Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
© ABB GroupDecember 9, 2014 | Slide 1
Becky, Service/ Power World 2014, Sept. 12
Assist Smart GridLeading on-line monitoring technology& asset management
Sensor(SF6, In,Mechanical Character, PD)
IED
Integrated solution
Enable smart Grid
ABB-assistance for Smart GridIntegrated solution
© ABB GroupDecember 9, 2014 | Slide 3
§ FOCS + DCB meet the requirement of
SGCC
ABB-assistance for Smart GridDCB with FOCS
© ABB GroupDecember 9, 2014 | Slide 4
Interfaceinternet
CCM AIM SIM
Sensorfor CB
Sensorfor Gas
Main IED
IEC 61850 HTTP
CBS
ABB-assistance for Smart GridPASS
© ABB GroupDecember 9, 2014 | Slide 5
ABB-assistance for Smart GridGIS
Smart controlpanel
SF6 gas sensor andrelay
IED of monitoring Gas
Sensor of PD
IED of PD Smart terminal
Control unit
EVT ECT MU
Sensor of travelcurve
Sensor of circuit ,coil and motor
IED of CB
© ABB GroupDecember 9, 2014 | Slide 6
ABB-assistance for Smart GridSF6 and circuit breaker monitoring solution
User interfacevia RS 232
(Optional)
Universal interface
4~20mA
RS485/Modbus
© ABB GroupDecember 9, 2014 | Slide 7
§ SF6 on-line monitoring
§ with 4~20mA /RS485 sensors;
§ SF6 leakage detection;
§ Data visualization via WebUI;
§ Alarm signalization;
§ IEC 61850 communication;
ABB-assistance for Smart GridMSM-SF6 monitoring function
SF6
SF6 Gas monitoring
MSM
© ABB GroupDecember 9, 2014 | Slide 8
Human Machine Interface (HMI)
SIM
RS485/ModBus4~20mA
ABB-assistance for Smart GridMSM-SF6 monitoring main parts
© ABB GroupDecember 9, 2014 | Slide 9
§ Capable of working independently or with CBS;
§ MSM stack can be mounted DIN rail (CCM + 10 AIM)
§ Easy to extend (Update Firmware of CCM after newmodules integration)
ABB-assistance for Smart GridMSM-SF6 monitoring
© ABB GroupDecember 9, 2014 | Slide 10
CBS (4 slots)Circuit Breaker Monitoring
§ Travel curve§ Opening/Closing Speed§ Opening/Closing time
§ Coil/Motor current§ Cabinet temperature§ Heater current
Mechanical System Electrical Controls& Auxiliaries
ABB-assistance for Smart GridCBS-circuit breaker monitoring function
M
© ABB GroupDecember 9, 2014 | Slide 12
Heater Current Transformers
Temperature SensorsTravel sensor (500ppr)
Current sensor for coil current
Current sensor for motor current
ABB-assistance for Smart GridCBS-circuit breaker monitoring function
© ABB GroupDecember 9, 2014 | Slide 13
§ Design based on extensive fieldexperience
§ Small panel footprint
§ Highest level of EMI immunity
§ Robust to mechanical shocks
§ Utilizes proven sensors
ABB-assistance for Smart GridCBS characteristics
© ABB GroupDecember 9, 2014 | Slide 14
§ Monitors SF6 gas and interrupter wear (independentproduct)
Interrupter WearSF6 Gas System
For Single-pole operation
For three-pole operation
ABB-assistance for Smart GridCBS characteristics
SF6
§ Complete data visualization on CB Insight via RS232
© ABB GroupDecember 9, 2014 | Slide 15
ABB-assistance for Smart GridIntegrated visualization - web-based user interface
© ABB GroupDecember 9, 2014 | Slide 16
UHF
1.Sersor ofUHF2. linecollector3. pc4. PD monitor
ABB-assistance for Smart GridUHF PD Monitoring system
© ABB GroupDecember 9, 2014 | Slide 18
§ Scope of HZ: 100MHz -1800MHz§ Sensitivity:1-10pC
ABB-assistance for Smart GridUHF sensor of ELK-3/550
© ABB GroupDecember 9, 2014 | Slide 20
1. Shielding of earth switchgear(Coupling-pole)
2. N-terminal3. Moving contactor of earth switch4. insulator5. GIS shell
ABB-assistance for Smart GridUHF sensor of ELK-3/550
© ABB GroupDecember 9, 2014 | Slide 21
§ Scope of HZ: 100MHz -1800MHz§ Sensitivity:1-10pC1. Sensing electrode
(plate pole)2. N-terminal3. Insulator4. Cover5. GIS shell6. SF6 gas
1. Repair2. Maintenance on time (~ 55 %1)
3. Maintenance on status(~8 %1)
4. Maintenance for reliability5. Maintenance on risk management
1: CIGRÉ (2012):2004-2007年高压设备可靠性的全球调研报告-SF6 断路器
Asset monitoring IED Date analysis Tool of asset management
Information
Total
ABB-assistance for Smart GridAssessment management base on the infromationmanagement and mantainuance
© ABB GroupDecember 9, 2014 | Slide 22
§ Radiographic inspection savescosts and downtime andenables better maintenanceplanning
§ Downtime is reduced from daysto hours.
§ ABB can perform radiographyon both equipment of its ownmanufacture and on theproducts of other and legacymanufacturers.
Example for product assessment managementSeeing through switchgear
© ABB GroupDecember 9, 2014 | Slide 23