4
MaxCell Installation Reports BSNL Nagpur Maharashtra circle India Amit Dubey MaxCell Market Manager - India

MaxCell Installation Reports BSNL Nagpur Maharashtra circle India Amit Dubey MaxCell Market Manager - India

Embed Size (px)

DESCRIPTION

SectionConduit ID, mm Existing Cable or sub duct OD mm Pull Length M Sweeps, degrees MaxCell InstallationsCable InstallationFinal Fill Ratio StyleTime, min Tension, kgs OD, mmTime, min Tension, kgs 1100empty147Straight Man Hand Pull Man HP 3.2% Remarks:- - This trial held in Nagpur with BSNL Maharashtra circle Western Telecom Project (WTP). - It was an empty mm and straight site - A swivel was used to pull in the MaxCell - One 18mm cable placed and rest two will be deploy later. - BSNL this circle will send letter to corporate office to let them know procurement guideline of MaxCell. - DGMs of Telecom Project and Maharashtra circle planning for a small trial order. Date: 2 nd June 2010 End User: BSNL Maharashtra Circle , Nagpur Installer: Milliken Venue: Zero miles, Nagpur Classification: in mm Empty conduit Amit Dubey MaxCell Market Manager - India Installation Results:

Citation preview

Page 1: MaxCell Installation Reports BSNL Nagpur Maharashtra circle India Amit Dubey MaxCell Market Manager - India

MaxCell Installation ReportsBSNL Nagpur Maharashtra circle

India

Amit DubeyMaxCell Market Manager - India

Page 2: MaxCell Installation Reports BSNL Nagpur Maharashtra circle India Amit Dubey MaxCell Market Manager - India

Date: 2nd June 2010End User: BSNL Maharashtra Circle , NagpurInstaller: MillikenVenue: Zero miles, NagpurClassification: in 110-100mm Empty conduit

Amit DubeyMaxCell Market Manager - India

BSNL Nagpur (India)

Installed Rope in 110-100mm

Installed MaxCell

Page 3: MaxCell Installation Reports BSNL Nagpur Maharashtra circle India Amit Dubey MaxCell Market Manager - India

Section Conduit ID, mm

Existing Cable or sub duct OD mm

Pull Length

M

Sweeps, degrees

MaxCell Installations Cable Installation Final Fill

RatioStyle Time, min

Tension, kgs

OD, mm Time, min

Tension, kgs

1 100 empty 147 Straight 5621-3 6 2 ManHand Pull

18 10 3 Man HP3.2%

Remarks:-

- This trial held in Nagpur with BSNL Maharashtra circle Western Telecom Project (WTP) .

- It was an empty 110-100mm and straight site

- A swivel was used to pull in the MaxCell

- One 18mm cable placed and rest two will be deploy later.

- BSNL this circle will send letter to corporate office to let them know procurement guideline of MaxCell.

- DGMs of Telecom Project and Maharashtra circle planning for a small trial order.

Date: 2nd June 2010End User: BSNL Maharashtra Circle , NagpurInstaller: MillikenVenue: Zero miles, NagpurClassification: in 110-100mm Empty conduit

Amit DubeyMaxCell Market Manager - India

Installation Results:

Page 4: MaxCell Installation Reports BSNL Nagpur Maharashtra circle India Amit Dubey MaxCell Market Manager - India

Date: 2nd June 2010End User: BSNL Maharashtra Circle , NagpurInstaller: MillikenVenue: Zero miles, NagpurClassification: in 110-100mm Empty conduit

Installed MaxCell

Thanks Western Telecom Project and Maharashtra Planning team.

Amit DubeyMaxCell Market Manager - India

Cable getting enter in MaxCell Successful Installed Cable