Marine Survey Practice This blog intended to provide information and experience to professionals who work in the difficult career of Marine Surveyor. Wednesday, January 30, 2013 Surveyor Guide Notes for Boiler Survey Boiler Surveys (Including Thermal Oil Heaters) General A complete boiler survey allows us to check out if any build-up of deposits has taken place, and deformations or wastage of plate work, piping or any of the various parts, which may compromise the sale working order of the unit. The survey should include research as to cause of any anomalies found and also their correction. Any repair will have to ensure the sale working order of the boiler until the next survey. A complete survey means a lull internal and external examination of all parts of the boiler and accessories such as super heater, economizer, air-heater internal organs and all mountings. This examination may lead the Surveyor to require thickness gauging of plate or tubes that appear to be wasted and eventually to a lower assigned working pressure, if calculations prove this necessary.

Marine Survey Practice

Embed Size (px)

Citation preview

Page 1: Marine Survey Practice

Marine Survey PracticeThis blog intended to provide information and experience to professionals who work in the difficult career of Marine Surveyor.

Wednesday, January 30, 2013

Surveyor Guide Notes for Boiler SurveyBoiler Surveys (Including Thermal Oil Heaters)

GeneralA complete boiler survey allows us to check out if any build-up of deposits has taken place, and deformations or wastage of plate work, piping or any of the various parts, which may compromise the sale working order of the unit. The survey should include research as to cause of any anomalies found and also their correction.

Any repair will have to ensure the sale working order of the boiler until the next survey.

A complete survey means a lull internal and external examination of all parts of the boiler and accessories such as super heater, economizer, air-heater internal organs and all mountings. This examination may lead the Surveyor to require thickness gauging of plate or tubes that appear to be wasted and eventually to a lower assigned working pressure, if calculations prove this necessary.

Page 2: Marine Survey Practice

 Collision chocks, rolling stays and boiler stools are to be examined. The oil fuel burning system is to be examined under working conditions and safely devices are to be checked, including any automatic burner light-up sequence to verify purging of the furnace prior to lighting burners. A general examination is to be made of fuel tank valves, pipes etc. and fuel pipes between pumps and burners.Safety valves are to be adjusted to a pressure not greater than 105 % of design pressure.

Water-tube boilers

Typical survey plan

The main points to remember are:

At superheat temperatures > 400 °C special steels and more advanced welding techniques will be involved.

Page 3: Marine Survey Practice

Check drawings of unfamiliar designs of boiler to correctly plan the survey.

Steam drum and tubes Pitting, fit of manhole door

Short-circuiting, erosion in headers. Weld fractures.

Overheating, leakage.Distortion of tubes, bulging of tubes. Condition of baffles Refractory.Pitting fit of manhole door.

Typical survey plan

Boiler should be thoroughly cleaned and prepared for survey.

Page 4: Marine Survey Practice

Furnaces Overheating and subsequent distortion

Combustion ChambersOverheating and distortion of crown.Leaking tubes and stays.

Tubes Thinning at ends, repeated expansion.

Shell Internal Wastage, grooving

Shell External Wastage, in way of leaking mountings.

Cochran type boiler

The main points lo remember for these varied designs are similar to the foregoing: Wastage, lire and water side.

Deformations due to overheating.

Leaking lubes.

Wastage externally due lo leaking mountings, manholes and handholds.

Hydraulic testing

Following major repairs or as required by the Surveyor hydraulic testing may be required.

Hydraulic test of boilers in service

Page 5: Marine Survey Practice

P = Working pressure in bars.

Before                1.25 P if P < 4012 th   year                           1.2 P + 2 if P > 40 After                    1.15 P whatever P12th year             value

Typical safety valve designs

Pressure tightness tests at working pressure may also be carried out after small maintenance jobs such as part re-tubing, renewal of rivets or extensive caulking of seams or rivets, welding of small cracked areas.

Plugging of Boiler Tubes

Water tube boilers

Screen tubes - These are the first rows of tubes and are exposed directly to the flame, they are gene rally very closely slacked lo afford protection to the super-heater elements which lie behind.

Page 6: Marine Survey Practice

Wale wall tubes - these are subject to the same defects as screen tubes, but more sensitive to poor circulation, particularly roof tubes.

Any tubes found plugged or (bulged) should be renewed.

Main steam generating lube bank - a maximum of 10 % of the tubes may be accepted plugged before renewals are required.

Note: In all cases of boiler problems it is important to ascertain the cause of damage (flame impingement, lack of boiler water treatment etc.) and take remedial action.

Smoke tube boilers

Any tubes found plugged should be renewed.

Tubes with excessive thinning at the ends because of repeated rolling or showing signs of movement should be renewed.

The maker’s instructions should be consulted where available.

Page 8: Marine Survey Practice

Posted by Harry González at 17:24 Email ThisBlogThis!Share to TwitterShare to FacebookShare to Pinterest

Newer Post Older Post Home

Total Pageviews

54,318About Me

Harry González View my complete profile

Translate

Powered by  Translate

Entries

▼  2013 (50)

o ▼  January (50)

Code of Ethics.

The Underwriter's Surveyor

Salvage Surveys

Guidelines on survey for Marine Surveyor.

Preparation for Survey

Hull Survey Methods

Failure and Damage

Notes Relative to Shell and Deck Plate Repairs

What to look for?

Surveyor Guide Notes for Weld Inspection and Repai...

Repair Quality Standard for Existing Ships

Surveyor Guide Notes for Coating Condition Survey

Initial Survey of Hull

Annual Survey of Hull

Page 9: Marine Survey Practice

Surveyor Guide Notes for Outside Inspection of the...

Surveyor Guide Notes for Anchors and Chains Survey...

Surveyor Guide Notes for Bilge Keels Survey

Surveyor Guide Notes for Doors Survey

Surveyor Guide Notes for Rudder, Rudder Stock and ...

Surveyor Guide Notes for Propeller Surveys

Intermediate and Periodical Survey

Renewal Survey

Surveyor Guide Notes for Additional Surveys

Surveyor Guide Notes for Reporting

Surveyor Guide Notes for General Cargo Ships Surve...

Surveyor Guide Notes for Hatch Covers of Dry Cargo...

Surveyor Guide Notes for Bulk Carriers Survey

Surveyor Guide Notes for Oil Tankers Survey

Surveyor Guide Notes for Container Ship Survey

Surveyor Guide Notes for Sailing Yachts Survey.

Surveyor Guide Notes for Boat Marine Survey

Surveyor Guide Notes for Wooden Vessels Survey

Surveyor Guide Notes for Draft Survey

Vernier Caliper.

Surveyor Guide Notes for Towing Arrangement Survey...

Surveyor Guide Notes for MODU Towing Arrangements....

Surveyor Guide Notes for Bollard Pull Tests.

Surveyor Guide Notes for Ship Stability, Inclining...

Surveyor Guide Notes for P&I insurance Surveys

Surveyor Guide Notes on Tailshaft Survey

Surveyor Guide Notes on Tailshaft/Propeller Assemb...

Surveyor Guide Notes for Boiler Survey

Surveyor Guide Notes for Marine Diesel Engine Surv...

Surveyor Guide Notes for Prepurchase Condition Sur...

Surveyor Guide Notes on Safety Construction Certif...

Surveyor Guide Notes on Safety Equipment Certifica...

Surveyor Guide Notes on Loadline Certificate Defic...

Surveyor Guide Notes on Marpol Certificate Deficie...

Surveyor Guideline Note on Hull Coating Inspection...

On/Off Hire Condition Survey

My Blog List

Calculo Estructural del Buque

Construcción del Buque I

Estabilidad del Buque I

Estabilidad del Buque II

Digital clock

Links

ABS

Page 10: Marine Survey Practice

American Club Mutual P&I Association AWS online Binco Britannian Steam Ship Bureau Veritas Veristar Class NK DNV Equasis Estudios de Náutica European Maritime Safety Agency (EMSA) Gard P&I General Cargo GL Group IACS INEA Venezuela Institute of Chartered Shipbrokers Intercargo International Group of P&I Clubs Intertanko Japan Coast Guard Japan Ship Owners' Mutual Protection & Indemnity Association Lloyd Register of Shipping London Pandi Marine Society NDE/NDT Resource Center Paris MOU Ship Strcture Committe Shipyards Directory Skuld Steamship Mutual P&I Club The ImarEST The Nautical Institute The Standard Club The Swedish Club UK P&I Club US Coast Guard West of England P&I

Simple template. Template images by Maliketh. Powered b