Maersk Developer

Embed Size (px)

Citation preview

  • 8/17/2019 Maersk Developer

    1/12

    MærskDeveloper

    Ultra deepwaterdrilling and development

    semi-submersible

  • 8/17/2019 Maersk Developer

    2/12

  • 8/17/2019 Maersk Developer

    3/12

    Maersk Drilling MærskDeveloper

    Main advantages• Exploraory, appraisal and developmen drilling

    • Bach drilling and compleion of muliple well clusers

    • Insallaion of subsea facilit componens

    • Derrick – 1,361 (3,000,000 lbs) combined load raing

    Max. 2,500,000 lbs single load raing

    • Main hoising sysem – 910 (2,000,000 lbs) capacit

    • Auxiliar y hoising sysem – 680 (1,500,000 lbs) capacit

    • Large heave compensaed knuckle-boom crane (165 lif

    capacit from deck o deck) wih winch for deploymen of

    subsea rees and oher componens up o 100 over he

    side of he rig o 3,000 m waer deph

    Mærsk

    DeveloperTYPE

    DPS2/M, Column sabilised dynamically posiioned semi-

    submersible drilling rig wih capabilit o aach o an 8-poin

    pre-insalled mooring sysem; provisions o aach o a

    12-poin pre-insalled mooring sys em

    BUILT

    KeppelFELS, Singapore , 2009

    CLASS

    American Bureau of Shipping

    FLAG

    Denmark 

    Maersk Drilling is a considerable player in he ulra deepwaer

    marke wih four newly buil drillships and hree Ulra

    Deepwaer Developmen semi-submersibles.

    Te hree semi-subs are DP rigs designed for year-round

    operaion in areas such as Brazil, he Gulf of Mexico, Wes

    Africa and Asia pacific a waer dephs up o 3,000 m

    (10,000 f ).

    • Large 5-chair driller’s cabin wih auomaed sequenced

    pipe handling operaions

    • Auomaed and dus-free bulk, mud and chemical ransfer

    and mixing sysems

    • Hydraulic work baskes and service plaforms providing

    safe access for servicing of major drilling equipmen

    • Deck drainage, conainmen and reamen sysems for

    conrolled discharge

  • 8/17/2019 Maersk Developer

    4/12

  • 8/17/2019 Maersk Developer

    5/12

    Maersk Drilling MærskDeveloper

    Main particulars

    Derrick raed for US GOM caegory 4 hurricane

    DIMENSIONS IMPERIAL METRIC

    Length overall 384 f 117 m

    Width overall 256 f 78 m

    Length of pontoons 376 f 115 m

    Pontoon (width / height) 57 f / 33 f 18 m / 10 m

    Columns 55 f x 57 f 17 m x 18 m

    Upper hull (length / width) 259 f / 258 f 78.5 m / 78 m

    Moonpool opening 108.3 f x 29.5 f 33 m x 9 m

    Draft operational (max / min) 67.3 f / 60.7 f 20.5 m / 18.5 m

    Draft transit 31.8 f 9.7 m

    PARTICULARS IMPERIAL METRIC

    Rated drilling depth 40,000 f 12,000 m

    Hook load static (main) 2,500,000 lbs 1,134

    Hook load static (aux) 1,500,000 lbs 680

    Rotary load s tatic (main) 2,756,000 lbs 1,250

    Rotary load static (aux) 2,000,000 lbs 907

    Setback load 2,646,000 lbs 1,200

    Variable deck load (max / transit) 15,400,000 lbs / 10,120,000 lbs 7,000 / 4,600

    Variable column load (max / transit) 3,300,000 lbs / 880,000 lbs 1,500 / 400

    Variable pontoon load (max / transit) 11,000,000 lbs / 4,400,000 lbs 5,000 / 2,000

    Total payload (max / tr ansit) 29,900,000 lbs / 15,400,000 lbs 13,500 / 7,000

    Riser tensioner load 4,200,000 lbs 1,906

    Pipe rack area 10,765 f 1,000 m

    WEATHER/DESIGN CRITERIA (SURVIVAL) IMPERIAL METRIC

    Water depth (moored in less than 1,640 ft / 500 m) 328 f – 10,000 f 100 m – 3,000 m

    Wind speed 56 knos 29 m/sec

    Wave height (Hs) 26.2 f 8 m

    Wave period 12.3 s 12.3 sCurrent (surface) 1.7 knos 0.9 m/sec

    CAPACITIES IMPERIAL METRIC

    Drill water 12,580 bbl 2,000 m³

    Potable water 5,032 bbl 800 m³

    Fuel oil 25,160 bbl 4,000 m³

    Brine 4,718 bbl 750 m³

    Base oil 4,718 bbl 750 m³

    Liquid mud (surface pits) 9,435 bbl 1,500 m³

    Liquid mud (pontoons) 9,435 bbl 1,500 m³Bulk mud 24,000 f³ 680 m³

    Bulk cement 24,000 f³ 680 m³

    Sack material 2,160 f³ 200 m³

    Accommodation 180 people 180 people

  • 8/17/2019 Maersk Developer

    6/12

    Maersk Drilling MærskDeveloper

    CROWN MOUNTED C OMPENSATIONMain roary: s aic / compensaing load 2,500,000 lbs /

    1,000,000 lbs (1,134 / 454 ). Hydraulic locking wih

    25 f sroke. Auxiliary roary: s aic / compensaing load

    1,500,000 lbs / 750,000 lbs (680 / 340 ). Hydraulic locking

    wih 25 f sroke. Ac ive heave compensaion mode

    available.

    DERRICK AND HOISTING SYSTEMS

    Raed drilling deph c apacit 30, 000 f. MAIN side equipped

    wih hoising Sysem capable of 2,500,000 lbs saic hook

    load. Drawworks: 6,000 hp. op drive: 2,000,000 lbs capacit.

    Roary: 60 ½”. AUX side equipped wih hoising Sysem

    capable of 1,500,000 lbs hook load. Drawworks: 4,500 hp

    op Drive: 1,500,000 lbs capacit. Roary: 60 ½”.

    TUBULAR HANDLING SYSTEMS

    Primary mover is one pipehandling knuckle-boom cr ane

    feeding wo horizonal pipe conveyor / skae sysems. wo

    V-door sand-building and ripping machines. wo column

    rackers for pipe handling and wo iron roughnecks. Offline

    casing make-up capabilit drill sring / casing verical

    seback designed for 3” – 16”. ubulars racked in nominal 135

    f s and lenghs. Marine riser ver ical sorage for 126 ea. 75f of riser joins. oal 9,450 f plus wo elescoping joins;

    addiional sorage area for drilling riser on deck.

    DRILL STRING AND TUBULARS

    In excess of 50,000 f se back capabilit for drill pipe, work

    sring and casing running sring, capable of racking 25,000 f

    of 6 ⅝” drill pipe. Approximaely 15,000 f of 9 ⅝” casing

    racking capacit in addiion o drill sring.

    MARINE RISER AND TENSIONING SYSTEMS

    Clip riser wih wo 15,000 psi choke & kill lines, one 7,500 psi

    booser line, w o hydraulic condui lines oal 10,000 f of

    riser, 75 f lengh joins and 21” OD Riser ensioning sysem

    consising of 6 x 700,000 lbs N-line cyl inder riser ensioners.

    ripsaver sysem o allow movemen of BOP and riser o we

    sorage posiion.

    BOP AND SUBSEA TREE HANDLING SYSTEMS

    A por side of he main deck: BOP overhead (ganr y tpe)

    crane: 2 x 125 . In he moonpool: BOP ransporer: 400 .

    Subsea ree overhead crane insalled underneah drill floor +

    subsea ree saging and skidding sysem. Subsea ree car

    underhull guide sysems each roary.

    WELL CONTROL EQUIPMENT18 ¾” BOP – 15,000 psi equipped wih wo annular + six ram

    preveners. Te lower ram can be c onfigured as a es ram.

    Muliplex BOP conrol sysem; redundancy o allow boh

    pods o operae wih one MUX cable. 60 ½” diverer sysem

    and riser gas handler, choke & kill manifold, 15,000 psi and

    mud gas separaor, 12 MMscfd.

    HP MUD SYSTEM

    Four 2,200 hp mud pumps raed for 7,500 psi.

    MUD RETURN SYSTEM

    Sysem design o minimise ime displacing mud sysem /

    compleion fluids and capable of handling more han one

    mud sysem. Provisions for cenrifuge and cuings dryer

    insallaion. Compleion fluid capabilit. Eigh shale shakers.

    Cuings blower sysem.

    MUD AND BULK SYSTEM

    Fied wih wo auomaic sack cuing machines in sack

    sore and one bigbag machine: One dual liquid addiive

    pump uni. Four surge ank oule feeders, four auomaic

    mud mixing hoppers, one causic mixing uni. wo HP mud

    shearing devices.

    PROVISIONS FOR 3RD PARTY EQUIPMENT

    Designed for wo large work class ROV sysems

    (Oceaneering Millenium +) por forward and s arboard af for

    flexibilit of operaion. Diesel cemening uni (Halliburon).

    Saging area for subsea compleion equipmen, including

    subsea ree ranspor sysem. C ompleion equipmen,

    including well es equipmen and coil ubing. Dedicaed

    conrol rooms, sore rooms and offices for 3rd part sysem

    operaors.

    POWER SYSTEMS

    8 generaors x 4,800 kw(e), 11 kVAC, 60 Hz, divided ino wo

    self-conained power plans. Power Disribuion Sysem:

    690 VAC, 60 Hz I. One emergency generaor: 1,500 kW(e).

    POSITIONING SYSTEMS

    DP Class 2: power managemen sysem and posiion,

    reference sysems o DP Class 3. Azimuhing hrusers

    8 x 4,000 kW(e) of min. 700 kN saic hrus each. Opional

    moored operaion: four double drum windlasses for 3.”

    K4 chains, 8 x 600 m K-4 chain for aachmen o a pre-

    insalled. Space for addiional windlasses and chain for12-poin mooring sysem.

    Key features

  • 8/17/2019 Maersk Developer

    7/12

    Maersk Drilling MærskDeveloper

    CRANESPor deck crane: Knuckle -boom crane wih 3,000 m, 3” wire

    for deploymen of subsea rees and oher modules up o

    100 heave compensaed over he side of he rig. 165 lif

    capabilit from supply boa. Auxiliary whipline hois 15 SWL

    @ 50 m. Sarboard deck crane: 50 m max. reach, SWL 60 @

    20 m dynamic. One pipehandling knuckle-boom crane: 30 m

    max. reach, SWL 12 @ 10 m.

    HELICOPTER DECK 

    Helicoper deck suiable for an EH101 helicoper or Sikorsky

    S61.

    SAFETY EQUIPMENT

    Lifesaving and firefighing equipmen in accordance wih

    Danish Mariime Auhorit requiremens and he IMO MODU

    code 2001. Te rig holds a vessel specific safet case which

    has been approved by HSE UK.

    ACCOMMODATION

    Accommodaion for 180 people in 10 one-man rooms and 85

    wo-men rooms. Ample office spaces and conference rooms

    for cliens and 3rd part service conracors. Recrea ion

    rooms, oal area of 270 m.

  • 8/17/2019 Maersk Developer

    8/12

  • 8/17/2019 Maersk Developer

    9/12

    Maersk Drilling MærskDeveloper

    Rig Floor

    FLEXIBILITY FOR MULTIPLE ACTIVITIES

    • wo hoising / roary sysems

    • Large seback area for drill pipe, casing and compleion

    riser ouside of derrick / drillfloor

    • Offline pipe handling capabilit : sandbuilding , casing

    make-up and rack back • ransfer of drill sring, casing and riser from ouside of

    derrick / drillfloor

    OPTIMUM LAYOUT FOR SUBSEA COMPLETION

    • Capabilit for large umbilical and services (ubing hanger

    running ool or subsurface es ree)

    • Addiional space for small umbilicals for compleion

    accessories

    Subsea completions

    FLEXIBLE SYSTE M FOR

    MULTIPLE WELL SUBSEA DEVELOPMEN TS

    • Opion o deploy equipmen hrough he main well cenre

    or over he side by large knuckle -boom crane

    • Large saging area for muliple subsea rees and

    accessories

    • Flexibilit in subsea ree handling area for various subsea

    sysem designs

    • High load capacit for flabed ransporer and ree car• High verical clearance in moonpool for subsea sysem

    sack-up and ranspor

    The rig includes a number of innovative features, which enhance the capacity and f lexibility formultiple concurrent activities and improve the drill ing efficiency. Back-up facilities and solutions

    are generally provided to reduce the impact of equipment failures.

    The hull design and layout are based on the operational experience of various deepwater operators

    and third party system suppliers and incorporate a number of innovative ideas from our potential

    customers. Great emphasis has been made on optimising the rig’s layout to facilitate flexibility in

    installation and operation of third party equipment.

    Drilling features

    Optimised layout

    Moonpool

    LARGE MOONPOOL;

    FLEXIBILITY FOR MULTIPLE ACTIVITIES

    • N-Line riser ensioner sysem wih ripsaver

    • ransfer of equipmen across he moonpool

    • Dedicaed off-line ‘we parking’ posiion for BOP / drilling

    riser• BOP handling area (sarboard side)

    • Subsea ree saging area (por side)

    Logistics

    MAX IMUM USUABLE DECK SPACE FOR OPTIMUM

    LAYOUT OF DRILLING AND COMPLETION EQUIPMENT

    • 9,600 f (2,926 m) verical riser sorage

    • Large verical drill pipe and casing seback area

    • Large pipe rack area (af) for deepwaer compleion

    equipmen l ayou

    • Well es equipmen

    • ubing / downhole ools

    • Compleion riser accessories• Compleion fluids / filraion

    • Simulaion

    • Coil ubing

    • Primary ROV wihin upper hull ; 2nd ROV locaion on af deck 

  • 8/17/2019 Maersk Developer

    10/12

    Maersk Drilling MærskDeveloper

    Drilling featuresTOP VIEW AND DRILL FLOOR

    TANK TOP

  • 8/17/2019 Maersk Developer

    11/12

    Maersk Drilling MærskDeveloper

    SIDE VIEW

  • 8/17/2019 Maersk Developer

    12/12

    ISCLAIME R: Tis brochure is for promoional purposes only. All descr ipions, specificaions and o her informaion conained in his brochure and/or in any accompanying ma erial is: (i) inended o give only a general indicaion of he sorsservice or equipmen or perfor mance ha migh be available (ii) inended o b e no more han an inviaion o rea (iii) subjec o conra c and possible change or alera ion a our discreion and wihou noice o you (iv) no o be relied

    pon by you for any purposes whasoever when enering ino any legally binding agreemen wih us.”

    Head office:

    Maersk Drilling

    , Esplanaden

    Copenhagen K

    Denmark

    Telephone: +

    Telefax: +

    E-mail: [email protected]

    www.maerskdrilling.com

    Follow us to learn more

      www.maerskdrilling.com

      www.facebook.com/MaerskDrilling

      www.linkedin.com/company/maerskdrilling

      www.twitter.com/maerskdrilling

      www.vimeo.com/maerskdrilling

      www.youtube.com/user/Maerskcom

      www.instagram.com/maerskdrilling

    October