011 Mr. Cliff Guffey President American Postal Workers Union (APWU), AFL-CIO 1300 L Street, NW Washington, DC

Space Evaluation and Other Costs

Last Saved: April 16, 2011

Losing Facility: Industry P&DC

1, Affected FacilityFacility Name Industry P&DC

Street Address: 15421 E. Gale 5tCity, State ZIP: City of Industry CA 91715-9998

2. Lease Information. (If not leased skip to 3 below.)Enter annual lease cost USPS Owned

Enter lease expiration date---7N""/A;;:-:::....:::.:=::::-------------Enter lease options/terms ......:.:N""/A.:....... _

3. Current Square FootageEnter the total interior square footage of the facili~~4~59::;.,54~2'--------------_

Enter gained square footage expected with the AMF-..:.1.::J6,.:...75::.;6=-- _

4. Planned use for acquired space from approved AMI

5. Facility Costs

Enter any projected one-time facility costs:....:..:!$",,1O?'c:::O=.Oo=-:--:__---:-~-_:___=__=___,::__c:___::_(This number shown below under One-Time Costs section.

6. Savings Information

Space SaVings ($):___,;:;:;-:---.-: -.-.,-;---.-:-=-;:---=-:-;;~=(This number carried forward to the Executive Summary)

7. Notes $10K for removal and cleanup of Loose Mail Feed System.

Employee Relocation Costs: -.=;$=.38::.>.,=.60:.,:3'-- _

Mail Processing Equipment Relocation Costs: $154,365(from MPE Inventory )

Facility Costs: -.=;$.:..10::.>.,.::,.00:.,:0'-- _(from above)

Total One-Time Costs: $202,968(This number carried forward to Executive Summary)

Losing Facility: IndUstry P&DC Gaining Facility: .;::S=anc.;t::.a.:..;An:.:;a::..;P.:...&=:D:..;C"-- _

YTD Range of Report: 0~7~/O::.;1.:.:/09:.::.-.:......::06=I3O=/..:.;10"__ _

(11 (21 (3)

Current CostProduct Associated REC per 1,000

Images

Letters VVichita REC $33.72Flats VVichita REC $34.57

PARSCOA VVichita REC $167.09PARS Redirects VVichita REC $44.05

APPS N/A

Package Page 58

(4) (51 (6)

Current CostProduct Associated REC per 1,000

Images

LettersFlats

PARSCOA

PARS RedirectsAPPS

AMP Space Evaluation and Other Costs