Sui Northern Gas Pipelines Limited
LNG Distribution Plans
&
Infrastructure Development Pakistan Institute of Petroleum
January 11th, 2016 Kashif Siddiqui
General Manager, LNG-LPG
Sui Northern Gas Pipelines Ltd. [email protected]
1
Sui Northern Gas Pipelines Limited
CONTENTS
2
Pakistan’s Energy Mix
Pakistan’s Natural Gas Supply-Demand Projections
Imbalance of Demand-Supply on SNGPL’s Network
Demand-Supply Imbalance – Hit to Economy
RLNG – Lifeline for the Economy
Allocation of RLNG to Consumers on SNGPL’s Network
Sector-wise Consumption of RLNG on SNGPL’s Network
LNG Imports Transaction Structure
SNGPL’s System augmentation for upcoming LNG Supply
Supply of Gas to RLNG based 4000 MW Power Plants
Sui Northern Gas Pipelines Limited 3
Oil
35%
Natural Gas
46%
LPG
1%
Coal
5%
Electricity
13%
Source: Pakistan Energy Yearbook 2014
Pakistan’s Energy Mix
Sui Northern Gas Pipelines Limited 4
Natural Gas Supply-Demand Projections
Sui Northern Gas Pipelines Limited
Demand Supply Imbalance – SNGPL Network
5
2012-13 2013-14 2014-15 2015-16
1603 1476
1258 1157
2320 2470 2380
2541
717
994 1122
1384
System Input Demand Shortfall
MMCFD
Natural depletion of existing gas fields and NO addition of major indigenous gas source
Increase in gas demand on account of expansion in network every year, which results in addition
of 30~40 MMCFD load during summers and 80~100 MMCFD load during winters
This shortage persists despite MORATORIUM on new Industrial & Commercial connections
since 2011
Sui Northern Gas Pipelines Limited
Winter Increase in Demand (Nov. – Feb.)
6
2013-14 2014-15 2015-16
1468 1261
1151
2665 2654 2809
1197 1393
1658
MMCFD
System Input Demand Gap
• The gap between demand and supply is bridged through massive curtailment in Punjab province in all
consumer categories except domestic and commercial consumers on year round basis
• Total demand of Khyber Pakhtunkhwa (KP) to be met due to decision of Peshawar High Court on
Article-158 of the Constitution, till the time the demand does not exceed the supplies from sources in KP
Sui Northern Gas Pipelines Limited
LOST OPPORTUNITY SNGPL’s Operational Infrastructure
Gas Sources
• 39 Gas Sources
Compression
• 216,000HP
• 11 Compressor Stations
Transmission
• >7,800 Km
Distribution
• > 100,000 Km
• > 3200 Towns & Villages
Consumers
• > 5.0 Million
7
Sui Northern Gas Pipelines Limited
• Gas supplies were discontinued to consumers where GSAs for firm supply have
expired. These include consumers from Power and Fertilizer sectors.
• Resultantly, power generation capacity of around 2284 MW either goes idle or shifted
to more expensive Liquid Fuels.
• Massive investment made in Fertilizer Sector went astray.
• Further, gas supply to CNG Sector (demand 300 MMCFD) in Punjab, has remained
suspended since November 2014.
• Resultantly, the billions of rupees worth investments incurred on around 2,300 CNG
Stations and the massive capital put in by all CNG fitted vehicle owners went idle.
The bread and butter of people associated was adversely hit.
• Additionally, with the onset of winters this year, gas supplies to Industrial sector
(demand 563 MMCFD) across Punjab were also suspended, in order to ensure
maximum availability of gas for highest priority Domestic and Commercial sectors.
• The costs of energy input raised manifold for the industrial units in Punjab, thereby
resulting in financial losses, decrease in textile exports and threat of unemployment !
8
Demand Supply Gap - Hit to the Economy
Sui Northern Gas Pipelines Limited
• LNG imports have been materialized and first flow of Re-gasified LNG
(RLNG) was injected into SNGPL’s network on March 27, 2015.
• Power Sector
Power generation capacity of 2284 MW was brought back into production or
switched from expensive liquid fuels to RLNG.
• Industrial Sector
Over 500 industrial units (mainly export-oriented textile sector) have been
revived during winters to whom gas supplies were suspended.
• CNG Sector
Around 750 CNG stations across Punjab operated even during the month of
December for the first time in many years.
• Fertilizer Sector
Production of fertilizer re-initiated thereby contributing massively to the
agriculture economy of the Country.
9
RLNG – Lifeline for the Economy
Sui Northern Gas Pipelines Limited 10
Sectors Before LNG Imports
Current Scenario
(Nov-Dec 2015)
Power 42 MMCFD 129 MMCFD
Fertilizer 4 MMCFD
(Operational for 7 days only
during 4 months)
40 MMCFD (Operational for all 61 days of
Nov-Dec 2015)
General Industry Nil RLNG offered and individual
customers are adding...
Textile* 4 Hrs for Captive and
17% for Processing
4 Hrs and 17% on RLNG
w.e.f. 25.12.2015
CNG Nil 9 days
* Despite reduction in input by around 150 MMCFD and addition of demand by 90 MMCFD,
supplies to Industry continued this winter at par with last year supplies, only due to injection
of RLNG in SNGPL’s system.
RLNG – Lifeline for the Economy
Sui Northern Gas Pipelines Limited
LNG Allocations
11
POWER
FIRM COMMITMENT MMCFD
250 MW LNG fired Power Plant of M/s Davis Cogen (Pvt.) Ltd 50
1200 MW Balloki Power Project 200
1200 MW CCPP Bhikhi 200
1200 MW Haveli Bahadur Shah 200
425 MW Combined Cycle Power Project Nandipur 100
Rousch 85
AS AND WHEN AVAILABLE
FKPCL 24
HALMORE POWER 40
ORIENT POWER 40
SAIF POWER 40
SAPHIRE POWER 40
KAPCO 140
FERTLIZER
56
CNG
CNG
INDUSTRY
Textile Industry @ 4 Hrs for Captive and 17% for Processing 60
Other Individual Industrial Consumers 100
Sui Northern Gas Pipelines Limited 12
LNG
Suppliers PSO
SSGC
(Local
Buyer)
SNGPL
(Local
Buyer)
EETL
(Terminal
Operator)
SSGC SNGPL
SPA
(Long Term)
MSA
(Spot/Short Term)
Tripartite
Agreement
LSA
GTA
GSAs with
RLNG
Consumers
Re-gasification
Contract
LNG IMPORTS TRANSACTION STRUCTURE
Sui Northern Gas Pipelines Limited
Scope of Responsibilities
• PSO: Procure LNG, both Long Term (SPA) and Short Term
(MSA) LNG ; and on-sell it right at shore to SSGC and
SNGPL according to their allocations (currently 100%
for SNGPL)
• SSGC: Make LNG available to EETPL for its own as well as
SNGPL share for Storage & Re-Gasification
• EETPL: Receive, store, and re-gasify LNG under LSA with
SSGC; and deliver RLNG into SSGC network
• SNGPL: Receive RLNG from SSGC (through swap
arrangement initially) and sell it to designated buyers
13
Sui Northern Gas Pipelines Limited 14
SYSTEM AUGMENTATION FOR LNG SUPPLY
AUGMENTATION PLAN
SNGPL has prepared an augmentation plan of its system
downstream Sawan (Sawan is starting point of SNGPL
pipeline system which is located in District Khairpur
Province Sindh) to receive additional LNG supply up to
1.2 BCFD on the basis of two Projects under the
nomenclature i.e. Project-1 & Project-2.
Sui Northern Gas Pipelines Limited 15
SYSTEM AUGMENTATION FOR LNG SUPPLY
Objective Transportation / receiving of additional 400 MMCFD
LNG Supply into Company’s system
Infrastructure
Involved
a- 42”dia x 111.355 KM Pipeline from Sawan to Qadirpur
(Qadirpur is located in District Ghotkhi, Province Sindh)
b- 5000 HP compression at AC1(X) Bhong
Estimated Project
Cost Rs. 18,543 million.
Project Approvals Project has been approved by our Board of Directors as well as OGRA.
Project Financing Syndicated term finance loan has been arranged from consortium of
eight banks.
Project Completion
date Nearing Completion.
Sui Northern Gas Pipelines Limited
PROJECT -1 MAP
GAS SOURCE
COMPRESSOR
STN.
EXISTING PIPELINES
PROPOSED PROJECT-1
(42”DIA. X 111.355 KM)
COMPLETED
16
Sui Northern Gas Pipelines Limited 17
SYSTEM AUGMENTATION FOR LNG SUPPLY
Objective Transportation / receiving of 1200 MMCFD LNG including 400
MMCFD LNG of Project-1 into Company’s system.
Infrastructure Involved
a- 16” to 42” x 762 KM Pipeline
b- 25000 HP compression at AC1(X)
and AC 6 (Multan)
42” - 70 KM
36” - 303 KM
30” - 109 KM
24”-16” - 280 KM
Estimated Project Cost Rs. 57,941 million.
Project Status Engineering and material procurement activities are in progress.
Project Financing
GOP has approved the provision of sovereign guarantee for
commercial loan, terms of which are being finalized and are in
advance stages of financial close. For stop gap arrangement, Company
has secured bridge finance facility of Rs. 15 billion.
Project Completion date December, 2016
Sui Northern Gas Pipelines Limited PROJECT -2 MAP
GAS SOURCE
COMPRESSOR
STN.
EXISTING
PIPELINES PROPOSED PROJECT 2
(42”-16” Dia x 762KMs)
Summary of Pipeline
42” 70 KM
36” 303 KM
30” 109 KM
24” 145 KM
18” 65 KM
16” 70 KM
Total 762 KM 18
Sui Northern Gas Pipelines Limited 19
Power Plant Location
Quantity of
Gas required
(MMCFD)
Infrastructure Proposed Estimated Cost
(Rs. Million)
Bhikhi
(Govt. Of Punjab) 200 30” dia x 18 Km 1360
Balloki
(Govt. Of Pakistan) 200 30” dia x 8 Km 880
Haveli Bahadur Shah
(Govt. Of Pakistan) 200 30” dia x 38 Km 2800
Nandipur
(Govt. Of Pakistan) 100 24” dia x 85 Km 4750
SUPPLY OF GAS TO RLNG BASED
4000 MW POWER PLANTS
Sui Northern Gas Pipelines Limited 20
SUPPLY OF GAS TO RLNG BASED 4000 MW POWER PLANTS
Sui Northern Gas Pipelines Limited
THANK YOU
&