ReportNo. 1591-CO List of Projects for External Financing 1977-1979 Colombia May 13, 1977 Latin America and the Caribbean Regional Office FOR OFFICIAL USE ONLY Document of the World Bank Thisdocumenthasa restricted distributionand may be used by recipients only in the performance of their officialduties. Its contentsmaynot otherwise be disclosed without World Bank authorization. FEP Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

List of Projects for External Financing 1977-1979 Colombia

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: List of Projects for External Financing 1977-1979 Colombia

Report No. 1591-CO

List of Projects forExternal Financing 1977-1979ColombiaMay 13, 1977

Latin America and the Caribbean Regional Office

FOR OFFICIAL USE ONLY

Document of the World Bank

This document has a restricted distribution and may be used by recipientsonly in the performance of their official duties. Its contents may nototherwise be disclosed without World Bank authorization. FEP

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: List of Projects for External Financing 1977-1979 Colombia
Page 3: List of Projects for External Financing 1977-1979 Colombia

FOR OFFICIAL USE ONLY

CONSULTATIVE GROUP FOR COLOMBIA

PROJECT LIST

INDEX

Abbreviations Used

Introduction

Annex A: External Loans Signed During 1976

Annex B: 1977 Project List

Annex C: 1978 Project List

Annex D: 1979 Project List

Annex E: Projects Deleted from PreviousProject Lists

Annex F: Individual Project Descriptions

This document has a restricted distribution and may be used by recipients only in the performanceof their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

Page 4: List of Projects for External Financing 1977-1979 Colombia

ABBREVIATIONS USED

CAP Corporaci6n Andina de Fomento.CAR Corporaci6n Aut6noma Regional de la Sabana de Bogota.CDMB Corporaci6n para el Desarrollo de la Meseta de Bucaramanga.CFP Corporaci6n Financiera Popular.CFT Corporaci6n Financiera del Transporte.CIDA Canadian International Development Agency.CNT Corporaci6n Nacional de Turismo.COLPUE1-TOS Puertos de Colombia.CONICOL Compantia Colombiana de Niquel.CORELCA Corporaci6n Electrica de la Costa Atlantica.CRAMSA Corporaci6n Regional Aut6noma de Manizales,Salamina y Aranzazu.CVC Corporaci6n Aut6noma Regional del Valle del Cauca.DAAC Departamento Administrativo de AeronAutica Civil.DAINCO Departarnento Administrativo de Intendencias y Comisarias.ECOMINAS Empresa Colombiana de Minas.ECONIQUEL Empresa Colombiana de Niquel Ltda.ECOPETROL Empresa Colombiana de Petr6leos.EDIS Empresa Distrital de Servicios (Bogota).EEEB Empresa de Energia Electrica de BogotA.ELECTRIBOL Electrificadora de Bolivar.EMCALI Empresas Municipales de Cali.EMTB Empresas Municipales de Telefonos de Bucaramanga.EPB Empresas Piblicas de Barranquilla.EPM Empresas Piiblicas de Medellin.ETB Empresa de Telefonos de Bogota.FAN Fondo Aeronautico Civil.FIP Fondo de Inversiones Privadas.FNC Ferrocarriles Nacionales de Colombia.FONADE Fondo Nacional de Proyectos de Desarrollo.HIMAT Instituto Colombiano de Hidrologia y Metereologia.ICA Instituto Colombiano Agropecuario.ICEL Instituto Colombiano de Energia Electrica.ICSS Instituto Colombiano de Seguros Sociales.ICT Instituto de Credito Territorial.IDB Interamerican Development Bank.IFI Instituto de Fomento Industrial.INAGRARIO Almacenes Generales de Dep6sito de Caja Agraria e Idema.INCORA Instituto Colombiano de la Reforma Agraria.INDERENA Instituto de Desarrollo de los Recursos Naturales Renovables.INRAVISION Instituto Nacional de Radio y Televisi6n.INSFOPAL Instituto de Fomento Municipal.ISA Interconexi6n Electrica,S.A.KfW Kreditanstalt flAr Wiederaufbau.MOPT Ministerio de Obras Puiblicas y Transporte.NAVENAL Compafnia Nacional de Navegaci6n.NPD National Planning Department/Departamento Nacional de Planeaci6n.SENA Servicio Nacional de Aprendizaje.TELECOM Empresa Nacional de Telecomunicaciones,USAID US Agency for International Development.

Page 5: List of Projects for External Financing 1977-1979 Colombia

Page 1

INTRODUCTION

1. This report contains the list of external loans signed in 1976 (Annex A),a list of projects for which external finance will be sought during the period1977-79 (Annexes B, C, and D), a list of projects deleted from the previousProject Lists (Annex E), and individual project descriptions (Annex F). Eachlist contains the name of the project, the executing agency, the expectedlender(s), the total cost, the external financing required, and the status ofreadiness of the project. The individual descriptions contain additionalinformation which would be of interest to potential lenders.

2. Data for these Project Lists, which will be presented at the meetingof the Consultative Group scheduled for June 27, 28 and 29, 1977, were compiledby the Colombian Government. It is to be expected, however, that loans for someprojects will not be signed during the year shown, because the project could beeither cancelled or postponed. Based on past experience this slippage may besubstantial, although it is not possible to identify the individual projects.

3. The report "Economic Position and Prospects of Colombia" dated May 10,1977, indicated that in order to provide adequate external support to Colombia'sdevelopment effort, annual commitments required from external borrowers forproject financing would need to amount to US$550 million in 1977, US$615 millionin 1978 and US$665 million in 1979. The difference between these requirementsand the amounts indicated in the Project List reflects the anticipated projectslippage, but, more significantly, reflects the fact that project list totalindicate the year in which the loan would be signed while actual loan disburse-ments are likely to take place over several years following loan signing.

4. The Project List reflects the fact that the Colombian Government hasdeveloped a broad strategy for improving the quality of life for the poorest50 percent of Colombia's population, whilst stimulating output in industry andagriculture, particularly in export-oriented production, and dealing with thecrucial problem of energy by increasing non-thermal generating capacity, andincreasing petroleum production.

5. The following table summarizes by sector and year the amount ofexternal financing which would be required to finance the projects presented inthe Project List. It also indicates the percentage of total financing whichwould be accounted for each sector.

Page 6: List of Projects for External Financing 1977-1979 Colombia

Page 2

COLOMBIA - CONSULTATIVE GROUP

PROJECT LIST - 1977 - 1979: SUMIARY OF EXTERNAL FINANCING REQUESTED BY SECTOR

(In US$ million)

1977 1978 1979 1977-79 Percentage

1. Power 442.8 898,2 400.8 1,741L8 50.27%2. Transportation ]10.2 56.0 160.5 326.7 9.43, Water Supply and

Sewerage - 88.1 33,0 121.1 3.54. Education 10.0 - - 10.0 0.3

5, Nutrition andHealth 50.0 2.5 9.4 61.9 1.8

6. Agriculture 116.0 70.7 50.0 236.7 6Q87. Industry and

Mining 299.5 80.0 170.0 549.5 15.88. Communications 149.4 - 50.0 199.4 5.89. Urban and Regional

Development 11-1.8 87.0 - 198,8 5.710. Pre-Investment - 10,0 15.0 25.0 0.7

TOTAL 1,289,7 1,292.5 888.7 3,470.9 100.0%

Page 7: List of Projects for External Financing 1977-1979 Colombia

ANNEX APage 1

CONSULTATIVE GROUP FOR COLOMBIA

External Loans Signed in 1976(in US$ million)

External Financing by Category External Financing by Source

Category SourceExternal External

A. PROJECTS Fiipncing Financing1Washington based agencies

I. Power 14.5 2.6%11 Transportation 55.7 10.0 1. IDB 139.8 25.0III. Water Supply - - 2. World Bank 80.0 14.3IV. Education . 4.0 0.7 3 ISAID 234 4X2V. Nutrition and Health 23.1 4.1 Sub-total 243.2 43.5VI. Agriculture 86.1 15.4VII. Industry 227.3 40.7 Bilateral AgreementsVIII. Communications 2.9 0.5IX. Mining - - 1. German DemocraticXO Pre-Investment 300 O.5 Republic 55.0 9.8

Sub-total 416.6 74.5 2. Canada 16.7 3.03. France 8.5 1.5

-- 4. Netherlands 7.3 1.3B. BILATERAL AGREEMENTS 73.4 13.2 5. Corporaci6n Andina

de Fomento 2.5 0.56. Belgium 0.6 0.1

C. REFINANCING 46,5 8.3 Sub-total 90.6 16.2

Suppliers and BanksD. CENTRAL GOVERNMENT 22.6 4X

1. Bank Consortia 100,0 17.92. USA 56.9 10.2

Total 559.1 100.0 3. France 28.1 5.04. Italy 12.1 2.25. Sweden 109 1.96. Panama 6.2 1.17. Japan 6.0 1l18. Mexico 3,0 0,59. German Federal

Republic 1.7 0.310. United Kingdom 0.4 0.1

Sub-total 225.3 40J3

Total 559.1 100.0

/ As in the past, Project List figures refer to final contracted amounts, i.e., afterall clearances have been obtained in Bogot6a and disbursement may legally begin. Inthe World Bank's economic reports external assistance commitments are defined asExecutive Board approvals in the case of the Washington lending agencies and as signedcontracts for others. Since some agency loans may be approved in one year but notfully contracted until the following year, the two sets of figures may differ.

Page 8: List of Projects for External Financing 1977-1979 Colombia

ANNEX APage 2

COLOMBIA - EXTERNAL LOANS SIGNED IN 1976

External Interest Amortization Grace DateCategory Name and Borrower Financing Source (Percent) (Years) (Years) Signed

(US$ million)

A. Projects

I. POWER

1. Cartagena Thermal. CORELCA. 2.3 Pittsburgh 3/4 9 1/2 1 April 22NationalBank (USA)

2. Transmission Equipment. ICEL 3.2 French 7 1/2 10 1V2 May 25Bank Consortium

3. Expansion of Generation 6.0 C. Itoh 8 7 1/2 J12 SeptemberCapacity. CORELCA (Japan) 15

4. Transmission Equipment. ISA 3,0 Aceros 8 7 1/2 1/2 October 22Acatepex 2(Mexico) 1973

Sub-total 1-4.5

1 Unl,ess otherwise indicated, projects were listed in the Tenth Progress Report - 1976 Project list.L Loans reported are only those which after having been signed, have been duly registered at the Ministryof Finance. Some loans reported only at this time may have been signed before 1976.

3 ALove London Interbank Rate for six months deposits.4/ External Financing reduced from $7.7 million in Tenth Progress Report.J Project listed for the first time.

Page 9: List of Projects for External Financing 1977-1979 Colombia

ANNlEX APage 3

External Interest Amortization Grace DateCategory Name and Borrower Financing Source (Percent) (Years) (Years) Signed

(US$ million)

II. TRANSPORTATION

1. "'Pick and Shovel" RoadConstruction Program. National 5.0 USAID 2-3 'O 10 March 2Feeder Roads Fund

2. Highway Project. Ministry of 11.0 IDB 8 20 5 1/2 June 16Public Work and Transport 34.8 IDB 2 30 7 June 16

3. Dredging Equipment for Canal del 3.1 Nether 6 1/2 20 7 April 7Dique. Ministry of Public Works lands Govand Transport erment

4. Ports Equipment and Spare 1.2 Banco 2 5 1 1/2 SeptemberParts. COLPUERTOS Cafetero 27

(Panama)

0.4 Reliance 8 1/2 4 1/2 1/2 July 30Mercury(UK)

5. Equipment. Municipality of 0.2 Caterpillar 8 1/2 5 1/2 1 1/2 NovemberMedellin (USA) 26

Sub-total 55.7

j Above London Interbank Rate for six months deposits.7/ Project listed for the first time0

Page 10: List of Projects for External Financing 1977-1979 Colombia

ANNEX APage 4

External Interest Amortization Grace DateCategory Name and Borrower Financing Source (Percent) (Years) (Years) Signed

(US$ million)

gSIII. WATER SUPPLY AND SEWERAGE

IV. EDUCATION

1. Rural Program. SENA 2,0 USAID 2-3 40 10 September 30

2. Rural Training. PopularCommunity Action 20O USAID 2-3 40 10 October 19

Sub-total 400

V. NUTRITION AND HEALTH

1l Hospital Equipment. Ministryof Health 5ol French 3 1/2 15 3 January 13

Government

12.0 French Bank 7 1/2 10 2/2 January 13Consortium

2. Nutrition Sector Program. 6,0 USAID 2-3 40 10 SeptemberGovernment of Colombia 14

Sub-total 23.1

8' No loans were signed in 1976 for this sector

Page 11: List of Projects for External Financing 1977-1979 Colombia

ANNEX APage 5

External Interest Amortization Grace DateCategory Name and Borrower Financing Source (Percent) (Years) (Years) Signed

(us$ million)

VI. AGRICULTURE

lo Equipment and Credit forRural Cooperatives. Govern 5.0 USAID 2-3 40 10 March 26ment of Colombia

20 Marketing and Processing. ICA 3.4 USAID 2-3 40 10 June 14

3~ Integrated Rural Development 64.0 IDB 2 30 5 December(Boyaca - Santander) CAJA 16AGRARIA

4. Integrated Rural Development 13.7 CIDA 3 30 7 DecemberCAJA AGRARIA 17

Sub-total 86.1

VIIo INDUSTRY

lo DFC VI. Banco de la Rep6blica SOO World Bank g 1/2 16 1/2 3 March 31

2/ 2 January 52. Regional Integration Projects. 2.5 CAF 5-9 3-15

IFI

/ Depending on sub-project

Page 12: List of Projects for External Financing 1977-1979 Colombia

ANNEX APage 6

External Interest Amortization Grace DateCategory Name and Borrower Financing Source (Percent) (Years) (Years) Signed

(US$ million)

3. Ricaurte Industrial Complex. 2.7 Banque de Paris 7.2 5 1/2 March 5Boyac6 Liquor Industry et de Pays Bas

(France)

4. Barrancabermeja Cracking Plant 1and General Equipment. ECOPETROL 100.0 Bank Consortium 1 5/8 7 2 1/2 December 13

12.1 Technipetrol 9 10 1/2 3 November 3(Italy)

50 Development Finance Companies. 30.0 IDB 8 17 1 DecemberBanco de la Repidblica 16

Sub-total 227.3

VIIIo COMMUNICATIONS

1. Expansion of Buga Telephone o.8 Siemens 8 6 1/2 2 June 8Service. Empresas Municipa- (Germany)les de Buga

2. Communications Equipment. ETB 1.2 Ericsson 9 10 1/2 2 1/2 July 13(Sweden)

3 Expansion of Pereira Telephone 0.9 Siemens 8 6 1/2 2 December 9Service. Empresas Pfiblicas de (Germany)Pereira

Sub-total 2.9

10 Above London Interbank Rate for six months deposits.

Page 13: List of Projects for External Financing 1977-1979 Colombia

ANNEX APage 7

External Interest Amortization Grace DateCategory Name and Borrower Financing Source (Percent) (Years) (Years) Signed

(US$ million)

IX. URBAN AMD REGIONAL DEVELOPMENT

X. PRE- INVESTMENT

1. Pre-investment studies. 3.0 Governmeit 3 19 1/2 7 March 18FONADE of Canada

Sub-total 3.0

B. Bilateral Agreements

1. Equipment and Services, 3.4 French 3 1/2 15 1/2 January 13Government of Colombia Government

10.2 French Bank 7 2/2 10 1/2 January 13Consortium

4.2 Netherlands 3 3/4 30 8 April 7.Government

55.0 German Deniocra 6 10 2 Decembertic Republic 21

1/ No loans were signed in 1976 for this sector12/ Project listed for the first time

Page 14: List of Projects for External Financing 1977-1979 Colombia

ANNEX APage 8

External Interest Amortization Grace DateCategory Name and Borrower Financing Source (Percent (Years) (Years) Signed

(US$ million)

0.6 Governmentof Belgium 2 30 10 December 1

Sub-total 73.4

C, Refinincing w1. CVC 10.0 Bank of 1 3/4 5 1 1/2 February 3

California(USA)

2. EPM 12.0 Chase 1 3/4 7 2 May 20ManhattanBank (USA)

3. EPM 9.7 Ericsson 8.2 5 - -may 25(Sweden)

4. CORELCA 4.0 First National 1 11 3 1/2 SeptemberCity Bank (USA) 11, 1975 1

5. ICEL - 3.5 First National 1 8 2 DecemberCity Bank (USA) 1, 1975 1(

Jj9 Includes borrowing to service debt.lk,/ Above LDndon Interbank Rate for six months deposits.L/ Project listed for the first time.j6/ Loans reported are only those which after having been signed, have been duly registered in the Ministry.

of Finance. Some loans reported only at this time may have been signed before 1976.

Page 15: List of Projects for External Financing 1977-1979 Colombia

ANNEX APage 9

External Interest Amortization Grace DateCategory Name and Borrower Financing Source (Percent) (Years) (Years) Signed

(US$ million)

2,0 First National 1 10 4 DecemberCity Bank (USA) 1, 1975 1

6. Electrificadora de 0.3 First National 6 1/2 3 1/2 1 1/2 NovemberSantander 1/ City Bank (USA) 12, 1975 D!

7. ETB 500 Banco de Colom- 1 3/4 5 2 1/2 December 7bia (Panama)

Sub-total 46.5

D. Central Government Borrowing

1. Air Force Equipment. 19.6 Federal Financ 8 7 1 June 10Ministry of Defense. ing Bank (USA)

3.0 Republic Natio 9 3/4 4 1 June 21nal Bank (USA)

Sub-total 22.6

Total 559.1

12/ Loans reported are only those which after having been signed, have been duly registered in the Ministryof Finance. Some loans reported only at this time may have been signed before 1976.

18 Above US prime rate.S/ Project listed for the first time.20 Above London i'nterbank Rate for six months deposits.

Page 16: List of Projects for External Financing 1977-1979 Colombia

ANNEX BPage 1

COLOMBIA - 1977 PROJECT LIST -/- STATUS REPORT

(US$ million)Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarks

A. Projects

I. POWER

l. San Carlos Power Preliminary NPD approval given.First Stage 2/ ISA Studies completed. Loan nego-

(World Bank/IDB/ 3/ tiations expected in mid 1977.Suppliers) 3500- 236.0 Bidding documents completed.

2. Expansion of Thermo-Barranquilla Project under NPD review.and Thermo-Cartagena 4/ CORELCA 5/ 5/ Studies completed. Specifications

(Suppliers) 110.0- 80,0 under preparation.

1/ Unless indicated otherwise, all projects were listed in the 1977 Project List (Tenth Progress Report),2/ Listed as San Carlos Power Project in 1977 Project List (Tenth Progress Report).3/ Total Cost increased from $300.0 million in 1977 Project List (Tenth Progress Report).4/ Rescheduled from 1978 Project List (Tenth Progress Report).5/ Total Cost and External Financing increased from $70.0 and 45,0 million in 1978 Project List (Tenth

Progress Report).

Page 17: List of Projects for External Financing 1977-1979 Colombia

ANNEX BPage 2

(US$ million)

Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarks

3. Ayacucho Power Plant. 6/ICEL Project not yet presented to NPD.

Centrales Electricas del Studies completed. Bidding docu-

Norte de Santander ments being prepared.

(n.d.) 6.0 5.0

4. Guajira Electrification 7/ICEL Preliminary NPD approval given.

(Canada and Studies completed. Negotiations

Commercial Banks) 15.0 12.02' under way. Contracts awarded.

5. Transmission line for the Inter- Preliminary NPD approval given.

connection of Central System Studies completed. Loan negotia-

with Atlantic Coast. ISA tions expected in mid 1977.

(World Bank/KfW) 130.09/ 85.09/ Bidding documents completed.

6. Sabanalarga-Fundaci6n-Valledupar Final approval given. Studies

transmission line. 10/ CORELCA completed. Loan negotiations

(KfW and Commercial Banks) 22.4 18.11-1/ completed and signature expected

first half of 1977. Contractsawarded.

6/ Project listed for the first time.

7/ Listed as Guajira Emergency Program in 1976 Project List (Tenth Progress Report).

8/ External Financing reduced from $14.0 million in 1976 Project List (Tenth Progress Report).

9/ Total Cost and External Financing increased from $115.0 and 80.0 million in 1977 Project List (Tenth

Progress Report).10/ Rescheduled from 1976 Project List (Tenth Progress Report).

11/ Total Cost and External Financing decreased from $23.0 and 19.5 million in 1976 Project List (Tenth

Progress Report).

Page 18: List of Projects for External Financing 1977-1979 Colombia

ANNEX BPage 3

(US$ million)Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarks

7. Barrancabermeja - BucaramangaTransmission line. Electrifi-cadora de Santander

(Commercial Banks) 5.7 3.0 Loan signed

8. Expansion of Cartagena sub-

transmission system. ELECTRIBOL(Suppliers) 4.5 3.7 Loan signed

Sub-Total 643.6 442.8

Page 19: List of Projects for External Financing 1977-1979 Colombia

ANNEX BPage 4

(US$ million)Name, Borrower and Total External

Category Possible Lending Source Cost Financing Remarks

II. TRANSPORTATION

1. Aerial Navigation Aids and Project under NPD review. Studies

Airports Equipment 12/ completed.

DAAC/FAN 13/ 13/(Suppliers) 22.1 - 20.2 -

2. Highway Maintenance and Preliminary NPD approval given.

Rehabilitation 14/ MOPT Studies completed. NegotiationsNational Road Fund 15/ 15/ expected in mid 1977. Bidding

(World Bank) 152.1 - 90.0 - documents being prepared.

Sub-Total 174.2 110.2

12/ Some Contracts expected to be signed in 1978 and 1979.13/ Total Cost and External Financing increased from $13.4 and 13.0 million in 1977 Project List (Tenth

Progress Report).14/ Listed as Rehabilitation of Paved Network in 1977 Project List (Tenth Progress Report).

15/ Total Cost and External Financing increased from $130.0 and 60.0 million in 1977 Project List (Tenth

Progress Report).

Page 20: List of Projects for External Financing 1977-1979 Colombia

ANNEX BPage 5

(US$ million)Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarks

III. WATER SUPPLY AND SEWERAGE

No projects have been presented for this sector.

Page 21: List of Projects for External Financing 1977-1979 Colombia

ANNEX BPage 6

(US$ million)Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarks

IV. EDUCATION

1. Replacement of University Partial project under NPD review,Equipment. Ministry of Studies being prepared.Education. ICFES

(n.d.) 10.0 10.0

Sub-Total 10.0 lO0

Page 22: List of Projects for External Financing 1977-1979 Colombia

ANNEX BPage 7

(US$ million)Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarks

V. NUTRITION AND HEALTH

l. Provision and Replacement of Preliminary NPD approval given.Hospital Equipment0 First Studies completed. BiddingStage. 19/ ICSS documents being prepared.

(n.d.) 5.0 5.0

2, Nutrition Program. Government Preliminary NPD approval given.of Colombia. 20' / Studies completed. Negotiations

(World Bank) 65.0' 30.0 v / expected in mid 1977,

3, Hospital Equipment. Ministry Loans with Belgium and the Nether-of Health. (France) 901 9.1 lands signed. For remainder of

(Federal Republic of Germany) 5,9 5.9 project, studies are completed.

Sub-Total 85.0 50,0

19/ Partly to be contracted in 1979.20/ Total Cost and External Financing modified from $80.0 and 35.0 million in 1977 Project List (Tenth

Progress Report).

Page 23: List of Projects for External Financing 1977-1979 Colombia

ANNEX BPage 8

(US$ million)Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarks

VI. AGRICULTURE

1. Agricultural Credit II 21/ Loan signed January 7, 1977

Banco de la Rep5blica.(World Bank) 209.4 64.0

2. Integrated Rural Development Loan signed February 4, 1977

CAJA AGRARIA(World Bank) 110.0 52.0

Sub-Total 319.4 116.0

21/ Rescheduled from 1976 Project List (Tenth Progress Report).

Page 24: List of Projects for External Financing 1977-1979 Colombia

ANNEX BPage 9

(US$ million)Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarks

VII. INDUSTRY AND MINING

1. Industrial Credit II 23/ Preliminary NPD approval given.Banco de la Rep6blica Negotiations under way.

(Canada) 5.0 5.0

2. Small Scale Industry. CFP/ Project under NPD review. StudiesBanco de la Repu'blica completed. Negotiations expected

(World Bank) 30.0 15.0 in mid 1977.

3. Exploration Well Program 23/ Project not yet presented to NPD.ECOPETROL

(n.d.) 115.6 97.0

4. Expansion of Oil Pipeline Project not yet presented to NPD.Network (Galan - Salgar, Salgar- Studies completed.Bogota and Covef'as - Ayacucho)23/ECOPETROL

(Suppliers) 18.2 6.2

23/ Project listed for the first time.

Page 25: List of Projects for External Financing 1977-1979 Colombia

ANNEX BPage 10

(US$ million)Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarks

5. Cerro Matoso Nickel Develop- Preliminary NPD approval given.ment. ECONIQUEL /CONICOL Studies completed. Bidding

(World Bank/Suppliers) 249.7 85.0 documents being prepared.

6. Expansion of Refining Capacity24/ Preliminary NPD approval given.ECOPETROL 267.8 85.0 for part of the project. Studies

(n.d.) being prepared.

7. Development of Small and Medium Loan signed.Sized Industries. 25/ CFP

(KfW) 3.2 3.2

8. Industrial Credit. 25/ FIP Loan signed(KfW) 1.7 1.7

9. Feasibilitv study for phospho- Study is required before proceedingric rock. 26/ ECOMINAS with Phosphate Industry Project.

(IDB) 1.6 1.4

Sub-Total 692.8 299.5

24/ Project con1ines projects listed as Expansion of Cartagena Refinery, part of Barrancabermeja CrackingPlant and General Equipment in 1976 Project List (Tenth Progress Report).

25/ Rescheduled from 1976 Project List (Tenth Progress Report).26/ Project listed for the first time.

Page 26: List of Projects for External Financing 1977-1979 Colombia

ANNEX BPage 11

(US$ million)Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarks

VIII, COMMUNICATIONS

lo Telecom IV. TELECOM 2 Preliminary NPD approval given.(World Bank) 88,2 7/ 62.0 Studies completed, Negotiations

expected in first semester of 1977.Bidding documents being prepared.

2, Replacement of Equipment and Project under NPD review. StudiesExpansion for Channels 1 and 2 completed, Bidding documentsand the National Radio First being prepared.Stage 28/ INRAVISION

(n.d.) 7.2 5.0

3. Expansion of Bogota Telephone Preliminary NPD approval given.Service 29/ ETB Studies completed. Negotiations

(Ericsson-ITT) 26630/ .1923.2/ under way.

4, Acquisition of Pay Telephones 31/ Project under NPD review. StudiesETB completed. Bidding documents being

(Suppliers) 2.5 2.0 prepared.

5, Acquisiton of Six Mobile Tele- Project under NPD review. Studiesphone Exchanges. 31/ ETB completed, Bidding documents

(Suppliers) 1.9 1.7 being prepared.

27/ Total Cost reduced from $110.0 in 1977 Project List (Tenth Progress Report),28/ Listed as Radio, Educational T.V. and T,V. equipment in 1977 Project List (Tenth Progress Report).29/ Listed as Telephone Equipment in 1977 Project List (Tenth Progress Report),

30/ Total Cost and External Financing increased from $12.5 and 9,9 million in 1977 Project List (Tenth

Progress Report),

31/ Project listed for the first time,

Page 27: List of Projects for External Financing 1977-1979 Colombia

ANNEX BPage 12

(US$ million)Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarks

6. Expansion of Barranquilla Preliminary NPD approval given.

Telephone System. EMTB 8 Studies completed. Contract(Ericsson) 2.9 awarded.

7. Expansion of the Bucaramanga Preliminary NPD approval given.

Telephone System. ENPB Studies completed. Project may

(n.d.) 2.1 1.8 be financed with existing creditline.

8. Rural Telephones. (Stage I)33/ Preliminary NPD approval given.

TELECOM Studies completed. Negotiations

(IDB) 54.8 29.0 under way. Bidding documentsbeing prepared.

9. Complementary Telecommunications 35/ Project under NPD review. Studies

for National Territories. 34/ 8.0 -/ 8.0 -/ completed. Bidding documents

(n.d.) being prepared.

32/ Total Cost and External Financing reduced from $3.0 and 2.3 million in 1977 Project List (Tenth Progress

Report).33/ Rescheduled from 1976 Project List (Tenth Progress Report).

34/ Listed as Communication System for Eastern Colombia in 1977 Project List (Tenth Progress Report).

35/ Total Cost and External Financing increased from $7.0 and 6.0 million in 1977 Project List (Tenth

Progress Report).

Page 28: List of Projects for External Financing 1977-1979 Colombia

ANNEX BPage 13

(US$ million)

Name, Borrower and Total ExternalCategory Possible Lending Sources Cost Financing Remarks

10. Expansion of the Medellin Project under NPD review. Studies

Telephone System. EPM 36 36 completed. Bidding documents(Suppliers) 31.5 _ 18.9 _ being prepared.

Sub-Total 225.7 149.4

36/ Total Cost and External Financing increased from $10.7 and 10.7 million in 1977 Project List (Tenth

Progress Report).

Page 29: List of Projects for External Financing 1977-1979 Colombia

ANNEX BPage 14

(US$ million)Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarks

IX. URBAN AND REGIONAL DEVELOPMENT

1. Integrated program for Erosion Preliminary NPD approval given.Control and Urban Development 37/ Studies completed. NegotiationsCRAMSA/CDNB 38 under way. Bidding documents

(IDB) 33.O - 16.0 being prepared.

2. Development Plan for Buenaven- Preliminary NPD approval given.tura. CVC Studies partially completed.

(IDB) 68.9 34.3 Negotiations under way.

3. Integration of Services for Preliminary NPD approval given.Squatter Housing. National Studies partially completed.Government. Negotiations expected for second

(World Bank) 70.0 30.0 half of 1977.

4. Urban renewal in the South Preliminary NPD approval given.East Zone of Cartagena. ICT Studies under way.

(World Bank) 20.0 10.0

37/ Rescheduled from 1976 Project List (Tenth Progress Report).38/ Total cost decreased from $41.2 million in 1976 Project List (Tenth Progress Report).

Page 30: List of Projects for External Financing 1977-1979 Colombia

ANNEX BPage 15

(US$ million)Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarks

5, General Equipment. 39/ Project under NPD review. StudiesDAINCO completed. Negotiations partially

(Netherlands and n.d.) 14.2 14.2 completed.

6. Choc6 Regional Development. 40/ Preliminarv NPD approval given.National Government 41/ 41/ Studies completed.

(Netherlands) 17.7- 7.3-

Sub-Total 223.8 111.8

39/ Listed as Machinery, Electrical Equipment and River Transportation for Eastern Colombia in 1977.Project List (Tenth Progress Report). Expanded to include sea and telecommunications equipment.

40/ Rescheduled from 1976 Project List (Tenth Progress Report).

41/ Total Costs and External Financing increased from $10.0 and 4.0 million in 1976 Project List (TenthProgress Report).

Page 31: List of Projects for External Financing 1977-1979 Colombia

ANNEX B

Page 16

(US$ million)Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarks

X. PRE-INVESTMENT

No projects have been presented for this sector.

TOTAL 2,374.5 1,289.7

Page 32: List of Projects for External Financing 1977-1979 Colombia

ANNEX CPage I

1/COLOMBIA - 1978 PROJECT LIST - STATUS REPORT

(US$ million)Name, Borrower and Total External

Category Possible Lending Source Cost Financing Remarks

A. Projects

I. POWER

1. Transmission System for Project not yet presented to NPD.Guadalupe Power. 2/ EPM Studies completed.

(n.d.) 4.7 3.1

2. Diversion of Nechi,Pajarito Project not yet presented to NPD.and Dolores rivers. 2/ EPM Studies completed.

(n.d.) 12,5 7.5

3. Ayura Power. 2/ EPM Project not yet presented to NPD.(n.d.) 5.8 3.5 Studies completed.

4. Expansion of Troneras Power Project not yet presented to NPD.Plant. 2/ EPM Studies completed.

(n.d.) 7.0 4.8

5. Expansion of Guadalupe I Power Project not yet presented to NPD.Plant. 2/ EPM Studies completed.

(n.d.) 19.1 12.8

1/ Unless indicated otherwise, all projects were listed in 1978 Project List (Tenth Progress Report).2/ Listed as Guadalupe IV in 1978 Project List (Tenth Progress Report).

Page 33: List of Projects for External Financing 1977-1979 Colombia

ANNEX CPage 2

(USs million)Name, Borrower and Total External

Category Possible Lending Source Cost Financing Remarks

6. Maintenance and Repair Shop.3/ Preliminary NPD approval given.EEEB. Studies completed.

(n.d.) 3.2 1.9

7. Operations Control Center and Preliminary NPD approval given.Telecommunications System. 4/ Studies completed.EEEB

(n.d.) 6.4 4.5

8. Replacement of Pumping Equipment Preliminary NPD approval given.in Sesquilg. 5/ EEEB Studies completed.

(n.d.) 2.5 2.2

9. Hydroelectrical Development of Project not yet presented to NPD.the Alto Sin6 Basin. 6/ ISA/ Feasibility studies completed.CORELCA

(n.d.) 410.0 290.0

3/ Project listed for the first time.4/ Listed as Power Dispatching Center and Telecommunications system in 1978 Project List (Tenth Progress

Report).5/ Project formerlyincluded in Expansion of sub-transmission system, and regulation of Bogota river

headwaters listed in 1978 Project List (Tenth Progress Report).6/ Project includes Urra Power Plant listed in 1978 Project List (Tenth Progress Report).

Page 34: List of Projects for External Financing 1977-1979 Colombia

ANNEX CPage 3

(US$ million)Name, Borrower and Total External

Category Possible Lending Source Cost Financing Remarks

10. Thermo-Cerrejon. CORELCA Project not yet presented to NPD.(n.d.) 150.0- 120.0-71 Studies under preparation.

11. Cauca River Regulation Project under NPD review.(Salvajina Power Plant)8/CVC Studies under review.

(Japan/IDB) 301.1, 121.5

12. Mesitas Power. 9/ EEEB Preliminary NPD approval given.

(n.d.) 150.0 94.7 Design studies under preparation.

13. Equipment for Chivor II Power Preliminary NPD approval given.

Plant. 9/ ISA Design studies under preparation.(Suppliers) 30.0 30.0

14. Earthquake-Proof Strengthening Preliminary NPD approval given.of the Sesquile Dam. 10/ EEEB Studies completed.

(n.d.) 6.1 3.6

7/ Total Cost and External Financing increased from $70.0 and 46.0 million in 1978 Project List (Tenth

Progress Report).8/ Project listed for the first time.9/ Rescheduled from 1977 Project List (Tenth Progress Report).

10/ Project formerly included in Expansion of sub-transmission system and regulation of Bogota riverheadwaters listed in 1978 Project List (Tenth Progress Report).

Page 35: List of Projects for External Financing 1977-1979 Colombia

ANNEX CPage 4

(US$ million)Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarks

15. Data Processing Center. 11/ Preliminary NPD approval given.EEEB Studies completed.

(n,d,) 2,5 2.l

16. Electrification Program for Project under NPD review.Antioquia. 12/ ICEL/ Elec- Feasibility studies completed.trificadora de Antioquia, Bidding documents being prepared.

(n,d.) 6.7 4.0

17. San Carlos II and Jaguas Project under NPD review.Power Plant, 11/ ISA Feasibility studies completed,

(n.d.) 280.0 190.0

18. Emergency Mobile Power Preliminary NPD approval given.Plants. 11/ ICEL

(Suppliers) 2,8 2.0

Sub-Total 1,400.4 898.2

ll/ Project listed for the first time. To be contracted partly in 1979.12/ Listed as Electrification Program for Antioquia and Cundinamarca in 1977 Project List (Tenth Progress

Report). Cundinamarca electrification has been rescheduled to 1978.

Page 36: List of Projects for External Financing 1977-1979 Colombia

ANNEX CPage 5

(US$ million)Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarks

II. TRANSPORTATION

le Airports. 13/ DAAC/FAN Project not yet presented to NPD,

(World Bank) 93,3 56,0 Studies completed and will beupdated.

Sub-Total 93,3 56.0

13/ Project listed for the first time.

Page 37: List of Projects for External Financing 1977-1979 Colombia

ANNEX CPage 6

(US$ million)Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarks

III. WATER SUPPLY AND SEWERAGE

1. Expansion of the Bogota Water Project not yet presented to NPDO

Supply and Sewerage System. 14/ Design studies being prepared.

EAAB(n.d.) 49.4 29=0

2, Expansion of the Medellin Project not yet presented to NPD,

Water Supply and Sewerage Design scudies being prepared.

System. 16/ (nd.) 13 5/ 6715/

3. National Program for Water Project under NPD review. DesignSupply and Solid Waste Disposal 16/ studies partially completed;

INSFOPAL 17/ 17/ remainder is being prepared.(CIDA) 23.17 12.4 -

14/ Project listed for the first time.15/ Total Cost and External Financing reduced from $23.6 and 11.8 million in 1977 Project List (Tenth Progress

Report).16/ Rescheduled from 1977 Project List (Tenth Progress Report).17/ Total Cost and External Financing reduced from $25.7 and 12.5 million in 1977 Project List (Tenth Progress

Report).

Page 38: List of Projects for External Financing 1977-1979 Colombia

ANNEX C

Page 7

(US$ million)Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarks

4. Expansion of the Bucaramanga Project not yet been presented toWater Supply and Sewerage NPD, Design studies being prepared,System. 18/ EMPB

(n.d.) 10.0 5.0

5. Expansion of the Water Supply Project under NPD review. Studiesand Sewerage Master Plant in completed.Cali r EM4CALI

(World Bank) 450lg/ 15.019/

6, Water Supply and Sewerage for Project not yet been presented toIntermediate and Small Cities 20/ NPD, Design studies being prepared.INSFOPAL

(IDB) 40.0 20.0

Sub-Total 180.5 88,1

18/ Project listed for the first time.19/ Total Cost increased from $40.0 in 1977 Project List (Tenth Progress Report).20/ Listed as Water Supply and Sewerage in 1978 Project List (Tenth Progress Report).

Page 39: List of Projects for External Financing 1977-1979 Colombia

ANNEX CPage 8

(US$ million)Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarks

IV. EDUCATION

No projects have been presented for this sector,

Page 40: List of Projects for External Financing 1977-1979 Colombia

ANNEX CPage 9

(US$ million)Name, Borrower and Total External

Category Possible Lending Source Cost Financing Remarks

V. NUTRITION AND HEALTH

1. Hospital Equipment. 21/ Studies completed. Loan for firstMinistry of Health. stage of project signed in 1976;

(Belgium) 2.5 2.5 for second stage expected to besigned in 1977.

Sub-Total 2.5 2.5

21/ Project listed for the first time.

Page 41: List of Projects for External Financing 1977-1979 Colombia

ANNEX CPage 10

(US$ million)Name, Borrower and Total External

Category Possible Lending Source Cost Financing Remarks

VI. AGRICULTURE

1. Valledupar I. 22/ INCORA Project under NPD review. Existing

(n.d.) 14.0 10.0 study being updated.

2. Agricultural Rehabilitation Study to determine priority of

Program. 23/ INCORA/HIMAT sub-projects being prepared.

(World Bank/IDB) 60.0 30.0

3. San Juan del Cesar Agricultural Preliminary NPD approval given.

Rehabilitation. 24/ INCORA-HIMAT Studies completed. Negotiations(KfW) 44.925/ 30.72 5/ under way.

Sub-Total 118.9 70.7

22/ Project listed for the first time.

23/ Rescheduled from 1977 Project List (Tenth Progress Report).

24/ Listed as Agricultural Development-Cesar in 1977 Project List (Tenth Progress Report).

25/ Total Cost and External Financing increased from $21.0 and 13.3 million in 1977 Project List (Tenth

Progress Report).

Page 42: List of Projects for External Financing 1977-1979 Colombia

ANNEX CPage 11

(US$ million)Name, Borrower and Total External

Category Possible Lending Source Cost Financing Remarks

VII. INDUSTRY AND MINING

1. Exploration of Copper Resources Project not yet presented to NPD.in the Antioquia and Choco De- Preliminary studies completed.partments. 26/ ECOMINAS

(n.d.) 10.,0 5.0

2. Cerrejon Coal. Carbones Colom- Project not yet presented to NPD.

bianos. (n.d.) 150.021/ 75.027/ Feasibility studies being prepared.

Sub-Total 160.0 80.0

26/ Project listed for the first time.27/ Total Cost and External Financing increased from $100.0 and 50.0 million in 1978 Project List (Tenth

Progress Report).

Page 43: List of Projects for External Financing 1977-1979 Colombia

ANNEX CPage 12

(US$ million)

Name, Borrower and Total External

Category Possible Lending Source Cost Financing Remarks

VIII. COMMUNICATIONS

No projects have been presented for this sector.

Page 44: List of Projects for External Financing 1977-1979 Colombia

ANNEX CPage 13

(US$ million)Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarks

IX. URBAN AND REGIONAL DEVELOPMENT

1. Cartagena-Baru Tourism. 28/ CNT Preliminary NPD approval given.(World Bank) 48.6 20.0 Studies completed. Project

pending until basic issues solved.

2. Santa Marta and San Andres Preliminary NPD approval given.Tourism. 28/ CNT 29/ 29/ Studies completed.

(IDB) 34.8 - 17.0 -

3. Regional Development of Old Project under NPD review. StudiesCaldas. 30/ National Government 31/ 31/ being prepared.

(World Bank) 100.0 - 50.0 -

Sub-Total 183,4 87.0

28/ Rescheduled from 1977 Project List (Tenth Progress Report).29/ Total Cost and External Financing modified from $33.1 and 18.2 million in 1977 Project List (Tenth

Progress Report),30/ Listed as Urban Decentralization Program in 1978 Project List (Tenth Progress Report).31/ Total Cost and External Financing increased from $50.0 and 40.0 million in 1978 Project List (Tenth

Progress Report).

Page 45: List of Projects for External Financing 1977-1979 Colombia

ANNEX CPage 14

(US$ million)Name, Borrower and Total External

Category Possible Lending Source Cost Financing Remarks

X. PRE-INVESTMENT

1. Pre-Investment studies, 32 Project not yet presented to NPD,FONADE

(IDB ) 20.0 10.0

Sub-Total 20.0 10,0

TOTAL 2,159.0 1,292.5

32/ Project listed for the first time.

Page 46: List of Projects for External Financing 1977-1979 Colombia

ANNEX DPage 1

1/COLOMBIA - 1979 PROJECT LIST - STATUS REPORT

(US$ million)Name, Borrower and Total External

Category Possible Lending Source Cost Financing Remarks

A. Projects

I. POWER

1. Expansion of Transmission Project not yet presented to NPD.System. 2/ ISA Design studies being prepared.

(n.d.) 37.0 27.5

2. Betania Power. ISA Project not yet presented to NPD.(nod.) 310.0 190.0 Design studies being prepared.

3. Expansion of MedellIn Project not yet presented to NPD.Transmission and Distribution Feasibility studies completed.System. EPM Design studies will be prepared.

(n.d.) 7.8 5.9

4. Expansion of Rural Distribution Project not yet presented to NPDoSystem. EEEB Feasibility studies completed.

(n.d.) 21.2 6.9 Design studies will be prepared.

5. Expansion of the Power Distri- Project not yet presented to NPD.bution System in Rural Cundina- Feasibility studies being prepared.marca. 3/ EEEB

(n.d.) 25.0 7.6

1/ Unless otherwise indicated, projects are listed for the first time.2/ Rescheduled from 1978 Project List (Tenth Progress Report).3/ Includes part of project scheduled in 1977 Project List (Tenth Progress Report).

Page 47: List of Projects for External Financing 1977-1979 Colombia

ANNEX DPage 2

(US$ million)Name, Borrower and Total External

Category Possible Lending Source Cost Financing Remarks

6. Magdalena - Cesar - Guajira Project not yet presented to NPDoElectrification. 4/ CORELCA Feasibility studies completed.

(Suppliers) 20.3 6.1

7. Mocoa Power Plant. ICEL Project not yet presented to NPDo(n.d.) 5,0 2.3 Feasibility studies will be pre-

pared.

8. Expansion of transformer Project not yet presented to NPD.capacity. 5/ ISA Feasibility studies will be

(n.d.) 10.6 9.5 prepared.

9, Expansion of Transmission Project not yet presented to NPD.System, 6/ ICEL - Electrificadoras Studies to be carried out.

(n.d.) 40.0 25.0

100 San Carlos II and Jaguas Power Project under NPD review.Plant. 6/ ISA Feasibility studies completed,

(n.d.) 160.0 120.0

Sub-Total 636.9 400,8

4/ Rescheduled from 1977 Project List (Tenth Progress Report) where listed as Cesar-Guajira Electrification.5/ Rescheduled from 1978 Project List (Tenth Progress Report).6/ Project partly to be contracted in 1978.

Page 48: List of Projects for External Financing 1977-1979 Colombia

ANNEX DPage 3

(US$ million)

Name, Borrower and Total ExternalCategory Possible Lending Source Cost Financing Remarks

II. TRANSPORTATION

1. Feeder Roads Construction. 7/ Project not yet presented to NPD.

Fondo Nacional de Caminos Studies have been completed.Vecinales.

(IDB) llo9 5A9

20 Railways Rehabilitation Plan. 7/ Project not yet presented to NPD.

FNC 8/ 8/ Studies have been partially(World Bank) 32,0-' 18,0- completed0

3, Highway Construction, MOPT Project not yet presented to NPD.(n.d.) 273.1 136.6 Studies being prepared.

Sub-Total 317.0 160,5

7/ Rescheduled from 1978 Project List (Tenth Progress Report).8/ Total Cost and External Financing reduced from $60.0 and $35.7 million in 1978 Project List (Tenth

Progress Report).

Page 49: List of Projects for External Financing 1977-1979 Colombia

ANNEX DPage 4

(US$ million)Name, Borrower and Total External

Category Possible Lending Source Cost Financing Remarks

TII. WATER SUPPLY AND SEWERAGE

1. Water Supply and Sewerage for Project not yet presented to NPD.Intermediate and Small Cities.9/ Studies to identify cities being

INSFOPAL prepared.(World Bank) 40M0 20.0

2. Bogota River Regulation. 10/ Project not yet presented to NPD.EAAB/CAR Most feasibility studies completed.

(World Bank and IDB) 22.1 13.0

Sub-Total 62.1 33.0

9/ Listed as Water Supply and Sewerage for 32 intermediate cities in 1977 Project List (Tenth Progress

Report).10/ Rescheduled from 1977 Project List (Tenth Progress Report). Energy component not yet included.

Page 50: List of Projects for External Financing 1977-1979 Colombia

ANNEX DPage 5

(US$ million)Name, Borrower and Total External

Category Possible Lending Source Cost Financing Remarks

IV. EDUCATION

No projects have been presented for this sector.

Page 51: List of Projects for External Financing 1977-1979 Colombia

ANNEX DPage 6

(US$ million)Name, Borrower and Total External

Category Possible Lending Source Cost Financing Remarks

V. NUTRITION AND HEALTH

1. Provision and Replacement Project not yet presented to NPD.of Hospital Equipment. Studies being prepared.Second Phase. 11/ ICCS

(n.d.) 9i.4 9.4

Sub-Total 9.4 9.4

11/ First stage to be contracted in 1977.

Page 52: List of Projects for External Financing 1977-1979 Colombia

ANNEX DPage 7

(US$ million)Name, Borrower and Total External

Category Possible Lending Source Cost Financing Remarks

VI. AGRICULTURE

1. Sierra and Cienaga of Santa Project not yet presented to NPD.Marta Development. 12/ Studies being prepared.INDERENA 13'

(World Bank) 30,0'/ 150Q13/

2. National Program for Industrial Project not yet presented to NPD.Reforestacion. 14/ Banco de la Technical Assistance being soughtRepu'blica. 15' 5 for project preparation.

(World Bank/IDB) 30.0=/ 15.0(X/

3. Fisheries Development. 16/ Project not yet presented to NPD.INDERENA Technical assistance is being sought

(IDB) 30.0 20.0 for project preparation.

Sub-Total 90.0 50.0

12/ Rescheduled from 1978 Project List (Tenth Progress Report).13/ Total Cost and External Financing reduced from $35.3 and $18.4 million in 1978 Project List (Tenth

Progress Report).14/ Combines projects listed as Plantation of Industrial Forest and Forestry in 1977 Project List (Tenth

Progress Report).15/ Total Cost and External Financing reduced from $93.3 and $35.5 million in 1977 Project List (Tenth

Progress Report).16/ Project includes that listed as Marine Fisheries in 1978 Project List (Tenth Progress Report).

Page 53: List of Projects for External Financing 1977-1979 Colombia

ANNEX DPage 8

(US$ million)Name, Borrower and Total External

Category Possible Lending Source Cost Financing Remarks

VII. INDUSTRY AND MINING

Phosphate Industry. 17/ Project not yet presented to NPD.ECOMINAS Studies on the processing of

(IDB) 70.018/ 40.018/ phosphates to be prepared.

2. Exploration and Exploitation of Project not yet presented to NPD.Radio-active Minerals. Instituto Prospecting and exploration tode Asuntos Nucleares. be carried out.

(n.d.) 100.0 40.0

3. DFC VII. Banco de la Rep6blica. Project not yet presented to NPD.(World Bank) 70.0 50.0 Studies being prepared.

4. Semi-Integrated Plant for the Project not yet presented to NPD.Production of Sponge-Iron. IFI 54.0 40.0 Studies being prepared.

(n.d.)

Sub-Total 294.0 170.0

17/ Rescheduled from 1978 Project List (Tenth Progress Report).18/ Total Cost and External Financing increased from $60.0 and 30.0 million in 1978 Project List (Tenth

Progress Report).

Page 54: List of Projects for External Financing 1977-1979 Colombia

ANNEX DPage 9

(US$ million)

Name, Borrower and Total ExternalCategory Possible Lending Source Cost Financing Remarks

VIII. COMMUNICATIONS

1, Integrated Development of Project not yet presented to NPD.

Local Automatic TelephoneService. 19/ Second Phase

TELECOM and local telephonecompanies. 2 0

(World Bank) 60.022/ 40.0 2/

2. Acquisition of 100,000 telephones Project not yet presented to NPD.

ETB(Suppliers) 2.5 2.0

3. Expansion of the Cali Telepho- Project not yet presented to NPD.

ne System. 21/ EMCALI(n.d.) 10.0 8.0

Sub-Total 72.5 50.0

19/ Listed as Development of Local Automatic Telephones in 1978 Project List (Tenth Progress Report).

20/ Total Cost and External Financing increased from $40.0 and 20.0 million in 1978 Project List (Tenth

Progress Report).21/ Includes project listed as Telephone Equipmet in 1977 Project List (Tenth Progress Report).

Page 55: List of Projects for External Financing 1977-1979 Colombia

ANNEX DPage 10

(US$ million)Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarks

IX. URBAN AND REGIONAL DEVELOPMENT

No projects have been presented for this sector.

Page 56: List of Projects for External Financing 1977-1979 Colombia

ANNEX DPage 11

Name, Borrower and Total ExternalCategory Possible Lending Source Cost Financing Remarks

X. PRE-INVESTNENT

II Science and Technology. 22/ Project under NPD ceview. Studies

FONADE 23/ 23/ being prepared.(IDB) 30.G-- 1500

Sub-Total 30.0 15.0

TOTAL 1,511.9 888.7

22/ Rescheduled from 1977 Project List (Tenth Progress Report).

23/ Total Cost and External Financing increased from $20.0 and 100 million in 1977 Project List (Tenth

Progress Report).

Page 57: List of Projects for External Financing 1977-1979 Colombia

ANNEX EPage 1

COLOMBIA - PROJECTS DELETED FROM PREVIOUS PROJECT LIST

(US$ million)Name, Borrower and Total External

Category Possible Lending Source Cost Financing Remarks

A. Projects

I. POWER

1. Guadalupe - Cerro Matoso Cerro Matoso Nickel Project will now be

Transmission line. EPM 12,,0 12.0 supplied by the Central System -Atlantic Coast transmission line.

2. Expansion of Barranquilla Project delayed indefinitely.sub-transmission system. EPB 30.0 24.0

II. TRANSPORTATION

1l Ports Equipment and Spare Project financed from existing creditParts. COLPUERTOS 2.0 2,0 line.

2. Miscellaneous equipment for Project delayed indefinitely.Public Works. MOPT 100 10.0

IV. EDUCATION

1. Rural Primary Education Project will be financed from internalMinistry of Education 40.0 20,0 resources.

2. National Program for Educational Project will be financed from internalImprovement, Ministry of resources.Education 27.1 8.0

3, Urban Program. SENA 0,5 0,5 Project will be financed from existingcredit lines.

Page 58: List of Projects for External Financing 1977-1979 Colombia

ANNEX EPage 2

(US$ million)Name, Borrower and Total External

Category Possible Lending Sources Cost Financing Remarkcs

VI. AGRICULTURE

1. Ecological Stations INDERENA 2.7 105 Project delayed indefinitely.

2. Grain Storage and ProcessingINAGRARIO 14.0 lOoO Project delayed indefinitely0

3. Milk Processing Plant in Project to be financed fromNarifio l.2 1.2 existing credit lines.

VIII. COMMUNICATIONS

1. PCM Equipment. ETB 0.7 07 Project financed from existingcredit lines.

Page 59: List of Projects for External Financing 1977-1979 Colombia

ANNEX F

INDIVIDUAL PROJECT DESCRIPTIONS

Page 60: List of Projects for External Financing 1977-1979 Colombia
Page 61: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListPower (1)Page 1 of 2

I. NAME OF PROJECT: San Carlos Power Project-First Stage

IIo EXECUTING AGENCY: ISA

III, TOTAL ESTIMATED COST: US$350.0 million

IV. EXTERNAL FINANCING REQUESTED: US$23600 million

V. LENDING AGENCY: World Bank, IDB, Suppliers

VIo DESCRIPTION AND JUSTIFICATION: The project is located on the Guataperiver, in the eastern part of the Department of Antioquia, about 100 kmsfrom Medellin. The first stage of the project will utilize the flow fromthe Guatape river, augmented with that from the Nare River. The works inthe first stage comprise the construction of the dam and the power house.The dam will be on the Guatape river and will have a total height of 70mts.; the capacity of the reservoir will be 61 million cubic meters. Thepower house will be underground, In this first stage four Pelton Typeunits of 155 MW each will be installed, making a total installed capacityof 620 MW. The project also includes the construction of 220 KW Transmis-sion lines from San Carlos to Guatape, and from San Carlos to Torca. Theconstruction of initial infrastructure works has already started.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Costs are estimated as follows:

(in US$ million)

Local Costs Foreign ExchangeCosts

Preliminary works 10.83 6.84Civil works 59.28 98.41Equipment 13.34 127.44Engineering and

Administration 18.58 3.31Contingencies 11.97 _

Total 114.00 236,00

Local costs will be financed by contributions from ISA partners.

Page 62: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListPower (1)Page 2 of 2

Disbursements

(in US$ million)

1977 1978 1979 1980 1981 1982 Total

Local 6.34 16.18 22.36 23.90 27,62 17.60 114.00Foreign Exchange 5e91 31.62 33.14 59.90 72.20 33.23 236.00

Total 12.25 47.80 55e50 83.80 99.82 50.83 350.00

VIII. STATUS:

Studies Feasibility and design studies have beencompleted.

Steps required for obtaining Preliminary NPD approval has been given.financing Bidding documents have been completed.

Page 63: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListPower (2)

I. NAME OF PROJECT: Expansion of Thermo-Barranquilla andThermo-Cartagena

II. EXECUTING AGENCY: CORELCA

III. TOTAL ESTIMATED COST: US$110.0 million

lV. EXTERNAL FINANCING REQUESTED: US$80.0 million

V. LENDING AGENCY: Suppliers

VI. DESCRIPTION AND JUSTIFICATION: The project involves the design, supplyand installation of three 66 MW units in Barranquilla and Cartagena. Theunits will be able to burn fuel oil, natural gas and coal and will meetdemands through 1980-81.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Local costs are estimated at US$30.0million, to finance civil works and to locally finance the purchase ofequipment; foreign exchange costs are estimated at US$80.0 million andwill relate to imported equipment. Local costs will be financed byCORELCA and from the National Budget.

Disbursements

(In US$ million)

1977 1978 1979 1980 1981 Total

Local 4.0 10.0 9.6 5.2 1.2 30.0Foreign exchange 5.3 31.4 31.6 10.7 1.0 80.0

Total 9.3 41.4 41.2 15.9 2.2 110.0

VIII. STATUS:

Studies Feasibility and design studies have beencompleted.

Steps required for obtaining Project is under NPD review, Specifica-financing tions under preparation,

Page 64: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListPower (3)

1. NAME OF PROJECT: Ayacucho Power Plant

LI. FXECUTING AGENCY: ICEL - Centrales Electricas del Norte de

Santander

ILI. TOTAL, ESTIMATED COST: US$6.0 million

TV. EXTERNAL FINANCING REQUESTED: US$5.0 million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The project involves the acquisition ofa substation and of a 25 MW generator driven by a gas turbine, to supplyelectricity to the Norte de Santander Department and to the south of theCesar Department.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Local costs are US$1.0 million, of whichhalf will be for civil works and half for equipment; foreign exchangecosts will be US$5.0 million, mostly for equipment. Local costs will befinanced by Centrales Electricas del Norte de Santander.

Disbursements

(in US$ million)

1977 1978 Total

Local 0.8 0.2 1.0Foreign exchange 3.7 1.3 5.0

Total 4.5 1.5 6.0

VIII. STATUS:

Studies Design studies have been completed.

Steps required for obtainingfinancing Project not yet presented to NPD,

Bidding documents are being prepared.

Page 65: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListPower (4)

I. NAME OF PROJECT: Guajira Electrification

II. EXECUTING AGENCY: ICEL

III TOTAL ESTIMATED COST: US$15.0 million

IV. EXTERNAL FINANCING REQUESTED: US$12.0 million

V. LENDING AGENCY: Government of Canada and Commercial Banks.

VI. DESCRIPTION AND JUSTIFICATION: The project involves the construction ofa 30 MW gas power generation plant in Ballenas, using gas from local wells,and the construction of transmission and distribution lines required tocomplete the electric power infrastructure of the region.

VII, COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Local costs are estimated at US$3.0million and foreign exchange costs at US$12.0 million. Local costs willbe financed from the National Budget.

Disbursements

(in US$ million)

1977 1978 Total

Local 1.7 1.3 3.0Foreign exchange 8.5 3.5 12.0

Total 10.2 4.8 150

VIII. STATUS:

Studies Studies have been completed.

Steps required for obtainingfinancing Preliminary NPD approval given. Negotia-

tions under way. Contracts awarded,

Page 66: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListPower (5)

1. NAME OF PROJECT: Transmission Line for the Interconnectionof the Central System with the AtlanticCoast.

II. FXECUTING AGENCY: ISA

III. TOTAL ESTIMATED COST: US$130.0 million

IV. EXTERNAL FINANCING REQUESTED: US$85.0 million

V. LENDING AGENCY: World Bank and KfW

VI. DESCRIPTION AND JUSTIFICATION: The project involves the construction ofa 520 KV power transmission line, from San Carlos in the Department ofAntioquia to Sabanalarga, in the Department of Atlantico, thereby inter-connecting the central system with the Atlantic Coast. It will have foursub-stations: San Carlos, Cerromotoso, Chinu and Sabanalarga. The projectwill result in a better utilization of energy resources.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Local costs are estimated at US$45.0million and foreign exchange costs at US$85.0 million, of which US$65million are for materials and equipment, US$16.0 million for engineering,and the remainder for contingencies. Local costs will be financed fromthe National Budget.

Disbursements

(in US$ million)

1977 1978 1979 1980 1981 Total

Local 2.2 6.8 11.7 17.3 7.0 45.0Foreign exchange 8.8 19.2 31.6 23.3 201 85.0

Total 11.0 26.0 43.3 40.6 9.1 130.0

VIII. STATUS:

Studies Feasibility studies are complete. Designstudies are practically complete.

Steps required for obtaining Preliminary NPD approval has been given.financing Bidding documents have been completed.

Page 67: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListPower (6)

I. NAME OF PROJECT: Sabanalarga - Fundaci6n - ValleduparTransmission line

II. EXECUTING AGENCY: CORELCA

III. TOTAL ESTIMATED COST: US$22.4 million

IV. EXTERNAL FINANCING REQUESTED: US$18.1 million

V. LENDING AGENCY: KfW and Commercial Banks

VI. DESCRIPTION AND JUSTIFICATION: The project will permit interconnectionin the departments of Atlantico, Magdalena and Cesar through the trans-mission line Sabanalarga - Fundacion - Valledupar, overcoming presentdeficiencies in the service and replacing a number of high cost dieselunits now in operation. The 220 KV transmission line will be 235 kms.long and will have five substations,

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Local costs are estimated at US$4.3million and foreign exchange costs at US$18.1 million. Local costswill be financed through local borrowing and from the National Budget.

Disbursements(In US$ million)

1976 * 1977 1978 Total

Local 11 2.0 1.2 4.3Foreign Exchange - 8,5 9.6 18.1

Total 1.1 10.5 10.8 22,4

VIII. STATUS

Studies Feasibility studies have been completed.

Steps required for obtaining Final NPD approval has been given. Nego-financing tiations have been completed. Contractshave been awarded.

* Initial local disbursements have already taken place.

Page 68: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListTransportation (1)

I. NAME OF PROJECT Aerial Navigation Aids and AirportEquipment

II. EXECUTING AGENCY: DAAC - FAN

III. TOTAL ESTIMATED COST: US$22.1 million

IV. EXTERNAL FINANCING REQUESTED: US$20.2 million

V. LENDING AGENCY: Suppliers

VI. DESCRIPTION AND JUSTIFICATION: The project consists of three components,given below in descending order of priority:

a) spare parts for existing equipment and calibration of consoles tobe installed in the DAAC aircraft;

b) navigational aids, and micro-wave and PCM equipment for telephonelinks between Bogota and other locations; and

c) fire equipment--for six international airports.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing

(In US$ million)

Local Foreign Exchange

Spare parts 3.3Navigational aids - 12.8Fire equipment 0.9 5.1

Total 0.9 20,2

VIII. STATUS

Studies Studies for spare parts have beencompleted. Studies for navigational aids have to be revised. Biddingdocuments for fire equipment are being prepared.

Steps required for obtaining Project is under NPD review,financing

Page 69: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListTransportation (2)

I. NAME OF PROJECT: Highway Maintenance and Rehabilitation

II. E,XECUTING AGENCY: MOPT - National Road Fund

IIl. TOTAL ESTIMATED COST: US$152.1 million

IV. EXTERNAL FINANCING REQUESTED: US$90.0 million

V. IENDING AGENCY: World Bank

VI. DESCRIPTION AND JUSTIFICATION: The project involves the following:

a) rehabilitation of 978 kms of paved roads which are basic to thenational economy;

b) a vehicle weight control program providing for the installation ofabout 20 weighing stations;

c) the provision of road maintenance equipment, spare parts for majorrepairs and preventive maintenance of equipment;

d) technical assistance ande) logistic support for project execution.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Costs are estimated as follows:

(In US$ million)

Road rehabilitation 115.1Weight control 9.2Maintenance 26.8Technical Assistance 0.3Safety program 0.7

Total 152.1

Local costs will be financed by the National Highway Fund.

Disbursements Disbursements for civil works will bespread over a five year period. (1977-1981).

VIII. STATUS:

Studies Studies have been completed.

Steps required for obtaining Preliminary NPD approval has been given.financing Bidding documents are being prepared.

Page 70: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListEducation (1)

I. NAME OF PROJECT: Replacement of University Equipment

II. EXECUTING AGENCY: ICFES

III. TOTAL ESTIMATED COST: US$10.0 million

IV. EXTERNAL FINANCING REQUESTED: US$10.0 million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The purpose of the project is tosatisfy priority needs in equipping laboratories and providing teachingmaterial for universities.

VII. COSTS AND AVAILABILITY OF FUNDS: Details not yet available.

VIII. STATUS: The project will be prepared by ICFESwith the cooperation of the National Planning Department. Partialproject is under NPD review.

Page 71: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListNutrition andHealth (1)

I. NAIME OF PROJECT: Provision and Replacement of HospitalEquipment. First Stage

II. EXECUTING AGENCY: ICSS

III. TOTAL ESTIMATED COST: US$14.4 million

1V. EXTERNAL FINANCING REQUESTED: US$14.4 million (US$5.0 in 1977 andUS$9.4 in 1979)

V. LENDING AGENCY: Not yet defined

'VI. DESCRIPTION AND JUSTIFICATION: The project consists of equipping newhospitals and replacing equipment in existing hospitals to improve andexpand services. Surgical, laboratory, and dental equipment is expectedto be imported.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing All costs are foreign exchange costs.

Disbursement

1977 1978 1979 1980 TOTAL

4.1 2.7 4.6 3.0 14.4

VIII. STATUS ICSS has been authorized to contractloans for US$5.0 million and is requesting authorization for the re-mainder. Local expenditures will be financed from ICSS funds. PreliminaryNPD approval has been given.

Page 72: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListNutrition andHealth (2)

I. NAME OF PROJECT: Nutrition Program

II. EXECUTING AGENCY: National Government

III, TOTAL ESTIMATED COST: US$65.0 million

IV. EXTERNAL FINANCING REQUESTED: US$30.0 million

V. LENDING AGENCY: World Bank

VI. DESCRIPTION AND JUSTIFICATION: The National Government, being aware ofthe need to assist the poorest 50 percent of the population, has designeda series of strategies and mechanisms to increase production and produc-tivity and to contribute to increased availability and price reductionsof a number of foods of high calorific and protein content. The finalobjective is to improve the nutritional levels of the.population. Throughsystematic monitoring and evaluation the Government will be able to ensurecontinued cost-effectiveness as coverage expands. The Nutrition Programincludes the following aspects: nutritional education, research, improve-ment of community health care systems, food quality control, subsidizedfood distribution by means of coupons and an environmental health program.

VII. COSTS AND AVAILABILITY OF FUNDS:

Disbursements

(In US$ million)

1977 1978 1979 1980 Total

Local and ForeignExchange 11.8 19.6 21.0 12.6 65.0

VIII. STATUS:

Studies Studies have been completed.

Steps required for obtaining Preliminary NPD approval has been given.financing

Page 73: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListNutrition andHealth (3)

I. NAME OF PROJECT: Hospital Equipment

II. EXECUTING AGENCY: Ministry of Health

III. TOTAL ESTIMATED COST: US$15.0 million

IV. EXTERNAL FINANCING REQUESTED: US$15.0 million

V, LENDING AGENCY: Government of France and Federal Republicof Germany

VI. DESCRIPTION AND JUSTIFICATION: Acquisition of X-ray and anesthesiaequipment, lamps for surgery, surgery units, esterilization equipment,complementary equipment and components for odontological units to beused in rural areas.

VII. COSTS AND AVAILABILITY OF FUNDS: Not yet available.

VIII. STATUS: Studies are completed. Loans with theGovernment of Belgium and the Netherlands already signed.

Page 74: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListIndustry andMinig (1)

I. NAME OF PROJECT: Industrial Credit II

II. EXECUTING AGENCY: Banco de la Republica

III. TOTAL ESTIMATED COST: US$5.0 million

IV. EXTERNAL FINANCING REQUESTED: US$5.0 million

V. LENDING AGENCY: Government of Canada

VI. DESCRIPTION AND JUSTIFICATION: The objective of the project is tofinance the importation of machinery and equipment, intermediate goodsand raw materials for the public and private sectors. Such goods willhave a Canadian content of at least two thirds. Amortization paymentsfrom each sub-loan will be used for other projects which are yet to bedefined0 The selection and administration of the projects will becarried out by the Banco de la Repu'blica.

VII. COSTS AND AVAILABILITY OF FUNDS:

Disbursements

1977 1978 1979 Total

Foreign Exchange 1.0 3.0 1.0 5.0

VIII. STATUS

Steps required for obtaining The NPD has given its preliminary approval.financing

Page 75: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListIndustry andMining (2)

I. NAME OF PROJECT: Small Scale Industry

II. EXECUTING AGENCY: CFP/Banco de la Repdblica

III. TOTAL ESTIMATED COST: US$30.0 million

IV. EXTERNAL FINANCING REQUESTED: US$15.0 million

V. LENDING AGENCY: World Bank

VI. DESCRIPTION AND JUSTIFICATION: In meeting its objectives, CFP iscommitted to provide sufficient, timely and adequate credit; to promoteand develop technical assistance programs for small industries, theirworkers and management; and to carry out research in the sector. CFPhas in the past obtained resources from the World Bank, USAID and KfW.

VII, COSTS AND AVAIIABILITY OF FUNDS: In addition to external financing, CFPwill have resources from the Fondo de Fomento Industrial, the Fondo Na-cional del Ahorro, the Fondo de Inversiones Privadas and its own borrowings.

VIII. STATUS:

Studies Studies have been completed.

Steps required for obtaining Project is under NPD review. Negotiationsfinancing are under way.

Page 76: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListIndustry andMining (3)

1. NAME OF PROJECT: Exploration Well Program

II. EXECUTING AGENCY: Empresa Colombiana de Petr6leos (ECOPETROL)

III. TOTAL ESTIMATED COST: US$115.6 million

IV. EXTERNAL FINANCING REQUESTED: US$97.0 million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The Empresa Colombiana de Petr6leos, inan intensive effort to discover new petroleum resources which would makeit possible to eliminate imports, has developed an exploration programwhich involves drilling 14 wells a year. These wells are located in thefollowing sedimentary basins:

- Middle Magdalena Valley- Lower Magdalena Valley- Caribbean Coast- Catatumbo- Upper Magdalena Valley

Joint venture arrangements are notinvolved in this program.

VII. COSTS AND AVAILABILITY OF FUNDS: The program would be developed from 1977to 1980 as follows:

(In US$ million)

1977 1978 1979 1980

1/ 2/ 1/ 2/ 1/ 2/ 1/ 2/

Geologicalstudies 7.0 0.1 12.0 - 15.0 - 18.0 -Exploration 8.0 3.5 9.0 4.3 12.0 5.1 16.0 5.6

Total 15.0 3.6 21.0 4.3 27.0 5.1 34.0 5.6

1/ Local

2/ Foreign exchange

VIIIo STATUS: Project has not yet been presented to NPD,

Page 77: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListIndustry andMining (4)Page 1 of 3

I. NAME OF PROJECT: Expansion of Galan-Salgar Oil Pipeline

II. EXECUTING AGENCY: Empresa Colombiana de Petr6leos (ECOPETROL)

III. TOTAL ESTIMATED COST: US$2.8 million

IV. EXTERNAL FINANCING REQUESTED: US$2.0 million

V. LENDING AGENCY: International Financial Organizationsand/or Suppliers

VI. DESCRIPTION AND JUSTIFICATION: An immediate expansion of this pipelineand of pumping capacity is needed to meet demands for refined productsin the Central and Western parts of Colombia. New pumping equipment isrequired at Galan and Puerto Nifto and the power generating capacity ofthe Sebastopol station must be increased. With this, it would be possibleto transport 100,000 barrels a day between Galan and Sebastopol and 80,000barrels a day between Sebastopol and Salgar.

VII. COSTS AND AVAILABILITY OF FUNDS:

1977 1978 Total

External costs 1.80 0.20 2.00Local costs 0.77 0.06 0.83

Total 2.57 0.26 2.83

VIII. STATUS

Studies The relevant studies have been completedand negotiations are expected to begin in the near future.

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 78: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListIndustry andMining (4)Page 2 of 3

I, NAME OF PROJECT: Expansion of Oil Pipeline from Salgarto Bogotd

II. EXECUTING AGENCY: Empresa Colombiana de Petr6leos (ECOPETROL)

III. TOTAL ESTIMATED COST: US$8.9 million

1V. EXTERNAL FINANCING REQUESTED: US$1.0 million

V. LENDING AGENCY: International Financial Organizationsand/or Suppliers

VI. DESCRIPTION AND JUSTIFICATION: The capacity of the existing oil pipelinefrom Salgar to Bogota is insufficient to meet the demands of the area andan immediate expansion is needed, New pumping equipment has been installedat Villeta and it is planned to construct a new 10'' pipeline between Sal-gar and Villeta and to install new pumping equipment at Alban.

VII. COSTS AND AVAILABILITY OF FUNDS:

1977 1978 Total

External costs 1.0 - 1.0Local costs 5,4 2e5 7,9

Total 6.4 2,5 8.9

VIII, STATUS: Project has not yet been presented to NPD.

Page 79: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListIndustry andMining (4)Page 3 of 3

I. NAME OF PROJECT: Covef0as-Ayacucho Oil Pipeline

II. EXECUTING AGENCY: Empresa Colombiana de Petr6leos (ECOPETROL)

III. TOTAL ESTIMATED COST: US$6.5 million

IV. EXTERNAL FINANCING REQUESTED: US$3.2 million

V. LENDING AGENCY: International Financial Organization and/orSuppliers

VI. DESCRIPTION AND JUSTIFICATION: An expansion in the existing pipelineinstallation between Coventas and Ayacucho is needed in order to move crudepetroleum, both imports and production from the Putumayo field, to theBarrancabermeja refinery. Despite the expansion of the pipeline betweenPozos Colorados and Ayacucho, the capacity of this line will be inadequateby 1979 given the volume of crude imports which will be required. Theproject involves:

1) Expansion of th~e 12" pipeline between Covefias and Ayacucho.

2) Expansion of storage facilities at Coveflas.

3) Construction of a pumping station between Covefnas and Ayacucho, and

4) Renewal of 30 Kms. of the existing line.

VII. COSTS AND AVAILABILITY OF FUNDS:

(in US$ million)

1977 1978 Total

External costs 2.2 0.2 2.4Internal costs 1.0 3.1 4.

Total 3.2 3.3 6.5

VIIIo STATUS: The Empresa Colombiana de Petr6leos hasprepared the relevant studies; it is expected that steps to secure finan-cing will begin in the near future: Project has not yet been presented

to the NPD,

Page 80: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListIndustry andMining (5)Page 1 of 2

I. NAME OF PROJECT: Cerro-Matoso Nickel Development

IIo EXECUTING AGENCY: Empresa Colombiana de Niquel (ECONIQUEL)and Compaftia Colombiana de Niquel (CONICOL)

III. TOTAL ESTIMATED COST: US$249.7 million

IV. EXTERNAL FINANCING REQUESTED: US$85.0 million

V. LENDING AGENCY: World Bank and Suppliers

VI, DESCRIPTION AND JUSTIFICATION: The project involves the exploitation andprocessing of nickel at Cerro Matoso in the C6rdoba Department. The meta-lurgical process known as RKEF (Rotary Kiln-Electric Furnace) allows theproduction of ferronickel with a nickel content of 35% - 40% and a recove-ry rate of 90%. The plant, which will have a processing capacity of850,000 dry tons a year, will produce an average of 42 million pounds offerronickel a year over the life of the concession, and will give rise toexports worth more than US$90 million a year. During the constructionphase about 1300 people will be employed. In the production phase, about700 jobs will be directly created. The area of Montelibano will benefitfrom associated developments including the provision of housing, hospitals,and roads.

VII. CQSTS A1D-AVAIIABILITY OF FUNDS:

Costs and Financing Although recent estimates of the costof the project show some increases previous estimates remain generallyvalid.

(In US$ million)

Local Costs Foreign Costs Total

Mining, production andadministration 9.7 13.3 23.0

Processing plant andinstalations 78,0 78.3 156.3

Interests during construc-tion - 21.2 21.2

Working capital 2.4 4,7 7.1Other 8.3 33.8 42.1

Total 98.4 151.3 249.7

Page 81: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListIndustry andMining (5)Page 2 of 2

Disbursements In line with present plans, the construc-tion program will extend over 36 months, during which installations willbe completed and production begin. Annual disbursements will be as follows:

(in US$ million)

1977 1978 1979 Total

Foreign exchange 29.2 45.0 24.2 98.4Local 41.4 68.4 41.5 151.3

Total 70.6 113.4 65.7 249.7

VIII. STATUS: Feasibility studies have been completedby the Bechtel Corporation of San Francisco. Preliminary NPD approvalhas been given. Bidding documents are being prepared.

Page 82: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListIndustry andMining (6)

I. NAME OF PROJECT: Expansion of refining capacity

II. EXECUTING AGENCY: ECOPETROL

III. TOTAL ESTIMATED COST: US$267.8 million

IV, EXTERNAL FINANCING REQUESTED: US$85.0 million

V. LENDING AGENCY: Not yet defined

VIT DESCRIPTION AND JUSTIFICATION: To diminish the imports of oil and topostpone the imports of refined oil products, ECOPETROL has initiatedan expansion of its facilities both in Barrancabermeja and Cartagena.The works in Barrancabermeja involve expanding the cracking plant whilethe works in Cartagena involve the expansion of the existing refinery.

VII. COSTS AND AVAILABILITY OF FUNDS:

Disbursements

For Barrancabermeja

(In US$ million)

1977 1978 1979 Total

Local 27.0 18.0 10.0 55.0Foreign exchange 32.0 28.5 21.9 82.4

Total 59.0 46.5 31.9 137.4

For Cartagena

Local 28.2Foreign exchange 39.6

Total 67.8

VIII. STATUS:

Studies Studies have been completed. ECOPETROLhas received authorization to proceed with the Barrancabermeja sub-projectand is seeking authorization to proceed in Cartagena.

Steps required for obtaining Preliminary NPD approval has been givenfinancing for part of the project.

Page 83: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListIndustry andMining (7)

I. NAME OF PROJECT: Feasibility study for Phosphoric Rock

II. EXECUTING AGENCY: Empresa Colombiana de Minas (ECOMINAS)

III. TOTAL ESTIMATED COST: US$1.6 million

IV, EXTERNAL FINANCING REQUESTED: US$1.4 million

V. LENDING AGENCY: IDB

VI, DESCRIPTION AND JUSTIFICATION: This feasibility study will point to themost appropiate use of each of the phosphate deposits which have beenlocated and the size and location of the plant which will be needed forprocessing the materials, The project will facilitate the utilizationof national resources in place of imported phosphates, the cost of which,at present, amounts to more than US$60 million a year.

VII. COSTS AND AVAILABILITY OF FUNDS: The study is expected to start in July1977 and to be completed in 18 months.

VIII. STATUS: Geological studies have been completedin Boyaca and Santander which have confirmed the existance of depositsin Pesca (BoyacA) and Sardinita (Norte de Santander). The InternationalFertilizers Development Center (IFCO) has carried out a study of thecharacteristics of the resources in both locations; the Pesca depositsare suitable for the production of phosphoric acid. The National PlanningDepartment has given its preliminary approval to the request of ECOMINASwith respect to the financing of the feasibility study.

Page 84: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListCommunications (1)Page l of 2

I. NAME OF PROJECT: Fourth Telecommunication Program (LongDistance Telephones, National and Inter-national, and First Stage of AutomaticLocal Exchanges).

II. EXECUTING AGENCY: Empresa Nacional de Telecomunicaciones(TELECOM)

III. TOTAL ESTIMATED COST: US$88.2 million

IV. EXTERNAL FINANCING REQUESTED: US$62.0 million

V. LENDING AGENCY: World Bank

VI. DESCRIPTION AND JUSTIFICATION: The program is designed to develop localtelephone systems through the association of TELECOM with municipalities,in order to meet existing demand. In addition, the equipment needed toestablish links between local exchanges and the national network will beinstalled taking account of projected traffic between primary and secondarycenters based on the studies commissioned by the enterprise. Given this,61,180 automatic lines will be installed in some 70 municipalities andthese exchanges will be interconnected with the national network through2129 additional circuits; some 22,200 telephones will also be acquired.

With respect to the long distance aspectof the program, 39 interurban exchanges will be equipped with a total of10,340 terminals, components for the assembly of 150 manual switch-boards will be acquired, and ten long distance lines will be installedin new locations which do not require automatic exchanges.

The transmission system will be improvedthrough the acquisition of nine microwave linkages which will replaceVHF and UHF systems which have now been in use for some time and whichhave inadequate capacity for the new program.

Existing links will be expanded in twophases: the first in 1979 will consist of 414 circuits; the second in1987 will consist of 6143 circuits.

Finally, a new international exchange willbe acquired and installed in Choconta to meet traffic demands in 1978-82.

Page 85: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListCommunications (1)Page 2 of 2

VII. COSTS AND AVAILABILITY OF FUNDS:

Disbursements(in US$ million)

1977 1978 1979 1980

Subprogram 1/ 2/ L/ 2/ 1/ 2/ 1/ 2/

A-Local telephone - 841 3,246 8,289 10,487 11,501 9,467 6,107B-Long distancecommunications - 215 30 1,534 120 1,234 30 5,838

C-TransmissionSystem - 114 36 1,430 284 4,970 220 7,268

D-Internal ser-vice - 390 - 3,121 191 3 516 149 782

Total - 1,560 3,312 14,374 11,082 21,221 9,866 19,995

1981 1982 Total

Subprogram 1/ 2/ 1/ 2/ 1/ 2/

A-Local telephone 638 1,532 - - 23,838 28,270B-Long distance

communications 301 - 75 1,669 556 10,490C-Transmission

system 592 - 147 1,843 1,279 15,625D-Internal ser-vice - - - - 340 7,809

Total 1,531 1,532 222 3,512 26,013 62,194

1/ local currency

2/ foreign currency

VIII. STATUS TELECOM has taken initial steps to secureexternal credit. Preliminary NPD approval has beeu given. Negotiationsare under way.

Page 86: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListCommunications (2)Page 1 of 2

I. NAME OF PROJECT: Replacement of Equipment and Expansionfor Channels 1 and 2 of the National Radioand T,V. Service ( First Stage )

II. EXECUTING AGENCY: INRAVISION

III. TOTAL ESTIMATED COST: US$ 7.2 million

IV. EXTERNAL FINANCING REQUESTED: US$5.0 million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The project involves the replacement offive 10 KW transmitters for Channel 1 located on the peaks of Manjui, Pande Azucar,Padre Amaya, Jurisdicciones and Kennedy, and the relocationof three similar transmitters located on the peaks of Manjui, Pan de Azu-car and Padre Amaya for Channel 2.

In order to bring Channel 2 to theAtlantic Coast and parts of the Santander departments, two 10 KW transmit-ters and four 1 KW transmitters will be installed. With this expansionit is hoped to be able to provide the same coverage for both Channels 1and 2 and to obtain part of the funds needed for the future expansion ofEducational T.V. Two AM transmitters for the National Radio ( at El Rosal-100 KW and El Barne - 15 KW) will be replace4 and sound consols, recordplayers, tape recorders and monitors will be installed for study purposes;a 100 KW AM transmitter will be installed in Cali, and 15 KW transmitterswill be installed in Cu'cuta, Pasto, Barranquilla, and Cartagena. The ex-pansion of the National Radio will benefit some 10 million people who atpresent do not have access to the system.

VII. COSTS AND AVAILABILITY OF FUNDS:( In US$ thousands )

1977 1978 1979

1/ 2/ 1/ 2/ 1/ 2/

Replacement of T. V.equipment 313 500 157 1,000 - 1,000Expansion of Channel 2 40 259 60 400 40 350Replacement of NationalRadio Equipment - - 70 250 - 170Expansion of National Radio - - 140 350 100 849

Total 353 759 427 2,000 140 2,369

Page 87: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListCommunications (2)Page 2 of 2

1980 Total

1/ 2/ 1/ 2/

Replacement of T.Vo equipment - 500 470 3 000Expansion of Channel 2 - 350 140 1,359Replacement of NationalRadio equipment - 54 70 474Expansion of National Radio 100 200 340 1,399

Total 100 1,104 1,020 6,232

1/ Local

2/ Foreign exchange

External credit will cover 807% of theforeign exchange costs -(the value of imported equipment. )

VIII. STATUS: The necessary authorization to proceedwith the first stage is being sought. The total program which includestwo stages requires external financing of about US$13.3 million. It isexpected that the second stage could be started around 1979. Project isunder NPD review. Bidding documents are under preparation.

Page 88: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListCommunications (3)Page 1 of 2

I. NAME OF PROJECT: Expansion of the Bogota Telephone Service

II. EXECUTING AGENCY: Empresa de Telefonos de Bogota

III. TOTAL ESTIMATED COST: US$15.1 million

IV. EXTERNAL FINANCING REQUESTED: US$9.3 million

V. LENDING AGENCY: Suppliers

VI. DESCRIPTION AND JUSTIFICATION: The Empresa de Telefonos de Bogota hasstarted the process of contracting for 74,000 new lines with which itis expected to meet demand through 1979-87. This is in line with the1979-1987 Plan for Telephone Development in Bogota and takes account ofthe option foreseen in contract number 002/74 with Ericsson and ITT.

VII, COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing The total cost of this project is madeup of local costs of US$3.6 millions which includes the costs of trans-port, local manpower and the improvement of existing buildings. The otherUS$11.5 million represents the cost of imported equipment.

Disbursements

(in US$ million)

1977 1978 1979 1980 1981 Total

Local 1.74 2.03 1.16 0.58 0.29 5.80Foreign exchange 1.86 2.80 3.25 0.93 0.46 9.30

Total 3.60 4.83 4.41 1.51 0.75 15.10

VIII. STATUS: The National Planning Department hasissued a preliminary approval of the project. A resolution from theMinistry of Finance and Public Credit authorizing the enterprise to enterinto an agreement with the suppliers is now awaited.

Page 89: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListCommunications (3)Page 2 of 2

I. NAME OF PROJECT: Expansion of the BogotA Telephone Service

II. EXECUTING AGENCY: Empresa de Telefonos de Bogota

III. TOTAL ESTIMATED COST: US$11.5 million

IV. EXTERNAL FINANCING REQUESTED: US$9.9 million

V. LENDING AGENCY: Suppliers

VI. DESCRIPTION AND JUSTIFICATION: In line with the forecasts which weremade in the Development Plan of the Empresa de Telefonos de Bogota, in1975 Ericsson and ITT were awarded contracts for the installation of24,000 lines. These contracts envisaged the installation of 144,000additional lines in two stages of 70,000 and 74,000 lines respectively.The first stage (70,000 lines) involves the completion of the followingexchanges: Suba I, Centro IX, Fontib6n II, Bosa I, San Carlos II,Normandia II, and Bochica I. This program will make it possible to meetthe most urgent needs.

VII. COSTS AND AVAILABILITY OF FUNDS:

( In US$ million )

1977 1978 1979 1980 Total

Local 0.3 0.6 0.4 0.3 1.6Foreign Exchange 2.2 3.1 3.6 1.0 9.9

Total 2.5 3.7 4.0 1.3 11.5

VIII. STATUS: The Board of the Empresa de Telefonosde Bogota has authorized the use of the option included in bid Number002/74. Steps are being taken to make it possible to obtain a creditin the second half of 1977. Preliminary NPD approval has been given.

Page 90: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListCommunication (4)

I. NAME OF PROJECT: Acquisition of 5000 Pay Telephones

IIo EXECUTING AGENCY: Empresa de Teldfonos de Bogota

III. TOTAL ESTIMATED COST: US$20 5 million

IV. EXTERNAL FINANCING REQUESTED: TJS$2.0 million

V. LENDING AGENCY: Suppliers

VI. DESCRIPTION AND JUS'TIFICATION: The enterprise has decided to acquire5000 pay telephones to meet demands through 1982, taking account of theneeds of priority areas and of the need to fulfill social objectives.

VII. COSTS AND AVAILABILITY OF FUNDS:

Disbursements

(In US$ million)

1977 1978 1979 1980 Total

Local 0.20 0.60 0.60 0.60 2.00Foreign exchange 0.10 0.15 0.15 0.10 0.50

Total 0.30 0.75 0.75 0.70 2,50

VIII. STATUS: Project is under NPD review. Governmentresolution is now awaited in order to proceed with bidding for the supplyof equip-ment.

Page 91: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListCommunications (5)

I. NANE OF PROJECT: Acquisition of Six Mobile TelephoneExchanges

HiT EXECUTING AGENCY: Empresa de Telefonos de Bogota

Ill. TOTAL ESTIMATED COST: US$1.9 million

IV. EXTERNAL FINANCING REQUESTED: US$1.7 million

V. LENDING AGENCY: Suppliers

VI. DESCRIPTION AND JUSTIFICATION: The project invoLves the expansion ofthe telephone system of Bogota through acquisition of six mobileexchanges of 1000 lines apiece. This will make it possible to satisfydemands under emergency conditions or if demand grows faster thanexpected.

VII. COSTS AND AVAILABILITY OF FUNDS: Details not yet available.

VIII. STATUS:

Studies Studies have been completed,

Steps recquired for obtaining Project is under NPD review. Biddingfinancing documents are being prepared.

Page 92: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListCommunications (6)Page 1 of 2

I. NAME OF PROJECT: Expansion of the Barranquilla TelephoneSystem (II Stage)

II. EXECUTING AGENCY: Empresa Municipal de Telgfonos de Barran-quilla

III. TOTAL ESTIMATED COST: US$2.9 million

IV. EXTERNAL FINANCING REQUESTED: US$1.8 million

V. LENDING AGENCY: Ericsson

VI. DESCRIPTION AND JUSTIFICATION: The Empresa Municipal de Telefonos deBarranquilla intends to carry out a second stage of the program to developtelephone services. Twenty thousand new lines will be installed, makingit possible to meet demand through 1984. These lines will be located asfollows:

- Centro III: 8.000 lines- Estadio III: 5.000 lines- Victoria I: 3.000 lines- Sub-exchange

20 de Julio 2.000 lines- Sub-exchange

Soledad 2.000 lines

Taking account of the density of telepho-nes in the city the program is fully justified and will guarantee theprovision of adequate services.

VII. COSTS AND AVAILABILITY OF FUNDS:

(In US$ thousands)

1977 1978 1979

Loc Ext Loc Ext toc Ext

Own Resources - 30 200 90 300 90External credit - 110 - 340 - 330

Total - 140 200 430 300 420

Page 93: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListCommunications (6)Page 2 of 2

1980 1981 1982

Loc Ext Loc Ext Loc Ext

Own resources I00 2 - 70 - 60

External credit - 300 - 210 - 200

Total 100 370 - 280 - 260

1983 1984 Total

Loc Ext Loc Ext Loc Ext

aOn resources - 60 - 30 600 500

XIxternal credit - 190 - 120 - 1,800

Total - 250 - 150 600 2,300

VIII. STATUS: The project has received the preliminaryapproval of the National Planning Department.

Page 94: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListCommunications (7)

1. NAME OF PROJECT: Expansion of the Bucaramanga TelephoneSystem

II. EXECUTING AGENCY: Empresas P6blicas de Bucaramanga

III. TOTAL. ESTIMATED COSTr: US$2.1 million

IV. EXTERNAL FINANCING REQUESTED: US$1.8 million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: Studies carried out by Empresas Puiblicasde Bucaramanga and the Ministry of Communications concerning the developmentof the telephone system in the Bucaramanga metropolitan area ( includingthe areas of Floridablanca, Gir6n and the Southern districts) haveshown that there is a need for 16,000 new lines; these would be installedin two stages, 8,000 in each. The execution of the first stage will meetthe needs of areas where the existing system is particularly inadequate.

VII. COSTS AND AVAILABILITY OF FUNDS: Details not yet known

VIII. STATUS:- By Resolution No. 04895 of April 28,1976,Empresas Publicas de Bucaramanga were authorized to seek an externalcredit for this prpject. It is expected this process will be completedin 1977.

Page 95: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListCommunications (8)Page ' of 2

I. NAME OF PROJECT: Rural Telephones (Stage I)

II. EXECUTING AGENCY: Empresa Nacional de Telecomunicaciones(TELECOM)

III. TOTAL ESTIMATED COST: US$54.8 million

IVo EXTERNAL FINANCING REQUESTED: US$29.0 million

V. LENDING AGENCY: IDB

VI. DESCRIPTION AND JUSTIFICATION: The main object of this project is tobring telephone services to rural communities which now lack them and toimprove services in small towns where existing services are inadequate.It is also planned to connect such places with existing long distancenetworks. The project covers 21 departments and in its first stage willbenefit 2,200 rural communities. The project will have two components:

a) Rural Networks: Extension of telephone services in rural communities.

b) Complementary Networks: This corresponds to the improvement ofregional networks: i.e. departmental networks excluding those of de-partamental capitalsand major cities.

The rural telephone program has beenconceived in order to benefit rural communities and small towns where thepoorest parts of the population are located. These people are also thetarget group for the Integrated Rural Development Program (DRI) and theNational Food and Nutrition Program (PAN), the execution of which requiresan efficient communications system.

The rural telephone program will establishthe basic infrastructure for regional telecommunications systems in ruralareas and will be of great importance for their economic development.The rate of return for the project will exceed 15%.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing The IDB will finance the whole cost ofthe rural networks which will be on the order of US$29.0 million. Theinvestments in the complementary networks will be financed with dnmesticresources, mainly from lie Fondo de Telefon£a Rural.

Page 96: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListCommunications (8)Page 2 of 2

Disbursements

(In US$ million)

1977 1978 1979 1980 1981 Total

Local 1.9 8.8 9.8 4.1 1.2 25.8Foreign exchanges 5.7 10.4 10.3 2.6 - 29.0

Total 7.6 19.2 20.1 6.7 1.2 54.8

VIII. STATUS: Negotiations with the IDB are proceeding.Given that TELECOM has already obtained the necessary authorization it ishoped that it will soon be possible to obtain authorization, from CONPESto seek the guarantee of the National Government.

Page 97: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListCommunications (9)

I. NAME OF PROJECT: Complementary Telecommunications Programfor National Territories

II. EXECUTING AGENCY: TELECOM

III. TOTAL ESTIMATED COST: US$8.O million

IV. EXTERNAL FINANCING REQUESTED: US$800 million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: Programs for the development of telecom-munications infrastructure in South-Eastern Colombia have mainly focussedon the improvement of long distance telephone services in small towns andon the provision of local telephone services when circumstances have sojustified. Many of the municipalities of the region have inadequatetelephone services and the intention is to improve them; the smallestpopulation centers are, for the most part, completely lacking in theseservices.

The basic goal of the program is topromote the economic and social integration of the southeast region withthe rest of the country. For this reason it will be necessary to obtain:automatic telephone exchanges, manual exchanges, table telephones andtransmission equipment including multichannel VHF or UHF equipment, singlechannel VHF radio equipment and portable systems. Other requirementsinclude networks, power plants and Telex equipment.

VII. COSTS AND AVAILABILITY OF FUNDS: Not yet known

VIII. STATUS:

Studies Preliminary studies have been completed,

Steps required for obtaining Project is under NPD review. Biddingfinancing documents are under preparation.

Page 98: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListCommunications(10)Page 1 of 2

I. NAME OF PROJECT: Expansion of the Medellin Telephone System

II. EXECUTING AGENCY: Empresas P6blicas de Medellin

III. TOTAL ESTIMATED COST: US$31.5 million

IV. EXTERNAL FINANCING REQUESTED: US$18.9 million

V. LENDING AGENCY: Suppliers

VI. DESCRIPTION AND JUSTIFICATION: The project involves the expansion oftelephone exchanges by 53,600 lines as follows:

Medellin Nuevas NuevasLineas Lineas

Centro 5,000 San Javier 3,000America 3,000 Col6n 7,000Bosque 3,000 Otrabanda 4,000Berlin 2,000 Guayaba 5,000Nutibara 4,000 Villahermosa 3,000San Bernardo 2,000 Caribe 2,000Castilla 3,000 Florencia 3,000

Otros Municipios NuevasLineas

Envigado 2,000Itagui 2,000Sabaneta 600

The foreseen installations will make itpossible to meet demand in the system managed by the enterprise in linewith the studies that have been undertaken.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs

(in US$ million)

Local costs Foreign exchange Total

Internal plant 14.9 14.9External plant 12.6 4.0 16,6

Total 12.6 18.9 31.5

Page 99: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListCommunications (10)Page 2 of 2

VIII. STATUS: Feasibility studies and designs wereundertaken by the enterprise in the context of the Expansion Plan forthe telephone system 1970-80. The National Planning Department hasgiven a favorable opinion on the project and bidding documents arebeing prepared.

Page 100: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListUrban & RegionalDevelopment (1)

I. NAME OF PROJECT: Integrated Plan for Urban Development andErosion Control

II. EXECUTING AGENCY: Corporaci6n de Defensa de la Meseta deBucaramanga (COMB) and Corporaci6n Regio-nal Aut6noma de Manizales, Salamina yAranzuzu (CRAMSA).

III. TOTAL ESTIMATED COST: US$33 million

IV. EXTERNAL FINANCING REQUESTED: US$16.0 million

V. LENDING AGENCY: IDB

VI. DESCRIPTION AND JUSTIFICATION: The cities which will benefit from thisplan are located on mountain plateaux surrounded by steep escarpmentswhich are subject to severe erosion, and instability. The plan involvesurban planning, water management and soil stabilization activities. Itis also-envisaged that scientific instruments will be acquired and ecolo-gical studies will be carried out.

VII. COSTS AND AVAILABILITY OF FUNDS:

(in US$ million)

1977 1978 1979 1980 Total

CRAMSA 5.2 4.7 5.0 2.0 16.9CMDB 5.8 5.1 3.8 1.4 16.1

VIII. STATUS: The loan has been approved by the Boardof Directors of the IDB and negotiations are expected to be completed inthe near future.

Page 101: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListUrban & RegionalDevelopment (2)Page 1 of 2

I. NAME OF PROJECT: Development Plan for Buenaventura

II. EXECUTING AGENCY: CVC

III. TOTAL ESTIMATED COST: US$68.9 million

IV. EXTERNAL FINANCING REQUESTED: US$34.3 million

V. LENDING AGENCY: IDB

VI. DESCRIPTION AND JUSTIFICATION: The purpose of this project is to partial-ly restructure the economy of the city through the promotion of industrialactivities for which the city offers attractive conditions in terms of theavailability of natural resources, as a consequence of its geographicallocation, or in light of the pre-existing development of small and medium-scale industrv. These activities are aimed at generating new employmentand ensuring general increases in family income. In addition, some of theprincipal problems of the city (public services, education, health, etc.)will be resolved and its physical evolution will be modified.

Among Colombia medium-sized cities Buena-ventura is perhaps the most disadvantaged from the economic, physical,social and administrative points of view. Through this project it ishoped to bring about a substantial improvement in its conditions and inparticular to provide the city with an economic base for sustained deve-lopment once the plan is executed. About 7,000 additional jobs are ex-pected to be generated and the growth rate of the city's economy isexpected to increase from 2.6% to 6,2% a year.

The Pacific region in which Buenaventurais located can substantially increase the food supply and foreing exchangeearnings of the country if its fishing and forestry resources are properlyexploited. The purpose of the plan is to provide the economic means andservice infrastructure for the city that will enable it to become theeconomic center for the area.

The executing agency for the project willbe the CVC. The sub-executing agencies will be national agencies providingspecific services which will be directed and coordinated by the CVC.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs The total cost is estimated at US$68.9million of which US$8.5 million are direc: foreign costs, US$13.1 areindirect foreign costs and the remander local costs.

Page 102: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListUrban & RegionalDevelopment (2)Page 2 of 2

Disbursements

(in thousands of US$)

1976 1977 1978 1979 1980 Total

IDB loan US$ 12,077 8,013 8,475 5,735 34,300Local US$ 3,456 9,585 6,858 7,516 7,225 34,640

Total US$ 3,456 21,662 14,871 15,991 12,960 68,940

VIII. STATUS:

Studies: CVC started feasibility studies for theproject in 1971 and in August 1972 the contract for the formulation ofthe plan was awarded to a consulting firm. The first stage was completedat the end of the first quarter of 1974. That stage defined the sectoralstudies, and steps were taken to obtain the approval of the National Plan-ning Department for contracting the financing of eight specific studiescosting US$222,000,with Fonade. These studies were completed in June 1975.Design will be completed in mid 1978.

Steps required for obtainingfinancing: The National Planning Department hasgiven preliminary approval for the project. The IDB has completed itsevaluation of the project.

Page 103: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListUrban & RegionalDevelopment (3)

I. NAM OF PROJECT: Integration of Services for SquatterHousing,

II. EXECUTING AGENCY: ICT/ICBF,.Ministries of Health and Education/SENA

Ill. TOTAL ESTIMATED COST: US$70.0 million

IV, EXTERNAL FINANCING REQUESTED, US$30.0 million

V. LENDING AGENCY: World Bank

V!G DESCRIPTION AND TUSTIFICATION: The objective of the project is to reducethe pressure in urban centers caused by inrigration, The basic mechanismis the Centro de Desarrollo Vecinal, where the following services willbe offered: liealt.i, education, food service, libraries, cooperativemarkets, recreation and train-ing. The project attemps to facilitate improvedcoTnnunity organization, improvements in sanitary cornditions, improvementsin educational levels and housing, the provision of public services andhigher levels of employment through training and through the organizationof community enterprises.

VII, COSTS AND AVAILABILITY OF FUNDS:

Disbursements

(In US$ million)

1977 1978 1979 1980 1981 Total

Local and Foreignexchange 59O 12.0 20.0 22.0 110 70.0

VIII. STATUS:

Studies Studies have been completed.

Steps required for obtaining Preliminary NPD approval has been given.financing

Page 104: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListUrban & RegionalDevelopment (4)Page 1 of 2

I. NAME OF PROJECT: Urban Renewal in the South East Zone ofCartagena

II. EXECUTING AGENCY: ICT

III. TOTAL ESTIMATED COST: US$20.0 million

IV. EXTERNAL FINANCING REQUESTED: US$10.0 million

V. LENDING AGENCY: World Bank

VI. DESCRIPTION AND JUSTIFICATION: The first stage of this program involvestwo types of improvements in two areas. The areas are defined as follows:

Area 1: (Approximately 35 hectares). Bounded by:

Cafta de Maria Auxiliadora,

Avenida Pedro Romero, Carrera 46

(Amador y Cortes) and shoreline.

Area 2: (Approximately 40 hectares). Bounded by:

Carrera 46 (Amador y Cortes),

Avenida Pedro de Heredia,

Carrera 49 B and shoreline.

The project includes: physical recoveryof the area through in-filling and drainage works; the provision of watersupply, drainage and electric power; the construction of motor and pedes-trian routes; a social development program which will facilitate andstimulate community participation in these works and the planning for theintegration of the area into the rest of the city. The project furtherinvolves the construction and equipping of a community development centre(C.D.V.) in the locality of La Esperanza which will provide integratedfamily and child welfare and community services. Once the results of theoperations to be carried out under the first stage of the project areknown, the second stage of the project will be undertaken. The projectis not based on erradication but seeks to bring the benefits of develop-ment to a marginal area and to provide the opportunity for the inhabitantsof the area to live in better conditions.

It should be noted that the first stageof the program will benefit some 30,000 people - equivalent to about 35percent of the population of the Southeast zone of the city.

Page 105: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListUrban & RegionalDevelopment (4)Page 2 of 2

VII. COSTS AND AVAILABILITY OF FUNDS:

(in US$ million)

1977 1978 1979 1980 Total

External resources O~5 3.5 3.0 3.0 10.0Internal resources 3.5 2.5 2.0 2.0 10.0

Total 4.0 600 5,0 5.0 20;0.

VIII. STATUS:

Studies Design studies for certain parts of theproject are now being carried out.

Steps required for obtaining Preliminary NPD approval has been given,financing

Page 106: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListUrban & RegionalDevelopment (5)Page 1 of 2

Is NAME OF PROJECT: General Equipment

II. EXECUTING AGENCY: DAINCO

III. TOTAL ESTIM4ATED COST: US$12.0 million

IV. EXTERNAL FINANCING REQJESTED: US$12.0 million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: In light of an analysis of the problemsarising from inadequate communications and public services in the natio-nal territories, an investmernt plan for these areas has been preparedwith a view to providing better social and physical infrastructure. TheGovernment believes the resolution of the irgent problems arising frominadequate communications and public services could have an importantimpact on corLrnercial agricultural output. Given this, the Governmentwishes to obtain equipment for road construction and for river transport.It is also planned to acquire electric generating equipment in order tobe able to meet demand,

VII. COSTS AND AVAILABILITY OF FUNDS: The costs of the program are as follows:

1. Public works equipment 6.420 River transport equipment 1.93. Electricity generating

equipment 3,7

Total 12.0

VIII. STATUS: DAINCO, together with DNP has elaborateda three year investment plan for 1977-79 for the Intendencias and Comisa-rias which it has begun to execute with domestic budgetary resources.

Steps required for obtaining Project is under NPD review.financing

Page 107: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListUrban & RegionalDevelopment (5)Page 2 of 2

I. NAME OF PROJECT: Acquisition of Sea Transport andTelecommunications Equipment forNational Territories

II. EXECUTING AGENCY: DAINCO

III. TOTAL ESTIMATED COST; US$2.2 million

IV. EXTERNAL FINANCING REQUESTED: US$2.2 million

V. LENDING AGENCY: Government of the Netherlands

VI. DESCRIPTION AND JUSTIFICATION: In light of the investment plan fornational territories and as a complement to financing obtained fromother sources it has been agreed that financial resources availablefrom the Government of the Netherlands will be used for the acquisitionof cargo and passenger vessels to provide services between Cartagenaand San Andres and between Providencia and San Andres. It is alsoplanned to acquire simplex and duplex telecommunications equipment toimprove communications in the part of the Southeast zone of Colombiawhich is administered by the Departamento Administrativo de Intendenciasy Comisarias.

VII. COSTS AND AVAILABILITY OF FUNDS: The disbursement of funds will be asfollows:

(In US$ million)

1. Acquisition of passengerand cargo vessels 1.2

2. Communications equipmant 1.0

Total 2.2.

VIII. STATUS:

Studies Studies have been completed.

Steps required for obtaining Project is under NPD review.financing

Page 108: List of Projects for External Financing 1977-1979 Colombia

1977 Project ListUrban & RegionalDevelopment (6)

1. NAME OF PROJECTL Choc6 Regional Develooment

II. EXECUTING AGENCY: National Government

III. TOTAL ESTTIMATED COST: US$17.7 million

ItV. E.XTERNAL FINANCING REQUISTED: US$7.3 million

V. LENDING AGENCY- Government of the Netherlands

VI. DESCRIPTION AND JIJSTIFICATION: The investments would providehealth, education, water supply and sewerage, transport, energy andcommunication facilities. For each of these sectors, areas have beenchosen on thle basis of an analysis of the most urgent needs,prior to,rndertaking other investments in fisheries, forest industries, miningand food priluction, The objective in defining these priorities hasbeen to cover the existing deficit in the basic services, which willbe necessary to promote the integrated development of the region.

T'he execution of the plan will involveintervention on t-he part of the Government in areas where there hasbeen little Government activity and which presently suffer theconsequences of inadequate infrastructure and services. In addition,the investments of different agencies will be coordinated in an effortto achieve a common objective.

VII. COSTS AND AVAILABILITY OF FUNDSCosts and Financing Costs have been estimated as follows:

( In US $ million )

Transportation 7.6Energy 4.6Radio and Educational TV 3.1Water supply and sewarage 4.4

Total 19.7

Disbursements1977 1978 1979 Total

Local 2.2 4.2 0.9 7=3Foreign Exchange 4.9 4.1 3.4 12,7

7.1 8.3 4.3 17.7

VIII. STATUSStudies. Feasibility and design studies will heelaborated by each executing agency under the coordination and directionof the National Planning Department.

Steps required for obtaining Preliminary NPD approval has bee.n) given,financing

Page 109: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (1)

J. NAME OF PROJECT: Transmission System for Guadalupe PowerProject

II. EXECUTING AGENCY: EPM

III TOTAL ESTIMATED COST: US$4.7 million

IV, EXTERNAL FINANCING REQUESTED: US$3.1 million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: For the transmission of the energygenerated in the Guadalupe I power project to Medellin, the followingworks will be carried out:

a) a 230 KV substation in Guadalupe I power plant;

b) a one circuit 230 KV transmission line of 80 kms; and

c) a 230 KV substation in Medellin. These works will complementthe expansion of the Guadalupe I power plant.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing The proposed loan will finance equipmentcosting US$3.13 million. Local costs amounting to US$1.61 million will befor civil works and will be financed by EPMo

Disbursements

(in US$ million)

1978 1979 1980 1981 1982 Total

Local 051 0.26 0.26 0.26 0.32 1.61Foreign Exchange 0.62 - 2.18 - 0.32 3.13

Total 1.13 0.26 2.44 0.26 0.64 4.74

VIII. STATUS

Studies Feasibility studies are complete.Design studies to be carried out.

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 110: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (2)

I. NAME OF PROJECT: Diversion of Nechi, Pajarito andDolores Rivers

.I FXECIJTING AGENCY: EPM

III. TOTAL ESTIMATED COST: US$1205 million

IV. EXTERNAL FINANCING REQUESTED: USV7.5 million

V. LENDIN'G AGENCY: Not yet defined

VI. DESCRIPTIOiN AND JUSTIFICATION^ The diversion of the Nechi, Pajarito andDolores rivers to the Guadalupe river basin will permit the constructionof the 140 MW Guadalupe I pow-er plant and the expansion of the Troneraspower plant of 26 MW. The Nechi river, with an average flow of 2e4 cubicmetars per second, will be diverted to the Pajarito river, which has anaverage flow of 2.5 cubic meters per second. The works required are adam, a 371 meter tur-nel and 843 meters of canals and pipelines. The Nechi-Pajarito system, will be then directed to the Dolores River, which has anaverage flow of 4 cubic meters per second, through a 3,234 meter canal.Finally the Nechi-Paiarito-Dolores system will be diverted to the Concepci6nriver, with an average flow of 4 cubic meters per second.

VII COSTS AiND AVAILABILITnY OF FUNDS:

Costs and Financing The cost of civil works is estimated atUS$9058 million and the cost of engineering and contingencies at US$2.88million. All costs are local. The costs not covered by foreign loanswill be financed by EPM.

Disbursements

(in US$ million)

1978 1979 1980 Total

Local and Foreign 4e7 5.2 2.6 12.5exchange

VIII, STATUS

Studies Feasibility studies have been completed.Design studies have yet to be carried out.

Steps required for obtaining Project has not yet been presented to NPD.

financing

Page 111: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (3)

I. NAME OF PROJECT: Ayura Power Project

II. EXECUTING AGENCY: EPM

III. TOTAL ESTIMATED COST: US$5.83

IV. EXTERNAL FINANCING REQUESTED: US$3.47

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The project involves the constructionof the 19 MW Ayura power plant to further utilize waters from the RioNegro river, presently diverted to Medellin for the water supply system.The present system comprises a 12 million cubic meter reservoir, whosewaters are carried to the filtration plant through a 8.6 km long tunneland two parallel pipelines of 1200 meterseach. There is a head of 380meters, and the average flow is 4 cubic meters per second. Works todouble that flow are under way, through the diversion of the Piedras andBuey rivers to the Rio Negro river basin, The works to be carried outcomprise the construction of the power house, facilities to dischargethe water to the filtering plant and other miscellaneous works, Thepower plant will be connected to the EPM system by a short transmissionline.

VII. COSTS AND AVAILABILITY OF FUNDS: Local costs are estimated at US$2.36million, of which US$1.90 million is for civil works and US$0.46 millionfor equipment. Foreign exchange costs are US$3.47 million for equipment.Local costs will be financed by EPM.

Disbursements

1978 1979 1980 1981 Total

Local 0.22 1.06 0,94 0,14 2.36Foreign Exchange 0.60 2,10 0,77 - 3.47

Total 0.82 3.16 1.71 0.14 5.83

VIII. STATUS

Studies Feasibility studies have been completed.Design studies have yet to be carried out.

Steps required for obtaining Project has not yet been presented to NPD.

financing

Page 112: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (4)

I. NAME OF PROJECT: Expansion of the Troneras Power Plant

II. EXECUTING AGENCY: EPM

III. TOTAL ESTIMATED COST: US$7.02 million

IV. EXTERNAL FINqANCING REQUESTED: US$4.78 million

V. LENDING AGENCY: Not yet defined

VIo DESCRIPTION AND JUSTIFICATION: The project consists of the installationOf a third generating unit in the Troneras power plant, for a totalcapacity of 62 MlU. to take advantage of the additional water flow arisingf:rom the diversion of the Nechi, Pajarito and Dolores rivers. There willbe a need to expand the powerhouse and to build 2 luns. of 115 KV transmis-sion line.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Local costs are estimated at US$2.24million, of which US$1.63 million will be for civil works and US$0.61million for equipment. Foreign exchange costs are US$4.78 million,all for equipment, Local costs will be financed by EPMo

Disbursements

1978 1979 1980 1981 1982 Total

Local 0.10 0.12 0.84 0.73 0.45 2.24Foreign Exchange 0.20 0.60 1.60 1.65 0.73 4.78

Total 0.30 0.72 2.44 2.38 1.18 7.02

VIII. STATUS

Studies Feasibility studies have been completed.Design studies have yet to be carried out.

Steps required for obtaining Project ha-s not yet been presented to NPD.financing

Page 113: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (5)

I. NAME OF PROJECT: Expansion of the Guadalupe I Power Plant

II. EXECUTING AGENCY: EPM

III. TOTAL ESTIMATED COST: US$19.14

IV. EXTERNAL FINANCING REQUESTED: US$12.77

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The project involves thl. replacement ofthe old, existing 40 MW Guadalupe I power plant, by a new 140 MW plant,which could be eventually expanded by an additional 140 MW. Such anexpansion is made possible by the increase in water flow in the Guadaluperiver resulting from the diversion of the Nechi, Pajarito and Doloresrivers to the Guadalupe river basin. The project works involve thereplacement of a number of elements in the existing Guadalupe I powerplant. The expanded plant will be connected to the EPM power system by ashort 230 KV transmission line.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Local costs are estimated at US$6.37million, of which US$3.37 million will be for civil works, and US$3.0million for equipment. Foreign exchange costs amounting to US$12.77million are for equipment. Local costs will be financed by EPM.

Disbursements

1978 1979 1980 1981 1982 Total

Local 0.58 0.63 2.55 1,88 0,73 6.37Foreign Exchange 060 1.70 4e70 4.70 1.07 12.77

1,18 2.33 7.25 6.58 1.80 19,14

VIII. STATUS

Studies Feasibility studies have been completed.Design studies are to be carried out.

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 114: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (6)

I. NAME OF PROJECT: Maintenance and Repair Shop

II. EXECUTING AGENCY: EEEB

III. TOTAL ESTIMATED COST: US$3.25

I\. EXTERNAL FINANCING REQUESTED: US$1.90

V, LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The maintenance and repair shop will

comprise four departmients: machinery, general equipment, transformerrepairs and vehicle repairs.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Costs have been estimated as follows:

(in US$ million)

Local Foreign

Buildings 0088Equipment 0.22 1.44Installation Engineeringand Administration 0.14 0.29

Contingencies 011 0.17

Total 1.35 1.90

Local costs will be financed by EEEB

Disbursements

(in US$ million)

1978 1979 1980 Total

Local 0.15 0.73 0,47 1.35Foreign Exchange - 0.31 1.59 190

Total 0.15 1.04 2.06 3,25

VIII. STATUS

Studies Feasibility studies have been completed,

Design studies are to be carried out.

Steps required for obtaining Preliminary NPD approval has :

financing

Page 115: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (7)Page 1 of 2

I. NAME OF PROJECT: Operations Control Center and Telecomuni-cations System

II. EXECUTING AGENCY: EEEB

III. TOTAL ESTIMATED COST: US$6.41 million

IV. EXTERNAL FINANCING REQUESTED: US$4.51 million

V. LENDING AGENCY: Not yet defined

VI, DESCRIPTION AND JUSTIFICATION: The project will provide:

a) an automatic system for data collection to improve the control of thegeneration, transmission and distribution of electric power;

b) 40 remote stations operated by two computers;

c) peripheral equipment such as TV facilities, recording units, etc.; and

d) a communications center

The project will help improve the effecti-ve control of generating plants and distribution centers, particularly inemergency situations. The center will work in coordination with the Natio-nal Dispatching Center to be operated by ISA.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Costs have been estimated as follow:

(in US$ million)

Local Foreign exchange

Equipment 1.50 4.21Engineering and

Administration 0.40 0.30

Total 1.90 4.51

Local costs will be financed by EEEB

Disbursements

1978 1979 1980 1981 Total

Local O0'50 0.59 0.60 0.21 1.90Foreign exchange 0.83 1.56 1.54 0.58 4.51

Total 1.33 2.15 2.14 0.79 6.41

Page 116: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (7)Page 2 of 2

VIII. STATUS:

Studies Feasibility studies have been completed.and design studies have been partially completed.

Steps required for obtaining Preliminary NPD approval has been given.financing

Page 117: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (8)

I. NAME OF PROJECT: Replacement of Pumping Equipment in Sesquile

II. EXECUTING AGENCY: EEEB

III. TOTAL ESTIMATED COST: US$2.54 million

IV. EXTERNAL FINANCING REQUESTED: US$2.23 million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The existing eight cubic meter per secondpumping unit will be replaced and a second unit of the same capacity willbe installed. The proposed expansion of pumping capacity will improve theoperation of the Tomine reservoir and will permit better regulation of theBogota river, thus complementing the Chingaza project. Furthermore, theproject is part of the water regulation works required for the Mesitaspower project.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Costs have been estimated as follows:

Local Foreing exchange

Civil works andinstallation 0.08 -

Equipment - 2.23Engineering and

Administration 0.23 -

Total 0.31 2.23

Local costs will be financed by EEEB

Disbursements

(in US$ million)

1978 1979 1980 Total

Local 003 0.15 0.13 0o31Foreign exchange 0.45 1.78 - 2.23

Total 0.48 1.93 0.13 2.54

VIII. STATUSStudies. Feasibility studies have been compieted.Design studies are being prepared in consultation with manufaccurers.

Steps required for obtaining Preliminary NPD approval has been given.financing

Page 118: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (9)Page 1 of 2

1. NAME OF PROJECT: Hydroelectrical Development of the AltoSint Basin

II. EXEClTTING AGENCY: ISA - CORELGA

III, TOTAL ESTIMATED COST: US$410.0 million

IV, EXTERNAL FINANCING REQUESTED: US$290.0 million

V. LEN4DING AGENCY: Not yet defined

VI, DESCRIPTION AND JUSTIFICATION: The project will develop the hydroelectricpotential of the Alto Sind basin - that part of the Sind river between theUrrd Canyorn and the headwaters of the river. The project involves the cons-truction of two power plants: Urra I and Urrd II, with a total installedcapacity of 1050 A% and also invjlves the diversion of the San Jorge andVerde rivers to the Urra II reservoir.

The project, in addition to generatingelectric energy, will provide other benefits such as flood control, largerwater flows in the dry season, water storage for irrigation and improve-ments in river navigation.

VII, COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing The cost of Urrd I is estimated at US$100million, of UrrA II at US$210 million and of the river diversion at US$100million. These costs do not allow for price excalations or interest duringconstruction. Local costs are estimated at US$120 million and includecivil works, enginnering and supervision, Foreign exchange costs are esti-mated at US$290 million for equipment, civil works, engineering and super-vision. Local costs will be financed by the shareholders of ISAo

Disbursements

(in US$ million)

1978 1979 1980 1981 1982 1983 1984

Local 5.94 8,01 14.69 15.51 24,12 19,66 19.95Foreign exchange 7,80 11,27 27.43 32.02 62,00 54,95 65.35

Total 13,74 19.28 42,12 47,53 86,12 74,61 85.30

Page 119: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (9)Page 2 of 2

1985 1986 Total

Local 8.04 4.08 120.0Foreign exchange 23.98 5.20 290.0

Total 32.02 9.28 410.0

VIIIo STATUS:

Studies Feasibility studieE have been completed.

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 120: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (10)

I. NAME OF PROJECT: Thermo-Cerrej6n

II. EXECUTING AGENCY: CORELCA

III. TOTAL ESTIMATED COST: US$150.0 million

IV. EXTERNAL FINANCING REQUESTED: US$120.0 million

V. LENDING AGENCY: IDB

VI. DESCRIPTION AND JUSTIFICATION: The project involves the design, supplyand installation of a 250 MW thermal power plant using coal as a fuelwhich will supply the energy rquired for the exploitation of the coaldeposits of Cerrej6n, for the establishment of an industrial complex inthe Guajira and to meet the demand of the CORELCA market and from the restof the country during critical years.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing_ Local costs are estimated at US$30.0million and will relate to civil works and to locally purchased equipment;the foreign exchange costs are estimated at US$120.0 million and will referto imported equipment. Local costs will be financed by CORELCA and fromthe National Budget.

Disbursements

(in US$ million)

1978 1979 1980 1981 1982 1983 Total

Local 2.25 7.45 12.25 5.50 2.20 0.35 30.00Foreign exchange 6.00 6.00 32.00 50.00 22.20 4.00 120.00

Total 8.25 13.45 44.25 55.50 24.20 4.35 150.00

VIII. STATUS:

Studies Feasibility and design studies are beingcarried out by consultants and are expected tu be completed in late 1977.

Steps required for obtaining Project has not yet been presented to NPD,financing

Page 121: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (11)Page 1 of 2

I. NAME OF PROJECT: Cauca River Regulation(Salvajina Power Plant)

II. EXECUTING AGENCY: CVC

III. TOTAL ESTIMATED COST: US$301.1 million

IV. EXTERNAL FINANCING REQUESTED: US$121.5 million

V. LENDING AGENCY: Governmentof Japan & IDB

VI. DESCRIPTION AND JUSTIFICATION: The objective of the project is to:

a) control the periodic flooding of the Cauca river;

b) drain an agricultural area of 100,000 hectares in the Cauca and Risa-ralda valleys; and

c) make use of the electric power resources of the river. The projectinvolves the construction of a dam at Salvajina, drainage canals andpumping stations, a power plant with a capacity of 180 MW and atransmission line to Pance. The project will bring about a reduc-tion in crop losses due to floods, and an increase in power generatingcapacity.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Costs have been estimated as follows:

Local Foreign Exchange

Initial works 6.0 -Civil works 48.5 68.5Equipment 26.5 53.0Land rehabilitation 98.6 -

Total 179.6 121.5

Local costs for the electric power component will be financed by CVC; forthe agricultural component,they will be financed by the beneficiaries andthe Fondo Financiero Agropecuario.

Page 122: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (11)Page 2 of 2

VIII. STATUS:

Studies Feasibility and design studies have beencompleted and are under review.

Steps required for obtaining Project is under NPD review.financing

Page 123: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (12)Page 1 of 2

I. NAME OF PROJECT: Mesitas Power Project

II. EXECUTING AGENCY: EEEB

III. TOTAL ESTIMATED COST: US$150.0 million

IV. EXTERNAL FINANCING REQUESTED: US$94.7 million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The project will utilize a fall with ahead of 1920 meters between the Mufla reservoir and 2 kms. downstream fromthe existing Dario Valencia power plant. The project consists of twopower plants: El Paraiso of 230 KW and La Guaca of 290 KW; tunnels;andan additional pumping station, in MufIa, to transfer 35 cubic meters persecond from the Bogota river to the Mufna reservoir.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing- Total costs have been estimated as follows:

(in US$ million)

Local Foreign exchange

Civil works 16.4 35.5Equipment 21.1 45.5Engineering and

Administration 17.8 13.7

Total 55.3 94.7

Disbursements

(in US$ million)

1978 1979 1980 1981 1982 Total

Local 1.7 10.7 11.7 15.9 15.3 55.3Foreign exchange 0.1 10.7 15.4 49.0 19.5 94.7

Total 1.8 21.4 27.1 64.9 34.8 150.0

Page 124: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (12)Page 2 of 2

VIII. STATUS:

Studies Feasibility studies have been completed.Design studies to be carried out by consultants, have been almost com-pleted.

Steps required for obtaining Preliminary NPD approval has been given.financing

Page 125: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (13)

I. NAME OF PROJECT: Equipment for Chivor II Power Plant

II. EXECUTING AGENCY: ISA

III. TOTAL ESTIMATED COST: US$30.0 million

IV. EXTERNAL FINANCING REQUESTED: US$30.0 million

V. LENDING AGENCY: Suppliers

VI. DESCRIPTION AND JUSTIFICATION: The Chivor power project is scheduled tobe executed in two stages: the first stage will be in operation in thefirst semester of 1977. The second stage consists of the construction oftwo tunnels, and the installation of four additional 125 MW generatingunits, to give a total installed capacity of 1000 MW.

VII. COSTS AND AVAILABILITY OF FUNDS: Details are not yet available

VIII. STATUS:

Studies Design studies are being carried out byISA.

Steps required for obtaining Preliminary NPD approval has been given.financing

Page 126: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (14)Page 1 of 2

I. NAKE OF PROJECT: Earthquake-Proof Strengthening of theSesquile Dam.

II, EXECUTING AGENCY: EEEB

III. TOTAL ESTIMATED COST: US$6.06 million

IV. EXTERNAL FINANCING REQUESTED: US$3.60 million

V, LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The recent development in soil mechanicsand sismology, make it possible to improve the seismic characteristics ofthe dam. The proposed works, in addition to giving greater seismic pro-tection, will permit an eventual increase in the water storage capacityof the Tomine reservoir by 200 million cubic meters.

VII, COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Costs have been estimated as follows:

(In US$ million)

Local Foreign Exchange

Civil works 1.10 2.06Equipment 0.64 1.19Engineering and Administration 0.49 0.01Contingencies 0,23 0e34

Total 2,46 3,60

Local costs will be financed by EEEB.

Disbursements

(In US$ million)

1978 1979 1980 1981 Total

Local 010 1,39 0.70 0.27 2,46Foreign exchange 0.04 2.10 1,06 0.40 3,60

Total 0,14 3X49 1.76 0 67 6,06

Page 127: List of Projects for External Financing 1977-1979 Colombia

1978 Project LirtPower (14)Page 2 of 2

VIII. STATUS:

Studies Feasibility studies have been completed.Design studies have been partially completed.

Steps required for obtaining Preliminary NPD approval has been given.financing

Page 128: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (15)

I. NAME OF PROJECT: Data Processing Center

II. EXECUTING AGENCY: EEEB

III. TOTAL ESTIMATED COST: US$2.5

IV. EXTERNAL FINANCING REQUESTED: US$2.1

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The center will take over the processingof accounting, statistics, personnel data, material and equipmentinventories, and other miscellaneous functions.

COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing. Costs have been estimated as follows:

( In US$ million )Foreign

Local Exchange

Civil Works 0.03 -Equipment 0.06 1.95Technical Assistance 0.05 -Engineering and Administration 0.21 -Contingencies 0.01 0.19

Total 0.36 2.14

Local costs will be financed by EEEBO

Disbursements( In US$ million )

1978 1979 1980 1981 1982 Total

Local 009 0.09 0.06 0.06 0.06 0.36ForeignExchange 0.51 0.43 0,40 0.40 0.40 2J4

Total 0.60 0.52 0X46 0.46 0.46 2.50

STATUSStudies. Feasibility studies have beencompleted. Design studies will be carried out,

Steps required for obtaining Preliminary NPD approval has been given.

Page 129: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (16)

I NAME OF PROJECT: Electrification Program for Antioquia

II. EXECUTING AGENCY: ICEL - Electrificadora de Antioquia

III. TOTAL ESTIMATED COST: US$6.7 million

IV. EXTERNAL FINANCING REQUESTED: US$4.0 million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The objective of the project is to comple-ment the electrification of Urabg and to provide electric infrastructurein the west of Antioquia and the lower Magdalena river area. The projectinvolves design studies, acquisition of equipment and the construction oftransmission and distribution facilities for this part of the country.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Local costs are US$2.7 million, of whichUS$0.6 million are-for civil works, US$0.4 million for installation andUS$1.7 million for equipment. Foreign exchange costs are US$4.0 million,mostly for equipment. Local costs will be financed from the NationalBudget and with a loan from the Antioquia Development Institute.

Disbursements

(in US$ million)

1977 1978 1979 Total

Local 0.9 0.9 0.9 2.7Foreign exchange 1.8 1.0 1.2 4.0

Total 2.7 1.9 2.1 6.7

VIII. STATUS:

Studies Feasibility studies are complete.

Steps required for obtaining Project is under NPD review. Biddingfinancing documents are under preparation.

Page 130: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (17.)Page 1 of 2

I. NAME OF PROJECT: San Carlos II and Jaguas Power Plant

II. EXECUTING AGENCY: ISA

III. TOTAL ESTIMATED COST: US$470.0 million

IV, EXTERNAL FINANCING REQUESTED: US$280.0 million

V. LENDING AGENCY: Not yet defined

V:I, DESCRIPTION AND JUSTIFICATION: The Jaguas project is located about 30kms. downstream from the Santa Rita dam, and is part of the hydroelectricdevelopment of the eastern part: of the Department of Antioquia. The powerplant will utilize water from the Nare river, which will be diverted tothe Guatape river basin upstream of the San Carlos dam. The dam will beon the Nare river. It will have a height of 52 mts. and the reservoirwill hold 220 million cubic meters of water. The underground power housewill be equipped with a 120 MW Francis type unit. To use the additionalwater flow from Jagua, the San Carlos I power plant will be equipped withsix additional units with a total capacity of 930 KW.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Costs are estimated as follows:

(In US$ million)

JAGUAS Local Costs Foreign ExchangeCosts

Civil works 41.0 55.3Equipment 7.0 26.5Engineering and Administration 7.9 1.5Contingencies 4.1 6.7

60.0 90.0

SAN CARLOS II

Civil works 55.0 63.1Equipment 50.0 114.0Engineering and AdministratioII 20.5 2.9Contingencies 4.5 10.0

130.0 190.0

Local costs will be financed by ISA shareholders.

Page 131: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (17)Page 2 of 2

Disbursements

JAGUAS 1978 1979 1980 1981 1982 1983 Total

Local 1.1 6.1 9.6 16.0 19.6 7.6 60.0Foreign exchange 0.2 8.0 22.4 24.0 26.2 9.2 90o0

Total 1.3 14e1 32.0 40.0 45.8 16.8 150.0

SAN CARLOS II

Local 5.4 6,7 13.4 32.5 41.5 30.5 130.0Foreign-exchange 18.3 15.7 44.4 44.0 35.4 32.2 190.0

Total 23.7 22.4 57.8 76.5 76.9 62.7 320 0

VIII. STATUS: -~

Studies Feasibility studies have been completed.

Steps required for obtaining Project is under NPD review.financing

Page 132: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPower (18)

I. NAME OF PROJECT: Emergency Mobile Power Plants

II. EXECUTING AGENCY: ICEL

III. TOTAL ESTIMATED COST: US$2.8 million

IV. EXTERNAL FINANCING REQUESTED: US$2.0 million

V. LENDING AGENCY: Suppliers

I.Tj DESCRIPTION AND JUSTIFICATION: Acquisition of spare parts for dieselsplants, located in isolated locations.

VII. COSTS AND AVAILABILITY OF FUNDS: Local costs will be financed from theNational Budget and from internally generated funds.

VIII. STATUS: Preliminary NPD approval has been given,

Page 133: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListTransportation (1)

I. NAME OF PROJECT: Airports

II. EXECUTING AGENCY: DAAC - FAN

III. TOTAL ESTIMATED COST: US$93.3 million

IV. EXTERNAL FINANCING REQUESTED: US$56.0 million

V. LENDING AGENCY: World Bank

VI. DESCRIPTION AND JUSTIFICATION: The project involves:

a) the construction of a new airport for Medellin to be located atRionegro;

b) improvements to the runway, taxiways, aprons,afreight and passengerterminals at the BogotA airport;

c) the construction of a new apron, taxiways, access road, a car parkingarea and water supply for the Barranquilla airport;

d) improvements to the taxiway, apron, access roads, the car parkingarea, drainage facilities and an extension of the existing runway atthe Cartagena airport; and

e) a study of a second runway for Bogota, and a general transport studyfor Eastern Colombia.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Local costs are estimated at US$37.3million and will be financed from the National Budget.

VIII. STATUS

Studies Feasibility studies for Barranquilla havebeen completed. Studies for Medellin and Cartagena are being carried outby consultants. Studies for Bogota have been completed but require updating.

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 134: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListWater Supply andSewerage (1)

I. NAME OF PROJECT: Expansion of the Water Supply andSewerage System in Bogota

II. EXECUTING AGENCY: EAAB

III. TOTAL ESTIMATED COST: US$49.4 million

IV. EXTERNAL FINANCING REQUESTED: US$29.0 million

V. LENDING AGENCY: not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The project consists of the expansionof water supply and sewerage services for Bogota in line with theMaster Plan for the city. The project contemplates the constructionof sewerage works, rain-water canals, storage pools to improve drainagefacilities in the city, and the installation of water supply pipes tomeet demand until 1981. It includes the provision of water supply andsewerage to recently developed areas.

VIIo COSTS AND AVAILABILITY OF FUNDS:

Costs The total cost is US$49.4 million ofwhich only a small portion, not yet estimated, consists of foreignexchange costs.

Disbursements

1978 1979 1980 1981 Total

Master Plan 4.4 4.4 4.3 -- 13.1Water supply pipes 0.2 0.7 0.4 0.3 1.6Recently developped

areas 8.7 8.7 8.7 8.6 34.7

Total 13.3 13.8 13.4 8.9 49.4

VIII. STATUS:

Studies Design studies are being carried out.

Steps required for obtainingfinancing Approved by the NPD.

Page 135: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListWater Supply andSewerage (2)Page 1 of 2

I. NAME OF PROJECT: Expansion of the Water Supply andSewerage System in Medellin

II. EXECUTING AGENCY: EPM

III. TOTAL ESTIMATED COST: US$13.0 million

IV. EXTERNAL FINANCING REQUESTED: US$6.7 million

V. LENDING AGENCY: IDB

VI. DESCRIPTION AND JUSTIFICATION: The water supply component of the projectcomprises:

a) the. utilization of water from the Buey River by means of the construc-tion of a dam and of a 2.1 kilometer diversion tunnel to carry waterto the Piedras River;

b) a water reservoir;

c) additional pumping stations for the Piedras River;

d) optimization of the Ayura water treatment plant;

e) expansion of the water distribution system for Medellin.

The sewerage component comprises:

a) pollution control for the water sources of Medellin;

b) expansion of the sewerage system of Medellin

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs

Local costs Foreign costs Total

Buey river works 3.80 6.20 10.00Distribution system 1.80 0.20 2.00La Fe water reservoir 0.35 0.15 0.50La Mosca pumping station 0.35 0.15 0.50

Total 6.30 6.ZO 13.00

Page 136: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListWater Supply andSewerage (2)Page 2 of 2

Financing and Disbursements

1978 1979 1980 1981 1982 Total

IDB loan - 0.3 1.9 3.20 1.30 6.7Local resources 1.2 1.0 1.0 1.90 1.20 6.3

Total 1.2 1.3 2.9 5.10 2.50 13.0

VIII. STATUS:

Studies Feasibility studies have been completed.Design studies will be contracted in 1977.

Steps required for obtainingfinancing Approved by the NPD.

Page 137: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListWater Supply andSewerage (3)Page 1 of 2

I. NAME OF PROJECT: National Program for Water Supply andSolid Waste Disposal

II. EXECUTING AGENCY: INSFOPAL

Ill1 TOTAL ESTIMATED COST: US$23.1 million

IV. EXTERNAL FINANCING REQUESTED: US$12.4 million

V. LENDING AGENCY: CIDA

VI. DESCRIPTION AND JUSTIFICATION: The water component of this projectcomprises the execution of water supply and sewerage works in 29 areas,benefitting 40 cities. The city populations range from 25,000 to 106,00,for a total of 877,000 people. The cities chosen have a high rate ofgrowth, on average 4.3% per year, and in many cases the water now suppliedto them is of poor quality.

The solid waste disposal component willbenefit the same cities. The street cleaning coverage in these citiesranges from 2% to 86% and the garbage collection coverage from'20% to95%. The program aims to achieve garbage collection coverage of not lessthan 90% in each city, and a street cleaning coverage of 100% for pavedstreets.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs

Local Costs Foreign exchange Totalcosts

Water supply 12,16 0.64 12.80Solid waste 1.00 9.26 10.26

Total 13e16 9.90 23.06

Financing and Disbursements

1978 1979 1980 Total

Local CIDA Local CIDA Local CIDA Local CIDA

Water supply 2.00 2.00 2A40 2.40 2.00 2.00 6,40 6.40Solid waste 1.36 4.64 2.40 1,36 0,50 - 4.26 6.00

Total 3.36 6.64 4,80 3.76 2.50 2.00 10,66 12.40

Page 138: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListWater Supply andSewerage (3)Page 2 of 2

VIII. STATUS:

Studies Feasibility studies have been completed.For the water supply component, design studies have been completed for19 subprojects, in five cases they are being prepared, and they have yetto be started in the remaining five cases. For the solid waste disposalcomponent, the design studies will be carried out in 1977.

Steps required for obtainingfinancing The NPD has given its preliminary approval.

Page 139: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListWater Supply andSewerage (5)Page 1 of 2

I. NAME OF PROJECT: Expansion of the Water Supply andSewerage Master Plan in Cali

II. EXECUTING AGENCY: EMCALI

III. TOTAL ESTIMATED COST: US$45.0 million

IV. EXTERNAL FINANCING REQUESTED: US$15.0 million

V. LENDING AGENCY: World Bank

VI. DESCRIPTION AND JUSTIFICATION: The project consists on the expansion ofthe water supply and sewerage master plan and in the protection of watersources.

The project involves the construction ofa sewage collector to deliver sewage downstream to the water treatmentplant, a rain water interceptor in the upper part of the city and anotherin the lower part, close to the Cali river, and the expansion of the city'ssewerage network.

The project also contemplates works forthe improvement of the storage and distribution of water for the city, aswell as the extension of the system to Yumbo, and its industrial sector.

These works will: a) meet the demandof Cali for water supply and sewerage facilities until 1985; b) avoid theperiodic flooding of the lower section of the city; and c) improve sanitaryconditions in Cali and Yumbo.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing The total cost of the project is US$47.8million. The foreign exchange component is US$15.0 million

Disbursement

(In US$ million)

1978 1979 1980 1981 Total

World Bank 503 405 3.0 2.2 15e0EMCALI and

National Government 11.6 9.8 6,6 4.8 32.8

Total 16.9 14.3 9.6 7,0 47.8

Page 140: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListWater Supply andSewerage (5)Page 2 of 2

VIII, STATUS:

Studies Feasibility and design studies have beencompleted.

Steps required for obtaining The NPD is reviewing the project. Thefinancing World Bank has completed its evaluation

of the project.

Page 141: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListWater Supply andSewerage (6)

I. NAME OF PROJECT: Water Supply and Sewerage forIntermediate and Small Cities

IIo EXECUTING AGENCY: INSFOPAL

III. TOTAL ESTIMATED COST: US$40.0 million

IV. EXTERNAL FINANCING REQUESTED: US$20.0 million

V. LENDING AGENCY: IDB

VI. DESCRIPTION AND JUSTIFICATION: The project consists of the installationof water supply and sewerage works in approximately 150 towns, withpopulation ranging from 5,000 to 50,000 inhabitants, Furthermore, theproject includes water supply works in Barrancabermeja, Sogamoso, Duitamaand Girardot, and sewerage works in Tunja, Duitama and Cartago.

VII, COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Estimated costs are as follows:

Local IDB Total

Water Supply and Seweragefor Small Cities 17.2 17.2 34.4

Other Cities' Works 2.8 2.8 5.6

Total 20.0 20.0 40.0

Disbursements The execution of the project is estimatedto take four years, starting in 1978.

VIII. STATUS:

Studies Design studies have been completed forapproximately 50 of the smaller towns. Studies for Barrancabermeja,Sogamoso, Tunja and Cartago have been completed. Design studies forDuitama are being prepared. Studies for Girardot will be carried out.

Steps required for obtaining Preliminary NPD approval has been given.financing

Page 142: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListNutrition andHealth (1)

I. NAME OF PROJECT: Hospital Equipment

II. EXECUTING AGENCY: Ministry of Health

III. TOTAL ESTIMATED COST: US$2.5 million

IV. EXTERNAL FINANCING REQUESTED: US$2.5 million

V. LENDING AGENCY: Government of Belgium

VI. DESCRIPTION AND JUSTIFICATION: Acquisition of equipment for the steamsterilization of instruments and for automatic X-ray developping.Equipment will be distributed through the country.

VII. COSTS AND AVAILABILITY OF FUNDS: Not yet available.

VIII. STATUS: Studies completed.

Page 143: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListAgriculture (1)

L. NAME OF PROJECT: Valledupar I Agricultural Development

II. EYECUTING AGENCY: INCORA

Ill. TOTAL ESTIMATED COST: US$14.0 million

IV. EXTERNAL FINANCING REQUESTED: US$10.0 million

V. LENDING AGENCY: Not yet dcfined

VI. DESCRIPTION AND JUSTIFICATION: The project involves irrigation worksand agrarian reform in 12,000 ha. around the city of Valledupar.The project involves the construction of a diversion dE-' on theGuatapuri river to provide 80 percent of water requirements. andthe drilling of 40 deep wells to provide the remainder. The projectwill increase production in the area, reduce imports and result ina better distribution of income; the economic rate of return has beencalculated at 18 percent.

VII. COSTS AND AVAILABILITY OF FUNDS:Details are not yet available. Localcosts are estimated at US$8.0 million.

VIII. STATUSStudies. Feasibility studies were completed in1972. HIMAT is updating the studies.

Steps required for obtaining Project is under NPD review.financing

Page 144: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListAgriculture (2)

I. NAME OF PROJECT: Agricultural Rehabilitation Program

II, EXECUTING AGENCY: INCORA - HIMAT

III. TOTAL ESTIMATED COST: US$60.0 million

IV, EXTERNAL FINANCING REQUESTED: US$30.0 million

V. LENDING AGENCY: World Bank - IDB

VI. DESCRIPTION AND JUSTIFICATION: The project complements the agriculturalrehabilitation projects initiated in the period 1960-70. The objectiveof the program is to increase agricultural production, by means of cropdiversification and the incorporation of new areas.

VII. COSTS AND AVAILABILITY OF FUNDS: Details are not yet available.

VIII. STATUS: Studies are available for some areas buthave yet to be carried out for others. A study has been contracted withconsultants to carry out an evaluation of feasibility studies for the 18INCORA irrigation districts and this study is expected to be completed byJune 1977.

Page 145: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListAgriculture (3)

I. NAME OF PROJECT: San Juan del Cesar AgriculturalRehabilitation

II. EXECUTING AGENCY: INCORA - HIMAT

IIIo TOTAL ESTIMATED COST: US$44.9 million

IV. EXTERNAL FINANCING REQUESTED: US$30.7 million

V. LENDING AGENCY: KfW

VI. DESCRIPTION AND JUSTIFICATION: The project is located in,the Baja Guaji-ra region, close to the Sierra Nevada de Santa Marta; it covers an areaof 11,210 has, of which 9,800 has, can be utilized, The project willprovide irrigation, drainage and roads in the area, with the objectiveof making intensive cultivation possible. The project area is dividedin two. The Southern area will be irrigated by a combination of surfacewaters from the Badillo river and underground water from 29 deep wells,The Nothern area will be irrigated with water from 17 deep wells. Theproject will result in a substantial increase in output and will have afavorable effect on income distribution in the region. It is estimatedthat the project will result in net exports of US$7.0 million per year,

VII. COSTS AND AVAILABILITY OF FUNDS:

Disbursements

(In US$ million)

1977 1978 1979 1980

Local 0,2 107 2,6 3,0Foreign exchange 0,4 2.9 5.0 7,0

Total 0.6 4,6 7e6 100

1981 1982 1983 Total

Local 3.6 1,7 1.4 14,2Foreign exchange 8.5 4.2 2,7 30.7

Total 1201 5,9 401 44.9

VIII. STATUS:

Studies Studies have been completed,

Steps required for obtaining Preliminary NPD approval has been given.financing Negotiations are under way,

Page 146: List of Projects for External Financing 1977-1979 Colombia

1978 Project List

Industry andMining (1)

I. NANE OF PROJECT: Exploration of Copper Resources in the

Antioquia and Choc6 Departments

II. EXECUTING AGENCY: Empresa Colombiana de Minas (ECOMINAS)

III. TOTAL ESTIMATED COST: US$10.0 million

IV. EXTERNAL FINANCING REQUESTED: US$5.0 million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: In order to develop the copper resourcesof the Choc6 and Antioquia, it will be necessary to continue exploratoryworks in order to define the reserves and to gather data for a feasibilitystudy. Colombia does not at present produce copper in significant quan-tities and all of its requirements in the form of wire, bars,ingots andsemiprocessed items are imported.

VII, COSTS AND AVAILABILITY OF FUNDS: Details not yet available

VIII. STATUS: In two places in the area concerned,potential reserves have already been estimated on the basis of availablegeological and geochemical data.

Steps reqiuired for obtaining Project has not yet been presented to NPD.

financing

Page 147: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListIndustry andMining (2)

I. NAME OF PROJECT: Cerrejon Coal

II. EXECUTING AGENCY: Carbones Colombianos

IIIo TOTAL ESTIMATED COST: US$150.0 million

IV. EXTERNAL FINANCING REQUESTED: US$75.0 million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: In order to promote the development ofthe local resources of the Guajira, a program has been designed to fa-cilitate an annual coal output of 5.0 million metric tons. This deve-lopment is not only consistent with the exploitation of natural resourcesbut also represents an important source of foreign exchange and employmentgeneration.

VII. COSTS AND AVAILABILITY OF FUNDS: Details not yet available.

VIII. STATUS: The extent of the reserves are now beingdefined and feasibility studies are under way. Once this phase has beencompleted, investments for transport and port facilities will be needed.

The project has not yet been presented to the NPD,

Page 148: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListUrban and RegionalDevelopment (1)Page 1 of 2

I. NAME OF PROJECT: Cartagena-Baru Tourism

[I. EXECUTING AGENCY: Corporaci6n Nacional de Turismo

III. TOTAL ESTIMATED COST: US$48.6 million

IV. EXTERNAL FINANCING REQUESTED: SU$20.0 million

V. LENDING AGENCY: World Bank

VI. DESCRIPTION AND JUSTIFICATION: The project consists of:

a) Hotels: Hotel development in the area of Mohan beach and Porto Naoon Bar6, comprising a total of 1900 rooms in four and five starhotels. The major part of this development will be undertaken bythe private sector.

b) Internal Infrastructure: This includes: roads; bridges over theCanal del Dique; urban infrastructure; a water supply system; distri-bution and transmission lines for electric power; a telephone exchan-ge; drainage; environmental protection; infrastructure improvementsin the communities of Pasacaballos, Santa Ana and Bar'u, and the cons-truction of a hotel training school.

c) External Infrastructure: In and around the city of Cartagena anumber of public works will be undertaken including improvements tothe airport, improvements in access roads and bridges leading to theairport; deepening of the canals and lagoons, beach protection works,the regulation of the Boquilla and remodelling and restoration worksin the historic area.

The project is designed to encourage theflow of international tourists given which the project would producesubstantial benefits in terms of foreign exchange earnings, job creationand national and regional incomes.

VII. COSTS AND AVAILABILITY OF FUNDS

Disbursements(In US$ million )

1978 1979 1980 1981 1982 TOTAL

Local 6.0 9.2 8.3 4.1 1.0 28.6Foreign Exchange 4.2 6.4 5.8 2.8 0.8 20.0

Total 10.2 15.6 14.1 6.9 1.8 48.6

VIII. STATUSStudies. Studies have been completed.

Page 149: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListUrban and RegionalDevelopment (1)Page 2 of 2

Steps required for obtaining Preliminary NPD approval has been given.financing Project pending until basic issues resolved.

Page 150: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListUrban and RegionalDevelopment (2)

I. NAME OF PROJECT: Santa Marta and San Andres Tourism

II. EXECUTING AGENCY: Corporacion Nacional de Turismo

III. TOTAL ESTIMATED COST: US$34.8 million

IV. EXTERNAL FINANCING REQUESTED: US$17.0 million

V. LENDING AGENCY: IDB

VI. DESCRIPTION AND JUSTIFICATION: The project involves the construction ofinfrastructure in the tourism centers of Santa Marta and San Andres. Anincrease in the hotel capacity of 2600 rooms is foreseen in Santa Martain the area of Pozos Colorados. It is expected that the first stage,involving 1300 rooms will be completed by 1982. In addition, publicservices ( water supply and drainage, the communication system and thegarbage collection and disposal system) will be expanded in Santa Martaand that improvements will also be made in the settement of Gaira.

In San Andres, existing conditions willbe improved through the expansion of the water supply and drainage system,the development of a garbage collection system and the improvement ofthe beaches. It is expected there will be an increase in the number ofhotel rooms at the beaches of Sardinas, San Luis and the nothern part ofPunta Hansa.

In addition to the benefits which willbe derived from the generation of employment and increased earnings fromtourism, it will be possible to bring about an improvement in livingconditions through better public services and better facilities forhealth care, recreation and education.

VII. COSTS AND AVAILABILITY OF FUNDS

Disbursements( In US$ million )

1978 1979 1980 1981 1982 TOTAL

Local 2.7 5.1 5.3 3.4 1.3 17.8Foreign Exchange 2.2 5.0 5.2 3.4 1.2 17.0

Total 4.9 10.1 10.5 6.8 2.5 34.8

VIII. STATUSStudies. Feasibility studies have beencompleted. Design studies partially completed.

Steps required for obtaining Preliminary NPD approval has been given.financing

Page 151: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListUrban and RegionalDevelopment (3)

IQ NAME OF PROJECT: Regional Development of Old Caldas

II. EXECUTING AGENCIES: ICT, ICCE, Creditario, ICA, INDERENA.

III. TOTAL ESTIMATED COST: US$100.0 million

IV. EXTERNAL FINANCING REQUESTED: US$50.0 million

VO LENDING AGENCY: World Bank

VI. DESCRIPTION AND JUSTIFICATION: Regional and urban policy involves thespatial harmonization and integration of sectoral policies designed toachieve a more equitable disteibution of the benefits of growth and theincreased efficiency of the economy as a whole. With this in mind, aprogram has been drawn up designed to improve the infrastructure of theOld Caldas region. This includes several components (water supply, drai-nage and roads) to meet existing deficiencies and also provides for bettersocial services (education, health and social organization).

The execution of the program will implythe rationalization of urban development and a resolution of the problemof marginal areas in terms of the provision of improved services andpopulation distribution.

VII, COSTS AND AVAILABILITY OF FUNDS: On the basis of preliminary estimates,the program would be partly financed with external resources and partlywith domestic resources from the National Budget and with local resourcesfrom the Department and cities involved.

VIII. STATUS: An analysis of the region has beencompleted and preliminary steps have been taken to co-ordinate theagencies which would participate in the program. Project is under NPDreview.

Page 152: List of Projects for External Financing 1977-1979 Colombia

1978 Project ListPre-Investment (1)

I. NAME OF PROJECT: Pre-Investment Studies

II. EXECUTING AGENCY: FONADE

III. TOTAL ESTIMATED COST: US$20.0 million

IV. EXTERNAL FINANCING REQUESTED: US$10.0 million

V. LENDING AGENCY: IDB

VI. DESCRIPTION AND JUSTIFICATION: The project will consist of pre-investment studies and project administration programs now being carried outby FONADE. The project includes the following studies:

a) studies to determine the technical and economic feasibility ofprojects;

b) post-feasibility studies;

c) sectorial pre-feasibility studies; and

d) general studies to identify projects or programs

VII. COSTS AND AVAILABILITY OF FUNDS: Details not yet available

VIII. STATUS:

Studies The project is now being prepared.

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 153: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListPower (1)Page 1 of 2

I. NAME OF PROJECT: Expansion of Transmission Facilities

II. EXECUTING AGENCY: ISA

III. TOTAL ESTIMATED COST: US$37.0 million

IV. EXTERNAL FINANCING REQUESTED: US$27.5 million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The project consists in the constructionof two 220 KV transmission lines, one from the Esmeralda sub-station nearManizales to the transmission system of CVC, the other from the San CarlosPower Plant to the transmission system of EPM. These lines will facilitatethe strengthening of the interconnected system and will permit the flow ofenergy from the new power plants to the markets served by the NationalInterconnected System.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Costs are estimated as follows:

(in US$ million)

Local Costs Foreign ExchangeCosts

Estimated cost 7.5 17.4Escalation 2.0 501Financial costs - 5.0

Total 9.5 27.5

The local component would be financed from contributions by partners of ISA.

Disbursements

(in US$ million)

1979 1980 1981 1982 1983 Total

Local 0.81 2.51 2.60 2.65 0.93 9.5Foreign 0.86 5A44 8.04 8.94 4.22 27.5

Total 1.67 7,95 10.64 11,59 5.15 37.0

Page 154: List of Projects for External Financing 1977-1979 Colombia

1979 Project List

Power (1)Page 2 of 2

VIII. STATUS:

Studies: Design studies are being carried out.

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 155: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListPower (2)Page 1 of 2

I. NAME OF PROJECT: Betania Power Project

II. EXECUTING AGENCY: ISA

III. TOTAL ESTIMATED COST: US$310 0 0 million

IV. EXTERNAL FINANCING REQUESTED: US$190.0 million

V. LENDING AGENCY: Not yet defined

DESCRIPTION AND JUSTIFICATION: The project is located on the MagdalenaRiver, about 30 kms. south of Neiva. The works to be carried out comprisean 80 meter dam which will create a reservoir of 1042 million of cubicmeters and a surface power house which will initially contain threegenerating units of 206 MW each, for a total of 618 MW. The power plantwill be interconnected to the CVC system by a double circuit, 220 KWtransmission line.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Costs are estimated as follows:

(in US$ million)

Local Costs Foreign ExchangeCosts

Civil works 63.6 87.4Equipment 24.0 60.8Engineering &

Administration 18.0 19.0Contingencies 14.4 22.8

Total 120.0 190.0

These costs exclude escalation. Local costs will be financed by theshareholders of ISA.

Disbursements

1979 1980 1981 1982 1983 1984 1985 Total

Local 4.8 7.8 210 28.2 30.0 18.0 10.8 120.0Foreign Exchange 7.6 1701 45.4 42.5 36.8 28,3 1203 190.0

Total 12.4 24.3 66.4 70.7 66,8 46,3 23.1 310,0

Page 156: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListPower (2)Page 2 of 2

VIII. STATUS

Studies Feasibility studies have been completed.Design studies are being carried out.

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 157: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListPower (3)

I. NAME OF PROJECT: Expansion of Medellin Transmissionand Distribution System

II* EXECUTING AGENCY: EPM

III. TOTAL ESTIMATED COST: US$7.84 million

IV. EXTERNAL FINANCING REQUESTED: US$5.90

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The project involves the expansion ofthe capacity of the transmission and distribution system in seven 110 KVMedellIn substations through the installation of seven transformers andrelated equipment.

VIIo COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing

(in US$ million)

Local Foreign Exchange

Sub-stations 0.67 3.22Distribution 1.27 2.68

Total 1.94 5.90

Local costs will be financed by EPM

Disbursements

1979 1980 1981 1982 Total

Local 0.34 0.60 0.60 0,40 1.94Foreign Exchange 1e30 2o00 1o40 1o20 5.90

Total 1.64 2,60 2,00 1,60 7.84

VIII, STATUS

Studies Feasibility studies have been complet3d.Design studies are to be carried out.

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 158: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListPower (4)

I. NA!E OF PROJECT: Expansion of Rural DistributionSystem

II. EXECUTING AGENCY: EEEB

III. TOTAL ESTIMATED COST: US$21.23 million

IV. EXTERNAL FINANCING REQUESTED: US$ 6.93 million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The project involves the constructionof 133 kms. of 3405 KV transmission lines; substations with a totaltransforming capacity of 42 MVA; 1461 kms. of primary distributioncircuits; the installation of 5200 distribution transformers and23,230 meters and 2520 street lighting posts. The project will meetthe increase in demand in rural areas served by EEEB.

VIIo COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Local costs are estimated at US$14.3million; foreign exchange costs at US$6.93 million. Local costs willbe financed by EEEB.

Disbursements

1979 1980 1981 1982 Total

Local 4.90 3.10 3.10 3,20 14.30Foreign Exchange 2,60 1,31 1,42 1,60 6,93

Total 7.50 4.41 4.52 4.80 21.23

VIII. STATUS

Studies Feasibility studies have been completed.Design studies will be carried out by EEEB during the execution of theproject.

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 159: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListPower (5)

I. NAME OF PROJECT: Expansion of Power Distribution Systemin Rural Cundinamarca

II. EXECUTING AGENCY: EEEB

III. TOTAL ESTIMATED COST: US$25.04 million

IV. EXTERNAL FINANCING REQUEST-ED: US$7.58 million

V. LENDING AGENCY: EEEB

VI. DESCRIPTION AND JUSTIFICATION: The project involves the construction of85 Kms of 34.5 KV sub-transmission lines, 845 Kms of primary circuits and950 Kns of secondary circuits; the installation of 35,5 MVA in transfercapacity, and the installation of 3400 distribution transformers. Theproject will supply energy to 16,590 new beneficiaries and will result inthe installation of 2550 street lighting posts. The rural areas of Cundi.-namarca are presently served by the Electrificadora de Cundinamarca, whichis expected to be merged into EEEB.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Local costs are estimated at US$17.46million and foreign exchange costs at US$7.58 million. Local costs will.be financed by EEEBO

Disbursements

(in US$ million)

1979 1980 1981 1982 Total

Local 4.82 4.40 3,34 4,90 17.46Foreign Exchange 2,40 1.70 1.38 2.10 7.58

7.22 6.10 4.72 7.00 25.04

VIII. STATUS

Studies Feasibility studies are being carriedout by EEEB.

Steps required for obtaining Project has not yet been presented to V'D,financing

Page 160: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListPower (6)

I. NAME OF PROJECT: Magdalena-Cesar-Guajira Electrification

II. EXECUTING AGENCY: CORELCA

III. TOTAL ESTIMATED COST: US$20.3 million

IV. EXTERNAL FINANCING REQUESTED: US$6.1 million

V. LENDING AGENCY: Suppliers

VI. DESCRIPTION AND JUSTIFICATION: The project will supply electric powerto parts of the Magdalena, Cesar and Guajira Departments by means of theconstruction of appropriate infrastructure, which will be served by theSabanalarga-Fundaci6n-Valledupar transmission line, and other lines fromthe departments of Bolivar and Norte de Santander. The project willpermit the replacement of existing, high cost, diesel units. The worksto be carried out consist of the construction of distribution systems for80 towns, 140 kms. of high voltage transmission lines, 1330 Kms. of sub-trasmission lines and 25 substations with a capacity of 97 MW.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Local costs are estimated at US$14.2million; foreign exchange costs at US$6.1 million. Local costs will befinanced from the National Budget.

Disbursements

1978 1979 1980 1981 Total

Local 0.3 5.0 6.2 2.7 14.2Foreign exchange - 2.5 2.8 0.8 6.1

Total 0.3 7.5 9.0 3.5 20.3

VIII. STATUS:

Studies Feasability studies have been completed.

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 161: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListPower (7)

I. NA,J!E OF PROJECT: Mocoa Power Plant

II. EXECiTTING AGENCY: ICEL

I-II, TOTAL ESTIMATED COST: US$5.0 million

IV. EXTERNAL FINANCING REQUESTED: US$2.3 million

V. LENDING AGENCY: Not yet defined

VI. DESCRTPTION AND JUSTIFI(ATION: The project consists of the design andconstruction of a 600 power plant on the Mocoa river to meet elecLricpower demand in the Inte.adency of Putumayo and in the south of the CaucaDepartment.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing. Local costs are estimated at US$2.7million and foreign exchange costs at US$2.3 million, Local costs willbe financed from the National Budget.

Disbursements

(in US$ million)

1979 1980 1981 1982 Total

Local 0.2 0.4 1.5 0.6 2.7Foreign Exchange _ _ 0.7 1.6 2.3

Total 0,2 0.4 2.2. 2.2 5.0

VIII. STATUS:

Studies Feasibility and design studies will becarried out by consultant in 1977/78,

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 162: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListPower (8)

I. NAME OF PROJECT: Expansion of Transformer Capacity

II. EXECUTING AGENCY: ISA

III. TOTAL ESTIMATED COST: US$10.6 million

IV. EXTERNAL FINANCING REQUESTED: US$9.5 million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The project involves the expansion ofthe substationsof the 220 KV interconnected transmission system, throughthe addition of 480 MVA of transformer capacity.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Local costs are estimated at US$1.1million; foreign costs, including a US$1.6 million financial charge,are estimated at US$9.5 million. Local costs will be financed by ISAshareholders.

Disbursements

(In US$ million)

1979 1980 1981 1982 Total

Local 0.2 0.3 0.3 0.3 1.1Foreign exchange 2.1 2.6 2.5 2.3 9.5

Total 2.3 2.9 2.8 2.6 10.6

VIII. STATUS:

Studies Feasibility studies are being carriedout.

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 163: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListPower (9)

I. NAME OF PROJECT: Expansion of Transmission System

1I. EXECU TING AGENCY: ICEL - Electrificadoras

III. TOTAL ESTIMATED COST: US$40.0 million

IV. EXTERNAL FINANCING REQUESTED: US$25.0 million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The project objective is to expand thetransmission system. servjing ICEL subsidiaries. The project involv'es theacquisition of eqtuipment and the construction of 400 kms. of 220 KV lines.and 600 khms of 11.5 KIt lines. Sub-projects will be located in the Depart-ments of Tolima, Hui.la, Choc6, Cauca, NariTho, Meta and the Intendency ofCaqueta.

VII7 COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Local costs are estimated at US$15.0million, of which US$4.5 are for civil works, US$2.5 million for insta-llation and US$8.0 million for equipment; the foreign exchange costs areestimnated at US$25.0 million most of which is for imported equipment.Local costs will be financed by the electrificadoras.

Disbursements

1977 1978 1979 1980 1981 1982 Total

Local 0.2 2.0 3.3 4.2 3.1 2.2 15.0Foreign exchange - 3.3 6.6 7.0 5.1 3.0 25.0

Total 0.2 5.3 9.9 11.2 8.2 5.2 40.0

VIII. STATUS:

Studies Feasibility studies to be carried out.

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 164: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListPower (10)Page 1 of 2

I. NAME OF PROJECT: San Carlos II and Jaguas Power Plant

II. EXECUTING AGENCY: ISA

III. TOTAL ESTIMATED COST: US $470.0 Million

IV. EXTERNAL FINANCING REQUESTED: US $280.0 Million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The Jaguas project is located about 30kms.downstream from the Santa Rita dam, and is part of the hydroelectricdevelopment of the eastern part of the Department of Antioquia. The powerplant will utilize water from the Nare river, which will be diverted tothe Guatape river basin upstream of the San Carlos dam. The dam will beon the Nar6 river. It will have a height of 52 mts. and the reservoirwill hold 220 million cubic meters of water. The underground powerhouse will be equipped with a 120 MW Francis type unit. To use theadditional water flow from Jagua, the San Carlos I power plant will beequipped with six additional units with a total capacity of 930 KW.

VIIo COSTS AND AVAILABILITY OF FUNDS

Costs and Financing Costs are estimated as follows:

(in US$ million)

JAGUAS Local Costs Foreign ExchangeCosts

Civil works 41.0 55.3Equipment 700 26.5Engineering and Administration 7,9 1.5Contingencies 4,1 6.7

60.0 90.0

SAN CARLOS II

Civil Works 55.0 63.1Equipment 50.0 114.0Engineering and Administrption 20,5 2.9Contingencies 4.5 10,0

130.0 190.0

Local costs will be financed by ISA shareholders,

Page 165: List of Projects for External Financing 1977-1979 Colombia

1979 Project Li stPower (10)Page 2 of 2

Disbursements

(in US$ million)

JAGUAS1978 1979 1980 1981 1982 1983 TOTAL

Local o1. 60 9.6 16.0 19.6 7.6 60.0Foreign Exchange 0,2 8,0 22.4 24.0 26.2 9.2 90.0

Total 103 14.1 32.0 40.0 4508 1608 150,0

SAIN CARLOS II

1978 1979 1980 1981 1982 1983 TOTAL

Local 5.4 6.7 13.4 32.5 41,5 30.5 130.0Forei,gn Exchange 18.3 15.7 44.4 44.0 35,4 3202 190,0

Total 23.7 22,4 57.8 76.5 76.9 62.7 320.0

VIII, STATUS

Studies: Feasibility studies have been completed..

Steps required for obtaining Project is under NPD review.f inancing,

Page 166: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListTransportation (1)

I. NAME OF PROJECT: Feeder Road Construction

II. EXECUTING AGENCY: National Feeder Roads Fund

III. TOTAL ESTIMATED COST: US$11.9 million

IV. EXTERNAL FINANCING REQUESTED: US$5.9 million

V. LENDING AGENCY: IDB

VI. DESCRIPTION AND JUSTIFICATION: The objective of the project is theconstruction of feeder roads which will complete the road networkthereby incorporating new areas in the national economy. The projectinvolves 283.3 kms of surfacing, 360.0 kms of drainage work, and 388.7kms of gravelling.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Local funds will be financed from theNational Feeder Roads Fund, which is made up of earmarked contributionsfrom the National Budget, and contributions from the departments andother entities.

VIII. STATUS:

Studies Design studies and economic justifi-cation studies have been completed. An additional study for the acqui-sition of road maintenance equipment is being prepared.

Steps required for obtaining Project not yet presented to NPDOfinancing

Page 167: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListTransportation (2)

1. NAME OF PROJECT: Railways Rehabilitation Plan

II. EXECUTING AGENCY: FNC

III. TOTAL ESTIMATED COST: US$32.0 million

IV. EXTERNAL FINANCING REQUESTED: US$18.0 million

V. LENDING AGENCY: World Bank

VI. DESCRIPTION AND JUSTIFICATION: The project involves the acquisition ofequipment and spare parts for the Railways, and improvements in theRailways infrastructure. This project is the second phase of works carriedout in 1973-1975 and its objective is to rehabilitate the main lines.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Local costs, amounting to US$14.0 million,will be financed from the National Budget.

VIII. STATUS:

Studies Feasibility studies have been partiallycompleted.

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 168: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListTransportation (3)

I. NAME OF PROJECT: Highway Construction

fI. EXECUTING AGENCY: MOPT - National Road Fund

lll. TOTAL ESTIMATED COST: US$273.1 million

IV. EXTERNAL FINANCING REQUESTED: US$136.6 million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The project involves the constructionof the following roads:

Pasto- Tumaco 275 Kms,Mocoa- Pasto 147Mocoa- Pitalito 135Timbio-El Estanquillo 74Pasto-Aeropuerto Cano 33Bel6n-Capitanejo 113Malaga- La Lejia 122Bosconia- El Carmen 156Chiquinquira- Barbosa 53Medellin- Turbo 356C6cuta - Ocaffa 210Rio Humea- Aguazul 142Sub-Total 1.816 Kms.

VII. COSTS AND AVAILABILITY OF FUNDS:Details are not yet available.Local costs will be financed from the National Budget.

VIII. STATUS:Studies. Design studies are being carried out.

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 169: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListWater Supply andSewerage (1)

I. NAME OF PROJECT: Water Supply and Sewerage for Interme-diate and Small Cities

II. EXECUTING AGENCY: INSFOPAL

III. TOTAL ESTIMATED COST: US$40.0 million

IV. EXTERNAL FINANCING REQUESTED: US$20.0 million

V. LENDING AGENCY: World Bank

VI. DESCRIPTION AND JUSTIFICATION: The project will be the third stage ofthe program and will improve the now deficient health conditions in anumber of cities and towns.

VII. COSTS AND AVAILABILITY OF FUNDS: Details are not yet available

VIII. STATUS:

S tudies INSFOPAL is carrying out studies toidentify the cities and towns which will be included.

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 170: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListWater Supply andSewerage Project(2)

I. NANE OF PROJECT: Bogota River Regulation

II. EXECUTING AGENCY: EAAB and CAR

III. TOTAL ESTIMATED COST: US$22.1 million

IV. EXTERNAL FINANCING REQUESTED: US$13.0 million

V. LENDING AGENCY: World Bank/IDB

VI. DESCRIPTION AND JUSTIFICATION: The Bogota River has to be deepenedand its course corrected and widened, between Juan Amarillo and Ali-cachin. This is to permit the construction of drainage works, sewagecollectors, rain water canals, and water storage pools which are neces-sary to assure adequate drainage for the urban area. The present waterlevels of the Bogota River do not permit adequate drainage by gravityfor some parts of the city, and the river capacity in some stretcheswill be insufficient to absorb discharge in future years.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs Total costs are estimated at US$22.1million. This amount does not include the cost of certain improvementsto the river which have not yet been estimated.

Disbursements (in US$ million)

1979 1980 1981 1982 TotalLocal andForeign exchange 7.1 6.1 4.5 4.4 22.1

VIII. STATUS:

Studies Most feasibility studies are completed.Other studies are being carried out. Design studies have yet to becontracted.

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 171: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListNutrition andHealth (1)

1. NAME OF PROJECT: Provision and Replacement of HospitalEquipment Second Phase

II, EXECUTING AGENCY: ICSS

III. TOTAL ESTIMATED COST: US$14.4 million

VI. EXTERNAL FINANCING REQUESTED: US$14.4 million (US$5.0 in 1977 andUS$9.4 in 1979)

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The project consists of equipping newhospitals and replacing equipment in existing hospitals to improve andexpand services. Surgical, laboratory, and dental equipment is expectedto be imported.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing All costs are foreign exchange costs.

Disbursement

1977 1978 1979 1980 TOTALLocal andForeign exchange 4.1 2.7 4.6 3.0 14.4

VIII. STATUS ICSS has been authorized to contractloans for US$5.0 million and is requesting authorization for the re-mainder. Local expenditures will be financed from ICSS funds. Projecthas not yet been presented to NPDo

Page 172: List of Projects for External Financing 1977-1979 Colombia
Page 173: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListAgriculture (1)

I 4. APE OF PROJECT: Sierra and Cienaga of Santa MartaDevelopment

ll. EXECUTING AGENCY: INDERENA

111, TOTAL ESTIMATED COST: US $30.0 million

Lx!, 3EXTERNAL FINA|NCNG REqUSTED US$15.0 million

V TLENDING AGENCY: World Bank

ri DESCRIPTION KMiD_JUSTIYIA' T'L-'N: The objective of the project Is c carryout social. and agrioJltural piograms to modify existing lansd use patternsa-Id to minimze t1ie negative impact on the environment for this purpose.The followin& actions will he carried out: agrarian refor-a, soil rehabili-t-ation and reclai.matiori, deve.lopment of social infrastructure, integratedcouimunity develop-ment, the necessary engineeri.ng works to achieve hydro-biological equailibrium in the Ciernaga de Santa Marta, organization of theuse of the Cienaga de Santa ntarta and implementation of an organizationfor the adeq-uate use of the resources of the Cienaga.

VII. COSTS AND AVAILABILITY OF FUNDS: Details are not yet available,

VIII. STATUS:

Studies Pre-feasibility- studies have been carriedout by the UNDP.

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 174: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListAgriculture (2)

I. NAME OF PROJECT: National Program for Industrial Refo-restation

II. EXECUTING AGENCY: Banco de la Rep6blica

III. TOTAL ESTIMATED COST: US$30.0 million

IV. EXTERNAL FINANCING REQUESTED: US$15.0 million

V. LENDING AGENCY: World Bank and IDB

VI. DESCRIPTION AND JUSTIFICATION: The objective of the project is theestablishment of:

a) 265,000 has. of coniferous forest to meet the needs for long fiberwood in the paper industry;

b) 75,000 has. of rapid growth forest to meet the needs of the construc-tion and other industries;

c) 27,000 has. of quality wood forest for the furniture industry. Theproject will prevent erosion and will replace imports.

VII. COSTS AND AVAILABILITY OF FUNDS: Details not yet available.

VIII. STATUS:

Studies Studies by The Corporaci6n Forestalde Antioquia have been completed. Studies concerning the reforestationof the Cauca and Cauca Valleys were contracted by the National PlanningDepartment in January 1976 and will be concluded by late 1977. The IDBwill provide technical assistance for the final design of the program.

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 175: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListAgriculture (3)

I. NAME OF PROJECT: Fisheries Development

II EXECUTING AGENCY: Not yet defined

III. TOTAL ESTIMATED COST: US$30.0 million

IV. EXTERNAL FINANCING REQUESTED: US$20.0 million

V. LENDING AGENCY: IDB

VI. DESCRIPTION AND JUSTIFICATION: The objective of the project is to es-tablish an investment plan to stimulate the integrated development ofindustrial and subsistence fishing. The project will help raise nutri-tional levels, generate employment and raise the living standards offishermen on the Atlantic and Pacific Coasts.

VII. COSTS AND AVAILABILITY OF FUNDS: Details are not yet available.

VIII. STATUS: Technical assistance has been requestedfrom the IDB. To achieve inter-institutional coordination,a committeehas been created, made up of representatives of the NPD, IFI, INDERENA,Ministry of Agriculture, the Ministry of Foreign Affairs and the Colom-bian Oceonographic Commission. Project has not yet been presented toNPD.

Page 176: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListIndustry andMining (1)Page 1 to 2

I. NAME OF PROJECT: Phosphate Industry

II. EXECUTING AGENCY: Empresa Colombiana de Minas (ECOMINAS)

III. TOTAL ESTIMATED COST: US$70.0 million

IV. EXTERNAL FINANCING REQUESTED: US$40.0 million

V. LENDING AGENCY: IDB

VI. DESCRIPTION AND JUSTIFICATION: The development of phosphates byECOMINAS has been planned as a solution to the problem facing Colombia inrespect of the supply of phosphoric fertilizers. It is intended to usedomestic phosphoric rock as the main material for producing sulphuricacid, phosphoric acid and superphosphates.

Supplying the domestic market for theseproducts will involve substituting for imports costing more than US$60million a year. It is also possible to envisage the export of surplusproduction.

This project will help develop the domes-tic fertilizer industry at a difficult time given the scarcity of rawmaterials and higher international prices.

VII. COSTS AND AVAILABILITY OF FUNDS:

Costs and Financing Once the feasibility studies have beencompleted it will be possible to define the costs and availability offunds with precision. Preliminary estimates are as follows:

(in US$ million)

1979 1980 1981 1982 Total

Foreign exchange 4.0 12.0 16.0 8.0 40.0Local 3.0 9.0 12.0 6.0 30.0

Total 7.0 21.0 28.0 14.0 70.0

VIIIo STATUS

Studies Pre-feasibility studies have beencompleted. The International Fertilizer Development Center is carryingout a study of the characteristics of the deposits at Pesca (Boyaca)and Sardinata (Norte de Santander) and have found that the Pesca depositsare suitable for the production of phosphoric acid. It is hoped to begina feasibility study concerning the industralization of phosphoric rock,financed by the IDB, during 1977.

Page 177: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListIrndustrv andMinirk (1)Page ' to 2

Steps reg ired for obta:_n Project has not yet been presented to NPD.financic.

Page 178: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListIndustry andMining (2)

I. NAME OF PROJECT: Exploration and Explotation ofRadioactive Minerals

II. EXECUTING AGENCY: Nuclear Affairs Institute

III. TOTAL ESTIMATED COST: US$100.0 million

IV. EXTERNAL_FINANCING _EQJESTED: US$40.0 million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: Preliminary studies have shown that someparts of the country may contain radioactive minerals. Foreigninvestors have shown interest in developing such minerals in associationwith the Nuclear Affairs Institute.

VII. COSTS AND AVAILABILITY OF FUNDS: Details not yet available.

VIII. STATUSStudies. A contract has been signed with aFrench company to carry out prospecting and exploration activities asan initial step in carrying out feasibility studies.

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 179: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListIndustry andMining (3)

I. NANE OF PROJECT: DFC VII

II. EXECUTING AGENCY: Banco de la Repilblica

III. TOTAL ESTIM9ATED COST: US$70.0 million

IV, EXTERNAL FINANCING REQUESTED: US$50.0 million

V. LENDING AGENCY: World Bank

VIo DESCRIPTION AND JUSTIFICATION: The project would be a continuation ofthe World Bank's financial assistance to Colombian development financecompanies. The loan would mainly finance sub-projects designed to createor expand export oriented industries and efficient import substitutionindustries.

VII. COSTS AND AVAILABILITY OF FUNDS: Details not yet available. The loanwould finance imports.

VIII. STATUS:

Steps required for obtaining Timing of negotiations for this loan wouldfinancing be contingent on rate of utilization of

the existing loan.

Page 180: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListIndustry andMining (4)

I. NAME OF PROJECT: Semi-Integrated Plan for the ProductionOf Sponge-Iron.

II. EXECUTING AGENCY: IFI

III, TOTAL ESTIMATED COST: US$54.0 million

IV. EXTERNAL FINANCING REQUESTED: US$40.0 million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: The availability of coal and gas onthe Northern Coast, and the eventual construction of port facilities,has made it possible to plan for the installation of a plant to producesponge-iron. It has been estimated that the local market could consume350,000 tons per year of sponge-iron.

VII. COSTS AND AVAILABILITY: Details not yet available.

VIII. STATUS

Studies Pre-feasibility studies have been

completed.

Steps required for obtaining Project has not yet been presented to

financing NPD.

Page 181: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListCommunications (1)

Page 1 of 2

I. NAME OF PROJECT: Integrated Development of local AutomaticTelephone Service.

II. EXECUTING AGENCY: Emnpresa Nacional de Telecomunicaciones(TELECOM). and local telephone companies.

III. TOTAL ESTIMATED COST: US$60.0 million

IV. EXTERNAL FINANCING REQUESTED: US$40.0 million

V. LENDING AGENCY: Not yet defined

VI. DESCRIPTION AND JUSTIFICATION: In order to achieve the progressiveintegration of the enterprises responsible for providing local telephoneservices; the Empresa Nacional de Telecomunicaciones has set aside 4.5%of its earnings to establish a fund for the development of local telephoneservices, The first stage of the program will be financed by the WorldBank, and will be undertaken through 1980, allowing the nationalizationof the system, the resolution of financial difficulties in existing enter-prises and the execution of an effective expansion program.

The main advantages of the integratedsystem can be summarized as follows:

1. It facilitates the coordination and administration of the local tele-phone system.

2. It makes it possible to standardize equipment and to obtain economiesof scale through volume buying and maintenance.

3. Cash payments for equipment and the use of international competitivebidding procedures make it possible to achieve better prices,

VII. COSTS AND AVAILABILITY OF FUNDS:

Disbursements

(in US$ million)

1979 1980 1981 1982 Total

Local costs 0.2 1.4 5.8 4.0 11.4Foreign costs 5.4 14.0 16,0 13.2 48.6

Total 5.6 15.4 21.8 17,2 60.0

VIII. STATUS

Studies The enterprise has completed prelim-inary studies which will be expanded in the near future.

Page 182: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListCommunications (1)Page 2 of 2

Steps required for obtaining Project has not yet been presented to NPD.financing

Page 183: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListCommunications (2)

I. NAME OF PROJECT: Acquisition of 100,000 Telephones

II. EXECUTING AGENCY: Empresa de Tel6fonos de Bogota

III0 TOTAL ESTIMATED COST: US$2.5 million

IV. EXTERNAL FINANCING REQUESTED: US$2.0 million

V. LENDING AGENCY: Suppliers

VI. DESCRIPTION AND JUSTIFICATION: In light of the rapid growth of demandit is necessary to increase the available number of telephone sets.

VII, COSTS AND AVAILABILITY OF FUNDS:

(in US$ million)

1979 1980

External costs 1.0 1.5

Total 1.0 1.5

VIIL. STATUS: Project has not yet been presented to NPD.

Page 184: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListCommunications (3)

I. NAME OF PROJECT: Expansion of the Cali Telephone System

II. EXECUTING AGENCY: Empresas Municipales de Cali (EMCALI)

III. TOTAL ESTIMATED COST: US$10.0 million

IV. EXTERNAL FINANCING REQUESTED: US$8.0 million

V. LENDING AGENCY: Suppliers

VI. DESCRIPTION AND JUSTIFICATION: New expansion of the telephone system inCali is needed to meet the growth of demand and indices of telephone den-sities in keeping with the size and level of development of the city.

VII. COSTS AND AVAILABILITY OF FUNDS: Details not yet available

VIII. STATUS: Studies are being carried out. Projecthas not yet been presented to NPDo

Page 185: List of Projects for External Financing 1977-1979 Colombia

1979 Project ListPre-Investment (1)

I NAME OF PROJECT: Science and Technology

II. EXECUTING AGENCY: FONADE

III. TOTAL ESTIMATED COST: US$30.0 million

IV. EXTERNAL FINANCING REQUESTED: US$15.0 million

V. LENDING AGENCY: IDB

VI. DESCRIPTION AND JUSTIFICATION: The objective of the project is topromote the country's ability to carry out scientific and technologicalresearch and to increase the possibility that foreign technology canbe adapted to Colombia.

The project will consists of loansto private enterprises to develop new products and processes, tointroduce quality control systems, to promote the creation of tech-nology and development centers at the level of individual enterprisesor groups of enterprises. The project will also seek to improve theability of local consulting firms to use foreign technology. It isalso seen through the creation, expansion and modernization of laboratoriesin specialized institutions, The project is justified on the basisthat the adequate transfer of technology would permit better utilizationof the country's resources, thus achieving higher levels of employmentand economic growth.

VII. COSTS AND AVAILABILITY OF FUNDSDisbursements

1978 1979 1980 1981 Total

Local 3.0 5.0 4,5 2.5 15.0Foreign Exchange 200 600 600 10 15.0

5.0 11O0 10.5 3,5 30.0

VIII. STATUS FONADE has created a pilot line of creditfor the financing of science and technology sub-projects. The performanceof this line will be evaluated before proceeding with the project.