Lighting Retrofit PCYC NSW Final Report
Chris Diener – PCYC Property & Projects Manager
This activity received funding from the Australian Government.
23.01.2015
Page 2 of 16 Friday, 23 January 2015
Table of Contents
Executive Summary .......................................................................................................................... 3
Project Objectives ............................................................................................................................. 4
Project Energy Efficiency Activities .................................................................................................. 6
Project Demonstration and Communications Activities.................................................................... 9
Outcomes and Benefits ................................................................................................................... 11
Budget ........................................................................................................................................... 13
Project Operation, Mechanism and Processes ............................................................................... 14
Conclusion ..................................................................................................................................... 16
Appendix - A Energy Efficiency & Cost Savings per Annum - B Types of Light Fitting & Quantity per Club - C Project Energy Efficiency Improvement Tables - D Communications & Media - E Product Sheets for Light Fittings - F EPA USA (2001) PCB Removal and Health Benefits - G Final Budget Breakdown - H Project Personnel - I Declaration
Page 3 of 16 Friday, 23 January 2015
Executive Summary
This report details the installation of new energy efficient lighting at 57 Police Citizens Youth Clubs (PCYC’s)
around NSW. This project commenced in May 2013 and was completed at the end of June the following year.
The project involved extensive consultation in lighting design for each room located within the individual PCYC
facilities. Each light fitting had to be assessed with consideration to the types of activities which were
contacted so they were fit for purpose. PCYC engaged the services of GSI Electrical Contractors as our partner
to remove all the old lighting and dispose appropriately and commence the installation of new lighting specific
to each room/area which met current lighting Australian Standards. The total number of light fittings which
were removed was 4,035. The project saw installation of 3,827 new energy efficiency light fittings installed
across all 57 clubs.
The objectives of the project were to improve the energy efficiency across PCYC NSW facilities by reducing
energy consumption and greenhouse gas emissions, reduce the ongoing cost of lighting maintenance and
capital replacements, and improve general safety and compliance using clean lighting technologies.
The project delivered excellent energy reductions across the state. With a total energy reduction of 31% from
3131 MWh to 2193 MWh, this equates to an annual saving of $315,986.00. The total Mj / Sqm reduced from
5570 to 3992.
In addition to improving the lighting at each of our facilities, PCYC was proud to be able to share the
knowledge of this project with the broader community including PCYC members and visitors.
The total value of this project totalled $1,728,356.00, jointly funded by PCYC NSW and Australian Government
has been expensed in accordance with the Funding Agreement.
Disclaimer: The views expressed herein are not necessarily the views of The Commonwealth of Australia, and The Commonwealth does not accept responsibility for any information or advice contained herein.
Page 4 of 16 Friday, 23 January 2015
Project Objectives
PCYC NSW aimed to improve the energy efficiency of 57 clubs across the state by reducing the impact of
disproportionate rising electricity costs faced by small communities. Our primary objectives were to reduce
electricity costs, greenhouse gas emissions and provided a community education hub to display a variety of
clean lighting technologies.
This project used Australian energy experts, Australian manufacturers and local Australian small business
installers (tradespeople) across NSW.
PCYC clubs operate with extended hours and most clubs operate between 6am & 10pm. The importance of
energy reduction via lighting is paramount. The peak usage times within PCYCs also correspond to the energy
network high peak hours of 7am-9am and 4pm-7pm as these times represent peak periods for after school
activities, programs, gym usage and exercise classes.
The major use of energy across PCYC NSW is lighting, using an estimated 40% of the total energy bill. The main
lighting areas, equating to approximately 35% of the total lighting cost, includes sporting halls, gymnastics
rooms, weights & cardio rooms, boxing rooms, martial arts rooms, offices and foyer areas. This project aimed
to reduce lighting energy costs by 58%, resulting in a total site energy reduction of 21%. Furthermore the
938 MWh of annual energy reduced by the project will also reduce the burden on the energy network during
peak usage periods.
(Refer to Appendix A for a comprehensive table of Energy Efficiency & Cost Savings per Annum.)
Additional project outcomes included a reduction in running costs through warranties, preventative and
reactive maintenance savings, improved safety and increased brightness (lux levels), and the education of the
community on clean lighting technologies.
PCYC sites have diverse lighting requirements and fitting types, allowing PCYC to display various clean lighting
technologies and applications to local communities to assist with developing an understanding and providing
education around the application of new clean lighting technologies
These activities aimed to contribute to the Australian Governments program objectives to:
• support a range of local councils and community organisations increase the energy efficiency of
different types of non-residential council and community-use buildings, facilities and lighting; and
• demonstrate and encourage the adoption of improved energy management practices within councils,
organisations and the broader community.
Page 5 of 16 Friday, 23 January 2015
Community Impact
Prior to the lighting retrofit, many of the rooms in the PCYC facilities were not adequately lit. A benefit for the
Community is the upgrade of lighting to enhance PCYC’s ability to conduct activities and programs. We hoped
this lighting upgrade would improve the experience that our members and visitors had when they attended
their local PCYC, provide a safe environment, deliver on our social obligation to reduce greenhouse gas
emissions and provided a community education hub to display a variety of clean lighting technologies.
Environment
Police Citizens Youth Clubs NSW are host to a range of community activities, sporting programs and Police
programs. In clubs you will find NSW Police case managing young offenders and youth at risk.
The activities and programs are designed and run based upon community need with PCYC NSW boasting a
membership of 82,000 members across the state. This membership represents the participant numbers, when
the attendance of spectators and parents are added into this equation the figures are in the vicinity of
150,000.
Representative Data
3992
2193
42%
69%
5570
3131
100%
100%
Total Energy Used (Mj/Sqm)
Total Energy Used (MWh)
Reduction of Total Lighting Energy Used (%)
Reduction of Total Site Energy Used
Total Energy Used(Mj/Sqm)
Total Energy Used(MWh)
Reduction of TotalLighting Energy Used
(%)
Reduction of Total SiteEnergy Used
Prior to CEEP 5570 3131 100% 100%Following CEEP 3992 2193 42% 69%
Summary of Savings Per Annum
Prior to CEEP Following CEEP
Page 6 of 16 Friday, 23 January 2015
Project Energy Efficiency Activities
Sites
The vast majority of PCYC Facilities located in regional and metropolitan received lighting upgrades. The 57
sites benefiting from these lighting improvements included;
Albury Armidale
Balmain
Bankstown
Bateau Bay
Bathurst
Belmore
Blacktown
Bourke
Broken Hill
Bulli
Burwood
Cabramatta (Fairfield)
Campbelltown
Cessnock
Coffs Harbour
Cowra (Binni Creek Rd)
Cowra (Young St)
Dubbo
Eastern Suburbs
Glebe
Goulburn
Griffith
Gunnedah
Hornsby
Kempsey
Lake Illawarra
Lake Macquarie
Lismore
Liverpool
Maitland
Marrickville
Moree
Morisset
Mt Druitt
Mudgee
Muswellbrook
Newcastle
North Sydney
Orange
Parkes
Parramatta
Penrith
Port Stephens
Shoalhaven
Singleton
South Sydney (Redfern)
St George (Rockdale)
Sutherland
Tamworth
Taree
Tweed Heads
Umina
Wellington
Wollongong
Woolloomooloo (Sydney)
Young
Product Supply
The lighting retrofit project utilised Australian lighting manufacturers and suppliers. The products selected
produced some of the lowest energy cost per square metre for lighting whilst meeting the Australian Standard
matched to activity areas. The lighting selected has won many high profile Government tenders and issued in
the National Stadium Program. Lighting included weatherproof battens, standard batten fittings, semi-
recessed, direct/indirect recessed, and high/low bay fittings.
(Refer to Appendix E for detailed product information.)
It was important to ensure that each variable space within a PCYC site, ranging from martial arts rooms, foyers,
hallways, main halls, offices, weights rooms and more would achieve the best possible lighting outcome for
Club staff and users within budget and to standard. To ensure this was achieved, light mapping was conducted
throughout all spaces with an appropriate type and a number of light fittings selected to meet the required
lighting standards.
(Refer to Appendix B for detailed listing of the Types of Light Fitting & Quantity per Club.)
Page 7 of 16 Friday, 23 January 2015
Installations
PCYC's project partner, Global Sustainability Initiatives (GSI) utilised its contractor network to complete 57
installations across NSW. Installations were completed to a strategic geographical roll out. This included
dividing the state into 6 clusters. The Greater Sydney clusters 1 and 2 were completed by the same installation
team.
For the remaining sites in clusters 3 to 6, GSI Project Manager consulted all Club Managers to determine the
best options for installation including their recommendations for preferred local installers.
One of PCYC's goals was to utilise local labour in the regional areas. Apart from supporting the local economy,
using local labour fosters an ongoing service relationship for any future lighting or energy reduction initiatives
in each area.
Quotes were obtained from preferred local installers as well as two additional local quotes for each site. The
job was awarded to the most cost efficient with consideration to the club managers’ preference. The final site
of the project was completed on time on 28 June 2014.
Challenges
PCYC NSW experienced a number of challenges with the lighting project. A number of issues which came to
our attention were distinctive to each particular site. In most cases a project management discussions and
contingency plan was developed in order to resolve each particular issue.
1. Designing the correct light to fit the purpose of the room.
Each of the PCYC facilities across the state is unique with vastly different infrastructure and activity options at
each location. At each facility, every room required a comprehensive assessment to determine the most
appropriate light for the purpose of the room. For example, the rock climbing room at PCYC Cessnock posed a
challenge due to the nature of the activity conducted and therefore suspended lighting was unable to be used.
In this case a lighting consultant was engaged to assist PCYC and GSI. The consultant proposed a lighting option
which would allow the full roof to be lit without suspended lighting. The lighting option selected ensured safe
and suitable lighting to accommodate the activity.
Page 8 of 16 Friday, 23 January 2015
2. Communication and co-ordination of lighting upgrade installation at individual PCYC’s
Each PCYC was consulted prior to installation to determine when the best time was to conduct the lighting
upgrade in order to minimise disruptions to activities and programs. In most cases the Club Manager and their
team were informed of dates and times and a timetable of rooms involved in the lighting upgrade would be
determined. Challenges arose when this information was not communicated to relevant stakeholders prior to
contactors arriving to conduct the works. For example, the former manager at PCYC Marrickville did not
adequately communicate with his staff or venue users the times and dates of the scheduled lighting upgrade.
By not providing adequate notice of the changes/interruptions which were planned the contactors were not
able to commence their scheduled works and had to leave the PCYC facility. The implications of this lack of
communication included loss of revenue as contactors had to be paid for the day, delays in the project
completion and new days had to be scheduled and frustrated members, venue users, volunteers and staff.
3. Timing of payments between funding agreement milestones and contactor milestones
The funding agreement stipulated that progress payments were scheduled to be paid within 30-days of
acceptance of a project milestone report. Due to the size of the project, PCYC’s across the state were divided
into regional clusters. As lighting installation projects were completed at each of the clubs within the cluster by
the contractor, PCYC NSW prepared and submitted the milestone reports.
PCYC was obligated to pay GSI for the works which had been completed in each cluster within a reasonable
timeframe. On some occasions, considerable time elapsed between works completed and invoiced by the
contractor, acceptance of the project milestone report submission and payment to PCYC. On these occasions,
PCYC had to manage the risk of the contactor not continuing to work on the remaining clubs by paying their
invoices from company funds, prior to reimbursement from the Department of Industry. This placed financial
burden on PCYC as an out of pocket expense for some of the milestone payments.
We acknowledge that the delay in payment was due to the Departments’ requirement that PCYC provide
adequate evidence of Milestone completion.
Page 9 of 16 Friday, 23 January 2015
Project Demonstration and Communications Activities
Stakeholders
PCYC Stakeholders included each of the respective clubs involved in the project. Stakeholders in each
community included the following; PCYC members, Venue users, visitors, PCYC staff and volunteers, NSW
Police, Club Advisory Committees, schools and community groups using the facilities.
Other stakeholders included GSI – lighting contactors, Marline Newcastle Building Service Engineers – lighting
consultant, Australian Government – Department of Industry, Building owners at clubs with Leasehold
agreements eg. Local Councils, Crown Lands.
Communication
As part of the CEEP program, PCYC implemented a communications plan to acknowledge, involve and inform
all stakeholders.
At each of the PCYCs, an A3 sign was erected in the foyer to inform people that the lighting upgrade was being
conducted. This sign acknowledged the funding provided by the Australian Government.
Each club manager was briefed on the project and was able to communicate to staff, volunteers, Police and
PCYC members (who total more than 80,000 through the 57 clubs) the benefits of the project. In addition, they
were provided with product sheets so they were aware of what lighting was being installed in each room. Club
Managers were made aware of the costs savings and were able to highlight the benefits which the club and
patrons would experience with the removal of the old lighting and installations of new energy efficient lighting
options.
PCYC also used its extensive social media and web-based networks to promote and highlight the successful
program.
Information about the project, including whole-of-project details and 10 club case studies were posted on the
PCYC NSW corporate website.
The PCYC NSW Facebook page has access to more than 16,500 unique viewers and details on the project,
along with links to detailed information on the PCYC website were posted on the page.
The PCYC Marketing and Communications team report that there has been no comments or correspondence received from the posting on PCYC website or Intranet regarding the installation of new lights under the Community Energy Efficiency Program.
Page 10 of 16 Friday, 23 January 2015
In addition, the PCYC communications and media department disseminated a media release and information
to state and national media, as well as those in 10 case study areas to ensure state-wide coverage for the
initiative.
PCYC has a link to their website regarding the CEEP project which people are able to access through the web
address www.pcycnsw.org.au.
(Refer to Appendix D for screenshots of this information.)
PCYC has a link within its internal Intranet website for all staff and volunteers. This Link provides access to the
case studies and project information to allow then to educate and market the project at a local level.
(Refer to Appendix D for screenshots of this information.)
PCYC has issued a press release to more than 40 print, radio digital media outlets across NSW. This press
release provides an overview of the project, designed to spark interest for media coverage at a local, city and
regional level. To date, PCYC has not received any enquiries for further information relating to running a story.
(Refer to Appendix D for an example of press release.)
Page 11 of 16 Friday, 23 January 2015
Outcomes and Benefits of the Project
PCYC NSW achieved its key project objectives across all 57 clubs. GSI are known throughout the industry as a
leader in measurement, verification and reporting on energy efficiency. The major tool used to complete the
MVR component of the works are as follows:
• Individual fitting counts taken
• Tong testing completed on individual circuits to verify actual amperage (AMPs) used
• Results are overlayed with the hours of operation (as provided by PCYC NSW)
• Calculations completed to determine total kilowatt hours (kWhs) used
• Post installation, circuits retested to measure new amperage (AMPs) usage
• Post installation AMP results overlayed with the hours of operation
• Recalculation completed to determine the new total kilowatt hours (kWhs) used
• Difference in kilowatt hours calculated to show benefit
(Refer to Appendix C for detailed product information_Project Energy Efficiency Improvement reports.)
As a result of the project being completed, PCYC NSW has been able to considerably reduce its capital
expenditure on lighting repairs and maintenance, upgrade its lighting to satisfy current Australian Standards
where some clubs had previously reported lighting issues; specifically around the brightness of lighting (Lux
compliance), and has also reduced its level of risk by removing some old fittings that contained dangerous
carcinogenics such as Polychlorinated Biphenyls (PCB’s).
At a number of the PCYC facilities, PCB’s were present in fluorescent light capacitors for power factor
correction on an inductive ballast circuit. Prolonged exposure to high concentrations of PCBs have been linked
to a variety of adverse health effects including cancerous growths, damage to bodily functions including effects
on the immune system, reproductive system, nervous system, endocrine system and skin irritations. Studies in
humans provide supportive evidence for potential carcinogenic and non-carcinogenic effects of PCBs. The
different health effects of PCBs may be interrelated, as alterations in one system may have significant
implications for the other systems of the body (EPA – USA). Further information is regarding the need to
removal PCB’s is presented in an article published by the US EPA in Appendix F. Removing the PCB’s which
were present in some of the lights originally installed in Clubs during the 1970’s ensures we maintain our duty
of care to provide a risk and hazard free environment for our members and visitors.
Page 12 of 16 Friday, 23 January 2015
Other benefits to PCYC NSW, its staff, members and the community would be the general improvement in
lighting quality. Some areas were previously under lit and the areas were deemed (as a result of the findings in
the initial project assessment) to be dangerous and a risk to the user. By improving the lighting, we could
ensure that we were adding to PCYC NSW’s delivery of safe and occupationally suitable environments.
Whilst PCYC has not undertaken surveys on the wider community and its members regarding the project
implementation, we have received many reports from staff and members applauding the dramatic
improvement in lighting and general look of the clubs. Where previously on occasion we would have to deal
with complaints about faulty light fittings and insufficient lighting, complaints have now reduced considerably.
PCYC NSW and GSI were proud to deliver this project throughout communities across NSW, utilising local
tradespeople were used to carry out the works. We are equally proud to have used an Australian Made
product, manufactured by an Australian owned company.
Page 13 of 16 Friday, 23 January 2015
Budget
The project did not experience any budgetary changes that could not have been managed in-house. The
funding was expensed in full and in accordance with the Funding Agreement.
PCYC believes that careful planning and solid consultation with GSI, prior to submitting the project application
allowed for the project to run smoothly and without any overruns. GSI have years of experience in the industry
and have undertaken several projects of a similar nature, including (at the time of awarding the contract to
GSI) some other Community Energy Efficiency Program projects.
As discussed in the Challenges section of Project Energy Efficiency Activities, the only budgetary challenge we
faced was the timing of payments between funding agreement milestones and contactor milestones.
As per the funding agreement, progress payments from the Department of Industry were scheduled to be paid
within 30-days of acceptance of a project milestone report. PCYC prepared and submitted the milestone
reports on completion of the works by the contactor, yet found that considerable time elapsed between works
completed and invoiced by the contractor, project milestone report submission and payment.
PCYC was obligated to pay GSI for their works in a reasonable timeframe. Without a clear and fair contract
payment conditions, it was unfair to “pay when paid”, so to align payments to the contractor with payment
from the Department of Industry. PCYC had to manage the risk of the contactor not continuing to work on the
remaining clubs by paying some invoices from company funds, prior to reimbursement from the Department
of Industry. This placed financial burden on PCYC as an out of pocket expense for some of the milestone
payments.
We acknowledge that the delay in payment was due to the Departments’ requirement that PCYC provide
adequate evidence of Milestone completion.
(Refer to Appendix G for the Final Budget Breakdown.)
Page 14 of 16 Friday, 23 January 2015
Project Operation, Mechanisms and Processes
Implementation Process
Initial lighting audits and feasibility studies were conducted at each of the selected sites in early 2012. The site
visits focused on identifying the best cost benefit outcome, balancing light amounts and usage patterns. All of
the sites are community facilities that have high use by local residents.
Given that the completion of highly technical energy efficiency projects was not one of PCYC NSW’s core
competencies, to reduce the CEEP Project risk profile, PCYC formed a partnership with an energy services
company (ESCo) - Global Sustainability Initiatives (GSI). In comparison to entering into a contract with a
consultant who works independently, the decision to form a partnership with an ESCo allowed us to work in
collaboration with GSI throughout the project life-cycle.
The partnership with GSI allowed close consultation throughout the project and decreased both financial and
technical risk as well as creating a sound and confident procurement process. Implementation of upgrades
commenced in June 2013 and was completed in June 2014.
Project management
Global Sustainability Initiatives acted as overall Project Manager working collaboratively with senior staff at
PCYC NSW State Office as well as Club Managers and their staff. The contracted installers worked very closely
with club staff at each site on the project ensuring quality workmanship and timely completion of works. Club
Managers, in particular, played a very effective role in facilitating good outcomes.
The Community Energy Efficiency Program managers were very helpful and provided guidance to PCYC on how
to best manage and successfully complete this project.
This has proven to be a very successful, well managed project, completed within the time frame. The project
was completed on budget, without any compromise in quality, regulatory, environmental or safety
requirements.
The project’s activities and progress were discussed with all stakeholders throughout the delivery period.
Throughout the process PCYC and GSI communicated via email, mail and telephone. PCYC provided support
and guidance to GSI Management to complete the milestone reports.
Page 15 of 16 Friday, 23 January 2015
Timely and regular communication occurred between the GSI Project Manager and all Club Managers. Below is
a snapshot of the Project Managers communication process for each site.
• Coordinate a pre install site visit from installers
• Confirm the hours of use for each room
• Confirm the rooms and light fittings being replaced according to the available site budget
• Clarify any issues that may impact on installation (eg. weights being moved, load bearing capacity of main
hall floors) based on Site Manager and installers site visit feedback
• Confirm tasks that are the responsibility of the Club to assist with the install ie. Club staff required to move
equipment, furniture, gymnasium floor matting and the like prior to or on the install
• Confirm what work can be completed in each room to fit in with the Club’s schedule of room bookings and
activities
• Arrange for secure storage on site for fittings prior to install
• Confirm suitable dates and start times for installation based on Club bookings and activities. Ensure that
early access is provided for electricians
Page 16 of 16 Friday, 23 January 2015
Conclusion
Without the assistance of the Australian Government, the project could not have been realised. The Australian
Government provided 50% of the funds under the Community Energy Efficiency program (CEEP). The
remaining funds for the project were provided by PCYC NSW.
The project has been successfully completed to the allocated budget of $1,728,356
The project was managed by PCYC and GSI. All of the milestones set in the Funding Agreement by the
Australian Government and PCYC NSW were completed.
All of our clubs across the state have significantly benefited from this project. Each of the 57 clubs has new
energy efficient lighting, specially tailored for their individual rooms and for the activities they conduct.
Electricity consumption has been reduced which means there are significant savings across electricity bills. This
cost saving can be diverted to our core business which is supporting young people to be active in life,
developing their skills and leadership and reducing youth crime.
We believe that selecting GSI as the right project partner and having a solid line of communication between all
parties has led to the success of this project. Having a project partner who is capable of delivering such a
project for PCYC and one which can utilise Australian made products and local companies has also been a
major factor for its success.
Cluster Site
Annual
Energy
Cost (inc
GST)
Energy
Action
Amount
New Cost
with Govt
Funding
Electricity
Savings PA
Simple
Payback
Period (yrs)
Simple
Payback
with Govt
Funding
(yrs)
Simple
RoI
(%)
Simple
RoI with
Govt
Funding
(%)
Total
Electricity
Used on
Site kWh
Electricity
Reduction
From Action
kWh
Main
Lighting
Uses
(%)
Other
Lighting
Uses
(%)
Electricity
Reduction in
Lighting (%)
Electricity
Reduction for
Whole Site (%)
Project
GHG
Reduction
(tonnes) Sites
1 Balmain $9,996 $16,081 $8,041 $3,199 5.0 2.5 19.9 39.8 37,944 10,843 47 16 61 29 49 1
1 Bankstown $12,240 $15,730 $7,865 $1,203 13.1 6.5 7.6 15.3 39,228 3,442 18 7 46 9 16 1
1 Belmore $12,196 $10,380 $5,190 $1,482 7.0 3.5 14.3 28.6 38,368 4,163 17 15 41 11 19 1
1 Burwood $12,276 $25,246 $12,623 $4,636 5.4 2.7 18.4 36.7 39,060 13,171 69 3 49 34 60 1
1 Campbelltown $10,738 $31,218 $15,609 $7,341 4.3 2.1 23.5 47.0 45,540 27,841 87 5 73 61 125 1
1 Eastern Suburbs $15,156 $35,410 $17,705 $5,084 7.0 3.5 14.4 28.7 48,288 14,463 58 5 51 30 65 1
1 Glebe $20,070 $27,735 $13,868 $7,420 3.7 1.9 26.8 53.5 75,702 24,989 51 7 63 33 113 1
1 Liverpool $17,052 $35,894 $17,947 $3,704 9.7 4.8 10.3 20.6 66,000 12,801 29 13 56 19 53 1
1 Marrickville $47,928 $74,320 $37,160 $26,231 2.8 1.4 35.3 70.6 197,196 96,363 70 2 66 47 434 1
1 St George (Rockdale) $27,972 $42,315 $21,158 $4,508 9.4 4.7 10.7 21.3 104,568 15,048 32 2 44 14 68 1
1 Sutherland $25,704 $35,297 $17,649 $14,635 2.4 1.2 41.5 82.9 74,736 37,992 79 3 64 51 171 1
2 Bateau Bay $31,704 $41,581 $20,791 $15,233 2.7 1.4 36.6 73.3 83,088 35,645 54 0 69 44 161 1
2 Blacktown $8,456 $26,681 $13,341 $2,315 11.5 5.8 8.7 17.4 31,600 7,725 45 3 61 24 40 1
2 Cabramatta (Fairfield) $18,432 $23,484 $11,742 $4,799 4.9 2.4 20.4 40.9 76,320 15,586 28 15 60 20 80 1
2 Cessnock (transf to Armidale) $7,372 $16,232 $8,116 $2,515 6.5 3.2 15.5 31.0 32,640 9,101 76 22 57 55 78 1
2 Hornsby $19,956 $18,340 $9,170 $1,663 11.0 5.5 9.1 18.1 63,240 5,391 23 0 36 9 25 1
2 Lake Macquarie $11,856 $29,317 $14,659 $6,489 4.5 2.3 22.1 44.3 32,120 15,697 76 18 53 49 71 1
2 Maitland $26,388 $42,756 $21,378 $8,872 4.8 2.4 20.8 41.5 96,402 28,939 49 0 60 30 130 1
2 Mt Druitt $10,432 $25,133 $12,567 $1,814 13.9 6.9 7.2 14.4 37,920 5,886 39 0 45 16 26 1
2 Newcastle $9,492 $30,985 $15,493 $6,621 4.7 2.3 21.4 42.7 27,468 17,106 84 15 47 62 77 1
2 North Sydney $13,164 $19,663 $9,832 $4,355 4.5 2.3 22.1 44.3 42,492 12,552 55 4 57 30 58 1
2 Parramatta $24,144 $28,997 $14,499 $2,879 10.1 5.0 9.9 19.9 101,688 10,825 30 1 35 11 49 1
2 Penrith $16,572 $38,072 $19,036 $4,347 8.8 4.4 11.4 22.8 68,616 16,072 47 1 49 23 15 1
2 Woolloomooloo (Sydney) $20,268 $44,779 $22,390 $7,421 6.0 3.0 16.6 33.1 56,772 18,024 53 5 61 32 84 1
3 Armidale $10,848 $13,950 $6,975 $2,689 5.2 2.6 19.3 38.6 29,164 6,453 32 56 69 22 29 1
3 Coffs Harbour $20,756 $25,220 $12,610 $3,871 6.5 3.3 15.3 30.7 57,440 11,874 35 13 58 21 11 1
3 Gunnendah $16,984 $23,526 $11,763 $4,175 5.6 2.8 17.7 35.5 47,880 11,080 40 8 57 23 50 1
3 Kempsey $19,284 $33,724 $16,862 $4,492 7.5 3.8 13.3 26.6 58,108 12,086 33 0 63 21 55 1
3 Lismore $12,532 $13,431 $6,716 $5,496 2.4 1.2 40.9 81.8 34,516 13,516 51 6 63 39 61 1
3 Moree $19,308 $42,557 $21,279 $9,297 4.6 2.3 21.8 43.7 55,936 24,049 71 28 61 43 108 1
3 Morriset $8,000 $15,937 $7,969 $3,969 4.0 2.0 24.9 49.8 26,000 11,518 61 0 72 44 52 1
3 Muswellbrook $15,648 $32,238 $16,119 $5,088 6.3 3.2 15.8 31.6 45,204 15,908 74 0 47 35 72 1
3 Port Stephens $13,272 $35,176 $17,588 $9,057 3.9 1.9 25.7 51.5 35,892 18,081 78 5 74 61 105 1
3 Singleton $35,332 $15,101 $7,551 $2,565 5.9 2.9 17.0 34.0 31,816 12,489 58 0 68 39 56 1
3 Taree $18,732 $35,470 $17,735 $9,138 3.9 1.9 25.8 51.5 53,512 23,576 67 14 66 44 106 1
3 Tweed Heads $20,492 $44,182 $22,091 $4,053 10.9 5.5 9.2 18.3 59,672 18,493 59 4 51 31 83 1
3 Umina $13,300 $24,459 $12,230 $3,142 7.8 3.9 12.8 25.7 34,592 7,297 46 6 40 21 29 1
4 Bathurst $15,996 $27,476 $13,738 $3,544 7.8 3.9 12.9 25.8 44,640 7,032 26 2 60 16 32 1
4 Cowra (Binni Creek Rd) $5,302 $19,223 $9,612 $2,010 9.6 4.8 10.5 20.9 13,248 4,483 57 12 59 34 20 1
4 Cowra (Young St) $14,472 $20,001 $10,001 $4,039 5.0 2.5 20.2 40.4 36,048 8,982 61 18 40 25 41 1
4 Dubbo $31,352 $36,940 $18,470 $10,432 3.5 1.8 28.2 56.5 98,648 29,306 42 0 69 30 132 1
4 Griffith $7,140 $18,256 $9,128 $1,656 11.0 5.5 9.1 18.1 30,020 4,656 40 5 58 22 21 1
4 Mudgee $25,100 $23,984 $11,992 $4,232 5.7 2.8 17.6 35.3 82,720 12,454 24 0 60 15 56 1
4 Orange $40,644 $81,601 $40,801 $12,944 6.3 3.2 15.9 31.7 129,124 36,717 49 1 58 28 165 1
4 Parkes $8,232 $20,777 $10,389 $2,302 9.0 4.5 11.1 22.2 24,480 6,113 47 3 52 25 28 1
4 Tamworth $5,132 $37,752 $18,876 $9,307 4.1 2.0 24.7 49.3 12,888 20,869 53 7 61 26 94 1
4 Wellington $7,756 $16,001 $8,001 $2,871 5.6 2.8 17.9 35.9 21,168 6,997 52 0 63 33 32 1
4 Young (High Bays Only now) $23,268 $29,281 $14,641 $5,787 5.1 2.5 19.8 39.5 68,714 28,809 63 0 66 42 130 1
5 Albury $12,928 $28,072 $14,036 $3,273 8.6 4.3 11.7 23.3 32,120 7,916 47 2 52 25 36 1
5 Bourke $16,000 $37,251 $18,626 $7,681 4.8 2.4 20.6 41.2 70,000 30,006 62 10 59 43 135 1
5 Broken Hill $6,005 $13,224 $6,612 $1,175 11.3 5.6 8.9 17.8 18,808 1,748 50 1 55 28 8 1
5 Bulli $6,156 $25,911 $12,956 $1,972 13.1 6.6 7.6 15.2 27,096 6,921 64 12 55 29 40 1
5 Goulburn $12,844 $31,425 $15,713 $5,524 5.7 2.8 17.6 35.2 38,684 14,854 67 0 57 38 13 1
5 Lake Illawarra $13,464 $30,181 $15,091 $5,131 5.9 2.9 17.0 34.0 53,784 18,301 63 5 51 17 83 1
5 Shoalhaven $11,368 $29,636 $14,818 $3,708 8.0 4.0 12.5 25.0 44,284 12,899 47 12 61 29 44 1
5 Wollongong $8,400 $16,836 $8,418 $1,781 9.5 4.7 10.6 21.2 31,676 5,998 33 1 57 19 27 1
6 South Sydney (Redfern) $35,868 $18,654 $9,327 $3,666 5.1 2.5 19.7 39.3 45,864 11,105 67 0 70 47 67 1
6 Cessnock (new) combined $32,000 $48,945 $24,473 $7,153 6.8 3.4 14.6 29.2 120,554 15,634 27 47 48 13 70 1
TOTALS $993,479 $1,702,044 $851,022 $315,986 5.4 2.7 18.6 37.1 3,131,296 937,885 2,962 440 3,302 1,771 4,147 58
AVERAGE $17,129 $29,346 $14,673 $5,448 5.4 2.7 18.6 37.1 53,988 16,170 51 8 57 31 72 1
Type of Fittings / Club No. of New
Fittings
Type of Fittings / Club No. of New
Fittings
Type of Fittings / Club No. of New
Fittings
PCYC Albury 61 PCYC Eastern Suburbs 95 PCYC Orange 156
36W x 1 Batten 26 18W x 1 Batten 5 18W x 2 Semi Recessed Troffer 4
36W x 1 Recessed Troffer 20 36W x 1 Batten 22 36W x 1 Recessed Troffer 78
36W x 6 Batten 15 36W x 1 Semi Recessed Troffer 55 36W x 1 Semi Recessed Troffer 14
PCYC Armidale 42 36W x 1 Weatherproof Batten 1 36W x 6 Batten 60
120W Matsushima Spotlight 4 36W x 5 Batten 12 PCYC Parkes 77
36W x 1 Batten 8 PCYC Glebe 76 36W x 1 Batten 46
36W x 1 Semi Recessed Troffer 10 36W x 1 Batten 14 36W x 1 Semi Recessed Troffer 6
36W x 1 Weatherproof Batten 1 36W x 1 Semi Recessed Troffer 47 36W x 1 Weatherproof Batten 12
36W x 5 Batten 19 36W x 5 Batten 15 36W x 2 Batten 4
PCYC Balmain 64 PCYC Goulburn 78 36W x 3 Batten 9
18W x 2 Semi Recessed Troffer 8 36W x 1 Batten 46 PCYC Parramatta 34
36W x 1 Batten 25 36W x 1 Semi Recessed Troffer 3 36W x 1 Batten 14
36W x 1 Semi Recessed Troffer 31 36W x 1 Weatherproof Batten 14 36W x 1 Semi Recessed Troffer 12
PCYC Bankstown 35 36W x 5 Batten 15 36W x 1 Weatherproof Batten 8
36W x 1 Batten 11 PCYC Griffith 32 PCYC Penrith 104
36W x 1 Semi Recessed Troffer 16 36W x 1 Batten 28 120W Matsushima Spotlight 10
36W x 6 Batten 8 36W x 1 Semi Recessed Troffer 4 36W x 1 Batten 59
PCYC Bateau Bay 73 PCYC Gunnedah 42 36W x 1 Semi Recessed Troffer 17
36W x 1 Batten 17 36W x 1 Batten 15 36W x 1 Weatherproof Batten 6
36W x 1 Batten 6 36W x 1 Semi Recessed Troffer 12 36W x 5 Batten 12
36W x 1 Semi Recessed Troffer 10 36W x 6 Batten 15 PCYC Port Stephens 80
36W x 1 Weatherproof Batten 4 PCYC Hornsby 35 36W x 1 Batten 35
36W x 5 Batten 36 36W x 1 Batten 20 36W x 1 Semi Recessed Troffer 26
PCYC Bathurst 52 36W x 5 Batten 15 36W x 1 Weatherproof Batten 1
36W x 1 Batten 26 PCYC Kempsey 82 36W x 5 Batten 18
36W x 1 Semi Recessed Troffer 6 36W x 1 Batten 41 PCYC Shoalhaven 58
36W x 6 Batten 20 36W x 1 Recessed Troffer 2 36W x 1 Batten 25
PCYC Belmore 36 36W x 1 Semi Recessed Troffer 23 36W x 1 Semi Recessed Troffer 8
36W x 1 Batten 17 36W x 5 Batten 16 36W x 1 Weatherproof Batten 7
36W x 1 Batten 7 PCYC Lake Illawarra 87 36W x 5 Batten 18
36W x 1 Semi Recessed Troffer 12 36W x 1 Batten 54 PCYC Singleton 35
PCYC Blacktown 66 36W x 1 Recessed Troffer 18 36W x 1 Batten 20
36W x 1 Batten 37 36W x 1 Semi Recessed Troffer 11 36W x 1 Semi Recessed Troffer 9
36W x 1 Semi Recessed Troffer 11 36W x 1 Weatherproof Batten 4 36W x 5 Batten 6
36W x 1 Weatherproof Batten 6 PCYC Lake Macquarie 61 PCYC South Sydney (Redfern) 60
36W x 5 Batten 12 36W x 1 Recessed Troffer 19 36W x 1 Batten 22
PCYC Bourke 102 36W x 1 Semi Recessed Troffer 3 36W x 1 Semi Recessed Troffer 36
36W x 1 Batten 75 36W x 2 Semi Recessed Troffer 18 36W x 2 Weatherproof Batten 2
36W x 1 Semi Recessed Troffer 12 36W x 5 Batten 21 PCYC St George (Rockdale) 50
36W x 5 Batten 15 PCYC Lismore 46 18W x 1 Batten 2
PCYC Broken Hill 41 36W x 1 Batten 31 36W x 1 Batten 10
36W x 1 Batten 34 36W x 1 Semi Recessed Troffer 12 36W x 1 Semi Recessed Troffer 8
36W x 1 Semi Recessed Troffer 7 36W x 1 Weatherproof Batten 3 36W x 2 Batten 8
PCYC Bulli 33 PCYC Liverpool 107 36W x 5 Batten 22
36W x 1 Batten 3 16W Brightgreen Downlight 12 PCYC Sutherland 99
36W x 1 Recessed Troffer 2 36W x 1 Batten 60 18W x 2 Semi Recessed Troffer 7
36W x 1 Semi Recessed Troffer 13 36W x 1 Semi Recessed Troffer 35 36W x 1 Batten 41
36W x 5 Batten 15 PCYC Maitland 70 36W x 1 Semi Recessed Troffer 37
PCYC Burwood 69 36W x 1 Batten 2 36W x 5 Batten 14
36W x 1 Batten 39 36W x 1 Semi Recessed Troffer 29 PCYC Tamworth 104
36W x 1 Semi Recessed Troffer 9 36W x 5 Batten 39 36W x 1 Batten 58
36W x 2 Semi Recessed Troffer 9 PCYC Marrickville 178 36W x 1 Semi Recessed Troffer 18
36W x 5 Batten 12 16W Brightgreen Downlight 16 36W x 1 Weatherproof Batten 6
PCYC Cabramatta (Fairfield) 50 36W x 1 Batten 21 36W x 2 Batten 6
36W x 1 Batten 15 36W x 1 Semi Recessed Troffer 51 36W x 3 Batten 8
36W x 1 Semi Recessed Troffer 14 36W x 1 Weatherproof Batten 36 36W x 5 Batten 8
36W x 4 Batten 9 36W x 6 Batten 54 PCYC Taree 55
36W x 5 Batten 12 PCYC Moree 79 36W x 1 Batten 15
PCYC Campbelltown 70 36W x 1 Recessed Troffer 43 36W x 5 Batten 40
18W x 1 Troffer 3 36W x 1 Semi Recessed Troffer 3 PCYC Tweed Heads 105
36W x 1 Batten 22 36W x 5 Batten 33 16W Brightgreen Downlight 12
36W x 1 Semi Recessed Troffer 27 PCYC Morisset 18 36W x 1 Batten 54
36W x 5 Batten 18 36W x 5 Batten 18 36W x 1 Semi Recessed Troffer 4
PCYC Cessnock 97 PCYC Mt Druitt 62 36W x 1 Weatherproof Batten 4
36W x 1 Batten 2 36W x 1 Batten 31 36W x 3 Batten 16
36W x 1 Weatherproof Batten 20 36W x 1 Semi Recessed Troffer 19 36W x 5 Batten 15
36W x 2 Batten 2 36W x 5 Batten 12 PCYC Umina 65
36W x 3 Batten 3 PCYC Mudgee 60 36W x 1 Batten 53
36W x 5 Batten 30 36W x 1 Batten 34 36W x 1 Semi Recessed Troffer 2
36W x 6 Batten 40 36W x 1 Semi Recessed Troffer 6 36W x 5 Batten 10
PCYC Coffs Harbour 56 36W x 1 Weatherproof Batten 5 PCYC Wellington 33
36W x 1 Batten 25 36W x 6 Batten 15 36W x 1 Batten 6
36W x 1 Semi Recessed Troffer 16 PCYC Muswellbrook 61 36W x 1 Semi Recessed Troffer 12
36W x 6 Batten 15 36W x 1 Batten 28 36W x 1 Weatherproof Batten 9
PCYC Cowra (Binni Creek Rd) 30 36W x 1 Recessed Troffer 2 36W x 3 Batten 6
36W x 1 Batten 12 36W x 1 Semi Recessed Troffer 10 PCYC Wollongong 27
36W x 1 Semi Recessed Troffer 3 36W x 5 Batten 21 36W x 1 Semi Recessed Troffer 16
36W x 5 Batten 15 PCYC Newcastle 62 36W x 5 Batten 11
PCYC Cowra (Young St) 76 36W x 1 Batten 12 PCYC Woolloomooloo (Sydney) 122
120W Matsushima Spotlight 3 36W x 1 Recessed Troffer 12 36W x 1 Batten 72
36W x 1 Batten 3 36W x 1 Semi Recessed Troffer 8 36W x 1 Recessed Troffer 9
36W x 1 Semi Recessed Troffer 9 36W x 2 Batten 15 36W x 1 Semi Recessed Troffer 33
36W x 1 Weatherproof Batten 7 36W x 6 Batten 15 36W x 5 Batten 8
36W x 3 Batten 12 PCYC North Sydney 47 PCYC Young 32
36W x 5 Batten 42 36W x 1 Batten 20 36W x 5 Batten 32
PCYC Dubbo 100 36W x 1 Batten 10 Grand Total 1296
120W Matsushima Spotlight 3 36W x 1 Semi Recessed Troffer 5
36W x 1 Batten 63 36W x 3 Batten 12
36W x 1 Semi Recessed Troffer 12 Grand Total 1378
36W x 1 Weatherproof Batten 4
36W x 5 Batten 18
Grand Total 1153
TOTAL No. OF NEW FITTINGS 3827
Type of Fittings No. of New Fittings No. of New Fittings No. of New Lamps.
(Globes)
No. of Fittings Removed No. of Lamps Removed.
120W Matsushima Spotlight 20 3827 8123 4035 7371
16W Brightgreen Downlight 40
18W x 1 Batten 7
18W x 1 Troffer 3
18W x 2 Semi Recessed Troffer 19
36W x 1 Batten 1469
36W x 1 Batten 23
36W x 1 Recessed Troffer 205
36W x 1 Semi Recessed Troffer 812
36W x 1 Weatherproof Batten 154
36W x 1 Weatherproof Batten 4
36W x 2 Batten 35
36W x 2 Semi Recessed Troffer 27
36W x 2 Weatherproof Batten 2
36W x 3 Batten 66
36W x 4 Batten 9
36W x 5 Batten 657
36W x 5 Batten 18
36W x 6 Batten 257
Grand Total 3827
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code BalmainType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annum
Baseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per annumEnergy Efficiency Improvement MJ per M2Effective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of Activity (exc GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
9.8
Building, Facility or Site 1PCYC Balmain
372 Darling St2041
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
37,944
136,598
38,621
123
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50304210/06/1977
1665
$16,081
$3,199
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code BankstownType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per annumEnergy Efficiency Improvement MJ per M2Effective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
10
Building, Facility or Site 1PCYC Bankstown
55 Meredith Street2200
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
39,228
141,221
12,391
28
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50260010/03/1961
1590$15,730
$1,203
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code BelmoreType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annum
Baseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2
Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of Activity (exc GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
8
Building, Facility or Site 1PCYC Belmore
332 Burwood Rd2192
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
38,368
138,125
14,0111
86
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50208020/07/1951
1600
$10,380
$1,482
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code BurwoodType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
8.8
Building, Facility or Site 1PCYC Burwood
17 Deane St2134
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
39,060
140,616
53,7521
92
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
502756Unknown
1527$25,246
$4,636
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code MintoType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (Ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
8.7
Building, Facility or Site 1PCYC Campbelltown
98 Minto Road2566
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
45,540
163,944
128,5421
79
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
5022621/09/1986
2083
$31,218
$7,341
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code DaceyvilleType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
12
Building, Facility or Site 1PCYC Daceyville
26A Bunnerong Rd2032
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
48,288
173,837
59,1551
109
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50312013/08/1945
1591$35,410
$5,084
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code GlebeType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of Activity (exc GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
12
Building, Facility or Site 1PCYC Glebe
2-4 Minogue Crescent2037
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
75,702
272,527
89,9601
116
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
5037441/01/1967
2351
$27,735
$7,420
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code MillerType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
12
Building, Facility or Site 1PCYC Liverpool
Cartwright Avenue2168
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
66,000
237,600
46,0841
166
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
503000Unknown
1435$35,894
$3,704
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code MarrickvilleType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
12.9
Building, Facility or Site 1PCYC Marrickville
531 Illawarra Rd2204
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
197,196
709,906
332,7122
172
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
504680Unknown
4127$74,320
$26,231
PROJECT TITLE PCYC Lighting Upgrade Project CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd
Site Name
Location (address)Suburb and Post Code RockdaleType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
2788
$42,315
$4,508Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
5024961/01/1969
9.6
Building, Facility or Site 1PCYC St George (Rockdale)
McCarthy Reserve, 9 Ador Ave2216
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
104,568
376,445
57,4811
135
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code SutherlandType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annum
Baseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of Activity (exc GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
10.2
Building, Facility or Site 1PCYC South Sutherland
Waratah Park, Eton Street South2232
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
74,736
269,050
138,0201
105
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50317223/06/1969
2552
$35,297
$14,635
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code Bateau BayType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate Method
Baseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per m2 annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Unknown
2583
$41,581
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
$15,233
10.6503874
3
Building, Facility or Site 1PCYC Bateau Bay
The Entrance Rd2261
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
83,088
299,117
128,322
116
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code BlacktownType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50213223/10/1973
1569$26,681
$2,315
8.2
Building, Facility or Site 1PCYC Blacktown
30 Second Avenue2148
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
31,600
113,760
27,8101
73
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code CabramattaType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
5032001/03/1961
2791$23,484
$4,799
12
Building, Facility or Site 1PCYC Cabramatta
Cnr Railway Parade & McBurney Road2166
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
76,320
274,752
56,1102
98
PROJECT TITLE PCYC Lighting Upgrade Project CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd
Site Name
Location (address)Suburb and Post Code HornsbyType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50293821/04/1965
2300$18,340
$1,663
11.3
Building, Facility or Site 1PCYC Hornsby
94 George Street2077
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
63,240
227,664
20,9772
99
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code WindaleType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
502860
3044$29,317
$6,489
11/12/1981
11
Building, Facility or Site 1PCYC Lake Macquarie
8A Lake Street2306
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
32,120
115,632
56,5092
38
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code MaitlandType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50340626/06/1963
3051$42,756
$8,872
10.9
Building, Facility or Site 1PCYC Maitland
James Street2320
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
96,402
347,047
104,1803
114
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code ShalveyType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate Method
Baseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50254825/07/2005
1924
$25,133
$1,814
8.2
Building, Facility or Site 1PCYC Mt Druitt
453a Luxford Rd2770
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
37,920
136,512
21,1901
71
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code BroadmeadowType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50340610/08/1966
3426$30,985
$6,621
10.9
Building, Facility or Site 1PCYC Newcastle
Cnr Young & Melbourne Rd2292
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
27,486
98,950
61,5824
29
PROJECT TITLE PCYC Lighting Upgrade Project CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd
Site Name
Location (address)Suburb and Post Code North SydneyType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50426416/05/1941
1429
$19,663
$4,355
11.7
Building, Facility or Site 1
PCYC North Sydney
224-230 Falcon Street2060
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
42,492
152,971
45,1871
107
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code ParramattaType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
503120
1478$28,997
$2,879
7/07/1960
10
Building, Facility or Site 1PCYC Parramatta
12 Hassall St2150
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
101,688
366,077
38,9701
248
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code PenrithType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
503125Unknown
2201$38,072
$4,347
12.5
Building, Facility or Site 1PCYC Penrith
100 Station Street2750
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
68,616
247,018
57,8591
112
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code WoolloomoolooType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
503,22410/04/1959
1389$44,779
$7,421
10.3
Building, Facility or Site 1PCYC Wooloomooloo
Cnr. Cathedral & Riley St9360 5835
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
56,772
204,379
64,8862
147
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code ArmidaleType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
5025748/05/1951
1693
$30,182
$6,555
8.3
Building, Facility or Site 1PCYC Armidale
176 Rusden Street2350
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
29,164
104,990
56,3801
62
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code Coffs HarbourType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50280826/05/1997
1691
$25,220
$4,806
9
Building, Facility or Site 1PCYC Coffs Harbour
74 Bray St2450
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
57,440
206,784
42,7461
122
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code GunnedahType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50286024/12/1981
1855
$23,526
$4,402
11
Building, Facility or Site 1PCYC Gunnedah
View Street2380
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
47,880
172,368
39,8881
93
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code KempseyType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
502574Unknown
1879
$33,724
$4,492
8.3
Building, Facility or Site 1PCYC Kempsey
38 Bloomfield St2440
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
58,108
209,189
43,5101
111
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code LismoreType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50272816/10/1970
1642
$13,431
$8,716
10.7
Building, Facility or Site 1PCYC Lismore
Cnr Orion & Dawson Streets2480
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
34,516
124,258
77,1592
76
PROJECT TITLE PCYC Lighting Upgrade Project CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd
Site Name
Location (address)Suburb and Post Code MoreeType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
5031981980
1369
$42,557
$9,279
12.7
Building, Facility or Site 1PCYC Moree
Boston Street2400
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
59,936
215,770
86,5761
158
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code MorissetType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate Method
Baseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
502000Unknown
969$15,937
$3,969
8
Building, Facility or Site 1PCYC Morisset
5 Kahibah St2264
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
26,001
93,604
41,4651
97
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code MuswellbrookType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
5042901/11/1996
2831$32,238
$6,168
13.8
Building, Facility or Site 1
PCYC Muswellbrook
Carl Street2333
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
45,204
162,734
57,2693
57
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code Nelson BayType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
5051221/06/1979
2005
$35,176
$9,678
14.1
Building, Facility or Site 1PCYC Port Stephens
7 Austral Street2315
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
35,892
129,211
84,1251
64
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code SingletonType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
503588Unknown
1154
$15,101
$2,565
11.5
Building, Facility or Site 1PCYC Singleton
High Street2330
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
31,816
114,538
44,9601
99
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code TareeType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate Method
Baseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
5029901/01/1988
3085
$35,470
$9,243
11.5
Building, Facility or Site 1PCYC Taree
Commerce Street2430
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
53,512
192,643
64,0555
62
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code Tweed HeadsType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate Method
Baseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
5030001/01/1992
2298$44,182
$7,113
12
Building, Facility or Site 1PCYC Tweed Heads
Adelaide/Florence Streets2485
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
59,672
214,819
66,5752
93
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code UminaType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
5025001/05/1999
1474
$24,459
$3,142
3.5
Building, Facility or Site 1
PCYC Umina
101 Osborne Ave2257
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
34,592
124,531
26,2692
84
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code BathurstType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50228813/02/1989
1990
$27,476
$3,544
8.8
Building, Facility or Site 1PCYC Bathurst
Cnr Morriset & Commonwealth St2795
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
44,640
160,704
25,3151
81
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code CowraType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50205428/07/1983
1341$19,223
$2,010
7.9
Building, Facility or Site 1
PCYC Cowra
Binni Creek Road2794
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
13,248
47,693
16,1391
36
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code CowraType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50205428/07/1983
1341$20,001
$4,039
7.9
Building, Facility or Site 1
PCYC Cowra
Young Road2794
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
36,048
129,773
32,3351
97
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code DubboType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50309427/06/1905
3086
$36,940
$10,432
9.9
Building, Facility or Site 1PCYC Dubbo
Cnr Erskine & Darling Streets2830
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
98,648
355,133
105,5023
115
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code GriffithType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50257419/10/1965
1307
$18,256
$1,656
8.3
Building, Facility or Site 1PCYC Griffith
5 Olympic St2680
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
30,020
109,843
16,7621
84
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code MudgeeType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50403010/07/1958
1630$23,984
$4,232
12.9
Building, Facility or Site 1PCYC Mudgee
50 Market Street2850
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
82,720
297,792
44,8342
183
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code OrangeType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate Method
Baseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50360018/03/1969
6101$81,601
$12,944
12
Building, Facility or Site 1PCYC Orange
96-98 Byng St2800
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
129,124
464,846
132,1814
76
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT IDFUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code ParkesType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
5025742/04/1974
2318
$20,777
$2,302
8.3
Building, Facility or Site 1
PCYC Parkes
36-40 Pearce St2870
Community Activity Building
Upgrade of old lighting to energy efficient lighting
The process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
24,480
88,128
22,0071
38
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code TamworthType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50312030/04/1974
2954
$37,752
$9,307
12
Building, Facility or Site 1
PCYC Tamworth
2 Darling Street2340
Community Activity Building
Upgrade of old lighting to energy efficient lighting
The process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
12,888
46,397
75,1281
16
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code WellingtonType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate Method
Baseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50231421/09/1992
937
$16,001
$2,871
8.9
Building, Facility or Site 1
PCYC Wellington
69 Gobolion St2820
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
21,168
76,205
25,1891
81
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code YoungType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50260015/11/1985
2934
$29,281
$6,580
10
Building, Facility or Site 1
PCYC Young
45 Lachlan Street2594
Community Activity Building
High Bay fittings over the Courts figures onlyThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
68,714
247,370
62,4561
84
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code AlburyType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate Method
Baseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50273019/10/1978
2583
$28,072
$3,273
10.5
Building, Facility or Site 1PCYC Albury
Cnr Keene & Andrews Streets2640
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
32,120
115,632
28,4981
45
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code BourkeType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
503666Unknown
1645$37,251
$7,681
11.8
Building, Facility or Site 1
PCYC Bourke
2 Wilson Street2840
Community Activity Building
Upgrade of old lighting to energy efficient lighting
The process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
70,000
252,000
108,0224
153
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code Broken HillType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50319823/05/1946
1406$13,224
$1,175
10.3
Building, Facility or Site 1
PCYC Broken Hill
Gypsum St2880
Community Activity Building
Upgrade of old lighting to energy efficient lighting
The process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
18,808
67,709
6,2931
48
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code BulliType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
5031208/10/1948
1814
$25,911
$1,972
12
Building, Facility or Site 1
PCYC Bulli
253 Princes Highway2516
Community Activity Building
Upgrade of old lighting to energy efficient lighting
The process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
27,096
97,546
24,9161
54
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code GoulburnType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50358812/04/1978
1658
$31,425
$5,524
11.5
Building, Facility or Site 1PCYC Goulburn
Crn Avoca and Derwent Street2580
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
38,684
139,262
53,4741
84
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code WarillaType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50312022/02/1975
2633
$30,181
$5,131
12
Building, Facility or Site 1
PCYC Lake Illawarra
Reddall Parade2528
Community Activity Building
Upgrade of old lighting to energy efficient lighting
The process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
53,784
193,622
65,8842
74
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code NowraType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
502132Unknown
2374
$29,636
$3,708
6.8
Building, Facility or Site 1PCYC Shoalhaven
Park Road2541
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
44,284
159,422
46,4361
67
PROJECT TITLE PCYC Lighting Upgrade Project CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd
Site Name
Location (address)Suburb and Post Code North WollongongType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)
Cost of Activity (ex GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
5028345/10/1951
1771
$16,836
$1,781
10.9
Building, Facility or Site 1PCYC Wollongong
GSI Office to provide2500
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
31,676
114,034
21,5931
64
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code RedfernType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of ActivityEstimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
50350023/06/1952
1485$18,654
$3,666
14
Building, Facility or Site 1PCYC South Sydney (Redfern)
638 Elizabeth St2016
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
45,864
165,110
39,9781
111
PROJECT TITLE PCYC Lighting Upgrade Project PROJECT ID CEEP1000FUNDING RECIPIENT Police Citizens Youth Clubs NSW Ltd DATE
Site Name
Location (address)Suburb and Post Code CessnockType of building, facility or siteActivity Type and MeasureEnergy Efficiency Estimate MethodBaseline Energy Usage kWh per annumBaseline Energy Efficiency Mj per annumEnergy Efficiency Improvement MJ per M2Energy Efficiency Improvement MJ per annumEffective Full Time StaffHours of Use (Daily)Weeks Open AnnuallyHours of Use (Annual)Year Building BuiltTotal Floor Area of Site (sqr/m)Cost of Activity (exc GST)Estimated Cost Savings (p/year)Typical Operating CircumstancesAny Particular Issues Affecting Energy Consumption
Permanent small office with PCYC staff working standard work hours eg, 9-5. Rest of site and activity rooms used intermittently as booked.
No
504500Unknown
1637
$48,945
$7,153
9
Building, Facility or Site 1PCYC Cessnock
196 Wollombi Road2325
Community Activity Building
Upgrade of old lighting to energy efficient lightingThe process used is to count the existing light fittings, type, obtain hours of use and enter into NSW IPART calculators against new fittings used.
120,554
433,994
56,3152
265
GSI Project Report PCYC NSW
Lighting Retrofit - PCYC NSW Overview
PCYC's proposed project aimed to improve the energy efficiency of 57 clubs across
New South Wales due to disproportionate rising electricity costs small community sites have been experiencing. The major uses of energy on site are lighting using 49%. The main lighting areas on the site use 44% and include the Main Sporting Hall, Gymnastics Room, Weights Room, Boxing Room, Martial Arts Rooms, Offices and Foyer areas. This project can reduce main lighting by 59% resulting in a total site energy reduction of 27%.
The project resulted in reducing the running costs of the PCYC’s facilities due to a
coordinated install, warranty and maintenance program, improved lighting levels and safety for the community. The project reduced electricity costs, greenhouse gas emissions and provide a community education hub displaying a variety of clean lighting technologies and implementation.
PCYC clubs operate with extended hours, many clubs operate between 6am & 10pm. The importance of energy reduction via lighting is paramount. The peak usage times within PCYC also correspond to the energy network high peak hours of 7am-9am and 4pm-7pm as these times represent peak periods for gym usage and exercise class times. Therefore, the 937 MWh of annual energy reduction from the project will also reduce the burden on the energy network at these peak times.
This project uses Australian energy experts, Australian manufacturers, local Australian small businesses installers (tradespeople) across NSW.
PCYC NSW Community Buildings
Police Citizens Youth Clubs are host to a range of community activities, sporting programsand Police programs.
In any club on any given day you will find NSW Police case managing young offenders and youth at risk. Sporting sessions for young people, adults and seniors. Boxing, martial arts, gymnastics, weights, traffic offenders programs, child care, education programs, playgroup, music programs and drop-in are just a sample of what is on offer.
The activities and programs are designed and run based upon community need with PCYC boasting a membership of 82,000 members across the state. This membership represents the participant numbers, when spectators and parents are added into this equation the figures are in the vicinity of 150,000.
GSI Project Report PCYC NSW
2
Main Hall Before Main Hall After
Objectives
PCYC's proposed project aims to improve the energy efficiency of PCYC facilities, the main areas on the sites include the Main Sporting Hall, Gymnastics Room, Weights Room, Boxing Room, Martial Arts Rooms, Offices and Foyer areas.
The anticipated outcomes from this project include a reduction in energy expenditure and greenhouse gas emissions. Additional project outcomes include a reduction in running costs through warranties and maintenance savings, improved safety and the education of the community on clean lighting technologies. PCYC sites have diverse lighting requirements and fitting types on sites, so PCYC will be able to display various clean lighting technologies and applications to the local community to assist with community understanding and education on applciaiton of new clean technologies.
Implementation
Initial audits and feasability studies were conducted at each of the selected sites in late 2011. The site vistis were focused on identifying the best cost benefit outcome. All of the sites are community facilities that have high use by local residents. Given that the completion of highly technical energy efficiency projects is not one ofPCYC’s core competencies, to reduce the CEEP Project risk profile, Council formed a partnership with an Energy Services Company (ESCo) Global Sustainability Initiatives (GSI). In comparison to entering into a contract with a consultant who works independently, the decision to form a partnership with an ESCo allowed PCYC to work in collaboration with GSI throughout the project life-cycle. The partnership with the ESCo allowed close consultation throughout the project and decreased both financial and technical risk as well as creating a sound and confident procurement process. Implementation of upgrades commenced in May 2013 and were completed in December 2013.
GSI Project Report PCYC NSW
3
Outcomes
The CEEP Program works concluded in December 2013 following quantifiable outcomes:
The upgrades have resulted in improved facilities and user amenity, with more even lighting resulting in reduced glare and less visual fatigue. The renewal of infrastructure has significantly reduced annual ongoing maintenance costs adding further financial savings to the project outcomes.
Business Case
It was a very worthwhile project financially providing a strong return to PCYC with a simple project payback period is 2.7 years.
Key Learnings
Access expert knowledge and obtain the right technical expertise where there are gaps internally;
Form relationships and network with industry experts and organisations for continous learning and partnership opportunities;
Engagement with facility users and communication to all stakeholders for smooth implementation;
Promotion to community for support and recognition of leading by example
Contact
Name: Chris Diener Position: Properties and Projects ManagerPhone: 02 9625 9111 Email: [email protected]
Clusters Installation Time
Frame
Electricity
savings/pa (KWh)
Cost $
savings/pa
GHG Tonnes
(Project Life)
1 - 5
July - December 2013
934,589
$310,508
4,133
GSI Project Report PCYC NSW
Lighting Retrofit - PCYC NSW PCYC Belmore
Site Upgrade Summary
To ensure the most efficient and least disruptive lighting upgrade occurred it was important that communications were maintained between the GSI Project Manager, Club Manager and Electrical Contractors throughout the installation. This included the following:
Site Upgrade Process Coordinate a pre install site visit from installers Confirm the hours of use for each room Confirm the rooms and light fittings being replaced according to the available site budget Clarify any issues that may impact on installation (eg. weights being moved, load bearing
capacity of Main Hall floors) based on Site Manager and installers site visit feedback Confirm tasks that are the responsibility of the Club to assist with the install ie. Club staff
required to move equipment, furniture, gymnasium floor matting and the like prior to or during the install
Confirm which days works can be completed in each room to fit in with the Club’s schedule of room bookings and activities
Confirm clear access to and on - site safe storage of fittings prior to and during install Confirm suitable dates and start times for installation based on Club bookings and activities
and that provide early access for electricians Rooms Completed Out of the total of 12 rooms on the site the following 8 were upgraded based a cost/benefit analysis including hours of use, existing lighting and the available installation budget.
Entrance Foyer Walkway 2 Stairway Walkway 1
Conference Room Main Office Police Room
Weights Room 1 Games Room
Cluster Installation Electricity
savings/pa (KWh)
$ Cost savings/pa GHG Tonnes
(Project Life)
1
July 2013
4,163
1,482.00
19
GSI Project Report PCYC NSW
2
Post Installation Measurement and Verification
On completion independent electricians completed ‘Tong’ (Amp) testing on lighting circuits to confirm energy reductions, light levels were measured and pre and post photos were taken.
Entrance Foyer Before Entrance Foyer After
GSI Project Report PCYC NSW
Lighting Retrofit - PCYC NSW PCYC Blacktown Site Upgrade Summary
To ensure the most efficient and least disruptive lighting upgrade occurred it was important that communications were maintained between the GSI Project Manager, Club Manager and Electrical Contractors throughout the installation. This included the following:
Site Upgrade Process Coordinate a pre install site visit from installers Confirm the hours of use for each room Confirm the rooms and light fittings being replaced according to the available site budget Clarify any issues that may impact on installation (eg. weights being moved, load bearing
capacity of Main Hall floors) based on Site Manager and installers site visit feedback Confirm tasks that are the responsibility of the Club to assist with the install ie. Club staff
required to move equipment, furniture, gymnasium floor matting and the like prior to or on the install
Confirm which days works can be completed in each room to fit in with the Club’s schedule of room bookings and activities
Confirm clear access to and on - site safe storage of fittings prior to and during install Confirm suitable dates and start times for installation based on Club bookings and activities
and that provide early access for electricians Rooms Completed Out of the total of 13 rooms on the site the following 11 were upgraded based a cost/benefit analysis including hours of use, existing lighting and the available installation budget.
Police Office Toilet (M) Toilet (F)
Entrance Stairwell & up walkway Main Hall
Office Dance Room Gym
Boxing Boxing Annexe
Cluster Installation Electricity
savings/pa (KWh)
Cost savings/pa
($)
GHG Tonnes
(Project Life)
2
July
7,725
2,315
40
GSI Project Report PCYC NSW
2
Post Installation Measurement and Verification
On completion independent electricians completed ‘Tong’ (Amp) testing on lighting circuits to confirm energy reductions, light levels were measured and pre and post photos were taken.
Gym Before Gym After
GSI Project Report PCYC NSW
Lighting Retrofit - PCYC NSW PCYC Bourke Site Upgrade Summary
To ensure the most efficient and least disruptive lighting upgrade occurred it was important that communications were maintained between the GSI Project Manager, Club Manager and Electrical Contractors throughout the installation. This included the following:
Site Upgrade Process Coordinate a pre install site visit from installers Confirm the hours of use for each room Confirm the rooms and light fittings being replaced according to the available site budget Clarify any issues that may impact on installation (eg. weights being moved, load bearing
capacity of Main Hall floors) based on Site Manager and installers site visit feedback Confirm tasks that are the responsibility of the Club to assist with the install ie. Club staff
required to move equipment, furniture, gymnasium floor matting and the like prior to or during the install
Confirm which days works can be completed in each room to fit in with the Club’s schedule of room bookings and activities
Confirm clear access to and on - site safe storage of fittings prior to and during install Confirm suitable dates and start times for installation based on Club bookings and activities
and that provide early access for electricians Rooms Completed Out of the total of 15 rooms on the site the following 13 were upgraded based a cost/benefit analysis including hours of use, existing lighting and the available installation budget.
Weights Area Main Office Front Office/Recep. Managers Office
Club Entry Foyer Youth Work Office Court
Gym (upstairs) Walkway Multi Purpose Room Activity Room
Meeting Room
Cluster Installation Electricity
savings/pa (KWh)
Cost savings/pa
($)
GHG Tonnes
(Project Life)
5
December
30,006
7,681
135
GSI Project Report PCYC NSW
2
Post Installation Measurement and Verification
On completion independent electricians completed ‘Tong’ (Amp) testing on lighting circuits to confirm energy reductions, light levels were measured and pre and post photos were taken.
Weights Area Before Weights Area After
GSI Project Report PCYC NSW
Lighting Retrofit - PCYC NSW PCYC Bulli Site Upgrade Summary
To ensure the most efficient and least disruptive lighting upgrade occurred it was important that communications were maintained between the GSI Project Manager, Club Manager and Electrical Contractors throughout the installation. This included the following:
Site Upgrade Process Coordinate a pre install site visit from installers Confirm the hours of use for each room Confirm the rooms and light fittings being replaced according to the available site budget Clarify any issues that may impact on installation (eg. weights being moved, load bearing
capacity of Main Hall floors) based on Site Manager and installers site visit feedback Confirm tasks that are the responsibility of the Club to assist with the install ie. Club staff
required to move equipment, furniture, gymnasium floor matting and the like prior to or during the install
Confirm which days works can be completed in each room to fit in with the Club’s schedule of room bookings and activities
Confirm clear access to and on - site safe storage of fittings prior to and during install Confirm suitable dates and start times for installation based on Club bookings and activities
and that provide early access for electricians Rooms Completed Out of the total of 13 rooms on the site the following 7 were upgraded based a cost/benefit analysis including hours of use, existing lighting and the available installation budget.
Club Office Foyer Managers Office
Police Office Large Basketball Court
Toilet Kitchen
Cluster Installation Electricity
savings/pa (KWh)
Cost savings/pa
($)
GHG Tonnes
(Project Life)
5
December
6,921
1,972
40
GSI Project Report PCYC NSW
2
Post Installation Measurement and Verification
On completion independent electricians completed ‘Tong’ (Amp) testing on lighting circuits to confirm energy reductions, light levels were measured and pre and post photos were taken.
Large Basketball Court Before Large Basketball Court After
GSI Project Report PCYC NSW
Lighting Retrofit - PCYC NSW PCYC Campbelltown Site Upgrade Summary
To ensure the most efficient and least disruptive lighting upgrade occurred it was important that communications were maintained between the GSI Project Manager, Club Manager and Electrical Contractors throughout the installation. This included the following:
Site Upgrade Process Coordinate a pre install site visit from installers Confirm the hours of use for each room Confirm the rooms and light fittings being replaced according to the available site budget Clarify any issues that may impact on installation (eg. weights being moved, load bearing
capacity of Main Hall floors) based on Site Manager and installers site visit feedback Confirm tasks that are the responsibility of the Club to assist with the install ie. Club staff
required to move equipment, furniture, gymnasium floor matting and the like prior to or during the install
Confirm which days works can be completed in each room to fit in with the Club’s schedule of room bookings and activities
Confirm clear access to and on - site safe storage of fittings prior to and during install Confirm suitable dates and start times for installation based on Club bookings and activities
and that provide early access for electricians Rooms Completed Out of the total of 18 rooms on the site the following 9 were upgraded based a cost/benefit analysis including hours of use, existing lighting and the available installation budget.
Front Entrance Police Office Foyer Hall Main Office
Gym Toilets (M) Hallway
Toilets Staff Toilets (F) Main Hall
Cluster Installation Electricity
savings/pa (KWh)
Cost savings/pa
($)
GHG Tonnes
(Project Life)
1
July 2013
27,841
7,341
125
GSI Project Report PCYC NSW
2
Post Installation Measurement and Verification
On completion independent electricians completed ‘Tong’ (Amp) testing on lighting circuits to confirm energy reductions, light levels were measured and pre and post photos were taken.
Main Hall Before Main Hall After
GSI Project Report PCYC NSW
Lighting Retrofit - PCYC NSW PCYC Newcastle Site Upgrade Summary
To ensure the most efficient and least disruptive lighting upgrade occurred it was important that communications were maintained between the GSI Project Manager, Club Manager and Electrical Contractors throughout the installation. This included the following:
Site Upgrade Process Coordinate a pre install site visit from installers Confirm the hours of use for each room Confirm the rooms and light fittings being replaced according to the available site budget Clarify any issues that may impact on installation (eg. weights being moved, load bearing
capacity of Main Hall floors) based on Site Manager and installers site visit feedback Confirm tasks that are the responsibility of the Club to assist with the install ie. Club staff
required to move equipment, furniture, gymnasium floor matting and the like prior to or during the install
Confirm which days works can be completed in each room to fit in with the Club’s schedule of room bookings and activities
Confirm clear access to and on - site safe storage of fittings prior to and during install Confirm suitable dates and start times for installation based on Club bookings and activities
and that provide early access for electricians Rooms Completed Out of the total of 12 rooms on the site the following 7 were upgraded based a cost/benefit analysis including hours of use, existing lighting and the available installation budget.
Entrance Foyer Manager/Police Office Reception/Office
Boxing Room Hunter Hall Gym
Cardio
Cluster Installation Electricity
savings/pa (KWh)
Cost savings/pa
($)
GHG Tonnes
(Project Life)
2
July 2013
17,106
6,621
77
GSI Project Report PCYC NSW
2
Post Installation Measurement and Verification
On completion independent electricians completed ‘Tong’ (Amp) testing on lighting circuits to confirm energy reductions, light levels were measured and pre and post photos were taken.
Hunter Hall Before Hunter Hall After
GSI Project Report PCYC NSW
Lighting Retrofit - PCYC NSW PCYC Parkes Site Upgrade Summary
To ensure the most efficient and least disruptive lighting upgrade occurred it was important that communications were maintained between the GSI Project Manager, Club Manager and Electrical Contractors throughout the installation. This included the following:
Site Upgrade Process Coordinate a pre install site visit from installers Confirm the hours of use for each room Confirm the rooms and light fittings being replaced according to the available site budget Clarify any issues that may impact on installation (eg. weights being moved, load bearing
capacity of Main Hall floors) based on Site Manager and installers site visit feedback Confirm tasks that are the responsibility of the Club to assist with the install ie. Club staff
required to move equipment, furniture, gymnasium floor matting and the like prior to or during the install
Confirm which days works can be completed in each room to fit in with the Club’s schedule of room bookings and activities
Confirm clear access to and on - site safe storage of fittings prior to and during install Confirm suitable dates and start times for installation based on Club bookings and activities
and that provide early access for electricians Rooms Completed Out of the total of 14 rooms on the site the following 10 were upgraded based a cost/benefit analysis including hours of use, existing lighting and the available installation budget.
Toilets (M) Toilets (F) Archery
Office Fitness/Boxing Hallway
Foyer Kids Care Gymnastics
Weights
Cluster Installation Electricity
savings/pa (KWh)
Cost savings/pa
($)
GHG Tonnes
(Project Life)
4
December
6,113
2,302
28
GSI Project Report PCYC NSW
2
Post Installation Measurement and Verification
On completion independent electricians completed ‘Tong’ (Amp) testing on lighting circuits to confirm energy reductions, light levels were measured and pre and post photos were taken.
Kids Care Before Kids Care After
GSI Project Report PCYC NSW
Lighting Retrofit - PCYC NSW PCYC Port Stephens Site Upgrade Summary
To ensure the most efficient and least disruptive lighting upgrade occurred it was important that communications were maintained between the GSI Project Manager, Club Manager and Electrical Contractors throughout the installation. This included the following:
Site Upgrade Process Coordinate a pre install site visit from installers Confirm the hours of use for each room Confirm the rooms and light fittings being replaced according to the available site budget Clarify any issues that may impact on installation (eg. weights being moved, load bearing
capacity of Main Hall floors) based on Site Manager and installers site visit feedback Confirm tasks that are the responsibility of the Club to assist with the install ie. Club staff
required to move equipment, furniture, gymnasium floor matting and the like prior to or during the install
Confirm which days works can be completed in each room to fit in with the Club’s schedule of room bookings and activities
Confirm clear access to and on - site safe storage of fittings prior to and during install Confirm suitable dates and start times for installation based on Club bookings and activities
and that provide early access for electricians Rooms Completed Out of the total of 19 areas on the site a total of 11 areas were upgraded based a cost/benefit analysis including hours of use, existing lighting and the available installation budget.
Cluster Installation Electricity
savings/pa (KWh)
Cost savings/pa
($)
GHG Tonnes
(Project Life)
3
August
18,081
$9,057
105
GSI Project Report PCYC NSW
2
External Entry Foyer Office & store
Main Walkway Reception Toilets M
Toilets F Main Hall Main Hall Seating Area
Dance Room Training Room
Post Installation Measurement and Verification
On completion independent electricians completed ‘Tong’ (Amp) testing on lighting circuits to confirm energy reductions, light levels were measured and pre and post photos were taken.
Main Hall Before Main Hall After
GSI Project Report PCYC NSW
Lighting Retrofit - PCYC NSW PCYC Taree Site Upgrade Summary
To ensure the most efficient and least disruptive lighting upgrade occurred it was important that communications were maintained between the GSI Project Manager, Club Manager and Electrical Contractors throughout the installation. This included the following:
Site Upgrade Process Coordinate a pre install site visit from installers Confirm the hours of use for each room Confirm the rooms and light fittings being replaced according to the available site budget Clarify any issues that may impact on installation (eg. weights being moved, load bearing
capacity of Main Hall floors) based on Site Manager and installers site visit feedback Confirm tasks that are the responsibility of the Club to assist with the install ie. Club staff
required to move equipment, furniture, gymnasium floor matting and the like prior to or during the install
Confirm which days works can be completed in each room to fit in with the Club’s schedule of room bookings and activities
Confirm clear access to and on - site safe storage of fittings prior to and during install Confirm suitable dates and start times for installation based on Club bookings and activities
and that provide early access for electricians Rooms Completed Out of the total of 13 rooms on the site the following 5 were upgraded based a cost/benefit analysis including hours of use, existing lighting and the available installation budget.
Multipurpose Room Gymnasium 1
Gymnasium 2 Auditorium Main Hall 1
Auditorium Main Hall 2
Cluster Installation Electricity
savings/pa (KWh)
Cost savings/pa
($)
GHG Tonnes
(Project Life)
3
September
23,576
9,138
106
GSI Project Report PCYC NSW
2
Post Installation Measurement and Verification
On completion independent electricians completed ‘Tong’ (Amp) testing on lighting circuits to confirm energy reductions, light levels were measured and pre and post photos were taken.
Multipurpose Room Before Multipurpose Room After
GSI Project Report PCYC NSW
Lighting Retrofit - PCYC NSW PCYC Young
Site Upgrade Summary
To ensure the most efficient and least disruptive lighting upgrade occurred it was important that communications were maintained between the GSI Project Manager, Club Manager and Electrical Contractors throughout the installation. This included the following:
Site Upgrade Process Coordinate a pre install site visit from installers Confirm the hours of use for each room Confirm the rooms and light fittings being replaced according to the available site budget Clarify any issues that may impact on installation (eg. weights being moved, load bearing
capacity of Main Hall floors) based on Site Manager and installers site visit feedback Confirm tasks that are the responsibility of the Club to assist with the install ie. Club staff
required to move equipment, furniture, gymnasium floor matting and the like prior to or on the install
Confirm which days works can be completed in each room to fit in with the Club’s schedule of room bookings and activities
Confirm clear access to and on - site safe storage of fittings prior to and during install Confirm suitable dates and start times for installation based on Club bookings and activities
and that provide early access for electricians Rooms Completed Out of the total of 13 rooms on the site the Main Hall was upgraded based a cost/benefit analysis including hours of use, existing lighting and the available installation budget.
Post Installation Measurement and Verification
On completion independent electricians completed ‘Tong’ (Amp) testing on lighting circuits to confirm energy reductions, light levels were measured and pre and post photos were taken.
Cluster Installation Electricity
savings/pa (KWh)
Cost savings/pa
($)
GHG Tonnes
(Project Life)
4
December
28,809
5,787
130
GSI Project Report PCYC NSW
2
Main Hall Before Main Hall After
Goes green!
You are in an energy-efficient club
Thanks to new clean lighting technologies
This project received funding by the Australian Government – Department of Industry as part of the Community Energy Efficiency Program.
PCYC NSW Website & Internal Intranet
PCYC NSW Intranet Site – Home Page
Select the Clubs & Properties link
PCYC NSW Intranet Site – Properties Page
Select the Community Energy Efficiency Program link
The link provides access to the whole of project and individual club case studies.
PCYC NSW Website – Home Page
Select the Media & Events icon
With more than 60 clubs and centres across the state and around 85,000 members, Police Citizens Youth Clubs NSW is one of Australia’s leading youth organisations.
State office: 1C Mimika Ave, Whalan NSW, 2770 Phone: 9625-9111.
Media release Attention news editors, chiefs of staff and producers
PCYC completes massive improvement project
A statewide project to improve lighting at PCYC clubs and reduce energy use and costs has been completed. Fifty-nine clubs, including PCYC Taree, were part of the project worth more than $1.7 million and jointly funded by PCYC NSW and federal government’s Department of Industry as part of the community energy efficiency program PCYC NSW properties and project manager Chris Diener said the objectives of the project were to improve the energy efficiency across PCYC NSW facilities by reducing energy consumption and greenhouse gas emissions, reducing the cost of lighting maintenance and capital replacements and improving general safety and compliance using clean lighting technologies. “The project involved extensive consultation in lighting design to be fit for purpose, removal of old lighting and installation of new lighting most suitable to each specific room and to meet current lighting Australian Standards,” he said. “PCYC clubs operate with extended hours and most clubs operate between 6am and 10pm. The importance of energy reduction via lighting is paramount. The peak usage times within PCYCs also correspond to the energy network high peak hours of 7am to 9am and 4pm to 7pm as these times represent peak periods for gym usage and exercise classes. “The major use of energy across PCYC NSW is lighting, using an estimated 49 per cent of the total energy bill. “This project aimed to reduce lighting energy costs by 59 per cent, resulting in a total site energy reduction of 27 per cent. “The 937 megawatt hours of annual energy reduced by the project will also reduce the burden on the energy network at these peak times.” The electricity use reduction represents a saving of 644 tonnes of greenhouse gases, equivalent to the emissions from 136 cars or burning 314 tonnes of coal. At PCYC Taree, lighting improvements were carried out to the multipurpose rooms, two gymnasiums and the two main hall auditoriums, saving the club nearly $10,000 in electricity costs each year. Copies of whole-of-project and club-specific case studies are attached to this release. For further information or comment, please contact PCYC NSW properties and project manager Chris Diener on 9625 9111.
ROOM REFLECTANCE
TECH
NICA
L IN
FORM
ATIO
N
POLAR INTENSITY DIAGRAM
ROOM INDEX
e1-BSB1x37
LEGEND: C0 BLUE. C90 RED. C45 DASHED (cd/klm)
C W F 1.00 2.00 3.00 4.00 5.00
0.47 0.62 0.68 0.72 0.74
0.41 0.56 0.63 0.68 0.71
0.36 0.52 0.60 0.64 0.68
0.45 0.58 0.64 0.67 0.69
0.39 0.54 0.60 0.64 0.67
0.35 0.50 0.57 0.61 0.64
0.43 0.55 0.60 0.63 0.65
0.38 0.51 0.57 0.61 0.63
0.34 0.48 0.54 0.58 0.61
0.32 0.44 0.50 0.53 0.56
0.70 0.50 0.20
0.50 0.20
0.30 0.20
0.30
0.10
0.50
0.30
0.10
0.50
0.30
0.10
0.00 0.00 0.00
LIGHT OUTPUT RATIO: 76.9% / SHR NOM: 1.75 / SHR MAX 1.77
UTILISATION FACTOR TABLE
80
160
240 30
60
90
e1 optimum Fluorescent Batten Fittingsopti
mum
- lig
hti
ng e
nerg
y sa
ving s
yste
m
The e1 Optimum range of batten fi ttings lead the world in energy effi ciency.
Superior light spread coupled with reduced energy consumption.
• Curved diffuser provides streamlined appearance
• Suitable for all general interior applications
• Surface mounted or suspended
• Dimming versions available
• Reduces ongoing maintenance costs
e1 optimum Fluorescent Batten Fittingsopti
mum
- lig
hti
ng e
nerg
y sa
ving s
yste
m
Cat. No. Description1x18W Surface Mounted Batten with Curved Plastic Diffuser1x37W Surface Mounted Batten with Curved Plastic Diffuser2x18W Surface Mounted Batten with Curved Plastic Diffuser2x37W Surface Mounted Batten with Curved Plastic Diffuser
e1-BSB1x18e1-BSB1x37e1-BSB2x18e1-BSB2x37
1x18W Surface Mounted Batten with Curved Plastic Diffuser - Dimmable1x37W Surface Mounted Batten with Curved Plastic Diffuser - Dimmable
e1-BSB1x18De1-BSB1x37D
2x18W Surface Mounted Batten with Curved Plastic Diffuser - Dimmablee1-BSB2x18D2x37W Surface Mounted Batten with Curved Plastic Diffuser - Dimmablee1-BSB2x37D1x18W Surface Mounted Batten with Curved Plastic Diffuser - Emergency1x37W Surface Mounted Batten with Curved Plastic Diffuser - Emergency
e1-BSB1x18EMe1-BSB1x37EM
2x18W Surface Mounted Batten with Curved Plastic Diffuser - Emergency2x37W Surface Mounted Batten with Curved Plastic Diffuser - Emergency1x18W Suspended Batten with Curved Plastic Diffuser1x37W Suspended Batten with Curved Plastic Diffuser
e1-BSB2x18EMe1-BSB2x37EMe1-BSB1x18-SUSe1-BSB1x37-SUS
2x18W Suspended Batten with Curved Plastic Diffuser2x37W Suspended Batten with Curved Plastic Diffuser
e1-BSB2x18-SUSe1-BSB2x37-SUS
1x18W Suspended Batten with Curved Plastic Diffuser - Dimmablee1-BSB1x18D-SUS1x37W Suspended Batten with Curved Plastic Diffuser - Dimmablee1-BSB1x37D-SUS2x18W Suspended Batten with Curved Plastic Diffuser - Dimmable2x37W Suspended Batten with Curved Plastic Diffuser - Dimmable
e1-BSB2x18D-SUSe1-BSB2x37D-SUS
1x18W Suspended Batten with Curved Plastic Diffuser - Emergency1x37W Suspended Batten with Curved Plastic Diffuser - Emergency2x18W Suspended Batten with Curved Plastic Diffuser - Emergency2x37W Suspended Batten with Curved Plastic Diffuser - Emergency
e1-BSB1x18EM-SUSe1-BSB1x37EM-SUSe1-BSB2x18EM-SUSe1-BSB2x37EM-SUS
Cat. No. Wattage
1x37W2x18W2x37W
1x18We1-BSB1x18e1-BSB1x37e1-BSB2x18e1-BSB2x37
L
12256151225
615W
118118118
118H
949494
94
L W
H
ROOM REFLECTANCE
TECH
NICA
L IN
FORM
ATIO
N
POLAR INTENSITY DIAGRAM
ROOM INDEX
e1-LB4x37
LEGEND: C0 BLUE. C90 RED. C45 DASHED (cd/klm)
C W F 1.00 2.00 3.00 4.00 5.00
0.57 0.71 0.77 0.80 0.82
0.51 0.67 0.73 0.77 0.80
0.47 0.63 0.70 0.75 0.77
0.55 0.69 0.74 0.77 0.79
0.50 0.65 0.71 0.75 0.77
0.47 0.62 0.69 0.72 0.75
0.54 0.67 0.72 0.74 0.76
0.50 0.63 0.69 0.72 0.74
0.46 0.61 0.67 0.70 0.73
0.44 0.58 0.64 0.67 0.69
0.70 0.50 0.20
0.50 0.20
0.30 0.20
0.30
0.10
0.50
0.30
0.10
0.50
0.30
0.10
0.00 0.00 0.00
LIGHT OUTPUT RATIO: 78.5% / SHR NOM: 1.50 / SHR MAX: 1.58
UTILISATION FACTOR TABLE
100
200
30030
60
90
The e1 Optimum range of luminaires lead the world in energy effi ciency.
Reduce energy consumption by 60%Reduce maintenance costs by up to 75%
• Suitable for warehousing, distribution and logistics centres, manufacturing and maintenance facilities, food and beverage industry, indoor sports centres and much, much more.
• Improved safety
• Dimming and Emergency versions available
• Impact Resistant versions available
e1 optimum High Bay / Low Bay Lightingopti
mum
- lig
hti
ng e
nerg
y sa
ving s
yste
m
Cat. No. Description3x37W Low Bay Replacement 4x37W Low Bay Replacement 5x37W Low Bay Replacement 3x37W Low Bay Replacement - Dimmable
e1-LB3x37e1-LB4x37e1-LB5x37e1-LB3x37D
4x37W Low Bay Replacement - Dimmablee1-LB4x37D5x37W Low Bay Replacement - Dimmable3x37W Low Bay Replacement - Emergency4x37W Low Bay Replacement - Emergency5x37W Low Bay Replacement - Emergency
e1-LB5x37De1-LB3x37EMe1-LB4x37EMe1-LB5x37EM
3x37W Low Bay Replacement - Impact Resistante1-LBI3x374x37W Low Bay Replacement - Impact Resistant5x37W Low Bay Replacement - Impact Resistant3x37W High Bay Replacement4x37W High Bay Replacement
e1-LBI4x37e1-LBI5x37e1-HB3x37e1-HB4x37
5x37W High Bay Replacemente1-HB5x373x37W High Bay Replacement - Dimmable4x37W High Bay Replacement - Dimmable5x37W High Bay Replacement - Dimmable3x37W High Bay Replacement - Emergency
e1-HB3x37De1-HB4x37De1-HB5x37De1-HB3x37EM
4x37W High Bay Replacement - Emergencye1-HB4x37EM5x37W High Bay Replacement - Emergency3x37W High Bay Replacement - Impact Resistant4x37W High Bay Replacement - Impact Resistant5x37W High Bay Replacement - Impact Resistant
e1-HB5x37EMe1-HBI3x37e1-HBI4x37
MOUNTING:Add "-SM" to fitting code (E.g. e1-LB3x37-SM)Surface MountedAdd "-SUS" to fitting code (E.g. e1-LB3x37-SUS)Suspended
e1-HBI5x37
e1 optimum High Bay / Low Bay Lightingopti
mum
- lig
hti
ng e
nerg
y sa
ving s
yste
m
1225 485
115
Cat. No. Description3x58W Low Bay Replacement 4x58W Low Bay Replacement 5x58W Low Bay Replacement 3x58W Low Bay Replacement - Dimmable
e1-LB3x58e1-LB4x58e1-LB5x58e1-LB3x58D
4x58W Low Bay Replacement - Dimmablee1-LB4x58D5x58W Low Bay Replacement - Dimmable3x58W Low Bay Replacement - Emergency4x58W Low Bay Replacement - Emergency5x58W Low Bay Replacement - Emergency
e1-LB5x58De1-LB3x58EMe1-LB4x58EMe1-LB5x58EM
3x58W Low Bay Replacement - Impact Resistante1-LBI3x584x58W Low Bay Replacement - Impact Resistant5x58W Low Bay Replacement - Impact Resistant3x58W High Bay Replacement4x58W High Bay Replacement
e1-LBI4x58e1-LBI5x58e1-HB3x58e1-HB4x58
5x58W High Bay Replacemente1-HB5x583x58W High Bay Replacement - Dimmable4x58W High Bay Replacement - Dimmable5x58W High Bay Replacement - Dimmable3x58W High Bay Replacement - Emergency
e1-HB3x58De1-HB4x58De1-HB5x58De1-HB3x58EM
4x58W High Bay Replacement - Emergencye1-HB4x58EM5x58W High Bay Replacement - Emergency3x58W High Bay Replacement - Impact Resistant4x58W High Bay Replacement - Impact Resistant5x58W High Bay Replacement - Impact Resistant
e1-HB5x58EMe1-HBI3x58e1-HBI4x58
MOUNTING:Add "-SM" to fitting code (E.g. e1-LB3x58-SM)Surface MountedAdd "-SUS" to fitting code (E.g. e1-LB3x58-SUS)Suspended
e1-HBI5x58
e1 optimum High Bay / Low Bay Lightingopti
mum
- lig
hti
ng e
nerg
y sa
ving s
yste
m
1525 485
115
ROOM REFLECTANCE
TECH
NICA
L IN
FORM
ATIO
N
POLAR INTENSITY DIAGRAM
ROOM INDEX
e1-TR1x37-300
LEGEND: C0 BLUE. C90 RED. C45 DASHED (cd/klm)
C W F 1.00 2.00 3.00 4.00 5.00
0.53 0.69 0.76 0.79 0.82
0.47 0.64 0.72 0.76 0.79
0.43 0.60 0.69 0.73 0.76
0.52 0.67 0.73 0.76 0.78
0.46 0.63 0.70 0.74 0.76
0.42 0.59 0.67 0.71 0.74
0.50 0.64 0.70 0.73 0.75
0.45 0.61 0.68 0.71 0.73
0.42 0.58 0.65 0.69 0.72
0.40 0.55 0.62 0.66 0.68
0.70 0.50 0.20
0.50 0.20
0.30 0.20
0.30
0.10
0.50
0.30
0.10
0.50
0.30
0.10
0.00 0.00 0.00
LIGHT OUTPUT RATIO: 78.8% / SHR NOM: 1.50 / SHR MAX: 1.67
UTILISATION FACTOR TABLE
100
200
300
90
60
30
The e1 Optimum range of luminaires lead the world in energy effi ciency.
Superior light spread coupled with reduced glare signifi cantly improves the built environment.
• Complies fully with AS/NZS 1680
• Suitable for T-Bar and Plaster Ceilings
• Dimming and Emergency versions available
• Customised sizing available upon request
• Reduce ongoing maintenance costs
e1 optimum Direct/Indirect Recessed Luminaireopti
mum
- lig
hti
ng e
nerg
y sa
ving s
yste
m
Cat. No. Description1x18W Recessed Troffer (Nom.300x600)1x37W Recessed Troffer (Nom.300x1200)2x18W Recessed Troffer (Nom.300x600)2x37W Recessed Troffer (Nom.300x1200)
e1-TR1x18-300e1-TR1x37-300e1-TR2x18-300e1-TR2x37-300
1x18W Dimmable Recessed Troffer (Nom.300x600)1x37W Dimmable Recessed Troffer (Nom.300x1200)
e1-TR1x18D-300e1-TR1x37D-300
2x18W Dimmable Recessed Troffer (Nom.300x600)e1-TR2x18D-3002x37W Dimmable Recessed Troffer (Nom.300x1200)e1-TR2x37D-3001x18W Emergency Recessed Troffer (Nom.300x600)1x37W Emergency Recessed Troffer (Nom.300x1200)2x18W Emergency Recessed Troffer (Nom.300x600)2x37W Emergency Recessed Troffer (Nom.300x1200)
e1-TR1x18EM-300e1-TR1x37EM-300e1-TR2x18EM-300e1-TR2x37EM-300
Cat. No. Wattage
1x37W2x18W2x37W
1x18We1-TR1x18-300e1-TR1x37-300e1-TR2x18-300e1-TR2x37-300
L1
1190.5590.51190.5
590.5L2
12426421242
642W
293293293
293H
110110110
110
e1 optimum Direct/Indirect Recessed Luminaireopti
mum
- lig
hti
ng e
nerg
y sa
ving s
yste
m
L2
WL1
H
ROOM REFLECTANCE
TECH
NICA
L IN
FORM
ATIO
N
POLAR INTENSITY DIAGRAM
ROOM INDEXe1-TRS1x37-300
LEGEND: C0 BLUE, C45 DASHED, C90 RED (cd/klm)
C W F 1.00 2.00 3.00 4.00 5.000.70 0.50 0.20
0.50 0.20
0.30 0.20
0.300.100.500.300.100.500.300.10
0.00 0.00 0.00LIGHT OUTPUT RATIO: 93.0% / SHR NOM: 1.75 / SHR MAX: 1.79
UTILISATION FACTOR TABLE
The e1 Optimum range of luminaires lead the world in energy efficiency.
Superior light spread coupled with reduced glare significantly improvesthe built environment.
• Complies fully with AS/NZS 1680
• Suitable for T-Bar and Plaster Ceilings
• Suspended or Surface Mounted
• Dimming and Emergency versions available
• Customised sizing available upon request
• Reduce ongoing maintenance costs
e1 optimum Semi Recessed Luminaireopti
mum
- lig
hti
ng e
nerg
y sa
ving s
yste
m
0.56 0.74 0.82 0.86 0.890.49 0.67 0.76 0.82 0.850.43 0.62 0.71 0.77 0.810.54 0.70 0.77 0.81 0.840.47 0.64 0.72 0.77 0.810.42 0.60 0.68 0.74 0.770.51 0.66 0.72 0.76 0.790.45 0.61 0.69 0.73 0.760.41 0.57 0.65 0.70 0.740.38 0.53 0.60 0.64 0.67
Unit 4A2 Resolution DriveCaringbah NSW 2229Australia
PO Box 220Miranda NSW 2228
Ph: +61 2 9540 3302Fax: +61 2 9540 3306
80
160
24030
60
90
e1 optimum Semi Recessed Luminaireopti
mum
- lig
hti
ng e
nerg
y sa
ving s
yste
m
noitpircseD.oN .taC1x36W Suspended Semi RecessedTroffer1x36W Surface Mounted Semi RecessedTroffer
e1-TRS1x36-SUSe1-TRS1x36-SM
egattaW.oN .taC
1x36W1x36We1-TRS1x36-SUS
e1-TRS1x36-SM
L
13601360
W
356356
H
160160
Unit 4A2 Resolution DriveCaringbah NSW 2229Australia
PO Box 220Miranda NSW 2228
Ph: +61 2 9540 3302Fax: +61 2 9540 3306
The e1 Optimum range of luminaires lead the world in energy effi ciency.
Superior light spread coupled with reduced energy consumption.
• Suitable for use in high humidity, damp, dusty and corrosive environments
• G.R.P. body, clear polycarbonate lens, stainless steel lockable toggle clips
• IP65 rating
• Reduces ongoing maintenance costs
ROOM REFLECTANCE
TECH
NICA
L IN
FORM
ATIO
N
POLAR INTENSITY DIAGRAM
ROOM INDEX
e1-BWP1x37
LEGEND: C9 BLUE, C90 RED, C45 DASHED (cd/klm)
C W F 1.00 2.00 3.00 4.00 5.00
0.55 0.72 0.79 0.83 0.86
0.48 0.66 0.74 0.79 0.82
0.43 0.61 0.69 0.75 0.79
0.53 0.68 0.75 0.79 0.81
0.47 0.63 0.70 0.75 0.78
0.42 0.58 0.67 0.72 0.75
0.50 0.64 0.71 0.74 0.77
0.45 0.60 0.67 0.71 0.74
0.41 0.57 0.64 0.69 0.72
0.38 0.52 0.59 0.63 0.66
0.70 0.50 0.20
0.50 0.20
0.30 0.20
0.30
0.10
0.50
0.30
0.10
0.50
0.30
0.10
0.00 0.00 0.00
LIGHT OUTPUT RATIO: 83.5% / SHR NOM: 1.75 / SHR MAX: 1.75
UTILISATION FACTOR TABLE
80
160
24030
90
60
e1 optimum Weatherproof Battenopti
mum
- lig
hti
ng e
nerg
y sa
ving s
yste
m
Cat. No. Description1x18W Weatherproof Batten1x37W Weatherproof Batten2x18W Weatherproof Batten2x37W Weatherproof Batten
e1-BWP1x18e1-BWP1x37e1-BWP2x18e1-BWP2x37
1x18W Emergency Weatherproof Batten1x37W Emergency Weatherproof Batten
e1-BWP1x18EMe1-BWP1x37EM
2x18W Emergency Weatherproof Battene1-BWP2x18EM2x37W Emergency Weatherproof Battene1-BWP2x37EM
Cat. No. Wattage
1x37W2x18W2x37W
1x18We1-BWP1x18e1-BWP2x18e1-BWP1x37e1-BWP2x37
L1
12756661275
666L2
12456361245
636W1
170170170
170W2
140140140
140H
108108108
108
e1 optimum Weatherproof Battenopti
mum
- lig
hti
ng e
nerg
y sa
ving s
yste
m
L1
L2
H
W1
W2
The Problem: PCBs StillPrevalent inU.S. Schools
Health Effects of PCBs
The Solution: LightingRetrofits Remove Hazardand ImproveEnergy Efficiency
Should Light BallastsIn Your SchoolBe Removed?
What Postponing aLighting RetrofitCould Mean
Funding is AvailableTo Help FinanceLighting Retrofits
Lighting RetrofitsGet Results
Responding to thePublic’s Questions
For More Information
2
he U.S. Environmental Protection Agency (EPA)recommends removal of all pre-1979 fluorescent lightballasts in schools to prevent accidental exposure of
students, teachers, and other school personnel to highly toxicpolychlorinated biphenyls (PCBs) through fires or leaks.Removal of PCB-containing light fixtures, when done inconjunction with lighting upgrades, is an investment thatpays off with long-term benefits to students, school staff, thecommunity, and the environment.
3
5
6
A Guide for School Administrators
United StatesEnvironmental ProtectionAgency
Region 9Pollution Prevention ProgramSan Francisco, CA 94105
EPA 909B-00-003May 2001www.epa.gov/region09
7
8
Removing PCBs fromLight Fixtures:Protecting Students from Hidden Dangers
T
2
any schools in the U.S. have lightballasts containing PCBs. The PCBsare contained within the light ballasts’
capacitors and in the ballasts’ potting material,which is used for insulation. Until the late 1970s,PCBs were commonly used as insulators inelectrical equipment because they have hightolerance to heat, do not burn easily, and are non-explosive.
PCBs are very stablechemical compounds thatdo not readily breakdown. Because of this,they may remain in thebody, causing long-lastingtoxic effects over manyyears (see Health Effects ofPCBs). For this reason, itis critical to minimize anypotential exposure tothem.
The EPA banned themanufacture and import
The Problem: PCBs Still Prevalent in U.S. Schoolsof PCBs to the U.S. in 1979 because of their toxiceffects. They also banned the processing or use ofPCBs, except in totally enclosed equipment.However, no state or federal regulationsprecluded the continued use of the older PCBballasts. Therefore, a large number of PCBballasts are still in use in U.S. schools.
As long as the PCBs remain in the ballasts andpotting material, they do not pose a health risk orenvironmental hazard. However, as they age, theballasts degrade, increasing the risk of leaks oreven fires, which would pose a health andenvironmental hazard. The hazard can beworsened by mishandling the incident. Impropercleanup of a ballast leak at a school in Oregon in1999 potentially exposed school staff andmaintenance workers to PCBs (see WhatPostponing a Lighting Retrofit Could Mean, page 5).The EPA developed this booklet and itscompanion piece, for school maintenancepersonnel, to ensure that school personnel areaware of the risks posed by PCBs in light ballastsand informed of the proper and safe way tohandle fires, leaks, and retrofits.
he EPA has classified all PCBs as probable human carcinogens (cancer-causing substances).Evidence suggests a possible association between PCB exposure and liver cancer. PCBs
also have significant ecological and human health effects other than cancer.
The most likely way that staff may become exposed to PCBs from light ballasts is through breathingcontaminated air or touching PCB oil or PCB-contaminated materials after a ballast leak or fire. Noinformation is available on the short-term effects of PCBs in humans. However, long-term effectscan occur at any time after exposure and may last for months or years. They include:
l Affects to the nervous and reproductive system, immune system suppression;l Hormone disruption;l Respiratory tract symptoms;l Gastrointestinal effects;l Mild liver effects; andl Effects on the skin and eyes such as chloracne, skin rashes, and eye irritation.
Infants of mothers exposed to PCBs can experience developmental effects impairing movement,visual recognition memory, and short term memory. PCBs may also be passed onto infants throughtheir pregnant or nursing mothers.
Health Effects of PCBs
T
M
3
f these statements apply to your school, then the answer is most likely yes, your lightballasts probably contain PCBs and should be removed. PCB-free light ballasts manufacturedafter 1979 are required to have the statement “No PCBs.” Any building built before that time is
likely to have PCB-containing ballasts if it has not recently undergone a complete lighting retrofit(all light fixtures in the school were upgraded). Also, PCB-containing light ballasts were allowed tobe used in fluorescent lights after 1979 if the ballasts had been manufactured before the 1979 ban.Thus, schools built after 1979 that have not undergone a complete lighting retrofit could have PCB-containing light ballasts in their fluorescent light fixtures as well. To determine whether yourschool has PCB-containing ballasts, conduct a visual inspection of a representative number of lightfixtures (not just the tubes). See the companion booklet, A Guide for School Maintenance Personnel,for full instructions on identifying PCB ballasts.
he EPA recommends removing PCB- containing ballasts as part of a complete lighting retrofit (see Should Light Ballasts inYour School be Removed?, below). A completelighting retrofit includes removing old fluorescenttubes as well as ballasts, and replacing the entirelighting fixture with newer, more energy-efficientfixtures. Replacing the older ballasts with newerlighting technology improves lighting quality,distributing the light more uniformly and thusproviding a more comfortable and productivelearning environment. The newer lightingtechnology also increases energy efficiency whichmeans cost savings for the school in the long term(see Lighting Retrofits Get Results – Lower EnergyCosts and Improved Learning Environments, page 6,detailing how a California school benefitted froma lighting upgrade).
Lighting retrofits to eliminate PCB-containinglight ballasts should be a component of anyremodeling efforts. It is critical that the lightingupgrade be planned in sequence with otherremodeling projects such as roofing, seismicbracing, and indoor air quality improvements. Toensure that all building code requirements aremet and work is performed cost-effectively, theEPA recommends having an architect review therelationship of the lighting retrofit to otherplanned building improvements. Due to thehazardous nature of PCBs, only a qualifiedcontractor should perform the lighting retrofit.
The Solution: Lighting Retrofits Remove Hazardand Improve Energy Efficiency
For information about proper use, storage, anddisposal of PCBs, please contact your state solidand hazardous waste agency or call USEPA’sinformation hotline at(202) 554-1404.
How Should the Old Ballasts and FluorescentTubes beSafelyDisposed?
Safedisposal ofthe oldballastsandfluorescent tubes is critical. Because the ballastscontain PCBs and the fluorescent tubes containmercury, the waste ballasts and tubes from alighting retrofit should be handled as hazardouswaste.
The Toxic Substances Control Act (TSCA)regulates how PCBs, including ballasts thatcontain PCBs, should be disposed. All ballastscontaining PCBs must be packaged in a PCB-approved container, marked properly, andshipped by an authorized PCB transporter. Allleaking PCB-containing ballasts must be destroyedthrough high temperature incineration. TSCAallows several disposal options for non-leakingballasts, including disposal in a hazardous wastelandfill or recycling. However, many states have
Should Light Ballasts in Your School Be Removed?Your school was built before 1979.Your school has not had a complete lighting retrofit since 1979.
An intact ballast.
T
I
4
developed special regulations for disposing ofnon-leaking PCB ballasts that are more stringentthan TSCA. It is critical to contact the appropriatestate solid and hazardous waste agency and followtheir regulations and requirements when disposing ofnon-leaking PCB-containing ballasts.
When considering disposal options, factors thatshould be considered in determining the bestoption include cost, long-term environmentalimpacts, and long-term liability. Table 1 outlinesthree of the disposal options for non-leakingPCB-containing ballasts, the approximate costs,
and the advantages and disadvantages.The costs of incinerating the ballasts arehighest, while disposing of ballasts in ahazardous waste landfill is the lowest costoption. Recycling costs approximately$3.50 per ballast, and benefits theenvironment by recovering metals andreducing the volume of waste requiringburial or incineration.
Disposal of mercury-containing fluorescentlamps is regulated under the federalResource Conservation and Recovery Act(RCRA). Because of the high cost of testinga fluorescent lamp for mercury(approximately $140 per lamp) and thelikelihood that the lamp will fail the test,the EPA recommends assuming that allfluorescent lamps contain mercury andhandling them as hazardous waste. Aswith PCB-containing ballasts, it is critical tocheck with state solid and hazardous wasteagencies to ensure the lamps are handledappropriately. As with PCBs, states haveadopted stricter disposal requirementsthan Federal regulations. Also, some stateshave added mercury-containingfluorescent lamps to their universal wasterule, which allows streamlined storage,handling, and transportation requirementsfor specific types of waste. Contact yourstate or local hazardous waste program forinformation on proper disposal offluorescent tubes.
Table 2 shows the two most common methods ofdisposing of mercury-containing fluorescentlamps, recycling or burying in a hazardous wastelandfill. Although more costly, recycling recoversthe mercury and removes it from the wastestream, and allows the glass and metal to berecycled. In contrast, disposal in a hazardouswaste landfill results in the possibility thatmercury may leak from the landfill and the lostopportunity to recover the mercury, glass, andmetal.
Mercury-containing fluorescent lamps are neverincinerated due to the potential for mercuryrelease into the environment.
2Disposal of mercury-containing fluorescent lamps is regulatedfederally under the Resource Conservation and Recovery Act.
Table 2: Possible Methods for Disposal of Fluorescent Tubes2
Method Hazardous WasteLandfill
Recycling
$0.50 per 4-foot tube $0.60 per 4-foot tube
Minimal costMinimal cost; mercury isrecovered, metals and
glass are recycled
Mercury may leak from thelandfill; metals and glass are
wasted; long-term liability
Must ensure recyclingfacility is permitted;long-term liability
ApproximateCost
Advantages
Disadvantages
1Disposal of PCB-containing ballasts is regulated federally under theToxic Substances Control Act.
MethodHigh-Temperature
Incineration
Municipal,Hazardous or
Chemical WasteLandfill
Recycling ofMetals, High-Temperature
Incineration ofPCBs
Table 1: Possible Methods for Disposal of Intact PCB-Containing Light Ballasts1
High costPCBs may seep
from landfill;long-term liability
Must ensurerecycling facility is
permitted; long-termliability
Disadvantages
ApproximateCost
$8.00 per ballast(four pounds)
$0.50 per ballast(four pounds)
$3.50 per ballast(four pounds)
PCBs completelydestroyed, removing
future liabilityLow cost
PCBs completelydestroyed; metals
recycledAdvantages
5
As PCB-containing light ballasts age, thechance that they will leak or catch fireincreases. This risk is compounded by
the fact that there is virtually no way to detectwhether ballasts are leaking or about to catch fireby simply looking at a light fixture. One schoolin Oregon found this out the hard way when alight ballast leaked PCB-containing oil overbooks, desks, and other school equipment. Afterthe EPA become aware of this incident, theyexamined other light ballasts in the school andfound more leaking ballasts potentially exposingstudents and staff to PCBs.
During the inspection, the EPA also learned thatthe school district was in the process ofremodeling and upgrading light fixtures district-wide. Unaware that the old fixtures containedPCBs, the district had been taking them toanother local school to be dismantled. The EPAdiscovered that the old fixtures were not beinghandled properly and that the leaking PCBballasts were actually being stored on the school’splayground. In addition, the workers handlingthe leaking ballasts were not trained in the properhandling of hazardous materials. Lack ofawareness of the problem and mishandling ofthe response needlessly exposed students, staff,and maintenance workers to PCBs. The schooldistrict has spent more than $250,000 to clean upspilled PCBs, and is facing possible monetarypenalties for improper storage and handling ofPCB wastes.
Although a lighting retrofit might seem like alow educational priority in some schools whencompared with new computers and classrooms,school administrators should take into accountthe Oregon example and what they mightunexpectedly have to deal with if a ballast leaksor catches fire:
Effects on Student and Staff HealthA ballast leak or fire could happen at any time,without warning. If it happens in a busyclassroom in the middle of the day, a school couldbe looking at long-term health impacts on manystudents and staff. Even a small, isolated leakmay pose health issues for the staff or studentswho discover it. And once the leak or fire hasbeen cleaned up and decontaminated, the school
What Postponing a Lighting Retrofit Could Meanhas to convince students, parents, staff, and localmedia that it is safe to return. Students and staffwho have experienced a ballast leak or firefirsthand may be very reluctant to return toclassrooms where such an incident may happenagain.
Effects on Quality of EducationThe affected area, classroom, hallway, cafeteria,or auditorium will be off-limits during cleanupand decontamination. It may take several weeksbefore the area can be declared “clean” for useagain. The school will need to find appropriatetemporary quarters for students and staff; manyschool programs and functions may bedisrupted.
Response and Replacement CostsSignificant costs will be incurred to cover,at a minimum:
l Hiringproperlytrained andqualifiedcleanuppersonnel;
l Cleanup anddecontamina-tion ofcontaminated equipment and surfaces;
l Analytical testing of contaminated equipmentand surfaces for PCBs as well as the more toxicfurans, produced when PCBs burn;
l Compliance with environmental regulationsfor disposal of contaminated equipment andcleanup materials;
l Retesting of equipment and surfaces to ensurethat they are free of PCBs and furans; and
l Replacement of leaking or burned fixtures andany contaminated materials, such as desks.
Postponing a lighting retrofit and betting on thestructural integrity of old ballasts is a dangerousgamble with serious health and educationalimpacts for your students and staff and seriouscost impacts for your budget.
This ballast sparked a fire at a SouthernCalifornia school in 1999.
6
I n most states, there are several agencieswith funding available to support energyefficiency projects such as lighting retrofits.
Both public utilities and private energycompanies may offer such programs. Programsmay include technical assistance, rebates, orother funding assistance to support lightingupgrade projects. Contact your local energyprovider or state energy commission for moreinformation.
The EPA’s Energy Star program supportsschools, businesses and organizations planningto install energy-efficient lighting technologies.
Funding to Help FinanceLighting Retrofits is Available
The program offers assistance throughworkshops and information resources thatcan be accessed from the Internet. Theseinclude:
l Lighting Upgrade Technologies
l Financing Your Upgrades
l New Building Design Guidance
l Service and Product Providers
These manuals are available on the Internetat www.energystar.gov.
I n 1997, the Bass Lake School District in Oakhurst, California, performed a lighting retrofitwith the help of a loan program from the California Energy Commission. As a result, theschools reported a 9.25 percent decrease in energy costs in 1997, despite adding two new
permanent buildings, and a further 2 percent decrease in 1998. But most importantly, the schoolsnoted the “vastly improved learning environment provided by the new lighting system.”Lighting upgrades not only increase energy efficiency and save money, they also provide abetter, safer learning environment.
Although a lighting retrofit may seem to be an expensive undertaking, most retrofits pay forthemselves within a surprisingly short timeframe. For example, one Southern California schoolwith 29 classrooms and 703 students will recoup the costs of their upgrade in under sevenyears. The chart below outlines the upgrade and disposal costs as well as the actual funds savedthrough energy efficiency.
Disposal and Installation CostsDisposal of T12 lamps (580 fixtures x 2 lamps/fixture x $0.50/lamp): $580.00Disposal of ballasts (580 fixtures x 1 ballast/fixture x $3.00/ballast): $1,740.00Installation of 580 fixtures (580 fixtures x $54.00/fixture): $31,320.00
Total: $33,640.00
Energy Savings (one year)Electricity Demand Savings: $4,304.00
Lighting Retrofits Get Results—Lower Energy Costs andImproved Learning Environments
7
T his section is intended to help yourespond to concerns expressed bystudents, teachers and other school staff,
and parents. It provides some sample questionsthat may be posed and suggested answers.
Is my child in danger from PCBs in lightballasts?As long as the PCBs in the ballasts remain in theballasts or in the fixture, they do not pose anydanger to students. The use of PCBs inmagnetic light ballasts is considered an“enclosed” system. This use was not prohibitedby the EPA’s 1979 ban because, at the time,there was very little likelihood that the PCBswould escape their ballast containers. They area potential danger now because the increasingage of the magnetic ballasts has greatlyincreased the likelihood that they may leak.This is why we are currently fitting a lightingretrofit into our overall modernization plan - toremove this potential danger as soon aspossible.
Currently, students are not endangered byintact, non-leaking ballasts. Only leaking orburning ballasts are a hazard. The only way toprevent this hazard is through a completelighting retrofit which we are planning rightnow.
How will you deal with a leak or fire if ithappens?The EPA has written instructions to help makeschool maintenance personnel become aware ofthese potential problems and how to handlethem. This information will either beincorporated into the school’s EmergencyResponse Plan (if the school has one) or will beused as a supplement to the plan.
Only trained professionals, such as firefighters,can respond to leaks and fires because of thehazardous substance involved. The school’srole will be to evacuate the immediate area ofthe leak and make sure that all students andschool staff maintain a safe distance to preventany possible exposure. If there is a fire, theentire school will be evacuated until the fire hasbeen put out. Whatever area has been affectedwill be off-limits to all but trained professionals
Responding to the Public’s Questionsuntil it has been cleaned up, tested, and certifiedto be “clean” of PCBs or other substances.
What are the health effects of PCBs?The most likely way that students and staff maybe exposed to PCBs from light ballasts isthrough breathing contaminated air or touchingPCB oil or PCB-contaminated materials after aballast leak or fire. As soon as we know of a leakor fire, we will immediately evacuate the area toprevent students and staff from inhaling PCB-laden air or touching the oil.
Short-term effects, which may be noticedimmediately or shortly after exposure to PCBsinclude irritation of the eyes, nose, and throat.Short-termexposure to highlevels of PCBs candamage the liver.
Long-term effectscan occur at anytime afterexposure and maylast for months oryears. Theyinclude a severe,acne-like rash, called chloracne, that may persistfor years; nervous system damage, causingnumbness, weakness, and tingling (“pins andneedles”) in the arms and legs; muscle and jointpain; headaches; loss of appetite; nausea,vomiting, and abdominal pain; liver damage;reproductive effects, including still births andunderweight births; and thyroid glanddisorders.
The EPA has classified PCBs as probable humancarcinogens (cancer-causing substances). PCBexposure may cause liver, skin, and reproduc-tive cancers. PCBs may be passed onto infantsthrough their pregnant or nursing mothers.
What are some of the warning signs ofexposure to PCBs?Warning signs of PCB exposure include irritationof the eyes, nose, and throat. PCB-containing oilshould never be touched — any kind of skincontact constitutes overexposure.
8
Notes:For additional information about the use,storage, transportation, and disposal of PCBs,including ballasts containing PCBs, pleasecontact the TSCA information hotline at 202-554-1404, or refer to the EPA’s PCB website atwww.epa.gov/pcb.
For More Information
U.S. Environmental Protection AgencyRegion IX75 Hawthorne StreetSan Francisco, CA 94105
Page 23 of 24
Project Personnel
Police Citizens Youth Clubs NSW Ltd.
Christopher Diener
Properties & Project Manager
Ph. (02) 9625 9111
Global Sustainability Initiatives Pty Ltd.
Fiona O’Grady
Project Manager
Ph. (03) 9005 4700