London Borough of Brent
highways&[email protected] Roadworks/Events/Festivals
0208 937 5600 Network Management Team
September Start 18:00 22/09/2018 22/09/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com
Kick off 20:00 03/09/2018 03/09/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com
Kick Off 15:00 06/10/2018 06/10/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com
Kick off 18:00 14/10/2018 14/10/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com
Kick Off 14:30 21/10/2018 21/10/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com
Kick off 13:30 28/10/2018 28/10/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com
Kick off 20:00 29/10/2018 29/10/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com
Kick off 20:00 06/11/2018 06/11/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com
Kick off 19:45 15/11/2018 15/11/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com
Kick Off 14:00 18/11/2018 18/11/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com
Kick off 14:00 25/11/2018 25/11/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com
Kick off 20:00 28/11/2018 28/11/2018 1 Days Confirmed Event Day Road Closures www.wembleystadium.com
Road Area Location Description Works Type From To Proposed/Started Footway/Carriageway Permit Number Utility
ABBEYDALE ROAD WEMBLEY left of stairs to polish bakery abbeydale road Fit Stop Tap / Boundary Box - WORKING IN FOOTWAY MINOR 20/09/2018 24/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION MX044-10024380Affinity Water
01707 679 623
ABERDEEN ROAD LONDON 8 - 8 opp
new customer water supply 1x25mm MDPE mtrd, works in the footway and
inCarriageway. Our intention is to complete the Permanent Reinstatement inthe
same phase
STANDARD 19/09/2018 24/09/2018 6 Days IN PROGRESS SOME C/W INCURSION MU307-000806285630045-001Thames Water
0800 316 9800
ABERDEEN ROAD LONDON outside 34 to opposite the Junction of Lancaster RoadCUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED
DUCT and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS ONLYMINOR 22/09/2018 25/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/13984266J9
Virgin Media
0870 8883117
ABERDEEN ROAD LONDONABERDEEN ROAD, WHOLE STREET FROM
JUNCTION OF BURNLEY ROAD
IMGA192012. ABANDON 298M X 4'/6' MAIN AND INSERT 75MM/125MM PE AND
RELAYAND TRANSFER SERVICESMAJOR 15/10/2018 30/11/2018 47 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000724488
Cadent Gas Limited
0800 111 999
ACTON LANE LONDON OPP GREENHILL PARK
Works in footway and carriageway to carry out Service pipe relay between the
existing Water main and Harlseden Primary School boundary, as part of Thames
Water's Lead Pipe Replacement Project.
STANDARD 22/10/2018 26/10/2018 5 Days PROPOSED WORKS MULTI-WAY SIGNALS MU276-IA/AMP6/SCH/BRE/009Thames Water
0800 316 9800
ALBERT ROAD LONDON whole road
TTRO/18/021 - Proposed Temporary Traffic Order to change Albert Road j/w
Salusbury Road from two way road direction to one way road direction. Including
Single yellow line with time plate Mon - Sat, 8
HIGHWAYS ACT PERMITS 01/09/2018 29/02/2020 547 Days PROPOSED WORKS LANE CLOSURE AW888-L-MAIN-00000932LONDON BOROUGH OF BRENT
020 8937 5600
ALEXANDER AVENUE LONDON 16 ALEXANDER AVENUE, LONDON, NW10 3QSService Pipe Repair<33mm Fway in Footway. Our intention is tocomplete the
Permanent Reinstatement in the same phaseMINOR 25/09/2018 27/09/2018 3 Days PROPOSED WORKS SOME C/W INCURSION MU301-000031158856-001
Thames Water
0800 316 9800
ALEXANDER AVENUE LONDONF/P O/S 32 ALEXANDER AVENUE, LONDON, NW10
3QS
GAS SERVICE DISCONNECTION WITH EXCAVATION UNDER OUR
MANDATORYOBLIGATION TO COMPLY WITH THE GAS SAFETY
REGULATION 1994. EXCAVATE AND DISCONNECT DOMESTIC GAS SUPPLY
AND REINSTATE
MINOR 02/10/2018 04/10/2018 3 Days PROPOSED WORKS NO C/W INCURSION AZ007-1000757316Cadent Gas Limited
0800 111 999
ALEXANDER AVENUE LONDON whole road
WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -
NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS
REPLACEMENT SCHEME
MAJOR 18/10/2018 28/11/2018 42 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MBIW07/Z020Thames Water
0800 316 9800
ALL SOULS AVENUE LONDON 124S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE
FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASEMINOR 01/10/2018 01/10/2018 1 Days PROPOSED WORKS TWO-WAY SIGNALS MU026-003156SPYG--000001
Thames Water
0800 316 9800
ALL SOULS AVENUE LONDON whole road
WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -
NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS
REPLACEMENT SCHEME
MAJOR 13/11/2018 22/01/2019 71 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MBIW07/Z004Thames Water
0800 316 9800
ALRIC AVENUE LONDONFROM JUNCTION WITH BRUCE ROAD TO JUNCTION
WITH SELWYN ROAD
WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER TO
CARRY OUT MAINS REPLACEMENT SURFACE LOCATION: CW AND FWMAJOR 03/09/2018 23/10/2018 51 Days IN PROGRESS SOME C/W INCURSION MU821-H553/MSUL03/I002
Thames Water
0800 316 9800
AMERY GARDENS LONDON whole road
WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -
NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS
REPLACEMENT SCHEME
MAJOR 24/09/2018 05/10/2018 12 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MBIW07/Z010Thames Water
0800 316 9800
ASHDON ROAD LONDON S/O 83Boundary Box Exchange Fway in Footway. Our intention is to complete
thePermanent Reinstatement in the same phaseIMMEDIATE (URGENT) 14/09/2018 20/09/2018 7 Days IN PROGRESS SOME C/W INCURSION MU301-000031148101-001
Thames Water
0800 316 9800
ASHFORD ROAD LONDON JUNCTION WITH OLIVE ROADWORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS
REPLACEMENTMAJOR 22/10/2018 09/11/2018 19 Days PROPOSED WORKS MULTI-WAY SIGNALS MU821-H553/MBIW04/I010
Thames Water
0800 316 9800
ASHFORD ROAD LONDONFROM JUNCTION WITH OLIVE ROAD TO JUNCTION
WITH LARCH ROAD
WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER TO
CARRY OUT MAINS REPLACEMENT SURFACE LOCATION: CW AND FWMAJOR 12/11/2018 30/11/2018 19 Days PROPOSED WORKS ROAD CLOSURE MU821-H553/MBIW04/I004
Thames Water
0800 316 9800
Premiership Football
Spurs vs Manchester City
October
Chamjpions League
Spurs vs Barcelona
Spurs vs Cardiff
NFL Seattle Seahawks @ Oakland Rainers
Contact detailsEstimated
End DateEvent Description
Duration
PLEASE NOTE: WORKS THAT ARE SHOWN AS PROPOSED MAY BE RESCHEDULED TO COMMENCE BEFORE OR AFTER THE DATE SHOWN OR EVEN CANCELLED. WE ALSO RESERVE THE RIGHT TO AMEND START AND END DATES IN ACCORDANCE WITH PREVAILING CONDITIONS.
NFL Philadelphia Eagles @ Jacksonville Jaguars
Month Duration
For the Week Commencing 24th September 2018
Traffic Management NotesWorks StatusStart Date
Anthony Joshua v Alexander Povetkin
for the Wold Heavyweight Championship.
November
Champions League
Spurs vs PSV
Champions League
Spurs vs Inter Milan
NFL Tennessee Titans @ Los Angeles Chargers
England vs USA (International Friendly)
England vs Croatia (Nations League)
EE Cup
London Borough of Brent
highways&[email protected] Roadworks/Events/Festivals
0208 937 5600 Network Management Team
Contact detailsEstimated
End DateEvent DescriptionMonth Duration
For the Week Commencing 24th September 2018
Traffic Management NotesWorks StatusStart Date
ASHFORD ROAD LONDONFROM THE JUNCTION WITH OLIVE ROAD TO
JUNCTION WITH LARCH ROAD
WORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS
REPLACEMENTMAJOR 12/11/2018 30/11/2018 19 Days PROPOSED WORKS ROAD CLOSURE MU821-H553/MBIW04/I011
Thames Water
0800 316 9800
ASHFORD ROAD LONDON j/w Olive RoadProposed Temporary Traffic Order for a road closure at Ashford Road j/w Olive
Road to carrying out mains replacement worksHIGHWAYS ACT PERMITS 12/11/2018 30/11/2018 19 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000931
LONDON BOROUGH OF BRENT
020 8937 5600
ATHERTON HEIGHTS WEMBLEY 22 ATHERTON HEIGHTS, WEMBLEY, BRENT Relay Short Service Pipe - WORKING IN VERGE MINOR 20/09/2018 24/09/2018 5 Days PROPOSED WORKS GIVE & TAKE MX044-10025016Affinity Water
01707 679 623
BARNINGHAM WAY LONDONS/O 470 CHURCH LANE, BARNINGHAM WAY,
LONDON, BRENT
DS0014110 - MAINS INSTALLATION TO NEW DEVELOPMENT ON BEHALF OF
AFFINITY WATER ND - CW/FW - STANDARD SLG - FW CLOSURE, PEDS
WALKWAY PROVIDED - ROAD CLOSURE
MAJOR 17/09/2018 27/09/2018 11 Days IN PROGRESS ROAD CLOSURE MX043-215ND499Affinity Water
01707 679 623
BARNINGHAM WAY LONDON j/w Church LaneProposed Temporary Traffic Order for a road closure at Barningham Way j/w Church
Lane for a new water mains installation. Our ref: TTRO/18/014HIGHWAYS ACT PERMITS 17/09/2018 27/09/2018 11 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000916
LONDON BOROUGH OF BRENT
020 8937 5600
BARRETTS GREEN ROAD LONDONJUNCTION OF ACTION LANE TO THE SIDE OF THE
MACHINE SHOP E: 520714 N: 183114
Deployment of new roadside superfast broadband cabinet and associated
connections to BT and LV power supply.STANDARD 02/10/2018 15/10/2018 14 Days PROPOSED WORKS NO C/W INCURSION ZC001-00003164 202/01454
BEAMES ROAD LONDON 37 - 55 s/o
new customer watr supply 1x90mm BP BULK supply, works in the fotway andin
Carriageway. Our intention is to complete the PermanentReinstatementin the same
phase
STANDARD 17/09/2018 28/09/2018 12 Days IN PROGRESS TWO-WAY SIGNALS MU307-000804995910060-001Thames Water
0800 316 9800
BEAUMONT AVENUE WEMBLEY 42 BEAUMONT AVENUE, WEMBLEY BRENT Relay Short Service Pipe - WORKING IN FOOTWAY MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS GIVE & TAKE MX044-10025219Affinity Water
01707 679 623
BELTON ROAD LONDON o/s 12. f\w.
Network Operations Distribution:Install / Replace / Remove electrical link
box:Replace a very poor condition Link Box in the footway. Part of HSE Initiative to
replace all Identified High Risk Link Bo
STANDARD 26/09/2018 03/10/2018 8 Days PROPOSED WORKS SOME C/W INCURSION EC400-10752671London Power Networks plc
0800 0280709
BELTON ROAD LONDON J/W HIGH ROAD WILLESDEN-BOTH DIRECTIONS Stores Compound - Welfare and storage facilities MAJOR 19/05/2018 30/11/2018 196 Days PROPOSED WORKS SOME C/W INCURSION AW042-309939LONDON BOROUGH OF BRENT
020 8937 5600
BERESFORD AVENUE WEMBLEYBERESFORD AVENUE, JUNC NORTH CIRCULAR
ROAD, WEMBLY , BRENTBURST MAIN - WORKING IN FOOTWAY IMMEDIATE (URGENT) 17/09/2018 20/09/2018 4 Days IN PROGRESS NO C/W INCURSION MX044-10025721SS
Affinity Water
01707 679 623
BERESFORD AVENUE WEMBLEY North Circular Road/Beresford road London NW10 7UD Repair Water Main - working in footway IMMEDIATE (URGENT) 17/09/2018 20/09/2018 4 Days IN PROGRESS SOME C/W INCURSION MX044-10025721KBAffinity Water
01707 679 623
BERESFORD AVENUE WEMBLEYopp junction of Craigmuir Park, Beresford Avenue,
Wembley HA0 1NY. f\w.
Network Operations Distribution:Install / Replace / Remove electrical link box:2-way
link box excavation, replacement& reinstatement. Footway closed - Pedestrians to
be diverted to opp F/W via means o
STANDARD 16/10/2018 22/10/2018 7 Days PROPOSED WORKS SOME C/W INCURSION EC300-34802198London Power Networks plc
0800 0280709
BERTIE ROAD LONDON S/O 271-279 HIGH ROAD IN BERTIE ROADBoundary Box Exchange Fway in Footway. Our intention is to complete
thePermanent Reinstatement in the same phaseIMMEDIATE (URGENT) 19/09/2018 25/09/2018 7 Days IN PROGRESS SOME C/W INCURSION MU301-000031158174-001
Thames Water
0800 316 9800
BEVERLEY DRIVE EDGWAREQUEENSBURY STATION PARADE TO WIMBORNE
DRIVE
FOOTWAY RECONSTRUCTION PROGRAMME- RESERVE SCHEME- 2018/19-
PEDESTRIAN SIGNING AND GUARDING-FOOTWAY CLOSURE, SOME C/W
INCURSION, CHAPTER 8
MAJOR 04/07/2018 01/10/2018 90 Days PROPOSED WORKS SOME C/W INCURSION AW042-292288LONDON BOROUGH OF BRENT
020 8937 5600
BLOCKLEY ROAD WEMBLEY Junction Pasture Road Short Section Footway Relay STANDARD 01/10/2018 12/10/2018 12 Days PROPOSED WORKS SOME C/W INCURSION AW999-S000000000387LONDON BOROUGH OF BRENT
020 8937 5600
BOWRONS AVENUE WEMBLEY OUTSIDE NO.1 REMOVE FOOTWAY BLOCKAGE TO ALLOW CUSTOMER CONNECTION MINOR 28/09/2018 29/09/2018 2 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJBU/107085/LBCVirgin Media
0870 8883117
BOWRONS AVENUE WEMBLEY OUTSIDE NO.33 REMOVE FOOTWAY BLOCKAGE TO ALLOW CUSTOMER CONNECTION MINOR 28/09/2018 29/09/2018 2 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJBU/107085/LBC1Virgin Media
0870 8883117
BOYCROFT AVENUE LONDON 162, BOYCROFT AVENUE, LONDON, BRENT COMMUNICATION PIPE - REPLACE; 25 MDPE; 4' CI; 1 OF 1 MINOR 24/09/2018 26/09/2018 3 Days PROPOSED WORKS SOME C/W INCURSION MX044-285144600Affinity Water
01707 679 623
BRAEMAR AVENUE LONDONRESHELL PCP38, S/O 492 NEASDEN LANE NORTH,
BRAEMAR AVENUE
Erect/Renew 1 PCP cabinet and base (600mm x 300mm x 1000mm),Install 1m of 3
poly ducts in Footway,Provide 3 core drill(s) into jointbox or buildingMINOR 24/09/2018 26/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION BC006-TI001LC500269181400
BT
03301 233753
BRAMPTON GROVE WEMBLEY Outside 24 - 26 Short Section Footway Relay STANDARD 17/09/2018 28/09/2018 12 Days IN PROGRESS SOME C/W INCURSION AW999-S000000000388LONDON BOROUGH OF BRENT
020 8937 5600
BRENTFIELD ROAD LONDON Shackleton House, Stonebridge Park Water meter pit installation in footway MINOR 03/10/2018 05/10/2018 3 Days PROPOSED WORKS NO C/W INCURSION MU039-MGJV/BULK/200402Thames Water
0800 316 9800
BRENTVALE AVENUE WEMBLEY outside 71 to 73CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS
ONLYMINOR 25/09/2018 26/09/2018 2 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14004968J9A
Virgin Media
0870 8883117
BRONDESBURY PARK LONDON OUTSIDE NO.NW2 5JL REMOVE CARRIAGEWAY BLOCKAGE MINOR 08/10/2018 10/10/2018 3 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJFI/96706/LSME1Virgin Media
0870 8883117
BRONDESBURY VILLAS LONDON 101A CUSTOMER SIDE LEAKAGE REPAIR MINOR 27/09/2018 01/10/2018 5 Days PROPOSED WORKS NO C/W INCURSION MU356-003156SJSV--000001Thames Water
0800 316 9800
BROOK ROAD LONDON 25 CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT MINOR 24/09/2018 26/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION MU356-003156STNL--000001Thames Water
0800 316 9800
BROOKFIELD CRESCENT HARROW whole roadFOOTWAY RECONSTRUCTION PROGRAMME 2018/19-PEDESTRIAN SIGNING
AND GUARDING-FOOTWAY CLOSURE, SOME C/W INCURSION, CHAPTER 8MAJOR 17/09/2018 30/11/2018 75 Days IN PROGRESS SOME C/W INCURSION AW042-325265
LONDON BOROUGH OF BRENT
020 8937 5600
BURGESS AVENUE LONDONoutside Side of 157 Townsend Lane on Burgess
Avenue to 66 Burgess Avenue
CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS
ONLYMINOR 22/09/2018 25/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14040747J9A
Virgin Media
0870 8883117
BURNSIDE CRESCENT WEMBLEY WHOLE ROAD
FOOTWAY RECONSTRUCTION PROGRAMME- RESERVE SCHEME- 2018/19-
PEDESTRIAN SIGNING AND GUARDING-FOOTWAY CLOSURE, SOME C/W
INCURSION, CHAPTER 8
MAJOR 04/07/2018 01/10/2018 90 Days PROPOSED WORKS SOME C/W INCURSION AW042-292330LONDON BOROUGH OF BRENT
020 8937 5600
CAMPDEN CRESCENT WEMBLEY WHOLE ROAD
FOOTWAY RECONSTRUCTION PROGRAMME- RESERVE SCHEME- 2018/19-
PEDESTRIAN SIGNING AND GUARDING-FOOTWAY CLOSURE, SOME C/W
INCURSION, CHAPTER 8
MAJOR 04/07/2018 01/10/2018 90 Days PROPOSED WORKS SOME C/W INCURSION AW042-292337LONDON BOROUGH OF BRENT
020 8937 5600
CARDINAL HINSLEY CLOSE LONDON whole road
WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -
NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS
REPLACEMENT SCHEME
MAJOR 08/11/2018 16/11/2018 9 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MSUL40/Z001Thames Water
0800 316 9800
CARLISLE ROAD LONDON 21 OUTSIDE STOP VALVE REPLACEMENT IN FOOTWAY - LEAK REPAIR MINOR 19/09/2018 21/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION MU260-CSL-MGJV-200141Thames Water
0800 316 9800
London Borough of Brent
highways&[email protected] Roadworks/Events/Festivals
0208 937 5600 Network Management Team
Contact detailsEstimated
End DateEvent DescriptionMonth Duration
For the Week Commencing 24th September 2018
Traffic Management NotesWorks StatusStart Date
CARLTON VALE LONDON j/w Kilburn Park Road Sewer surveys - night work - no excavation HIGHWAYS ACT PERMITS 20/09/2018 21/09/2018 2 Days PROPOSED WORKS MULTI-WAY SIGNALS AW888-L-MAIN-00000940LONDON BOROUGH OF BRENT
020 8937 5600
CARLYON ROAD WEMBLEY s/o 255 Ealing Road
Proposed Temporary Traffic Order for a footway closure in Carlyon Road o/s new
development 255 Ealing Road to allow construction to be carried out. Our ref:
TTRO/18/001
HIGHWAYS ACT PERMITS 30/04/2018 17/12/2018 232 Days PROPOSED WORKS NO C/W INCURSION AW888-L-MAIN-00000886LONDON BOROUGH OF BRENT
020 8937 5600
CEDAR ROAD LONDONFROM JUNCTION WITH MORA ROAD TO JUNCTION
WITH IVY ROAD
WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER TO
CARRY OUT MAINS REPLACEMENT SURFACE LOCATION: CW AND FWMAJOR 03/09/2018 28/09/2018 26 Days IN PROGRESS SOME C/W INCURSION MU821-H553/MBIW04/I005
Thames Water
0800 316 9800
CENTRAL ROAD WEMBLEY FROM OPP NO.1 TO J/O DISTRICT ROAD IMGA192406. ABANDON 45M X 4' CI MAIN AND INSERT 75MM PE MAJOR 21/09/2018 11/10/2018 21 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000740451Cadent Gas Limited
0800 111 999
CENTRAL ROAD WEMBLEY CENTRAL ROAD, S/O NO.101 DISTRICT ROAD IMGA192406. STORAGE / COMPOUND / MUCK AND SPOIL AREA MAJOR 03/08/2018 12/10/2018 71 Days IN PROGRESS NO C/W INCURSION AZ007-1000732033Cadent Gas Limited
0800 111 999
CHADWICK ROAD LONDON footpath o/s 8 Trace, then excavate to repair gas escape and reinstate where possible IMMEDIATE (EMERGENCY) 17/09/2018 25/09/2018 9 Days IN PROGRESS NO C/W INCURSION AZ007-1000757401Cadent Gas Limited
0800 111 999
CHAMBERLAYNE ROAD LONDONChamberlayne Road from junction of Mostyn Road to
junction ofWakemanRoad
IMGA182254. replace approx 140m of 30in Medium Pressure CI GasMainwithNew
PE main by means of insertion. Includes 2 connectionsandremoval of a bendMAJOR 10/09/2018 04/10/2018 25 Days IN PROGRESS MULTI-WAY SIGNALS AZ007-1000754675
Cadent Gas Limited
0800 111 999
CHAMBERLAYNE ROAD LONDON j/w Banister RoadMajor Gas works - 3 way temp lights at Banister Road junction. Mortimor Road and
Harvist Road will be closed at the junction of Chamberlayne Road for the duration.HIGHWAYS ACT PERMITS 10/09/2018 07/10/2018 28 Days PROPOSED WORKS MULTI-WAY SIGNALS AW888-L-MAIN-00000926
LONDON BOROUGH OF BRENT
020 8937 5600
CHAMBERLAYNE ROAD LONDONIN THE NEARSIDE FOOTWAY OUTSIDE 153
CHAMBERLAYNE ROAD
ALTER AND RELAY 2X DOMESTIC SERVICE 3M FROM 75MM PE MAIN IN
NEARSIDEFOOTWAYMINOR 16/10/2018 18/10/2018 3 Days PROPOSED WORKS TWO-WAY SIGNALS AZ007-1000756403
Cadent Gas Limited
0800 111 999
CHANDOS ROAD LONDON TK1 - Flank wall of No.97 Melrose Av.. f\w.Connections Highway Services:Works on behalf of local authority (Works For Road
Purposes) :Pay and display scheme on behalf of LBB - Valji SenganiSTANDARD 21/09/2018 26/09/2018 6 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753439
London Power Networks plc
0800 0280709
CHANDOS ROAD LONDONCHANDOS ROAD, WHOLE STREET, FROM C/O
NO.97 MELROSE AVENUE TO C/O CHANDOSHOUSE
IMGA192010 ABANDON 229M X 4' CI MAIN AND INSERT 75MM PE AND RELAY
ORTRANSFER SERVICES.MAJOR 19/11/2018 21/12/2018 33 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000747624
Cadent Gas Limited
0800 111 999
CHAPLIN ROAD LONDON TK2 - Flank wall of 13 Belton RD. f\w.Connections Highway Services:Works on behalf of local authority (Works For Road
Purposes) :Pay and display scheme on behalf of LBB - Valji SenganiSTANDARD 21/09/2018 26/09/2018 6 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753437
London Power Networks plc
0800 0280709
CHAPLIN ROAD LONDON s/o 12 Belton road in Chaplin road. f\w.
Network Operations Distribution:Install / Replace / Remove electrical link
box:Replace a very poor condition Link Box in the footway. Part of HSE Initiative to
replace all Identified High Risk Link Bo
STANDARD 26/09/2018 03/10/2018 8 Days PROPOSED WORKS SOME C/W INCURSION EC400-10752676London Power Networks plc
0800 0280709
CHAPTER ROAD LONDON 221 CHAPTER ROAD, LONDON, NW2 5LUMain Clamp 0 to 6' Cway in Carriageway. Our intention is to complete thePermanent
Reinstatement in the same phaseMINOR 20/09/2018 24/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION MU301-000031153354-001
Thames Water
0800 316 9800
CHAPTER ROAD LONDON outside 60 to 64CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS
ONLYMINOR 22/09/2018 25/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14061025J9
Virgin Media
0870 8883117
CHAPTER ROAD LONDON TK3 - O/S NO.294. f\w.Connections Highway Services:Works on behalf of local authority (Works For Road
Purposes) :Pay and display scheme on behalf of LBB - Valji SenganiSTANDARD 21/09/2018 26/09/2018 6 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753435
London Power Networks plc
0800 0280709
CHATSWORTH AVENUE WEMBLEY OUTSIDE JUNIOR SCHOOL LAY NEW DUCT IN FOOTWAY TO ALLOW CUSTOMER CONNECTION STANDARD 09/10/2018 16/10/2018 8 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJBU/98885/LBAVirgin Media
0870 8883117
CHRISTCHURCH AVENUE LONDON 19 - 19 opp
New customer water supply 6x25mm MDPE mtrd, works in the footway and
inCarriageway. Our intention is to complete the Permanent Reinstatement inthe
same phase
STANDARD 17/09/2018 21/09/2018 5 Days IN PROGRESS PRIORITY WORKING MU307-000807056180100-001Thames Water
0800 316 9800
CHURCH LANE LONDON outside 105 to 109CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS
ONLYMINOR 21/09/2018 24/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14057729J9A
Virgin Media
0870 8883117
CHURCH LANE LONDON O/S 359 , CHURCH LANE Demolish 1 existing jointbox(s) or cabinet base(s) MINOR 24/09/2018 26/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION BC006-TI001LC500262181800BT
03301 233753
CHURCH PATH LONDONFROM JUNCTION WITH REDFERN ROAD TO
OUTSIDE NO 155
WORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS
REPLACEMENT SURFACE LOCATION: CW AND FWMAJOR 13/11/2018 10/12/2018 28 Days PROPOSED WORKS SOME C/W INCURSION MU821-H553/MKET13/I002
Thames Water
0800 316 9800
CHURCHILL ROAD LONDON
CHURCHILL ROAD, WHOLE STREET, FROM C/O
NO.1 BALMORAL ROAD TO C/O NO.138CHAPTER
ROAD
IMGA192010 ABANDON 236M X 8' CI MAIN AND INSERT 125MM PE AND RELAY
ORTRANSFER SERVICES.MAJOR 19/11/2018 21/12/2018 33 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000748012
Cadent Gas Limited
0800 111 999
CLAREMONT ROAD LONDON KILBURN LANE TO NUMBER 19 MAJOR CARRIAGEWAY RESSURFACING WORKS-ROAD CLOSURE 2018-2019 MAJOR 27/07/2018 24/10/2018 90 Days PROPOSED WORKS ROAD CLOSURE AW042-290797LONDON BOROUGH OF BRENT
020 8937 5600
CLARENDON GARDENS WEMBLEY 159Non-excavation permit for closing the road relating to sewer repair works on
Wembley Park DriveIMMEDIATE (EMERGENCY) 18/09/2018 01/10/2018 14 Days IN PROGRESS ROAD CLOSURE MU026-008107LDQG--0002
Thames Water
0800 316 9800
CLARENDON GARDENS WEMBLEYA DOMESTIC GAS ALTERATION AND RELAY FOR 38
CLARENDON GARDENS 2M THE MAIN
A DOMESTIC GAS ALTERATION AND RELAY FOR 38 CLARENDON GARDENS
2M THE MAINSTANDARD 04/10/2018 10/10/2018 7 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000758284
Cadent Gas Limited
0800 111 999
CLIFTON AVENUE WEMBLEY 51 CLIFTON AVE, WEMBLEY, BRENT Relay Long Service Pipe - working in footway and carriageway MINOR 18/09/2018 20/09/2018 3 Days IN PROGRESS GIVE & TAKE MX044-10013179Affinity Water
01707 679 623
COMPTON ROAD LONDONFROM THE JUNCTION WITH WAKEMAN ROAD TO
THE JUNCTION WITH PEMBER ROAD
MAJOR LARGE DIAMETER MAINS REPLACEMENT WORKS TO TAKE
PLACE.ABANDON154MOF METALLIC MAIN AND REPLACE IT WITH 154M OF
PE MAIN. INSERTION METHOD TO BE USED, NEW MAIN TO BE SLEEVED
INSIDE THE OLDTOREDUCEEX
MAJOR 20/09/2018 27/11/2018 69 Days PROPOSED WORKS ROAD CLOSURE AZ007-1000682228Cadent Gas Limited
0800 111 999
CONDUIT WAY LONDON 89-91 OUTSIDE STOP VALVE REPLACEMENT IN FOOTWAY - LEAK REPAIR MINOR 19/09/2018 21/09/2018 3 Days IN PROGRESS NO C/W INCURSION MU260-CSL-MGJV-200128Thames Water
0800 316 9800
COOPER ROAD LONDON 33B Box Install<33mm Fway in Footway. Our intention is to completethe Permanent
Reinstatement in the same phaseIMMEDIATE (URGENT) 19/09/2018 25/09/2018 7 Days IN PROGRESS SOME C/W INCURSION MU301-000031155167-001
Thames Water
0800 316 9800
COPPERMEAD CLOSE LONDONNEARSIDE FOOTWAY OUTSIDE OF NO. PLOT ONE
COPPER MEAD CLOSELAY NEW DOMESTIC SERVICE 2M FROM MAIN IN NEARSIDE FOOTWAY STANDARD 09/10/2018 15/10/2018 7 Days PROPOSED WORKS NO C/W INCURSION AZ007-1000755829
Cadent Gas Limited
0800 111 999
CORINIUM CLOSE WEMBLEY Outside number 5 . . f\w.
Connections Projects:Installation of a new electricity supply for a customer:Joint Bay
to expose .95ew cable for jointing. 35ew 3 core cable pull from joint bay to customer
service head position
MINOR 28/09/2018 02/10/2018 5 Days PROPOSED WORKS SOME C/W INCURSION EC300-34801698London Power Networks plc
0800 0280709
CORNWALL GARDENS LONDON 24B Box Install<33mm Fway in Footway. Our intention is to completethe Permanent
Reinstatement in the same phaseIMMEDIATE (URGENT) 14/09/2018 20/09/2018 7 Days IN PROGRESS SOME C/W INCURSION MU301-000031155344-001
Thames Water
0800 316 9800
CORONATION ROAD LONDONRoundabout junction on Coronation Road (Roundabout
with Rainsford Road)1x Joint Bay MAJOR 10/09/2018 25/09/2018 16 Days IN PROGRESS SOME C/W INCURSION ZP011-P-0094478/R11 202/01230
London Borough of Brent
highways&[email protected] Roadworks/Events/Festivals
0208 937 5600 Network Management Team
Contact detailsEstimated
End DateEvent DescriptionMonth Duration
For the Week Commencing 24th September 2018
Traffic Management NotesWorks StatusStart Date
CRANLEIGH GARDENS HARROW outside 30 to 34CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED
TEE and REPAIR BLOCKAGES IF FOUND, FOOTWAY WORKS ONLYMINOR 22/09/2018 25/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/13897467J9
Virgin Media
0870 8883117
CRAVEN PARK ROAD LONDON 76Remedial Works Following Defect Inspection- To rectify remedial work in
CarriagewayMINOR 26/09/2018 28/09/2018 3 Days PROPOSED REMEDIAL GIVE & TAKE AZ007-1000608009
Cadent Gas Limited
0800 111 999
CRICKLEWOOD BROADWAY LONDON O/S 147/149 Trial digs around shelter to confirm type of foundations - 0105/0104 MINOR 21/09/2018 23/09/2018 3 Days PROPOSED WORKS SOME C/W INCURSION RK001-00040815 202/00487
CUMBERLAND AVENUE LONDON WHOLE ROAD MAJOR CARRIAGEWAY RESURFACING WORKS -2018-2019-ROAD CLOSURE MAJOR 20/09/2018 22/09/2018 3 Days PROPOSED WORKS ROAD CLOSURE AW042-290740LONDON BOROUGH OF BRENT
020 8937 5600
DAIRY CLOSE LONDON whole road
WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -
NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS
REPLACEMENT SCHEME
MAJOR 11/10/2018 25/10/2018 15 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MSUL39/Z001Thames Water
0800 316 9800
DARTMOUTH ROAD LONDON outside 2 to 6CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED
TEE and REPAIR BLOCKAGES IF FOUND, FOOTWAY WORKS ONLYMINOR 21/09/2018 24/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14083519J9
Virgin Media
0870 8883117
DARTMOUTH ROAD LONDON TK5 - Flank Wall of 19 Mapesbury RD. f\w.Connections Highway Services:Works on behalf of local authority (Works For Road
Purposes) :Pay and display scheme on behalf of LBB - Valji SenganiSTANDARD 21/09/2018 26/09/2018 6 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753430
London Power Networks plc
0800 0280709
DARTMOUTH ROAD LONDON TK4 - opposite NO.37. f\w.Connections Highway Services:Works on behalf of local authority (Works For Road
Purposes) :Pay and display scheme on behalf of LBB - Valji SenganiSTANDARD 21/09/2018 26/09/2018 6 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753432
London Power Networks plc
0800 0280709
DARTMOUTH ROAD LONDON s/o 22 Mapesbury Road in Dartmouth Road nw2. f\w.
Network Operations Distribution:Install / Replace / Remove electrical link
box:Replace a very poor condition Link Box in the footway. Part of HSE Initiative to
replace all Identified High Risk Link Bo
STANDARD 09/10/2018 16/10/2018 8 Days PROPOSED WORKS NO C/W INCURSION EC400-10753143London Power Networks plc
0800 0280709
DEERHURST ROAD LONDON TK6 - Adjacent to car park, 68 Chatsworth RD. f\w.
Connections Highway Services:Works on behalf of local authority (Works For Road
Purposes) :Works on behalf of local authority - Disconnection Scheme to pay and
display units. Working in the footway wi
STANDARD 21/09/2018 26/09/2018 6 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753429London Power Networks plc
0800 0280709
DENZIL ROAD LONDON 6 / FIRST FLOOR CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT MINOR 20/09/2018 24/09/2018 5 Days PROPOSED WORKS NO C/W INCURSION MU356-003156SVFN--000001Thames Water
0800 316 9800
DISTRICT ROAD WEMBLEY ALLENDALE ROAD TO MAYBANK OPEN SPACE
FOOTWAY RECONSTRUCTION PROGRAMME- RESERVE SCHEME- 2018/19-
PEDESTRIAN SIGNING AND GUARDING-FOOTWAY CLOSURE, SOME C/W
INCURSION, CHAPTER 8
MAJOR 04/07/2018 01/10/2018 90 Days PROPOSED WORKS SOME C/W INCURSION AW042-292333LONDON BOROUGH OF BRENT
020 8937 5600
DISTRICT ROAD WEMBLEY FROM OPP. NO.37 TO O/S NO.110IMGA192406. ABANDON 386M X 4' CI MAIN AND INSERT 90MM
PEANDRELAYORTRANSFER APPROX 70 SERVICESMAJOR 17/07/2018 31/10/2018 107 Days IN PROGRESS SOME C/W INCURSION AZ007-1000688642
Cadent Gas Limited
0800 111 999
DOLLIS HILL LANE LONDON 201 CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT MINOR 27/09/2018 01/10/2018 5 Days PROPOSED WORKS NO C/W INCURSION MU356-003156STHR--000001Thames Water
0800 316 9800
DOLLIS HILL LANE LONDON 49-51 DOLLIS HILL LANE, NW2 6JHFerrule Exchange in Carriageway. Our intention is to complete thePermanent
Reinstatement in the same phaseMINOR 08/10/2018 10/10/2018 3 Days PROPOSED WORKS SOME C/W INCURSION MU301-000031151993-001
Thames Water
0800 316 9800
DRAYTON ROAD LONDON 102Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME
PERMANENT REINSTATEMENT WITHIN SAME PHASEMINOR 01/10/2018 01/10/2018 1 Days PROPOSED WORKS GIVE & TAKE MU026-003156SHVS--000001
Thames Water
0800 316 9800
DUDDEN HILL LANE LONDON O/s 167. f\w. c\w.Connections Projects:Electrical service alteration to customer supply:Disconnection
of existing serviceSTANDARD 03/10/2018 09/10/2018 7 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753153
London Power Networks plc
0800 0280709
DYNE ROAD LONDON 1a/1b opp
new customer water supply 1x90mm BP mtrd F/H, works in the footway andin
Carriageway. Our intention is to complete the Permanent Reinstatementin the same
phase
STANDARD 24/09/2018 27/09/2018 4 Days PROPOSED WORKS PRIORITY WORKING MU307-000806943350270-001Thames Water
0800 316 9800
DYNE ROAD LONDON S/O 1B - O/S AND OPP1x125mm BP NEW WATER METER SUPPLY IN F.WAY AND in Carriageway.
Ourintention is to complete the Permanent Reinstatement in the same phaseSTANDARD 24/09/2018 02/10/2018 9 Days PROPOSED WORKS PRIORITY WORKING MU307-000806987400100-001
Thames Water
0800 316 9800
EALING ROAD WEMBLEY outside 104 to 80 OUT OF HOURS CABLE PULL - FOOTWAY WORKS ONLY - NO EXCAVATION MINOR 20/09/2018 20/09/2018 1 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/12435883N9Virgin Media
0870 8883117
EALING ROAD WEMBLEY
O/S 6-3 T OPP JCN CARLYON ROAD TO ACROSS
C/W TO AT JCN WITH CARLYON ROAD, EALING
ROAD
Locate and excavate 2 blockages in existing duct MINOR 24/09/2018 25/09/2018 2 Days PROPOSED REMEDIAL NO C/W INCURSION BC006-TI001LC500268396700BT
03301 233753
EALING ROAD WEMBLEY OUTSIDE 188FIT NEW TEE AND LAY DUCT IN FOOTWAY AND CARRIAGEWAY FOR
CUSTOMER CONNECTIONMINOR 27/09/2018 01/10/2018 5 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJBU/98844/LBA
Virgin Media
0870 8883117
EALING ROAD WEMBLEY on the corner with Bowrons AvenueNon excavation works - Pedestrian management 50m barrier around cabinets for
repair/maintenance, Pedestrian diversion , shop entrances left clearMINOR 04/10/2018 05/10/2018 2 Days PROPOSED WORKS NO C/W INCURSION MG014-44936-RTS-CG-CABS 202/00486
EAST HILL WEMBLEY Junction Barn Way Short Section Footway Relay STANDARD 24/09/2018 05/10/2018 12 Days PROPOSED WORKS SOME C/W INCURSION AW999-S000000000386LONDON BOROUGH OF BRENT
020 8937 5600
EDGWARE ROAD LONDON Outside of Hyde House. f\w.Connections Highway Services:NEW SERVICE: (APPROX DEPTH 450mm-
600mm):New metered connection to Virgin Media cabinetSTANDARD 24/09/2018 28/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION EC300-34800203
London Power Networks plc
0800 0280709
EDGWARE ROAD LONDONIn lane 1 and 2 of the n/b c/w approx 60m s of the junc
with Gladstone Park GardensTfL speed camera works - 2 lane piezos, loops and centre scm MINOR 03/10/2018 05/10/2018 3 Days PROPOSED WORKS TWO-WAY SIGNALS YG504-392638
TFL
0343 222 1234
EDGWARE ROAD LONDONFrom j/o Wakemans Hill Avenue to j/o Windover
Avenue, Edgware Road, Brent, London.. c\w.
Network Operations Distribution:Install / Replace / Remove electrical link
box:Excavation of trench in carriageway to enable the installation of a duct that will
accommodate a new high voltage cable.
MAJOR 24/09/2018 16/11/2018 54 Days PROPOSED WORKS MULTI-WAY SIGNALS EC300-34795204London Power Networks plc
0800 0280709
ELSPETH ROAD WEMBLEY whole Rd Trunk Main Reinforcement. Kier working on behalf of Affinity Water. MAJOR 24/09/2018 04/11/2018 42 Days POTENTIAL WORKS PRIORITY WORKING MX049-TMRFELSPETHRDAffinity Water
01707 679 623
ELTHORNE WAY LONDON WHOLE ROAD
FOOTWAY RECONSTRUCTION PROGRAMME- RESERVE SCHEME- 2018/19-
PEDESTRIAN SIGNING AND GUARDING-FOOTWAY CLOSURE, SOME C/W
INCURSION, CHAPTER 8
MAJOR 04/07/2018 01/10/2018 90 Days PROPOSED WORKS SOME C/W INCURSION AW042-292339LONDON BOROUGH OF BRENT
020 8937 5600
EMPIRE WAY WEMBLEYO/S 1-49 MAPLE HOUSE TO OPP 64-72 RAGLAN
COURT , EMPIRE WAYLocate and excavate 2 blockage in existing duct MINOR 19/09/2018 21/09/2018 3 Days IN PROGRESS NO C/W INCURSION BC006-TI001LC500268968200
BT
03301 233753
ENGINEERS WAY WEMBLEY Junction of Olympic Way Excavate large HV joint bay in FW for UKPN disconnection. STANDARD 17/09/2018 21/09/2018 5 Days IN PROGRESS SOME C/W INCURSION VQ004-UKP7405 202/01887
ENGINEERS WAY WEMBLEY Stadium Boxing - Joshua v Povetkin HIGHWAYS ACT PERMITS 22/09/2018 22/09/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000914LONDON BOROUGH OF BRENT
020 8937 5600
ENGINEERS WAY WEMBLEY
ETHERNET CIRCUIT NUMBER BTSA210412, S58
WAIVER INC, OPP RUTHERFORD WAY JUNC,
ENGINEERS WAY
Build 1 concrete chamber 915mm x 445mm x 965mm deep in Footway,Install 2m of
1 way poly duct in FootwayMINOR 24/09/2018 26/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION BC006-TI001LC500267688200
BT
03301 233753
London Borough of Brent
highways&[email protected] Roadworks/Events/Festivals
0208 937 5600 Network Management Team
Contact detailsEstimated
End DateEvent DescriptionMonth Duration
For the Week Commencing 24th September 2018
Traffic Management NotesWorks StatusStart Date
ENGINEERS WAY WEMBLEY Stadium Tottenham v Barcelona HIGHWAYS ACT PERMITS 03/10/2018 03/10/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000933LONDON BOROUGH OF BRENT
020 8937 5600
ENGINEERS WAY WEMBLEY Stadium Tottenham v Cardiff HIGHWAYS ACT PERMITS 06/10/2018 06/10/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000920LONDON BOROUGH OF BRENT
020 8937 5600
ENGINEERS WAY WEMBLEY Stadium NFL - Seattle Seahawks @ Oakland Raiders HIGHWAYS ACT PERMITS 14/10/2018 14/10/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000921LONDON BOROUGH OF BRENT
020 8937 5600
ENGINEERS WAY WEMBLEY Stadium NFL - Titans @ Chargers HIGHWAYS ACT PERMITS 21/10/2018 21/10/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000865LONDON BOROUGH OF BRENT
020 8937 5600
ENGINEERS WAY WEMBLEY Stadium NFL - Eagles @ Jaguars HIGHWAYS ACT PERMITS 28/10/2018 28/10/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000866LONDON BOROUGH OF BRENT
020 8937 5600
ENGINEERS WAY WEMBLEY Stadium Tottenham v Man City HIGHWAYS ACT PERMITS 29/10/2018 29/10/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000934LONDON BOROUGH OF BRENT
020 8937 5600
ENGINEERS WAY WEMBLEY Stadium Tottenham v PSV HIGHWAYS ACT PERMITS 06/11/2018 06/11/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000935LONDON BOROUGH OF BRENT
020 8937 5600
ENGINEERS WAY WEMBLEY Stadium England v USA HIGHWAYS ACT PERMITS 15/11/2018 15/11/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000893LONDON BOROUGH OF BRENT
020 8937 5600
ENGINEERS WAY WEMBLEY Stadium England v Croatia HIGHWAYS ACT PERMITS 18/11/2018 18/11/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000867LONDON BOROUGH OF BRENT
020 8937 5600
ENGINEERS WAY WEMBLEY Stadium EE Wembley Cup HIGHWAYS ACT PERMITS 25/11/2018 25/11/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000937LONDON BOROUGH OF BRENT
020 8937 5600
ENGINEERS WAY WEMBLEY Stadium Tottenham v Inter Milan HIGHWAYS ACT PERMITS 28/11/2018 28/11/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000936LONDON BOROUGH OF BRENT
020 8937 5600
ETON GROVE LONDON 63 eton grove Brent Repair Water Main in the footway IMMEDIATE (URGENT) 17/09/2018 21/09/2018 5 Days IN PROGRESS SOME C/W INCURSION MX044-10025625Affinity Water
01707 679 623
EVELYN AVENUE LONDON whole roadFOOTWAY RECONSTRUCTION PROGRAMME 2018/19-PEDESTRIAN SIGNING
AND GUARDING-FOOTWAY CLOSURE, SOME C/W INCURSIONMAJOR 25/06/2018 28/09/2018 96 Days IN PROGRESS SOME C/W INCURSION AW042-292009
LONDON BOROUGH OF BRENT
020 8937 5600
FAIRFIELDS CRESCENT LONDON WHOLE ROAD MAJOR C/W RESURFACING(RESERVE SCHEME)-2018-2019-ROAD CLOSURE MAJOR 28/06/2018 25/09/2018 90 Days IN PROGRESS ROAD CLOSURE AW042-291118LONDON BOROUGH OF BRENT
020 8937 5600
FELIXSTOWE ROAD LONDON O/S NO 17/19 TO O/S NO 5, FELIXSTOWE ROAD Locate and excavate 1 blockage in existing duct MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS NO C/W INCURSION BC006-TI001LC500269051200BT
03301 233753
FELIXSTOWE ROAD LONDON O/S NO 17/19 TO O/S NO 45/47, FELIXSTOWE ROAD Locate and excavate 1 blockage in existing duct MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS NO C/W INCURSION BC006-TI001LC500269051600BT
03301 233753
FELIXSTOWE ROAD LONDONO/S NO 47 TO CNR JCTN WITH PURVES RD ON,
FELIXSTOWE ROADLocate and excavate 1 blockage in existing duct MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS NO C/W INCURSION BC006-TI001LC500269053500
BT
03301 233753
FERNWOOD AVENUE WEMBLEYFERNWOOD AVENUE, FROM C/O NO.203 CHAPLIN
ROADTOC/ONO.35/36FERNWOODAVENUE
IMGA192407 ABANDON APPROXIMATELY 62M X 4' CI
MAINANDINSERT75MMPEANDRELAYOR TRANSFER SERVICES.STANDARD 21/09/2018 04/10/2018 14 Days PROPOSED WORKS NO C/W INCURSION AZ007-1000748116
Cadent Gas Limited
0800 111 999
FIRST AVENUE WEMBLEY 3 FIRST AVENUE, PINNER, HA5 Relay Long Service Pipe - working in footway and carriageway MINOR 18/09/2018 20/09/2018 3 Days IN PROGRESS SOME C/W INCURSION MX044-10013012Affinity Water
01707 679 623
FIRST AVENUE WEMBLEY outside 10 to 14 INTERIM TO PERMANENT REINSTATEMENT INT HE FOOTWAY MINOR 29/09/2018 01/10/2018 3 Days PROPOSED PERMANENT NO C/W INCURSION NK100-/SSERRE/14027925J9AVirgin Media
0870 8883117
FIRST WAY WEMBLEY ENTRANCE TO CANNON INDUSTRIAL ESTATEIMGD180192. DIVERSION - CUT OFF EXISTING 125MM MAIN TO ALLOW
SITEREDEVELOPMENTSTANDARD 17/09/2018 24/09/2018 8 Days IN PROGRESS NO C/W INCURSION AZ007-1000744752
Cadent Gas Limited
0800 111 999
FIRST WAY WEMBLEY Footway - Gate 5 to opp Dhamecha
Proposed Temporary Traffic Order for a footway closure and temporary pedestrian
crossings o/s Plot E05 in First Way to carry out construction works. Our ref:
TTRO/17/032
HIGHWAYS ACT PERMITS 04/12/2017 03/06/2019 547 Days PROPOSED WORKS NO C/W INCURSION AW888-L-MAIN-00000831LONDON BOROUGH OF BRENT
020 8937 5600
FOXHOLT GARDENS LONDON 0pp 10Fire Hydrant Repack Gland No Excav in Footway. Our intention is tocomplete the
Permanent Reinstatement in the same phaseMINOR 19/09/2018 21/09/2018 3 Days IN PROGRESS SOME C/W INCURSION MU301-000031155965-001
Thames Water
0800 316 9800
FOXHOLT GARDENS LONDON 9 FOXHOLT GARDENS, LONDON, NW10 0TAValve Repack 0 to 6' Cway in Carriageway. Our intention is to completethe
Permanent Reinstatement in the same phaseIMMEDIATE (URGENT) 18/09/2018 24/09/2018 7 Days IN PROGRESS SOME C/W INCURSION MU301-000031152064-001
Thames Water
0800 316 9800
FRYENT WAY LONDON o/s moot court fryent way Repair Water Main (Urgent) - WORKING IN THE VERGE IMMEDIATE (URGENT) 18/09/2018 20/09/2018 3 Days IN PROGRESS NO C/W INCURSION MX044-10026098Affinity Water
01707 679 623
FULTON ROAD WEMBLEY
130M NORTHEAST AND ACROSS C/W TO 152M
EAST FROM JCTN WITH HARBUTT RD ON, FULTON
ROAD
Build 1 concrete chamber 915mm x 445mm x 965mm deep in Footway,Build 1
concrete chamber 725mm x 255mm x 665mm deep in Footway,Install 12m of 1 way
poly duct in Carriageway,Install 12m of 1 way poly d
STANDARD 24/09/2018 27/09/2018 4 Days PROPOSED WORKS TWO-WAY SIGNALS BC006-TI001LC500267670900BT
03301 233753
FULTON ROAD WEMBLEY from J/w Olympic Way to 50m west - f/way closureProposed Temporary Traffic Order for a footway closure o/s Box Park - Fulton Road
j/w Olympic Way to allow for construction works. Our ref: TTRO/18/004HIGHWAYS ACT PERMITS 31/07/2018 30/11/2018 123 Days PROPOSED WORKS NO C/W INCURSION AW888-L-MAIN-00000909
LONDON BOROUGH OF BRENT
020 8937 5600
GLENGALL ROAD LONDON O/s 135. f\w.
Network Operations Faults:Essential and immediate replacement or repair of multi-
way link box to ensure safe and reliable power supplies:urgent repairs to faulted link
box
IMMEDIATE (URGENT) 17/09/2018 24/09/2018 8 Days IN PROGRESS SOME C/W INCURSION EC400-10753547London Power Networks plc
0800 0280709
GOWAN ROAD LONDONFROM JUNCTION WITH HIGH ROAD TO OUTSIDE NO
58
WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER TO
CARRY OUT MAINS REPLACEMENT SURFACE LOCATION: CW AND FWMAJOR 24/09/2018 22/10/2018 29 Days PROPOSED WORKS SOME C/W INCURSION MU821-H553/MSUL25/I004
Thames Water
0800 316 9800
GREAT CENTRAL WAY WEMBLEYon footway Great Central Way, approx 30 yds from
Hannah CLose
SRC Defects - taking photos/ Testing/ Labelling -All works within existing cabinet.
Some C/W incursion. Works to be on the footpath and verge. Personal barriers to be
used Fault Invesigation & Rectif
MINOR 21/09/2018 21/09/2018 1 Days PROPOSED WORKS NO C/W INCURSION NX260-VF86164WHP/NJE05Vodafone
01724 848246
London Borough of Brent
highways&[email protected] Roadworks/Events/Festivals
0208 937 5600 Network Management Team
Contact detailsEstimated
End DateEvent DescriptionMonth Duration
For the Week Commencing 24th September 2018
Traffic Management NotesWorks StatusStart Date
GRENDON GARDENS WEMBLEY whole roadFOOTWAY RECONSTRUCTION PROGRAMME 2018/19-PEDESTRIAN SIGNING
AND GUARDING-FOOTWAY CLOSURE, SOME C/W INCURSIONMAJOR 04/07/2018 31/01/2019 212 Days IN PROGRESS SOME C/W INCURSION AW042-292012
LONDON BOROUGH OF BRENT
020 8937 5600
GROSVENOR CRESCENT LONDON OUTSIDE 19 INTERIM TO PERMANENT REINSTATEMENT IN THE FOOTWAY MINOR 27/09/2018 28/09/2018 2 Days PROPOSED PERMANENT NO C/W INCURSION NK100-/SSERRE/13941117J8Virgin Media
0870 8883117
GROVE CRESCENT LONDON jct Evelyn Avenue STORES COMPOUND- onsite 24 hours a day MAJOR 27/06/2018 04/12/2018 161 Days IN PROGRESS NO C/W INCURSION AW042-311245LONDON BOROUGH OF BRENT
020 8937 5600
GROVE PARK LONDON OUTSIDE 89 ON, GROVE PARKPerform 1 reinstatement activity,Performing an 1excavation to expose existing
power cable in FootwayMINOR 31/10/2018 02/11/2018 3 Days PROPOSED WORKS TWO-WAY SIGNALS BC006-TI001LC500262936001
BT
03301 233753
GROVE PARK LONDONGROVE PARK - WHOLE STREET FROM THE J/O
EDGWARE ROAD TO J/O STAGG LANE.
IMGA192293. ABANDON - 503M X 8' SI AND 66M X 8' SI AND 167M X 4' SI
AND4M X 4' SI AND INSERT 503M X 180MM PE AND 66M X 180MM PE AND
167M X 90MM PE AND 4M X 90MM PE AND RELAY OR TRANSFER SERVICES.
MAJOR 07/01/2019 25/03/2019 78 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000758311Cadent Gas Limited
0800 111 999
HANOVER ROAD LONDON 122Boundary Box Exchange Fway in Footway. Our intention is to complete
thePermanent Reinstatement in the same phaseIMMEDIATE (URGENT) 18/09/2018 24/09/2018 7 Days IN PROGRESS SOME C/W INCURSION MU301-000031157230-001
Thames Water
0800 316 9800
HARLESDEN ROAD LONDON OUTSIDE NO.131 CLEAR FOOTWAY BLOCKAGE MINOR 01/10/2018 03/10/2018 3 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJBU/106250/LBCVirgin Media
0870 8883117
HARLESDEN ROAD LONDONFROM SIDE OF HEALTH CENTRE TO OPPOSITE 197-
221INSTALL NEW CHAMBER AND DUCTING IN CARRIAGEWAY/VERGE/FOOTWAY STANDARD 15/10/2018 21/10/2018 7 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJBU/96765/LBA
Virgin Media
0870 8883117
HARROW ROAD WEMBLEY HARROW ROAD AT J/O LINTHORPE AVENUEIMGA192407 MAINS CONNECTIONS FOR ASSOCIATED WORKS IN LINTHORP
AVENUESTANDARD 10/09/2018 21/09/2018 12 Days IN PROGRESS SOME C/W INCURSION AZ007-1000755502
Cadent Gas Limited
0800 111 999
HARROW ROAD WEMBLEYONE HOLE IN RD BY ROKESBY PLACE, OPPOSITE
POLICE STATIONTrace, then excavate to repair gas escape and reinstate where possible IMMEDIATE (EMERGENCY) 13/09/2018 21/09/2018 9 Days IN PROGRESS SOME C/W INCURSION AZ007-1000756488
Cadent Gas Limited
0800 111 999
HARROW ROAD WEMBLEY OPP 815 TO OPP CHURCH , HARROW ROAD Locate and excavate 1 blockage in existing duct MINOR 24/09/2018 25/09/2018 2 Days PROPOSED WORKS NO C/W INCURSION BC006-TI001LC500268186202BT
03301 233753
HARROW ROAD WEMBLEYTregenna Court,Rear to 622, HARROW ROAD, ,
WEMBLEY, BRENT
COMMUNICATION PIPE - INSTALL ; 63 MDPE; 4' CI; 1 OF 1 - CROSSOVER/CW
WORKS - FW CLOSURE REQUIRED - PEDS TO USE WALKWAY IN CWMINOR 25/09/2018 27/09/2018 3 Days PROPOSED WORKS SOME C/W INCURSION MX044-284225800
Affinity Water
01707 679 623
HARROW ROAD WEMBLEY outside 547-549 clear carriageway blockage MINOR 26/09/2018 28/09/2018 3 Days PROPOSED WORKS MULTI-WAY SIGNALS NK100-/SCLJBU/103850/LSMVirgin Media
0870 8883117
HARROW ROAD LONDON Advertising board on Harrow road, Kensal Green. f\w.
Connections Small Service:Installation of a new electricity supply for a
customer:installation of a new 100amp single phase supply Bus stop 2825 to be
suspended and a footpath closure is required
MINOR 29/09/2018 30/09/2018 2 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753250London Power Networks plc
0800 0280709
HARROW ROAD WEMBLEY DIG IN NEARSIDE FOOTWAY OUTSIDE NO 178 LAY NEW DOMESTIC 32MM PE SERVICE 3M FROM MAIN IN FOOTWAY STANDARD 01/10/2018 05/10/2018 5 Days PROPOSED WORKS LANE CLOSURE AZ007-1000749053Cadent Gas Limited
0800 111 999
HARROW ROAD WEMBLEY O/S 567W.R.P. - Relocation of 3 Bay Non Ad Bus Shelter, Centre of Path, for and on behalf
of Transport For London 0105/1013 2784703MINOR 05/10/2018 06/10/2018 2 Days PROPOSED WORKS SOME C/W INCURSION RK001-00040807 202/02039
HARROW ROAD WEMBLEY OUTSIDE NO 537 LAY DUCT IN FOOTWAY AND CARRIAGEWAY MINOR 04/10/2018 08/10/2018 5 Days PROPOSED WORKS CONTRA-FLOW NK100-/SCLJBU/104733/LSMVirgin Media
0870 8883117
HARROW ROAD WEMBLEY o/s 778 HARROW ROAD, WEMBLEYaccessing BT chamber to cable duct, no excavation and to complete termination of
cable inside cabinets + pod install.MINOR 09/10/2018 09/10/2018 1 Days PROPOSED WORKS LANE CLOSURE BC005-HU789W00CMG-NMANZY2
BT
03301 233753
HARROW ROAD WEMBLEY HARROW ROAD, O/S NO.651 IMGA192407. MUCK AND SPOIL AREA ONLY STANDARD 01/10/2018 12/10/2018 12 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000757529Cadent Gas Limited
0800 111 999
HARROW ROAD WEMBLEY HARROW ROAD, OPPOSITE NO.641 AND NO.643 IMGA192407. STORAGE / COMPOUND AND WELFARE UNIT STANDARD 01/10/2018 12/10/2018 12 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000757528Cadent Gas Limited
0800 111 999
HARROW ROAD WEMBLEYTHE MAIN IS IN THE NEARSIDE CARRIAGEWAY
OUTSIDE OF 319A HARROW ROAD
LAY 2 X NEW GAS SERVICES TO FLAT 1& 2 319A HARROW ROAD 8M FROM
THE MAINSTANDARD 09/10/2018 15/10/2018 7 Days PROPOSED WORKS LANE CLOSURE AZ007-1000757336
Cadent Gas Limited
0800 111 999
HARROW ROAD LONDON In the footway outside No. 811-815 Harrow RoadTo excavate and connect onto the existing gas main, to lay a new gas service into
811-815 Harrow RoadSTANDARD 05/11/2018 14/11/2018 10 Days PROPOSED WORKS MULTI-WAY SIGNALS ZY040-180804-1 202/01241
HARROW ROAD WEMBLEY J/O Tring Avenue Upgrade of Thames Water Infrastructure in footway& carriageway MAJOR 12/12/2018 12/01/2019 32 Days PROPOSED WORKS MULTI-WAY SIGNALS MU302-KCD-MAJOR-H456-3Thames Water
0800 316 9800
HARROW ROAD LONDON 750-756
Proposed Temporary Traffic Order for a single yellow line and 'No waiting'
restriction, 09:30 - 14:30 Mon-Fri, 08.00 - 13.00 Sat, o/s 750-756 Harrow Road to
allow them to carry out construction works.
HIGHWAYS ACT PERMITS 01/04/2018 30/09/2019 548 Days PROPOSED WORKS NO C/W INCURSION AW888-L-MAIN-00000879LONDON BOROUGH OF BRENT
020 8937 5600
HARROWDENE ROAD WEMBLEY Jnc Hardwood Close in the C/W Trace, then excavate to repair a gas escape and reinstate wherepossible. IMMEDIATE (EMERGENCY) 12/09/2018 20/09/2018 9 Days IN PROGRESS SOME C/W INCURSION AZ007-1000756057Cadent Gas Limited
0800 111 999
HARTLAND ROAD LONDON outside 7 desilt pit in footway MINOR 18/09/2018 20/09/2018 3 Days IN PROGRESS SOME C/W INCURSION NK100-/SCLJFI/102642/LSMVirgin Media
0870 8883117
HARVIST ROAD LONDON 189Valve Repack in Carriageway. Our intention is to complete the
PermanentReinstatement in the same phaseMINOR 24/09/2018 26/09/2018 3 Days PROPOSED WORKS PRIORITY WORKING MU301-000031142885-002
Thames Water
0800 316 9800
HARVIST ROAD LONDON O/S KENSAL RISE PRIMARY SCHOOL
28/027 - 110981 - EXCAVATION FOR THE INSTALLATION OF IBUS CABLE INTO
TRAFFIC SIGNAL CONTROLLER AND IBUS CABLE INTO TRAFFIC SIGNAL
POLE 7, 08:00 - 17:00, FOOTWAY WORKS ONLY
MINOR 01/10/2018 01/10/2018 1 Days PROPOSED WORKS NO C/W INCURSION YG515-S000000002203TFL
0343 222 1234
HAWKINS ROAD LONDON Bridge (Rail Over Road) No: 08 Detailed examination of rail over road bridge working from 0930 - 1530 MAJOR 22/10/2018 22/10/2018 1 Days PROPOSED WORKS ROAD CLOSURE KL701-CAW-07-31-161018 202/04110
HAWKINS ROAD LONDON Bridge (Rail Over Road) No: 08Replace all existing Chevrons plates and painted chevrons with a high visability
seabridge sign type chevron plates to bridgeMAJOR 23/10/2018 23/10/2018 1 Days PROPOSED WORKS ROAD CLOSURE KL721-CAW-07-31-231018 202/04110
HAWKINS ROAD LONDON J/W Bridge Road
Proposed Temporary Traffic Order for a road closure at Hawkins Road j/w Bridge
Road to carry out a detailed bridge examination. From: 22/10/2018 (1 day), Times:
09:30 - 15:30hrs Our ref: TTRO/18/016
HIGHWAYS ACT PERMITS 22/10/2018 23/10/2018 2 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000928LONDON BOROUGH OF BRENT
020 8937 5600
HAYCROFT GARDENS LONDON whole road
sWORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -
NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS
REPLACEMENT SCHEME
MAJOR 18/10/2018 08/11/2018 22 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MBIW07/Z024Thames Water
0800 316 9800
HAYLAND CLOSE LONDON OUTSIDE NO.20REMOVE CARRIAGEWAY AND FOOTWAY BLOCKAGE TO ALLOW CUSTOMER
CONNECTIONMINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJFI/107197/LSM
Virgin Media
0870 8883117
HAZELDEAN ROAD LONDONFROM JUNCTION WITH BRUCE ROAD TO JUNCTION
WITH SELWYN ROAD
WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER TO
CARRY OUT MAINS REPLACEMENT SURFACE LOCATION: CW AND FWMAJOR 19/10/2018 05/02/2019 110 Days PROPOSED WORKS SOME C/W INCURSION MU821-H553/MSUL03/I001
Thames Water
0800 316 9800
HEATHER PARK DRIVE WEMBLEY 39 PERM REINSTATEMENT IN THE CARRIAGEWAY MINOR 21/09/2018 21/09/2018 1 Days PROPOSED PERMANENT GIVE & TAKE MU026-003156SPKT--000001Thames Water
0800 316 9800
London Borough of Brent
highways&[email protected] Roadworks/Events/Festivals
0208 937 5600 Network Management Team
Contact detailsEstimated
End DateEvent DescriptionMonth Duration
For the Week Commencing 24th September 2018
Traffic Management NotesWorks StatusStart Date
HEATHER PARK DRIVE WEMBLEY outside 128 to 114CLEAR BLOCKED DUCT and REPAIR BLOCKAGES IF FOUND FOOTWAY
WORKS ONLYMINOR 23/09/2018 23/09/2018 1 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/13966337J9
Virgin Media
0870 8883117
HEATHFIELD PARK LONDON OUTSIDE NO.17-19LAY NEW DUCT FROM EXISTING VM CHAMBER IN FOOTWAY, BUILD NEW
CHAMBER IN FOOTWAY.STANDARD 20/09/2018 27/09/2018 8 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SSEJF/101656/LBA
Virgin Media
0870 8883117
HEBER ROAD LONDON JUNCTION WITH OLIVE ROADWORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS
REPLACMENTMAJOR 22/10/2018 12/12/2018 52 Days PROPOSED WORKS MULTI-WAY SIGNALS MU821-H553/MBIW04/I009
Thames Water
0800 316 9800
HIGH ROAD WEMBLEY Outside and opposite 365 - 367
28/091 - 110746 - Access TfL traffic signal poles to install call cancel detectors and
replace pole 2 and pole 4: 2 x 2m poles with 2 x 4 m poles. 09:00-16:00. Footway
works only
MINOR 20/09/2018 21/09/2018 2 Days PROPOSED WORKS NO C/W INCURSION YG515-S000000002196TFL
0343 222 1234
HIGH ROAD LONDONOPP JCN WITH CHURCH ROAD TO AT JCN WITH
NEASDEN LANE , HIGH ROADWorks are to permanently reinstate the site MINOR 20/09/2018 21/09/2018 2 Days PROPOSED PERMANENT SOME C/W INCURSION BC006-TI001LC500264635500
BT
03301 233753
HIGH ROAD LONDON OUTSIDE NO.130 CLEAR BLOCKAGE IN FOOTWAY MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJBU/106488/LBAVirgin Media
0870 8883117
HIGH ROAD WEMBLEY kerb line o/s chesterfield house and 444 high road Permanent Reinstatement. KIER WORKING ON BEHALF OF AFFINITY WATER. MINOR 29/09/2018 30/09/2018 2 Days PROPOSED PERMANENT SOME C/W INCURSION MX049-THWM460021Affinity Water
01707 679 623
HIGH ROAD LONDON*CUSTOMER DRIVEN WORKS* FOOTWAY OUTSIDE
OF NUMBER 101LAY NEW SERVICE 3M FROM MAIN IN FOOTWAY STANDARD 15/10/2018 19/10/2018 5 Days PROPOSED WORKS MULTI-WAY SIGNALS AZ007-1000758154
Cadent Gas Limited
0800 111 999
HIGH ROAD WEMBLEYFROM J/O CRAWFORDAVENUE TO WEMBLEY HILL
ROAD.TRUNK MAINS SCHEME BY KIER ON BEHALF OF AFFINITY WATER MAJOR 02/04/2018 31/12/2018 274 Days POTENTIAL WORKS SOME C/W INCURSION MX049-HIGHROAD
Affinity Water
01707 679 623
HIGH ROAD LONDON FROM J/W STRODE ROAD TO COLIN ROADFOOTWAY RECONSTRUCTION PROGRAMME 2018/19-PEDESTRIAN SIGNING
AND GUARDING-FOOTWAY CLOSURE, SOME C/W INCURSION, CHAPTER 8MAJOR 18/06/2018 31/12/2018 197 Days IN PROGRESS SOME C/W INCURSION AW042-292123
LONDON BOROUGH OF BRENT
020 8937 5600
HIGH ROAD WEMBLEY Steps from High Road to Station Grove
Proposed temporary traffic order for a footpath/steps closure from High Road
leading down to Station Grove to allow construction of a new development on
Montrose Crescent car park plot. Our ref: TTRO
HIGHWAYS ACT PERMITS 05/07/2017 05/01/2019 550 Days PROPOSED WORKS NO C/W INCURSION AW888-L-MAIN-00000726LONDON BOROUGH OF BRENT
020 8937 5600
HIGH STREET LONDON jubilee clock to tavistock roadFOOTWAY RECONSTRUCTION PROGRAMME 2018/19-PEDESTRIAN SIGNING
AND GUARDING-FOOTWAY CLOSURE, SOME C/W INCURSION, CHAPTER 8MAJOR 04/07/2018 01/10/2018 90 Days PROPOSED WORKS SOME C/W INCURSION AW042-292196
LONDON BOROUGH OF BRENT
020 8937 5600
HIGH STREET LONDON JW Park ParadeExcavate in the CW to locate Thames Water valve, make sure valve is operable,
backfill and reinstateMINOR 11/10/2018 11/10/2018 1 Days PROPOSED WORKS MULTI-WAY SIGNALS MU277-000HCV6987350/01
Thames Water
0800 316 9800
HILL VIEW GARDENS LONDON 9 HILLVIEW GARDENS NW9 0TE Relay Short Service Pipe - WORKING IN FOOTWAY AND CARRIAGEWAY MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS GIVE & TAKE MX044-10025452Affinity Water
01707 679 623
HILLSIDE GARDENS HARROW O/S 11 in the F/WSupply new gas service to property due to poor condition of Cadent Gasplant to
prevent loss of supply.IMMEDIATE (URGENT) 14/09/2018 20/09/2018 7 Days IN PROGRESS NO C/W INCURSION AZ007-1000756767
Cadent Gas Limited
0800 111 999
HOLLAND ROAD LONDON o/s 161 . f\w.
Network Operations Distribution:Install / Replace / Remove electrical link box:-
Replace a very poor condition Link Box in the footway. Part of HSE Initiative to
replace all Identified High Risk Link
STANDARD 24/09/2018 01/10/2018 8 Days PROPOSED WORKS SOME C/W INCURSION EC400-10752497London Power Networks plc
0800 0280709
HOMEFIELD ROAD WEMBLEY HOMEFIELD ROAD Relay Short Service Pipe - workingin footway and carriageway MINOR 20/09/2018 24/09/2018 5 Days IN PROGRESS GIVE & TAKE MX044-10012970Affinity Water
01707 679 623
HONEYWOOD ROAD LONDONHONEYWOOD ROAD - WHOLE STREET FROM J/O
STATIONROADTOO/SNO.14HONEYWOODROAD.
IMGA202021 - ABANDON 113M X 100MM DI AND INSERT 113M
X75MMPEANDRELAYORTRANSFER SERVICES.MAJOR 28/08/2018 02/10/2018 36 Days IN PROGRESS SOME C/W INCURSION AZ007-1000726748
Cadent Gas Limited
0800 111 999
HOWARD ROAD LONDONNEARSIDE FOOTWAY OUTSIDE 46A HOWARD
ROADLAY NEW DOMESTIC SERVICE 2.8M FROM MAIN IN NEARSIDE FOOTWAY STANDARD 22/10/2018 26/10/2018 5 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000757080
Cadent Gas Limited
0800 111 999
HUDDLESTONE ROAD LONDONFROM JUNCTION WITH HIGH ROAD TO JUNCTION
WITH BALMORAL ROAD
WORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS
REPLACEMENT CW AND FWMAJOR 06/12/2018 21/01/2019 47 Days PROPOSED WORKS SOME C/W INCURSION MU821-H553/MSUL02//I002
Thames Water
0800 316 9800
IRWIN GARDENS LONDON 23Fire Hydrant Repack Gland Fway in Footway. Our intention is to completethe
Permanent Reinstatement in the same phaseMINOR 25/09/2018 27/09/2018 3 Days PROPOSED WORKS SOME C/W INCURSION MU301-000031159032-001
Thames Water
0800 316 9800
IVY ROAD LONDONFROM JUNCTION WITH CEDAR ROAD TO JUNCTION
WITH LARCH ROAD
WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER TO
CARRY OUT MAINS REPLACEMENT SURFACE LOCATION: CW AND FWSTANDARD 24/09/2018 03/10/2018 10 Days PROPOSED WORKS SOME C/W INCURSION MU821-H553/MBIW04/I006
Thames Water
0800 316 9800
IVY ROAD LONDON Whole of Road
WORKS METHODOLOGY: FORWARD PLANNING NOTICE FOR THE
NOTIFICATION OF A POTENTIAL MAINS REHABILITATION SCHEME WORKING
ON BEHALF OF THAMES WATER
MAJOR 07/11/2018 16/11/2018 10 Days PROPOSED WORKS SOME C/W INCURSION MU821-H553/MBIW04/Z002Thames Water
0800 316 9800
JEYMER AVENUE LONDONJEYMER AVENUE, C/O NO.44 PARK AVENUE
NORTHIMGA192010 ABANDON APPROXIMATELY 5M X 4' CI MAIN STANDARD 02/01/2019 15/01/2019 14 Days PROPOSED WORKS NO C/W INCURSION AZ008-1000748015
Cadent Gas Limited
0800 111 999
JEYMER AVENUE LONDONFROM JUNCTION WITH PARK AVENUE TO
JUNCTION WITH RIFFEL ROAD
WORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS
REPLACEMENT CW AND FWMAJOR 19/11/2018 04/02/2019 78 Days PROPOSED WORKS SOME C/W INCURSION MU821-H553/MSUL19/I001
Thames Water
0800 316 9800
KENDAL ROAD LONDON whole road major carriageway resurfacing works(preventative)2018-2019-road closure MAJOR 27/07/2018 24/10/2018 90 Days PROPOSED WORKS ROAD CLOSURE AW042-290768LONDON BOROUGH OF BRENT
020 8937 5600
KENTON ROAD HARROW OUTSIDE NO.3 KENTON PARK MANSIONS LAY DUCT IN FOOTWAY TO ALLOW CUSTOMER CONNECTION MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS NO C/W INCURSION NK100-/SCLJBU/106591/LSMVirgin Media
0870 8883117
KILBURN HIGH ROAD LONDON outside 218CUSTOMER CONNECTION RESIDENTIAL SUPPLY and CLEAR BLOCKAGES IF
FOUND. FOOTWAY WORKS ONLYMINOR 23/09/2018 23/09/2018 1 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/10587550J9
Virgin Media
0870 8883117
KILBURN HIGH ROAD LONDON in the area of the bridgeStructures Examination of bridge with Small Hoist in use 22:30hrs Monday 1st until
05:30hrs Tuesday 2nd October 2018 No disturbance to roadwayMINOR 01/10/2018 02/10/2018 2 Days PROPOSED WORKS MULTI-WAY SIGNALS KL333-CEFA-MCJ1-BRG-21 202/02523
KILBURN HIGH ROAD LONDON WILLESDEN LANE TO CHRISTCHURCH AVENUE major carriageway resurfacing works 2018-2019-road closure MAJOR 27/07/2018 24/10/2018 90 Days PROPOSED WORKS ROAD CLOSURE AW042-290924LONDON BOROUGH OF BRENT
020 8937 5600
KILBURN LANE LONDON outside 121 in carriage way Trace, then excavate to repair gas escape and reinstate where possible IMMEDIATE (EMERGENCY) 10/09/2018 21/09/2018 12 Days IN PROGRESS SOME C/W INCURSION AZ007-1000755207Cadent Gas Limited
0800 111 999
KILBURN LANE LONDON outside 287 to 291CUSTOMER CONNECTION RESIDENTIAL SUPPLY and CLEAR BLOCKAGES IF
FOUND. FOOTWAY WORKS ONLYMINOR 22/09/2018 25/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/11878354KCA
Virgin Media
0870 8883117
KILBURN PARK ROAD LONDON 81-83S81 EMERGENCY COVER REPLACEMEN--WORKS INTENDED TO INCLUDE
FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASEMINOR 27/09/2018 27/09/2018 1 Days PROPOSED WORKS MULTI-WAY SIGNALS MU026-003156RXJM--000002
Thames Water
0800 316 9800
KINGSBURY ROAD LONDONon footway Kingsbury Road, approx 55 yds from
Barmingham Way
Pedestrian diversion into carriageway. Excavation by hand on the footway, give and
take to be used. Day 1& 2 Installation of tsc, meter cabinet and TT earth. Day 3
Rigging, DICI, rewire site from new
STANDARD 08/10/2018 13/10/2018 6 Days PROPOSED WORKS GIVE & TAKE NX260-VF77670WHP/NJE01Vodafone
01724 848246
London Borough of Brent
highways&[email protected] Roadworks/Events/Festivals
0208 937 5600 Network Management Team
Contact detailsEstimated
End DateEvent DescriptionMonth Duration
For the Week Commencing 24th September 2018
Traffic Management NotesWorks StatusStart Date
KINGSBURY ROAD LONDON FROM J/W VALLEY DRIVE TO FRYENT WAY
KINGSBURY TOWN CENTRE -FOOTWAY WORKS BOTH SIDES-ALL SIGNING
LIGHTING AND GUARDING CONTAINED TO THE FOOTWAY NO C/WAY
INCURSION.
MAJOR 25/03/2018 31/08/2019 525 Days IN PROGRESS NO C/W INCURSION AW042-260642LONDON BOROUGH OF BRENT
020 8937 5600
LAKESIDE DRIVE LONDON Verge behind Lakeside Drive 1 x Joint Bay MAJOR 10/09/2018 25/09/2018 16 Days IN PROGRESS SOME C/W INCURSION ZP011-P-0094478/R12 202/04131
LAKESIDE DRIVE LONDON100m from j/w RAINSFORD ROAD and 148m from j/w
RAINSFORD ROAD
This permit is for Thames Water to carry out interim to permament reinstatement
workMINOR 27/09/2018 28/09/2018 2 Days PROPOSED PERMANENT SOME C/W INCURSION MU307-000805768370325-001
Thames Water
0800 316 9800
LARCH ROAD LONDON Outside 5 Larch Road . f\w.Connections Small Service:Installation of a new electricity supply for a
customer:Installing a 100amp three phase supplySTANDARD 27/09/2018 03/10/2018 7 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753379
London Power Networks plc
0800 0280709
LAWRENCE AVENUE LONDON 78 - 78 opp
New customer water supply 1x63mm BP mtrd, works in the footway and
inCarriageway. Our intention is to complete the Permanent Reinstatement inthe
same phase
MAJOR 26/11/2018 30/11/2018 5 Days PROPOSED WORKS ROAD CLOSURE MU307-000806963660360-001Thames Water
0800 316 9800
LENNOX GARDENS LONDONFROM JUNCTION WITH DUDDEN HILL LANE TO
JUNCTION WITH PARK VIEW ROAD
WORKING ON BEHALF OF THAMES WATER MAINS REPLACEMENT CW AND
FWMAJOR 17/09/2018 12/10/2018 26 Days IN PROGRESS SOME C/W INCURSION MU821-H553/MSUL46/I002
Thames Water
0800 316 9800
LIDDELL GARDENS LONDON whole road
WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -
NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS
REPLACEMENT SCHEME
MAJOR 09/11/2018 13/12/2018 35 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MSUL20/Z009Thames Water
0800 316 9800
LINCOLN ROAD WEMBLEY 18 LINCOLN ROAD, WEMBLEY Relay Short Service Pipe - WORKINGIN FOOTWAY AND CARRIAGEWAY MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION MX044-10020910Affinity Water
01707 679 623
LINDEN AVENUE WEMBLEY 4 Linden Avenue S/O Cott
Proposed Temporary Traffic Order for the full footpath closure o/s 4 Linden Avenue
HA9 8BD (Cottrell House) and suspension of loading bay on Wembley Hill Road to
allow construction of a new developmen
HIGHWAYS ACT PERMITS 03/04/2018 02/10/2019 548 Days PROPOSED WORKS NO C/W INCURSION AW888-L-MAIN-00000871LONDON BOROUGH OF BRENT
020 8937 5600
LINDSAY DRIVE HARROW from junction with Chapman Crescent to roundabout major c/w resurfacing works(reserve scheme)2018-2019-road closure MAJOR 28/06/2018 25/09/2018 90 Days IN PROGRESS ROAD CLOSURE AW042-291179LONDON BOROUGH OF BRENT
020 8937 5600
LINTHORPE AVENUE WEMBLEYFROM S/O NO.130 CHAPLIN ROAD TO TO O/S
NO.651 HARROW ROAD
IMGA192407. IMGA192407 ABANDON 306M X 4'
CIMAINANDINSERT90MMPEANDRELAYOR TRANSFER APPROX 40 SERVICESMAJOR 08/06/2018 21/09/2018 106 Days IN PROGRESS SOME C/W INCURSION AZ007-1000688588
Cadent Gas Limited
0800 111 999
LITTLETON ROAD HARROWLITTLETON ROAD, FROM S/O NO 47. SUDBURY
COURT DRIVE TO J/O PEBWORTH ROAD
IMGA192372. ABANDON 352M X 6' ST MAIN AND INSERT 125MM PE AND
RELAY ORTRANSFER SERVICES.MAJOR 24/09/2018 09/11/2018 47 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000730256
Cadent Gas Limited
0800 111 999
LOGAN ROAD WEMBLEY O/S NO 46/48, LOGAN ROADInstall 2m of 1 way poly duct in Footway,Provide 1 core drill(s) into jointbox or
buildingIMMEDIATE (URGENT) 19/09/2018 21/09/2018 3 Days IN PROGRESS NO C/W INCURSION BC006-TI001LC500269063000
BT
03301 233753
LYON PARK AVENUE WEMBLEY 183 lyon park avenue Relay Short Service Pipe - working in footway and carriageway MINOR 19/09/2018 21/09/2018 3 Days PROPOSED WORKS SOME C/W INCURSION MX044-10022580Affinity Water
01707 679 623
MAGNOLIA COURT HARROW outside 15 to 25CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS
ONLYMINOR 25/09/2018 26/09/2018 2 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14048467J9
Virgin Media
0870 8883117
MALLARD WAY LONDON IN FOOTWAY O/S 13 Trace, then excavate to repair gas escape and reinstate where possible IMMEDIATE (EMERGENCY) 17/09/2018 25/09/2018 9 Days IN PROGRESS NO C/W INCURSION AZ007-1000757462Cadent Gas Limited
0800 111 999
MALVERN MEWS LONDON 28 Excavate in carriageway to install new chamber approx 3-4m deep MAJOR 24/09/2018 05/10/2018 12 Days PROPOSED WORKS ROAD CLOSURE MU026-003156RFLS--0001Thames Water
0800 316 9800
MANOR FARM ROAD WEMBLEY OUTSIDE NO.78 AND OUTSIDE NO. 88REMOVE TWO CARRIAGEWAY BLOCKAGES TO ALLOW CUSTOMER
CONNECTIONSMINOR 02/10/2018 04/10/2018 3 Days PROPOSED WORKS MULTI-WAY SIGNALS NK100-/SCLJFI/106574/LSM
Virgin Media
0870 8883117
MAPESBURY ROAD LONDON56M SOUTH FROM JCTN WITH MOWBRAY RD ON,
MAPESBURY ROAD
Install 3m of 1 way poly duct in Footway,Provide 1 core drill(s) into jointbox or
buildingIMMEDIATE (URGENT) 19/09/2018 21/09/2018 3 Days IN PROGRESS NO C/W INCURSION BC006-TI001LC500269124000
BT
03301 233753
MAPESBURY ROAD LONDON o/s 22. f\w.
Network Operations Distribution:Install / Replace / Remove electrical link
box:Replace a very poor condition Link Box in the footway. Part of HSE Initiative to
replace all Identified High Risk Link Bo
STANDARD 09/10/2018 16/10/2018 8 Days PROPOSED WORKS NO C/W INCURSION EC400-10753144London Power Networks plc
0800 0280709
MAYBANK AVENUE WEMBLEY J/W GREENBANK AVENUE
FOOTWAY RECONSTRUCTION PROGRAMME- RESERVE SCHEME- 2018/19-
PEDESTRIAN SIGNING AND GUARDING-FOOTWAY CLOSURE, SOME C/W
INCURSION, CHAPTER 8
MAJOR 05/07/2018 02/10/2018 90 Days PROPOSED WORKS SOME C/W INCURSION AW042-292466LONDON BOROUGH OF BRENT
020 8937 5600
MAYO ROAD LONDON o/s 23-25. f\w.Network Operations Faults:Essential repair of electricity cables powering street
lighting / furniture:street light faultIMMEDIATE (URGENT) 19/09/2018 25/09/2018 7 Days IN PROGRESS NO C/W INCURSION EC400-10753690
London Power Networks plc
0800 0280709
MCNICOL DRIVE LONDON adj to no. 23 lay new gas service approx 1.5m in f/way STANDARD 05/10/2018 10/10/2018 6 Days PROPOSED WORKS SOME C/W INCURSION WY002-NSA00020689 202/02790
MELROSE AVENUE LONDON 155 CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT MINOR 27/09/2018 01/10/2018 5 Days PROPOSED WORKS NO C/W INCURSION MU356-003156SMNZ--000001Thames Water
0800 316 9800
MEYRICK ROAD LONDON O/S AND OPP 16x25MM NEW WATER SUPPLY CONNECTION, FOOTWAY AND in Carriageway.
Ourintention is to complete the Permanent Reinstatement in the same phaseSTANDARD 01/10/2018 05/10/2018 5 Days PROPOSED WORKS SOME C/W INCURSION MU307-000806973770045-001
Thames Water
0800 316 9800
MILMAN ROAD LONDON 20m before jct Harvist Road to jct Harvist Road STORES COMPOUND- Onsite 24 hours a day MAJOR 27/06/2018 04/12/2018 161 Days IN PROGRESS NO C/W INCURSION AW042-311239LONDON BOROUGH OF BRENT
020 8937 5600
MONKS PARK WEMBLEY 110 MONKS PARK, WEMBLEY Relay Short Service Pipe - WORKING IN FOOTWAY AND CARRIAGEWAY MINOR 20/09/2018 24/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION MX044-10018027Affinity Water
01707 679 623
MOUNT PLEASANT WEMBLEY outside 75 to 87CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS
ONLYMINOR 21/09/2018 24/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/13999070J9A
Virgin Media
0870 8883117
MOUNT PLEASANT WEMBLEY 152
Proposed Temporary Traffic Order for a double yellow line restriction o/s 152 Mount
Pleasant, Abbey Wharf to allow them to carry out construction works. Start date
from: 23/04/2018 to 22/10/2019 for
HIGHWAYS ACT PERMITS 23/04/2018 27/10/2019 553 Days PROPOSED WORKS NO C/W INCURSION AW888-L-MAIN-00000877LONDON BOROUGH OF BRENT
020 8937 5600
NAPIER ROAD LONDON WHOLE OF THE ROADWORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS
REPLACEMENT CW AND FWMAJOR 12/10/2018 07/11/2018 27 Days PROPOSED WORKS SOME C/W INCURSION MU821-H553/MSUL20/I002
Thames Water
0800 316 9800
NASH WAY HARROW In FW O/S SainsburysTHESE WORKS ARE FOR THE EXCAVATION OF A TRIAL HOLE TO ASSESS
THE SUITABILITY OF NEW TELECOMS EQUIPMENTMINOR 03/10/2018 03/10/2018 1 Days PROPOSED WORKS NO C/W INCURSION YN112-W96423-WK40 202/02805
NEASDEN LANE LONDON 270 supersave food& wineB Box Exchange<33mm Fway in Footway. Our intention is to completethe
Permanent Reinstatement in the same phaseMINOR 18/09/2018 20/09/2018 3 Days IN PROGRESS NO C/W INCURSION MU301-000031150385-001
Thames Water
0800 316 9800
NEASDEN LANE LONDON JUNC WITH ROUNDABOUT Permanent reinstatement of tarmac in carriageway MINOR 26/09/2018 26/09/2018 1 Days PROPOSED PERMANENT LANE CLOSURE MU026-003156SHTS-001001Thames Water
0800 316 9800
NEASDEN LANE LONDON Outside 60 New Foul Water Connection STANDARD 24/09/2018 05/10/2018 12 Days PROPOSED WORKS TWO-WAY SIGNALS AW999-S000000000345LONDON BOROUGH OF BRENT
020 8937 5600
NEASDEN LANE NORTH LONDON Junction with Braemar AvenueExcavation - install of new telecommunication cabinets on behalf of TEF. x2 Days on
site.MINOR 20/09/2018 21/09/2018 2 Days PROPOSED WORKS LANE CLOSURE MG074-82014-PGN/MW 202/02443
London Borough of Brent
highways&[email protected] Roadworks/Events/Festivals
0208 937 5600 Network Management Team
Contact detailsEstimated
End DateEvent DescriptionMonth Duration
For the Week Commencing 24th September 2018
Traffic Management NotesWorks StatusStart Date
NEWLANDS CLOSE WEMBLEY WHOLE STREET FROM J/O LINTHORPE AVENUEIMGA1921407 ABANDON 255M X 4' CI MAIN AND INSERT 75MM PE AND
RELAYORTRANSFER APPROX 28 SERVICESMAJOR 04/09/2018 28/09/2018 25 Days IN PROGRESS SOME C/W INCURSION AZ007-1000688640
Cadent Gas Limited
0800 111 999
NICOLL ROAD LONDON O/s 62. f\w.
Connections Projects:Electrical service alteration to customer supply:100A new
service and disconnection in footpath. Temporary walkway provided in suspended
parking bays.
STANDARD 27/09/2018 03/10/2018 7 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753237London Power Networks plc
0800 0280709
NORTH CIRCULAR ROAD LONDONVerge In gated compound in the verge at the side of the
access laneLift off existing kiosk and install new together with associated civils MAJOR 26/09/2018 26/09/2018 1 Days PROPOSED WORKS ROAD CLOSURE AZ014-NL0213
Cadent Gas Limited
0800 111 999
NORTH CIRCULAR ROAD LONDONBrent / Ealing boundary to Drury Way, East and
Westbound carriageways
NRW - Cyclic Cleansing for Brent Council NIL EXCAVATION. Back to back lane 3
and 2 closures on both carriageways for central reservation works. Eastbound
carriageway lane 3 and 2 swapping to westbound
MINOR 01/10/2018 02/10/2018 2 Days PROPOSED WORKS LANE CLOSURE AW001-CLEANSING75LONDON BOROUGH OF BRENT
020 8937 5600
NORTH CIRCULAR ROAD LONDON(westbound) WATERLOO ROAD TO CHARTLEY
AVENUE
BLOCK CLOSURE WB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &
CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,
GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS
MAJOR 05/10/2018 05/10/2018 1 Days PROPOSED WORKS LANE CLOSURE YG431-316828TFL
0343 222 1234
NORTH CIRCULAR ROAD LONDON(eastbound) CHARTLEY AVENUE TO WATERLOO
ROAD
BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &
CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,
GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS
MAJOR 05/10/2018 05/10/2018 1 Days PROPOSED WORKS LANE CLOSURE YG431-316990TFL
0343 222 1234
NORTH CIRCULAR ROAD LONDON(eastbound) JW DRURY WAY TO CHARTLEY
AVENUE
BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &
CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,
GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS
MAJOR 05/10/2018 05/10/2018 1 Days PROPOSED WORKS LANE CLOSURE YG431-316823TFL
0343 222 1234
NORTH CIRCULAR ROAD LONDON(westbound) CHARTLEY AVENUE TO JW DRURY
WAY
BLOCK CLOSURE WB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &
CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,
GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS
MAJOR 05/10/2018 05/10/2018 1 Days PROPOSED WORKS LANE CLOSURE YG431-316827TFL
0343 222 1234
NORTH CIRCULAR ROAD LONDON(eastbound) CHARTLEY AVENUE TO WATERLOO
ROAD
BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &
CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,
GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS
MAJOR 05/10/2018 06/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316608TFL
0343 222 1234
NORTH CIRCULAR ROAD LONDON(westbound) WATERLOO ROAD TO CHARTLEY
AVENUE
BLOCK CLOSURE WB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &
CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,
GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS
MAJOR 05/10/2018 06/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316617TFL
0343 222 1234
NORTH CIRCULAR ROAD LONDON(eastbound) CHARTLEY AVENUE TO WATERLOO
ROAD
BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &
CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,
GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS
MAJOR 05/10/2018 06/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316820TFL
0343 222 1234
NORTH CIRCULAR ROAD LONDON(eastbound) JW DRURY WAY TO CHARTLEY
AVENUE
BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &
CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,
GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS
MAJOR 05/10/2018 06/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316610TFL
0343 222 1234
NORTH CIRCULAR ROAD LONDON(westbound) CHARTLEY AVENUE TO JW DRURY
WAY WAY
BLOCK CLOSURE WB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &
CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,
GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS
MAJOR 05/10/2018 06/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316629TFL
0343 222 1234
NORTH CIRCULAR ROAD LONDON (eastbound) ABBEY ROAD TO GREAT CENTRAL WAY
BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &
CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,
GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS
MAJOR 08/10/2018 09/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316634TFL
0343 222 1234
NORTH CIRCULAR ROAD LONDON(westbound) JW GREAT CENTRAL WAY TO ABBEY
ROAD
BLOCK CLOSURE WB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &
CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,
GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS
MAJOR 08/10/2018 09/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316636TFL
0343 222 1234
NORTH CIRCULAR ROAD LONDON(eastbound) ABBEY ROAD TO JW GREAT CENTRAL
WAY
BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &
CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,
GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS
MAJOR 09/10/2018 10/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316638TFL
0343 222 1234
NORTH CIRCULAR ROAD LONDON(westbound) JW GREAT CENTRAL WAY TO ABBEY
ROAD
BLOCK CLOSURE WB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &
CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,
GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS
MAJOR 09/10/2018 10/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316640TFL
0343 222 1234
NORTH CIRCULAR ROAD LONDON (eastbound) AQUADUCT FLYOVER TO ABBEY ROAD
BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &
CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,
GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS
MAJOR 10/10/2018 11/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316652TFL
0343 222 1234
NORTH CIRCULAR ROAD LONDON(westbound) ABBEY ROAD TO THE AQUADUCT
FLYOVER
BLOCK CLOSURE WB# - TESTING LIGHTS& BOLLARDS, BULK CLEAN &
CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,
GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS
MAJOR 10/10/2018 11/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316657TFL
0343 222 1234
NORTH CIRCULAR ROAD LONDON (eastbound) AQUADUCT FLYOVER TO ABBEY ROAD
BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &
CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,
GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS
MAJOR 11/10/2018 12/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316666TFL
0343 222 1234
NORTH CIRCULAR ROAD LONDON(westbound) ABBEY ROAD TO THE AQUADUCT
FLYOVER
BLOCK CLOSURE WB# TESTING LIGHTS& BOLLARDS, BULK CLEAN &
CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS,
GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS
MAJOR 11/10/2018 12/10/2018 2 Days PROPOSED WORKS LANE CLOSURE YG431-316667TFL
0343 222 1234
NORTH CIRCULAR ROAD LONDONNeasden slips - 1st westbound slip and then 2nd
westbound slip, only one closed at a timeNRW - Cyclic Cleansing for Brent Council NIL EXCAVATION MINOR 15/10/2018 16/10/2018 2 Days PROPOSED WORKS LANE CLOSURE AW001-CLEANSING77
LONDON BOROUGH OF BRENT
020 8937 5600
NORTH CIRCULAR ROAD LONDON Neasden Slips - Eastbound off slips NRW - Cyclic Cleansing for Brent Council NIL EXCAVATION MINOR 16/10/2018 17/10/2018 2 Days PROPOSED WORKS LANE CLOSURE AW001-CLEANSING78LONDON BOROUGH OF BRENT
020 8937 5600
NORTH CIRCULAR ROAD LONDONDrury Way to Staples Corner - East and Westbound
carriageways
NRW - Cyclic Cleansing for Brent Council NIL EXCAVATION. Back to back lane 3
and 2 closure on both carriageways for central reservation works. Eastbound
carriageway lane 3 and 2, swapping to westbound
MINOR 01/11/2018 02/11/2018 2 Days PROPOSED WORKS LANE CLOSURE AW001-CLEANSING76LONDON BOROUGH OF BRENT
020 8937 5600
NORTH CIRCULAR ROAD LONDONEDGWARE ROAD FLYOVER TO COLES GREEN
ROAD'CYCLICAL ROUTINE MAINTENANCE FULL CLOSURE & DIVERSIONS' MAJOR 06/11/2018 08/11/2018 3 Days PROPOSED WORKS ROAD CLOSURE YG431-270171
TFL
0343 222 1234
NORTH CIRCULAR ROAD LONDON os 4B, Staples Corner Business ParkHoarding- TM: no impact on c/w - working hours: 0800-1800 - 24h contact: Ian
Greaves 07713784172STANDARD 03/02/2018 10/11/2018 281 Days PROPOSED WORKS NO C/W INCURSION YG450-378876
TFL
0343 222 1234
NORTH CIRCULAR ROAD LONDON
THESE WORKS ARE IN THE FOOTWAY APPROX
200MTRS EAST OF THE FLYOVER WITH HARROW
ROAD
THESE WORKS ARE FOR THE EXCAVATION AND INSTALLATION OF A NEW
TELECOMS CABINET AND MAST.MAJOR 24/12/2018 10/01/2019 18 Days PROPOSED WORKS ROAD CLOSURE YN112-W50855-WK39A 202/01638
OAKLANDS ROAD LONDONFrom outside no 97 to junction with Cricklewood
Broadway
WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER TO
CARRY OUT MAINS REPLACEMENT SURFACE LOCATION: C/W AND F/WMAJOR 18/07/2018 21/09/2018 66 Days IN PROGRESS SOME C/W INCURSION MU821-H553/MBIW04/I001
Thames Water
0800 316 9800
London Borough of Brent
highways&[email protected] Roadworks/Events/Festivals
0208 937 5600 Network Management Team
Contact detailsEstimated
End DateEvent DescriptionMonth Duration
For the Week Commencing 24th September 2018
Traffic Management NotesWorks StatusStart Date
OAKLANDS ROAD LONDON Cricklewood Broadway (A5) - Howard Road National Car Free Day - Road closure - 11:00 - 17:00 HIGHWAYS ACT PERMITS 22/09/2018 22/09/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000939LONDON BOROUGH OF BRENT
020 8937 5600
OAKLANDS ROAD LONDON JUNCTION WITH CRICKLEWOOD BROADWAYWORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS
REPLACEMENTMAJOR 08/10/2018 19/10/2018 12 Days PROPOSED WORKS ROAD CLOSURE MU821-H553/MBIW04/I007
Thames Water
0800 316 9800
OAKLANDS ROAD LONDON j/w Cricklewood Broadway
Proposed Temporary Traffic Order for a road closure at Oaklands Road j/w
Cricklewood Broadway to carrying out mains replacement works Our ref:
TTRO/18/020
HIGHWAYS ACT PERMITS 08/10/2018 19/10/2018 12 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000929LONDON BOROUGH OF BRENT
020 8937 5600
OKEHAMPTON ROAD LONDON whole road
WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -
NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS
REPLACEMENT SCHEME
MAJOR 27/09/2018 04/10/2018 8 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MBIW07/Z018Thames Water
0800 316 9800
OLD CHURCH LANE LONDON o/s 48 in f/p Trace, then excavate to repair gas escape and reinstate where possible IMMEDIATE (EMERGENCY) 12/09/2018 20/09/2018 9 Days IN PROGRESS SOME C/W INCURSION AZ007-1000755989Cadent Gas Limited
0800 111 999
OLD CHURCH LANE LONDON 1 Sewer repair in Carriageway IMMEDIATE (EMERGENCY) 28/08/2018 24/09/2018 28 Days IN PROGRESS LANE CLOSURE MU026-008107SFNP--001001Thames Water
0800 316 9800
OLD CHURCH LANE LONDON 03-MayNon excavation permit for compound relating to excavation permit MU026-
008107SFNP--001001 - Emergency works due to collapsed sewerIMMEDIATE (EMERGENCY) 28/08/2018 24/09/2018 28 Days IN PROGRESS SOME C/W INCURSION MU026-008107SFNP--001002
Thames Water
0800 316 9800
OLDBOROUGH ROAD WEMBLEY 7Remedial Works Following Defect Inspection- To rectify remedial work in
CarriagewayMINOR 22/09/2018 24/09/2018 3 Days PROPOSED REMEDIAL SOME C/W INCURSION AZ007-1000566826
Cadent Gas Limited
0800 111 999
OLIVE ROAD LONDON The Cross Junction with Heber Road and Ashford RoadWORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS
REPLACEMENTMAJOR 22/10/2018 09/11/2018 19 Days PROPOSED WORKS ROAD CLOSURE MU821-H553/MBIW04/I008
Thames Water
0800 316 9800
OLIVE ROAD LONDON j/w Heber RoadProposed Temporary Traffic Order for a road closure at Olive Road j/w Heber Road
to carry out mains replacement works.HIGHWAYS ACT PERMITS 22/10/2018 09/11/2018 19 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000930
LONDON BOROUGH OF BRENT
020 8937 5600
OXFORD ROAD LONDON O/s 14 - 22. f\w. c\w.
Connections Projects:Electrical service alteration to customer supply:Dig 4 x LV
Joint Holes& 2 x HV Joint Holes as shown on plans. Pull 4 x 80m 300mm WV & 2 x
80m 300mm Al Triplex
STANDARD 24/09/2018 05/10/2018 12 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753109London Power Networks plc
0800 0280709
PARK LANE WEMBLEYO/S CHESTERFIELD HOUSE PARK LANE,
WEMBLEY, BRENT
DS0015062 - 2 X MAINS INSTALLATION TO NEW DEVELOPMENT ON BEHALF
OF AFFINITY WATER ND -FW/CW - STANDARD SLG - ONE WAY ROAD
CLOSURE - 2 PARKING BAY SUSPENSIONS
MAJOR 19/11/2018 30/11/2018 12 Days PROPOSED WORKS ROAD CLOSURE MX043-215ND587/01Affinity Water
01707 679 623
PARK VIEW ROAD LONDONFROM JUNCTION WITH LENNOX GARDENS TO
JUNCTION WITH DOLLIS HILL LANE
WORKING ON BEHALF OF THAMES WATER MAINS REPALCEMENT CW AND
FWMAJOR 23/07/2018 30/11/2018 131 Days IN PROGRESS SOME C/W INCURSION MU821-H553/MSUL46/I003
Thames Water
0800 316 9800
PARKFIELD ROAD LONDON O/S 1 OUTSIDE STOP VALVE REPLACEMENT IN FOOTWAY - LEAK REPAIR MINOR 25/09/2018 27/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION MU260-CSL-MGJV-200643Thames Water
0800 316 9800
PEBWORTH ROAD HARROW 26 pebworth road, harrow, ha13ud Relay Long Service Pipe - Working in footway and carriageway MINOR 19/09/2018 24/09/2018 6 Days IN PROGRESS SOME C/W INCURSION MX044-10020401Affinity Water
01707 679 623
PETER AVENUE LONDON whole road
WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER -
NOTIFICATION OF POTENTIAL WORKS TO CARRY OUT MAINS
REPLACEMENT SCHEME
MAJOR 25/10/2018 01/11/2018 8 Days PROPOSED WORKS SOME C/W INCURSION MU821-H208/MBIW07/Z019Thames Water
0800 316 9800
PRESTON ROAD WEMBLEYPreston Road outside 'The Martins ' to o/s 27- 60 m
North and 60 m South
Laying the Anti skid to the zebra crossing-to put up four way lights at the junction
with Forty Avenue, Wembley Hill Road East Lane and Preston RoadMINOR 19/09/2018 21/09/2018 3 Days IN PROGRESS MULTI-WAY SIGNALS AW041-325456
LONDON BOROUGH OF BRENT
020 8937 5600
PRINCES AVENUE LONDON OUTSIDE NO.176 TO NO.169 REMOVE FOOTWAY/DRIVE BLOCKAGE TO ALLOW CUSTOMER CONNECTION MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJFI/106665/LSMVirgin Media
0870 8883117
PRINCES AVENUE LONDON 232 SEWER CLEANING - PLANNED MINOR 24/09/2018 26/09/2018 3 Days PROPOSED WORKS MULTI-WAY SIGNALS MU026-008107XVVB--000003Thames Water
0800 316 9800
PRINCES AVENUE LONDON 9 Princes Avenue Interim to perm works in the footway MINOR 25/09/2018 27/09/2018 3 Days PROPOSED PERMANENT SOME C/W INCURSION MX044-10020208Affinity Water
01707 679 623
PRINCES CLOSE LONDON 7 - Princes Avenue
Proposed Temporary Traffic Order for a single yellow line and 'No waiting'
restriction, 08:00 - 18:00 Mon - Fri, 09.00 - 13.00 Sat, in the cu-de-sac at the land
near 7 Princes Close, NW9 9QT j/w Princ
HIGHWAYS ACT PERMITS 25/05/2018 24/03/2019 304 Days PROPOSED WORKS NO C/W INCURSION AW888-L-MAIN-00000891LONDON BOROUGH OF BRENT
020 8937 5600
PRIORY CRESCENT WEMBLEY footway 12 priory crecent Relay Short Service Pipe - WORKING IN FOOTWAY MINOR 20/09/2018 24/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION MX044-10021194Affinity Water
01707 679 623
RANELAGH ROAD LONDONRANELAGH ROAD - WHOLE STREET FROM J/O
HONEYWOOD ROAD TO J/O STATIONROAD.
IMGA202021. ABANDON 91M X 100MM DI AND 156M X 100MM
DIANDINSERT91MX75MMPE AND 156M X 75MM PE AND RELAY OR
TRANSFER SERVICES.
MAJOR 28/08/2018 09/10/2018 43 Days IN PROGRESS SOME C/W INCURSION AZ007-1000726761Cadent Gas Limited
0800 111 999
REDFERN ROAD LONDONFROM JUNCTION WITH GLYNFIELD ROAD TO
OUTSIDE NO 68 AND 69
WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER TO
CARRY OUT MAINS REPLACEMENT SURFACE LOCATION: CW AND FWMAJOR 07/01/2019 07/02/2019 32 Days PROPOSED WORKS SOME C/W INCURSION MU821-H553/MKET13/I001
Thames Water
0800 316 9800
ROSSLYN CRESCENT WEMBLEY 43 ROSSLYN CRESCENT, WEMBLEY BRENT Relay Short Service Pipe - WORKING IN FOOTWAY AND CARRIAGEWAY MINOR 24/09/2018 26/09/2018 3 Days PROPOSED WORKS SOME C/W INCURSION MX044-10025160Affinity Water
01707 679 623
RUCKLIDGE AVENUE LONDON WHOLE ROAD MAJOR C/W RESURFACING WORKS - 2018-2019-ROAD CLOSURE MAJOR 28/06/2018 25/09/2018 90 Days IN PROGRESS ROAD CLOSURE AW042-291105LONDON BOROUGH OF BRENT
020 8937 5600
RUGBY AVENUE WEMBLEY 154 RUGBY AVENUE, WEMBLEYRelay Long Service Pipe - WORKING IN FOOTWAY AND CARRIAGEWAY - SAME
DAY REINSTATEMENT REQUIREDIMMEDIATE (URGENT) 20/09/2018 24/09/2018 5 Days IN PROGRESS ROAD CLOSURE MX044-10017190
Affinity Water
01707 679 623
SALUSBURY ROAD LONDON outside 65 to Junction of Victoria Road
OUT OF HOURS CABLE PULL - FOOTWAY WORKS ONLY - NO EXCAVATION,
Only one footway/permit to be worked on at any given time. Raised in conjunction
with NK100/SSERRE/14019921N9A
MINOR 20/09/2018 20/09/2018 1 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14019921N9Virgin Media
0870 8883117
SALUSBURY ROAD LONDON*CUSTOMER DRIVEN WORKS* FOOTWAY OUTSIDE
OF NUMBER 102LAY NEW SERVICE 2M FROM MAIN IN FOOTWAY STANDARD 17/09/2018 21/09/2018 5 Days IN PROGRESS TWO-WAY SIGNALS AZ007-1000749229
Cadent Gas Limited
0800 111 999
SALUSBURY ROAD LONDON OUTSIDE 53-55 REPAIR AND REPLACE DUCTING IN FOOTWAY MINOR 24/09/2018 26/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION NK100-/SCLJDA/97362/LDAVirgin Media
0870 8883117
SELWYN ROAD LONDONFROM JUNCTION WITH ALRIC AVENUE TO
JUNCTION WITH HAZELDEAN ROAD
WORKS METHODOLOGY: WORKING ON BEHALF OF THAMES WATER TO
CARRY OUT MAINS REPLACEMENT SURFACE LOCATION: C/W AND F/WMAJOR 13/11/2018 12/12/2018 30 Days PROPOSED WORKS SOME C/W INCURSION MU821-H553/MSUL03/I003
Thames Water
0800 316 9800
SHAKESPEARE DRIVE HARROW outside 42 lay duct and fit service point in footway MINOR 23/10/2018 25/10/2018 3 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SSEJPL/104621/PLSVirgin Media
0870 8883117
SHOOT UP HILL LONDON 38Main Clamp 0 to 6' Fway in Footway. Our intention is to complete thePermanent
Reinstatement in the same phaseIMMEDIATE (URGENT) 19/09/2018 25/09/2018 7 Days IN PROGRESS SOME C/W INCURSION MU301-000031143502-002
Thames Water
0800 316 9800
SONIA GARDENS LONDON OUTSIDE NO 34 TO SIDE OF NO 22 COMPOUND/ WELFARE UNIT FOR WORKS ON PARK VIEW MAJOR 02/08/2018 28/09/2018 58 Days IN PROGRESS SOME C/W INCURSION MU821-H553/MSUL46/I004Thames Water
0800 316 9800
London Borough of Brent
highways&[email protected] Roadworks/Events/Festivals
0208 937 5600 Network Management Team
Contact detailsEstimated
End DateEvent DescriptionMonth Duration
For the Week Commencing 24th September 2018
Traffic Management NotesWorks StatusStart Date
SONIA GARDENS LONDON WHOLE ROAD
FOOTWAY RECONSTRUCTION PROGRAMME- RESERVE SCHEME- 2018/19-
PEDESTRIAN SIGNING AND GUARDING-FOOTWAY CLOSURE, SOME C/W
INCURSION, CHAPTER 8
MAJOR 04/07/2018 01/10/2018 90 Days PROPOSED WORKS SOME C/W INCURSION AW042-292338LONDON BOROUGH OF BRENT
020 8937 5600
SONIA GARDENS LONDON S/o 167 Dudden Hill Lane. f\w. c\w. Connections Projects:Electrical service alteration to customer supply:New service STANDARD 03/10/2018 09/10/2018 7 Days PROPOSED WORKS SOME C/W INCURSION EC400-10753149London Power Networks plc
0800 0280709
SONIA GARDENS LONDON FOOTWAY OUTSIDE OF NO 2 SONIA GARDENS LAY 3 X NEW DOMSTIC GAS SERVICES 1M FROM MAIN IN THE FOOTWAY MINOR 08/10/2018 10/10/2018 3 Days PROPOSED WORKS GIVE & TAKE AZ007-1000748890Cadent Gas Limited
0800 111 999
SOUTH WAY WEMBLEY*CUSTOMER DRIVEN WORKS* FOOTWAY OUTSIDE
OF V.D.CDISCONNECT 8' MAIN IN FOOTWAY STANDARD 01/10/2018 09/10/2018 9 Days PROPOSED WORKS LANE CLOSURE AZ007-1000748455
Cadent Gas Limited
0800 111 999
SOUTH WAY WEMBLEY J/W Wembley Hill RoadProposed Temporary Traffic Order for a road closure in South Way j/w Wembley Hill
Road for a new sewer connection. Our ref: TTRO/18/012HIGHWAYS ACT PERMITS 06/08/2018 11/11/2018 98 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000908
LONDON BOROUGH OF BRENT
020 8937 5600
SOUTH WAY WEMBLEY J/W Wembley Hill RoadTM and excavation works to upgrade existing Thames infra structure in footway and
carriagewayMAJOR 29/08/2018 31/01/2019 156 Days IN PROGRESS ROAD CLOSURE MU302-KCD-MAJOR-H456-1
Thames Water
0800 316 9800
ST ALBANS ROAD LONDON o/s 10. f\w.Network Operations Faults:Essential repair of electricity cables powering street
lighting / furniture:repairs to lamp column walk way in the carriageIMMEDIATE (URGENT) 18/09/2018 24/09/2018 7 Days IN PROGRESS NO C/W INCURSION EC400-10753629
London Power Networks plc
0800 0280709
ST JOHNS ROAD WEMBLEY 109 ST JOHNS ROAD WEMBLEY Remedial works in the footway MINOR 17/09/2018 21/09/2018 5 Days IN PROGRESS SOME C/W INCURSION MX044-10015657Affinity Water
01707 679 623
ST JOHNS ROAD WEMBLEY Elm Road to High Road National Car Free day - Road Closure - 10:00 - 16:00 HIGHWAYS ACT PERMITS 22/09/2018 22/09/2018 1 Days PROPOSED WORKS ROAD CLOSURE AW888-L-MAIN-00000938LONDON BOROUGH OF BRENT
020 8937 5600
ST JOHNS ROAD WEMBLEY At the railway bridge (rail over road)Structures examination of the railway bridge using a truck mounted hoist. 09:30 -
15:00.MINOR 15/10/2018 15/10/2018 1 Days PROPOSED WORKS TWO-WAY SIGNALS KL333-NAJ1-BRG-14-2018 202/00697
ST MARYS ROAD LONDON O/S 19 OUTSIDE STOP VALVE REPLACEMENT IN FOOTWAY - LEAK REPAIR MINOR 25/09/2018 27/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION MU260-CSL-MGJV-200644Thames Water
0800 316 9800
STAPLEFORD ROAD WEMBLEY 9Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME
PERMANENT REINSTATEMENT WITHIN SAME PHASEMINOR 22/09/2018 24/09/2018 3 Days PROPOSED WORKS GIVE & TAKE MU026-008107VCQG--000005
Thames Water
0800 316 9800
STAPLEFORD ROAD WEMBLEY O/S NO 23, STAPLEFORD ROAD Install 3m of 1 way poly duct in Footway MINOR 20/09/2018 24/09/2018 5 Days PROPOSED WORKS NO C/W INCURSION BC006-TI001LC500269104000BT
03301 233753
TALBOT ROAD WEMBLEYOpposite number 2 TALBOT ROAD in footway&
carriageway
Excavate& connect to CGL Gas Main providing gas supply to new housing
development. Approx dimensions: 3m x 0.5m footway, 4m x 0.5m carriageway.
Depth: 0.8m. FIRST TIME PERM
MINOR 08/10/2018 10/10/2018 3 Days PROPOSED WORKS GIVE & TAKE ZP007-69601/EPLR 202/02290
TALBOT WALK LONDON 37Main Clamp in Footway. Our intention is to complete the PermanentReinstatement
in the same phaseMINOR 02/10/2018 04/10/2018 3 Days PROPOSED WORKS SOME C/W INCURSION MU301-000031131229-002
Thames Water
0800 316 9800
TANFIELD AVENUE LONDON 112 SELF DEFECT- Rectify remedial work in Footway MINOR 18/09/2018 20/09/2018 3 Days IN PROGRESS NO C/W INCURSION AZ007-1000733732Cadent Gas Limited
0800 111 999
TENNYSON ROAD LONDON s/o 135 Glengall road in Tennyson road. f\w.Network Operations Faults:Essential and immediate replacement or repair of multi-
way link box to ensure safe and reliable power supplies:repairs to faulted link boxIMMEDIATE (URGENT) 17/09/2018 24/09/2018 8 Days IN PROGRESS SOME C/W INCURSION EC400-10753548
London Power Networks plc
0800 0280709
THE AVENUE LONDONEXCAVATION IN FOOTPATH OUTSIDE 5-7 THE
AVENUE.. f\w.
Connections Small Service:Disconnection / reconnection of existing electricity
supply for a customer:EXCAVATION IN FOOTPATH OUTSIDE 5-7 THE AVENUE
TO PERMANENTLY DISCONNECT 2 ELECTRICITY SERVICES. F/P
STANDARD 14/09/2018 20/09/2018 7 Days IN PROGRESS NO C/W INCURSION EC400-10748214London Power Networks plc
0800 0280709
THE AVENUE LONDON outside 60 to 64CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED
TEE and REPAIR BLOCKAGES IF FOUND, FOOTWAY WORKS ONLYMINOR 22/09/2018 25/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14030462J9
Virgin Media
0870 8883117
THE CIRCLE LONDONjnc of The circle and North Cicular Road. Between
house no. 336 and 334Trace, then excavate to repair gas escape and reinstate where possible IMMEDIATE (EMERGENCY) 19/09/2018 25/09/2018 7 Days IN PROGRESS ROAD CLOSURE AZ007-1000758382
Cadent Gas Limited
0800 111 999
THE FAIRWAY WEMBLEY 42 the fairway wembley Relay Short Service Pipe - WORKING IN FOOTWAY AND CARRIAGEWAY MINOR 19/09/2018 21/09/2018 3 Days PROPOSED WORKS SOME C/W INCURSION MX044-10015865Affinity Water
01707 679 623
THE GROVE LONDON THE GROVE, O/S NO.41IMGA192408. URGENT: TO RESTORE GAS SUPPLY TO NO.41 THE GROVE,
LONDON,NW9 0TNIMMEDIATE (URGENT) 19/09/2018 25/09/2018 7 Days IN PROGRESS NO C/W INCURSION AZ007-1000758182
Cadent Gas Limited
0800 111 999
THE MALL HARROW whole road major carriageway resurfacing works -joint repairs 2018-2019-road closure MAJOR 27/07/2018 24/10/2018 90 Days PROPOSED WORKS ROAD CLOSURE AW042-290858LONDON BOROUGH OF BRENT
020 8937 5600
THE RIDGEWAY HARROW 8 the ridgeway kenton ha30ll Relay Long Service Pipe - WORKING IN FOOTWAY MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION MX044-10018002Affinity Water
01707 679 623
TORBAY ROAD LONDON WHOLE ROADPREVENTATIVE CARRIAGEWAY RESURFACING WORKS-2018 TO 2019-ROAD
CLOSUREMAJOR 18/09/2018 20/09/2018 3 Days IN PROGRESS ROAD CLOSURE AW042-290745
LONDON BOROUGH OF BRENT
020 8937 5600
TUDOR GARDENS LONDON OUTSIDE 27 Make works perm in footway MINOR 02/10/2018 04/10/2018 3 Days PROPOSED PERMANENT NO C/W INCURSION AZ007-1000742458Cadent Gas Limited
0800 111 999
UFFINGTON ROAD LONDONFrom Opposite Esher House to Opposite Shalford
CottagePERMIT IS FOR OFFICE AND SITE COMPOUND. MAJOR 04/07/2018 28/09/2018 87 Days IN PROGRESS SOME C/W INCURSION MU821-H208/MBIW07/I011
Thames Water
0800 316 9800
UPHILL DRIVE LONDON WHOLE ROADMAJOR CARRIAGEWAY RESURFACING WORKS(RESERVE SCHEME)2018-
2019-ROAD CLOSUREMAJOR 28/06/2018 25/09/2018 90 Days IN PROGRESS ROAD CLOSURE AW042-291242
LONDON BOROUGH OF BRENT
020 8937 5600
UXENDON CRESCENT WEMBLEY WHOLE ROADMAJOR CARRIAGEWAY RESURFACING(RESERVE) 2018-2019-ROAD
CLOSUREMAJOR 28/06/2018 25/09/2018 90 Days IN PROGRESS ROAD CLOSURE AW042-291135
LONDON BOROUGH OF BRENT
020 8937 5600
VALLEY DRIVE LONDON FRYENT WAY TO WALTHAM AVENUEFOOTWAY RECONSTRUCTION PROGRAMME 2018/19-PEDESTRIAN SIGNING
AND GUARDING-FOOTWAY CLOSURE, SOME C/W INCURSION, CHAPTER 8MAJOR 24/09/2018 28/02/2019 158 Days PROPOSED WORKS SOME C/W INCURSION AW042-325241
LONDON BOROUGH OF BRENT
020 8937 5600
VICTOR ROAD LONDON FOOTWAY OUTSIDE OF NO 4 VICTOR ROAD LAY NEW DOMESTIC GAS SERVICE 2M FROM MAIN IN THE FOOTWAY STANDARD 14/09/2018 20/09/2018 7 Days IN PROGRESS SOME C/W INCURSION AZ007-1000749530Cadent Gas Limited
0800 111 999
VICTOR ROAD LONDONFROM JUNCTION WITH HARROW ROAD TO END OF
THE ROAD
WORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS
REPLACEMENTMAJOR 03/09/2018 23/10/2018 51 Days IN PROGRESS SOME C/W INCURSION MU821-H553/MSUL20/I001
Thames Water
0800 316 9800
VICTORIA ROAD LONDONoutside Junction of Salusbury Road on Victoria Road to
106 Victoria Road
OUT OF HOURS CABLE PULL - FOOTWAY WORKS ONLY - NO EXCAVATION,
Only one footway/permit to be worked on at any given time. Raised in conjunction
with NK100/SSERRE/14019921N9
MINOR 20/09/2018 20/09/2018 1 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14019921N9AVirgin Media
0870 8883117
London Borough of Brent
highways&[email protected] Roadworks/Events/Festivals
0208 937 5600 Network Management Team
Contact detailsEstimated
End DateEvent DescriptionMonth Duration
For the Week Commencing 24th September 2018
Traffic Management NotesWorks StatusStart Date
VILLAGE WAY LONDON 67 OUTSIDE STOP VALVE INSTALLATION IN FOOTWAY MINOR 19/09/2018 21/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION MU275-OSV-199750Thames Water
0800 316 9800
VILLIERS ROAD LONDON 184 VILLIERS ROAD, LONDON, NW2 5PUMain Clamp in Carriageway. Our intention is to complete the
PermanentReinstatement in the same phaseMINOR 26/09/2018 28/09/2018 3 Days PROPOSED WORKS MULTI-WAY SIGNALS MU301-000031154810-001
Thames Water
0800 316 9800
WAKEMAN ROAD LONDON 86 OUTSIDE STOP VALVE REPLACEMENT IN FOOTWAY - LEAK REPAIR MINOR 25/09/2018 27/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION MU260-CSL-MGJV-200653Thames Water
0800 316 9800
WAKEMAN ROAD LONDONFROM JUNCTION WITH Chamberlayne Road TO
JUNCTION WITH COMPTON ROAD
MAJOR LARGE DIAMETER MAINS REPLACEMENT WORKS TO TAKE PLACE.
ABANDON 62MOF METALLIC MAIN AND REPLACE IT WITH 62M OF PE MAIN.
INSERTION METHOD TO BE USED, NEW MAIN TO BE SLEEVED INSIDE THE
OLD TO REDUCE
MAJOR 14/09/2018 21/11/2018 69 Days IN PROGRESS NO C/W INCURSION AZ007-1000668688Cadent Gas Limited
0800 111 999
WAKEMANS HILL AVENUE LONDONFrom electricity sub-station at the s/o 2 to j/o Edgware
Road, Wakemans Hill Avenue. . f\w. c\w.
Network Operations Distribution:Installation of new 11kv High Voltage electricity
cables to ensure safe and reliable power supplies:Excavation of trench in footway&
carriageway to enable the installat
MAJOR 05/10/2018 16/11/2018 43 Days PROPOSED WORKS SOME C/W INCURSION EC300-34795203London Power Networks plc
0800 0280709
WALM LANE LONDON outside 129a on Walm Lane to 131CLEAR BLOCKED DUCT and REPAIR BLOCKAGES IF FOUND FOOTWAY
WORKS ONLYMINOR 21/09/2018 24/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14009182J9A
Virgin Media
0870 8883117
WALM LANE LONDON Outside 179 Clear blockage and desilt chamber in footway. MINOR 03/10/2018 04/10/2018 2 Days PROPOSED WORKS SOME C/W INCURSION NK100-/SCLJBU/6417024/ERSVirgin Media
0870 8883117
WALM LANE LONDON 17
new customer water supply 1x32mm MDPE mtrd, works in the footway and
inCarriageway. Our intention is to complete the Permanent Reinstatement inthe
same phase
STANDARD 05/10/2018 10/10/2018 6 Days PROPOSED WORKS SOME C/W INCURSION MU307-000807582360045-001Thames Water
0800 316 9800
WARFIELD ROAD LONDONFROM THE JUNCTION WITH PEMBER ROAD TO THE
JUNCTION WITH HARROW ROAD
MAJOR LARGE DIAMETER MAINS REPLACEMENT WORKS TO TAKE
PLACE.ABANDON90MOFMETALLIC MAIN AND REPLACE IT WITH 90M OF PE
MAIN. INSERTIONMETHOD TO BE USED, NEW MAIN TO BE SLEEVED INSIDE
THEOLDTOREDUCEEXCAVAT
MAJOR 17/09/2018 22/11/2018 67 Days IN PROGRESS ROAD CLOSURE AZ007-1000682229Cadent Gas Limited
0800 111 999
WATFORD ROAD HARROWOn footway, west side of road, 30 metres north of John
Lyon roundabout.
Working on existing telecommunications cabinet on footway. No excavation, no
carriageway incursion. All signing lighting and guarding confined to footway, 1.2
metres will be maintained for peds.
MINOR 24/09/2018 26/09/2018 3 Days PROPOSED WORKS NO C/W INCURSION MG056-37660 202/01453
WATFORD ROAD WEMBLEY outside 123 to 127CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS
ONLYMINOR 25/09/2018 26/09/2018 2 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14098642J9
Virgin Media
0870 8883117
WELLS DRIVE LONDON outside 9 to 13CLEAR BLOCKED DUCT and REPAIR BLOCKAGES IF FOUND FOOTWAY
WORKS ONLYMINOR 22/09/2018 25/09/2018 4 Days PROPOSED WORKS NO C/W INCURSION NK100-/SSERRE/14055726J9A
Virgin Media
0870 8883117
WEMBLEY HILL ROAD WEMBLEY 90 WEMBLEY HILL ROAD, WEMBLEY Fit Stop Tap / Boundary Box - WORKING IN FOOTWAY MINOR 21/09/2018 25/09/2018 5 Days PROPOSED WORKS SOME C/W INCURSION MX044-10020754Affinity Water
01707 679 623
WEMBLEY HILL ROAD WEMBLEY J/W South WayTM and excavation works to upgrade existing Thames infra structure works in
footway& carriagewayMAJOR 29/08/2018 31/01/2019 156 Days IN PROGRESS MULTI-WAY SIGNALS MU302-KCD-MAJOR-H456-2
Thames Water
0800 316 9800
WEMBLEY PARK DRIVE WEMBLEY 3 Emergency sewer repair works in carriageway due to external flooding IMMEDIATE (EMERGENCY) 18/09/2018 01/10/2018 14 Days IN PROGRESS MULTI-WAY SIGNALS MU026-008107LDQG--0001Thames Water
0800 316 9800
WEST COURT WEMBLEY NEARSIDE FOOTWAY OUTSIDE 26 WEST COURTALTER AND RELAY DOMESTIC SERVICE 1.5M FROM MAIN IN NEARSIDE
FOOTWAYSTANDARD 28/09/2018 04/10/2018 7 Days PROPOSED WORKS NO C/W INCURSION AZ007-1000756975
Cadent Gas Limited
0800 111 999
WESTMORELAND ROAD LONDON Adj 6 Bowmans Trading Estate
Proposed Temporary Traffic Order for a footway and part carriageway closure adj. 6
Bowmans Trading Estate j/w Westmoreland Road to allow for construction works.
Our ref: TTRO/18/026
HIGHWAYS ACT PERMITS 21/09/2018 20/03/2020 547 Days PROPOSED WORKS SOME C/W INCURSION AW888-L-MAIN-00000925LONDON BOROUGH OF BRENT
020 8937 5600
WHITMORE GARDENS LONDON whole roadWORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS
REPLACEMENTMAJOR 13/08/2018 19/10/2018 68 Days IN PROGRESS SOME C/W INCURSION MU821-H208/MSUL20/Z001
Thames Water
0800 316 9800
WOODGRANGE CLOSE HARROW 37 Non excavation permit raised for compound - Related to pollution investigation IMMEDIATE (EMERGENCY) 29/08/2018 19/10/2018 52 Days IN PROGRESS SOME C/W INCURSION MU026-008107TBKJ--001001Thames Water
0800 316 9800
WOODSIDE PLACE WEMBLEYADJ TO 57 WOODSIDE AVENUE, WOODSIDE
PLACE, WEMBLEY, BRENT
COMMUNICATION PIPE - INSTALL; 25 MDPE; 4' CI; 1 OF 1 - FW WORKS - FW
CLOSURE REQUIRED - PEDS TO USE OPP FWMINOR 26/09/2018 28/09/2018 3 Days PROPOSED WORKS SOME C/W INCURSION MX044-285413600
Affinity Water
01707 679 623
WOODSIDE PLACE WEMBLEYjoint hole in fw adj to 55 with road crossing to site adj to
57 woodside ave . f\w. c\w.
Connections Small Service:Installation of a new electricity supply for a customer:new
supply with road crossing on woodside placeMAJOR 28/11/2018 04/12/2018 7 Days PROPOSED WORKS ROAD CLOSURE EC300-34801922
London Power Networks plc
0800 0280709
WOODSTOCK ROAD WEMBLEY O/S 10, WOODSTOCK ROAD Install 15m of 1 way poly duct in Verge,Install 3m of 1 way poly duct in Footway MINOR 19/09/2018 20/09/2018 2 Days PROPOSED WORKS NO C/W INCURSION BC006-TI001LC500267069003BT
03301 233753
WYCOMBE ROAD WEMBLEY Junction Beresford Ave to Outside Sub Station Trial Holes MAJOR 08/05/2018 31/05/2019 389 Days IN PROGRESS ROAD CLOSURE AW999-S000000000343LONDON BOROUGH OF BRENT
020 8937 5600
WYLD WAY WEMBLEYWHOLE STREET FROM S/O NO.130 VIVIAN AVENUE
TO J/O HARROW ROAD
IMGA192405. ABANDON 325M X 6/8' CI MAIN AND INSERT 125/180MM PE
ANDRELAY OR TRANSFER APPROX 40 SERVICESMAJOR 29/10/2018 30/11/2018 33 Days PROPOSED WORKS SOME C/W INCURSION AZ007-1000741692
Cadent Gas Limited
0800 111 999
YEATS CLOSE LONDONFROM ENTRANCE TO SELCO BUILDERS TO SMALL
ROUNDABOUT
footway + carriageway works-ped signing and guarding, 2 way lights, footway
closure, some c/w incursion-chapter 8.STANDARD 24/09/2018 07/10/2018 14 Days PROPOSED WORKS TWO-WAY SIGNALS AW041-326848
LONDON BOROUGH OF BRENT
020 8937 5600
YEWFIELD ROAD LONDON WHOLE ROADMAJOR CARRIAGEWAY RESURFACING WORKS(reserve scheme)2018-2019-
road closureMAJOR 28/06/2018 25/09/2018 90 Days IN PROGRESS ROAD CLOSURE AW042-291250
LONDON BOROUGH OF BRENT
020 8937 5600