MaxCell Installation Reports India. Amit Dubey MaxCell Market Manager - India. Date: December 20, 2009 End User: BSNL Installer: Milliken Venue: Rannikuti to Jadhavpur Exchange Classification: Outside Plant. BSNL (Kolkata, India). Amit Dubey MaxCell Market Manager - India. - PowerPoint PPT Presentation
Citation preview
MaxCell Installation Reports
India
Amit DubeyMaxCell Market Manager - India
Date: December 20, 2009End User: BSNLInstaller: Milliken Venue: Rannikuti to Jadhavpur Exchange Classification: Outside Plant
Amit DubeyMaxCell Market Manager - India
BSNL (Kolkata, India)
Amit DubeyMaxCell Market Manager - India
Installation Details
1 100 1)18mm
1) 12mm
158 1 x 45 5621-3 6 2 man HP 18mm
12mm
9
7
2 Man HP 10 %
2 100 (1) 18mm
(2) 12mm
190.90 1 x 90 5621-3 8 5 man HP 18mm
12mm
8
6
2 Man HP 10%
3 100 1) 12mm 180.64 1 x 45 5621-3 7 5 man HP 18mm
12mm
7
6
2 Man HP 6 %
4 100 Empty 178.67 1 x 45 5621-3 5 5 man HP 18mm
12mm
7
6
2 Man HP 5 %
5 100 Empty 187.33 1 x 45 5621-3 5 5 man HP 18mm
12mm
7
5
2 Man HP 5 %
Sec-tion
PullLength,
M Style Time, min OD, mm
FinalFill
Ratio
Sweeps,degrees
ConduitID, mm
Existing CableOD, mm Tension, kgs
MaxCell Installation Cable Installation
Time, min Tension, kgs
Date: December 20, 2009End User: BSNLInstaller: Milliken Venue: Rannikuti to Jadhavpur Exchange, KolkataClassification: Outside Plant
178.67mtrs
107mtrs
187.33 mtrs 190.90mtrs 180.64mtrs
these four manholes were in the road and two of them were not traceable
One 45 One 45 One 45 One 45
158mtrs
Install 158 mtrs in July 2008
Amit DubeyMaxCell Market Manager - India
Installation Details
Date: December 20, 2009End User: BSNLInstaller: Milliken Venue: Rannikuti to Jadhavpur Exchange Kolkata Classification: Outside Plant
- Izaz Sir and Mr Lee installed EM 5621-3 MaxCell in 158meters between two manhole assigned one km Ranikutti to Jadhavpur exchange, Kolkata in July 2008, other 5 manholes were located in the center of the road and were sealed with asphalt around the edge.
- Due to not opening of the manhole covers trial was pending since last one and half year, then BSNL Kolkata assign this work to an contractor to up r ise the manholes, install the MaxCell and two OF cable s in to MaxCell. It was very busy road so hurdles like permission from municipal corporation, local transport police and lastly contractor was not supportive.
- After putting pressure from BSNL corporate office to GM Kolkata at last all five manholes cover up raised in last two months and finally on 16th to 21srt Dec 09 we installed MaxCell and two 18mm a and 12mm Optical Fiber cable in MaxCell in Ranikutti to Jadhavpur exchange in the presence of DGM(Tx), EE(Tx), SDE and Des successfully.
Amit DubeyMaxCell Market Manager - India
Installation Details
Date: December 20, 2009End User: BSNLInstaller: Milliken Venue: Rannikuti to Jadhavpur Exchange Kolkata Classification: Outside Plant
- In one of the man hole contractor inserted number of bamboos in 100mm ID conduit to create problems in trial because his payment was not released.
- After removing these bamboos from conduits we tried Roding in available four 100mm conduits to installed rope but not succeed . There were one conduit in which one live12mm cable was though, after getting permission from BSNL NOC, on Sunday we cut the cable and installed EM 5621-3 MaxCell and a rope, using rope again install the same live cable and further installed 18 and 12mm cables in MaxCell successfully.
Bamboos inserted by contractors cable pulling trying roding with iron rodder
Date: December 20, 2009End User: BSNLInstaller: Milliken Venue: Rannikuti to Jadhavpur Exchange, Kolkata Classification: Outside Plant
Thankful to DGM(Tx) and contractor team.