21
LAZARD’S LEVELIZED COST OF ENERGY ANALYSIS—VERSION 14.0 OCTOBER 2020

Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

L A Z A R D ’ S L E V E L I Z E D C O S T O F E N E R G Y A N A LY S I S — V E R S I O N 1 4 . 0

O C T O B E R 2 0 2 0

Page 2: Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

Copyright 2020 Lazard

This study has been prepared by Lazard for general informational purposes only, and it is not intended to be, and should not be construed as, financial or other advice. No part of this material may be copied, photocopied or duplicated in any form by any means or redistributed without the prior consent of Lazard.

Introduction L A Z A R D ’ S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S — V E R S I O N 1 4 . 0

Lazard’s Levelized Cost of Energy (“LCOE”) analysis addresses the following topics:• Comparative LCOE analysis for various generation technologies on a $/MWh basis, including sensitivities for U.S. federal tax subsidies, fuel prices,

carbon pricing and costs of capital

• Illustration of how the LCOE of onshore wind and utility-scale solar compare to the marginal cost of selected conventional generation technologies

• Historical LCOE comparison of various utility-scale generation technologies

• Illustration of the historical LCOE declines for wind and utility-scale solar technologies

• Illustration of how the LCOEs of utility-scale solar and wind compare to those of gas peaking and combined cycle

• Comparison of capital costs on a $/kW basis for various generation technologies

• Deconstruction of the LCOE for various generation technologies by capital cost, fixed operations and maintenance expense, variable operations and maintenance expense and fuel cost

• Overview of the methodology utilized to prepare Lazard’s LCOE analysis

• Considerations regarding the operating characteristics and applications of various generation technologies

• Summary of assumptions utilized in Lazard’s LCOE analysis

• Summary considerations in respect of Lazard’s approach to evaluating the LCOE of various conventional and renewable energy technologies

Other factors would also have a potentially significant effect on the results contained herein, but have not been examined in the scope of this current analysis. These additional factors, among others, could include: capacity value vs. energy value; network upgrades, transmission, congestion or other integration-related costs; significant permitting or other development costs, unless otherwise noted; and costs of complying with various environmental regulations (e.g., carbon emissions offsets or emissions control systems). This analysis also does not address potential social and environmental externalities, including, for example, the social costs and rate consequences for those who cannot afford distributed generation solutions, as well as the long-term residual and societal consequences of various conventional generation technologies that are difficult to measure (e.g., nuclear waste disposal, airborne pollutants, greenhouse gases, etc.)

1

Page 3: Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

Copyright 2020 Lazard

This study has been prepared by Lazard for general informational purposes only, and it is not intended to be, and should not be construed as, financial or other advice. No part of this material may be copied, photocopied or duplicated in any form by any means or redistributed without the prior consent of Lazard.

Renewable Energy

Conventional

$150

$74

$63

$31

$29

$126

$59

$26

$151

$129

$65

$44

$227

$179

$94

$42

$38

$156

$101

$54

$198

$198

$159

$73

$0 $25 $50 $75 $100 $125 $150 $175 $200 $225 $250 $275

Solar PV–Rooftop Residential

Solar PV–Rooftop C&I

Solar PV–Community

Solar PV–Crystalline Utility Scale

Solar PV–Thin Film Utility Scale

Solar Thermal Tower with Storage

Geothermal

Wind

Gas Peaking

Nuclear

Coal

Gas Combined Cycle

(1)

(1)

(6)

$86(2)

(4)

L A Z A R D ’ S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S — V E R S I O N 1 4 . 0

Source: Lazard estimates.Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate and 40% equity at 12% cost. Please see page titled “Levelized Cost of Energy Comparison—Sensitivity to Cost of Capital” for cost of

capital sensitivities. These results are not intended to represent any particular geography. Please see page titled “Solar PV versus Gas Peaking and Wind versus CCGT—Global Markets” for regional sensitivities to selected technologies. (1) Unless otherwise indicated herein, the low case represents a single-axis tracking system and the high case represents a fixed-tilt system. (2) Represents the estimated implied midpoint of the LCOE of offshore wind, assuming a capital cost range of approximately $2,600 – $3,675/kW.(3) The fuel cost assumption for Lazard’s global, unsubsidized analysis for gas-fired generation resources is $3.45/MMBTU. (4) Unless otherwise indicated, the analysis herein does not reflect decommissioning costs, ongoing maintenance-related capital expenditures or the potential economic impacts of federal loan guarantees or other subsidies. (5) Represents the midpoint of the marginal cost of operating fully depreciated gas combined cycle, coal and nuclear facilities, inclusive of decommissioning costs for nuclear facilities. Analysis assumes that the salvage value for a decommissioned gas

combined cycle or coal asset is equivalent to its decommissioning and site restoration costs. Inputs are derived from a benchmark of operating gas combined cycle, coal and nuclear assets across the U.S. Capacity factors, fuel, variable and fixed operating expenses are based on upper- and lower-quartile estimates derived from Lazard’s research. Please see page titled “Levelized Cost of Energy Comparison—Renewable Energy versus Marginal Cost of Selected Existing Conventional Generation” for additional details.

(6) High end incorporates 90% carbon capture and storage. Does not include cost of transportation and storage. (7) Represents the LCOE of the observed high case gas combined cycle inputs using a 20% blend of “Blue” hydrogen, (i.e., hydrogen produced from a steam-methane reformer, using natural gas as a feedstock, and sequestering the resulting CO2 in a

nearby saline aquifer). No plant modifications are assumed beyond a 2% adjustment to the plant’s heat rate. The corresponding fuel cost is $5.20/MMBTU.(8) Represents the LCOE of the observed high case gas combined cycle inputs using a 20% blend of “Green” hydrogen, (i.e., hydrogen produced from an electrolyzer powered by a mix of wind and solar generation and stored in a nearby salt cavern). No

plant modifications are assumed beyond a 2% adjustment to the plant’s heat rate. The corresponding fuel cost is $10.05/MMBTU.

Levelized Cost of Energy Comparison—Unsubsidized Analysis

$29(5)

$41(5)

Selected renewable energy generation technologies are cost-competitive with conventional generation technologies under certain circumstances

(3)

(3)

Levelized Cost ($/MWh)

$28(5) $88(7) $127(8)

2

Page 4: Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

Copyright 2020 Lazard

This study has been prepared by Lazard for general informational purposes only, and it is not intended to be, and should not be construed as, financial or other advice. No part of this material may be copied, photocopied or duplicated in any form by any means or redistributed without the prior consent of Lazard.

Source: Lazard estimates.Note: The sensitivity analysis presented on this page also includes sensitivities related to the U.S. Tax Cuts and Jobs Act (“TCJA”) of 2017. The TCJA contains several provisions that impact the

LCOE of various generation technologies (e.g., a reduced federal corporate income tax rate, an ability to elect immediate bonus depreciation, limitations on the deductibility of interest expense and restrictions on the utilization of past net operating losses). On balance the TCJA reduced the LCOE of conventional generation technologies and marginally increased the LCOEof renewable energy technologies.

(1) The sensitivity analysis presented on this page assumes that projects qualify for the full ITC/PTC and have a capital structure that includes sponsor equity, tax equity and debt.

Unsubsidized

Levelized Cost of Energy Comparison—Sensitivity to U.S. Federal Tax Subsidies(1)

L A Z A R D ’ S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S — V E R S I O N 1 4 . 0

The Investment Tax Credit (“ITC”) and Production Tax Credit (“PTC”) remain important components of the levelized cost of renewable energy generation technologies

Levelized Cost ($/MWh)Subsidized

$150

$135

$74

$66

$63

$60

$31

$26

$29

$24

$126

$117

$59

$49

$26

$9

$227

$205

$179

$161

$94

$90

$42

$35

$38

$32

$156

$143

$101

$94

$54

$43

$0 $25 $50 $75 $100 $125 $150 $175 $200 $225 $250 $275

Solar PV–Rooftop Residential

Solar PV–Rooftop C&I

Solar PV–Community

Solar PV–Crystalline Utility Scale

Solar PV–Thin Film Utility Scale

Solar Thermal Tower with Storage

Geothermal

Wind

3

Page 5: Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

Copyright 2020 Lazard

This study has been prepared by Lazard for general informational purposes only, and it is not intended to be, and should not be construed as, financial or other advice. No part of this material may be copied, photocopied or duplicated in any form by any means or redistributed without the prior consent of Lazard.

Levelized Cost of Energy Comparison—Sensitivity to Fuel Prices

L A Z A R D ’ S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S — V E R S I O N 1 4 . 0

Variations in fuel prices can materially affect the LCOE of conventional generation technologies, but direct comparisons to “competing” renewable energy generation technologies must take into account issues such as dispatch characteristics (e.g., baseload and/or dispatchable intermediate capacity vs. those of peaking or intermittent technologies)

Source: Lazard estimates.Note: Unless otherwise noted, the assumptions used in this sensitivity correspond to those used in the global, unsubsidized analysis as presented on the page titled “Levelized Cost of Energy Comparison—Unsubsidized

Analysis”. (1) Assumes a fuel cost range for gas-fired generation resources of $2.59/MMBTU – $4.31/MMBTU (representing a range of ± 25% of the standard assumption of $3.45/MMBTU). (2) Assumes a fuel cost range for nuclear generation resources of $0.64/MMBTU – $1.06/MMBTU (representing a range of ± 25% of the standard assumption of $0.85MMBTU). (3) Assumes a fuel cost range for coal-fired generation resources of $1.10/MMBTU – $1.84/MMBTU (representing a range of ± 25% of the standard assumption of $1.47/MMBTU).

Unsubsidized ± 25% Fuel Price Adjustment

Renewable Energy

Conventional

$150

$74

$63

$31

$29

$126

$59

$26

$142

$125

$61

$38

$227

$179

$94

$42

$38

$156

$101

$54

$206

$200

$164

$80

$0 $25 $50 $75 $100 $125 $150 $175 $200 $225 $250 $275

Solar PV–Rooftop Residential

Solar PV–Rooftop C&I

Solar PV–Community

Solar PV–Crystalline Utility Scale

Solar PV–Thin Film Utility Scale

Solar Thermal Tower with Storage

Geothermal

Wind

Gas Peaking

Nuclear

Coal

Gas Combined Cycle

Levelized Cost ($/MWh)

(1)

(1)

(2)

(3)

4

Page 6: Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

Copyright 2020 Lazard

This study has been prepared by Lazard for general informational purposes only, and it is not intended to be, and should not be construed as, financial or other advice. No part of this material may be copied, photocopied or duplicated in any form by any means or redistributed without the prior consent of Lazard.

Renewable Energy

Conventional

$150

$74

$63

$31

$29

$126

$59

$26

$151

$165

$129

$65

$86

$44

$53

$227

$179

$94

$42

$38

$156

$101

$54

$198

$220

$198

$159

$165

$73

$92

$0 $25 $50 $75 $100 $125 $150 $175 $200 $225 $250 $275

Solar PV–Rooftop Residential

Solar PV–Rooftop C&I

Solar PV–Community

Solar PV–Crystalline Utility Scale

Solar PV–Thin Film Utility Scale

Solar Thermal Tower with Storage

Geothermal

Wind

Nuclear

L A Z A R D ’ S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S — V E R S I O N 1 4 . 0

Source: Lazard estimates.Note: Unless otherwise noted, the assumptions used in this sensitivity correspond to those used in the global, unsubsidized analysis as presented on the page titled “Levelized Cost of Energy Comparison—Unsubsidized Analysis”. (1) The low and high ranges reflect the LCOE of selected conventional generation technologies including illustrative carbon prices of $20/Ton and $40/Ton, respectively. (2) Reflects the midpoint of the marginal cost of operating fully depreciated gas combined cycle and coal facilities as shown on the page titled “Levelized Cost of Energy Comparison—Unsubsidized Analysis”. (3) The narrow spread between the high end of new build coal with and without carbon pricing results from the incorporation of 90% carbon capture and compression. The midpoint of the marginal cost of operating fully depreciated

coal facilities with the illustrative carbon pricing presented herein is $167/MWh. Operating coal facilities are not assumed to employ carbon capture and storage technology.(4) The midpoint of the marginal cost of operating fully depreciated gas combined cycle facilities with the illustrative carbon pricing presented herein is $59/MWh, reflecting the relatively higher heat rate for existing plants compared to

new build facilities.

Levelized Cost of Energy Comparison—Sensitivity to Carbon Pricing Carbon pricing is one avenue for policymakers to address carbon emissions via a market-based mechanism; a carbon price range of $20 – $40/Ton of carbon would increase the LCOE for certain conventional generation technologies to levels above those of onshore wind and utility-scale solar

Levelized Cost ($/MWh)

Gas Peaking

Coal

Gas Combined Cycle

Unsubsidized Unsubsidized with Carbon Pricing

$29(2)

$41(2)

$28(2)

Marginal Cost without Carbon Pricing

(1)

(1)(3)

(1)(4)

5

Page 7: Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

Copyright 2020 Lazard

This study has been prepared by Lazard for general informational purposes only, and it is not intended to be, and should not be construed as, financial or other advice. No part of this material may be copied, photocopied or duplicated in any form by any means or redistributed without the prior consent of Lazard.

$103$114

$127

$141

$156

$172

$65$70 $75

$80$86

$93

$28 $30$33 $37 $40 $44$34 $36 $38 $40 $43 $45

$113

$128

$145

$163$181

$200

$82$92

$102$112

$123$134

$53 $55 $57 $59 $61 $63

$143$153

$164$175

$186$198

0

20

40

60

80

100

120

140

160

180

200

$220

LCOE($/MWh)

Levelized Cost of Energy Comparison—Sensitivity to Cost of Capital

L A Z A R D ’ S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S — V E R S I O N 1 4 . 0

A key consideration in determining the LCOE values for utility-scale generation technologies is the cost, and availability, of capital(1); this dynamic is particularly significant for renewable energy generation technologies

Source: Lazard estimates.Note: Analysis assumes 60% debt and 40% equity. Unless otherwise noted, the assumptions used in this sensitivity correspond to those used in the global, unsubsidized analysis as presented on

the page titled “Levelized Cost of Energy Comparison—Unsubsidized Analysis”. (1) Cost of capital as used herein indicates the cost of capital applicable to the asset/plant and not the cost of capital of a particular investor/owner.(2) Reflects the average of the high and low LCOE for each respective cost of capital assumption.

Midpoint of Unsubsidized LCOE(2)

Gas Peaker

Nuclear

Geothermal

Coal

Gas—Combined Cycle

Solar PV–Crystalline

Wind

Solar Thermal Tower

After-Tax IRR/WACC 4.2% 5.4% 6.5% 7.7% 8.8% 10.0%

Cost of Equity 6.0% 8.0% 10.0% 12.0% 14.0% 16.0%

Cost of Debt 5.0% 6.0% 7.0% 8.0% 9.0% 10.0%

LCOE v14

6

Page 8: Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

Copyright 2020 Lazard

This study has been prepared by Lazard for general informational purposes only, and it is not intended to be, and should not be construed as, financial or other advice. No part of this material may be copied, photocopied or duplicated in any form by any means or redistributed without the prior consent of Lazard.

$26

$9

$29

$24

$34

$25$23

$54

$43

$38

$32

$48

$32 $32

0

10

20

30

40

50

60

$70

Onshore Wind Onshore Wind(Subsidized)

Solar PV–Thin Film Utility Scale

Solar PV–Thin Film Utility Scale (Subsidized)

Coal Nuclear Gas—Combined Cycle

Cost

of E

nerg

y ($/M

Wh)

L A Z A R D ’ S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S — V E R S I O N 1 4 . 0

Certain renewable energy generation technologies have an LCOE that is competitive with the marginal cost of existing conventional generation

Source: Lazard estimates.Note: Unless otherwise noted, the assumptions used in this sensitivity correspond to those used in the global, unsubsidized analysis as presented on the page titled “Levelized Cost of Energy

Comparison—Unsubsidized Analysis”. (1) Represents the marginal cost of operating fully depreciated gas combined cycle, coal and nuclear facilities, inclusive of decommissioning costs for nuclear facilities. Analysis assumes that the salvage

value for a decommissioned gas combined cycle or coal asset is equivalent to its decommissioning and site restoration costs. Inputs are derived from a benchmark of operating gas combined cycle, coal and nuclear assets across the U.S. Capacity factors, fuel, variable and fixed operating expenses are based on upper and lower quartile estimates derived from Lazard’s research.

(2) The subsidized analysis includes sensitivities related to the TCJA and U.S. federal tax subsidies. Please see page titled “Levelized Cost of Energy Comparison—Sensitivity to U.S. Federal Tax Subsidies” for additional details.

Levelized Cost of Energy Comparison—Renewable Energy versus Marginal Cost of Selected Existing Conventional Generation

Levelized Cost of New-Build Wind and Solar Marginal Cost of Selected Existing Conventional Generation(1)

(2) (2)

Subsidized Wind

Unsubsidized Solar PV

Unsubsidized Wind

Subsidized Solar PV

7

Page 9: Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

Copyright 2020 Lazard

This study has been prepared by Lazard for general informational purposes only, and it is not intended to be, and should not be construed as, financial or other advice. No part of this material may be copied, photocopied or duplicated in any form by any means or redistributed without the prior consent of Lazard.

L A Z A R D ’ S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S — V E R S I O N 1 4 . 0

Levelized Cost of Energy Comparison—Historical Utility-Scale Generation Comparison

Selected Historical Mean Unsubsidized LCOE Values(1)

Solar PV—Crystalline

(90%)

Lazard’s unsubsidized LCOE analysis indicates significant historical cost declines for utility-scale renewable energy generation technologies driven by, among other factors, decreasing capital costs, improving technologies and increased competition

$359

$248

$157$125

$98 $79$64

$55 $50 $43

$40 $37

$111$111 $111

$102$105

$109

$108 $102 $102 $102$109 $112

$83

$82$83 $75 $74

$74$65

$63 $60 $58 $56 $59

$135$124

$71 $72 $70$59 $55

$47 $45 $42

$41 $40

$123

$96 $95 $96$104 $112

$117 $117

$148 $151$155

$163$168

$157 $159$174

$145

$124

$150 $151

$140 $140 $141

$141

$76

$107 $104$116

$116 $116

$100 $98 $97$91 $91

$80

$275

$243 $227$216

$205 $205$192 $191

$183 $179 $175 $175

20

80

140

200

260

320

$380

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Mean LCOE($/MWh)

Gas—Combined Cycle(29%)

Wind(70%)

Nuclear33%

Coal1%

Solar ThermalTower (16%)

Gas Peaker(36%)

Geothermal6%

Source: Lazard estimates.(1) Reflects the average of the high and low LCOE for each respective technology in each respective year. Percentages represent the total decrease in the average LCOE since Lazard’s LCOE—

Version 3.0.

4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0LCOE Version 3.0 14.0

8

Page 10: Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

Copyright 2020 Lazard

This study has been prepared by Lazard for general informational purposes only, and it is not intended to be, and should not be construed as, financial or other advice. No part of this material may be copied, photocopied or duplicated in any form by any means or redistributed without the prior consent of Lazard.

$323

$226

$148

$101 $91 $72

$58 $49 $46 $40 $36 $31

$394

$270

$166 $149

$104 $86

$70 $61 $53 $46 $44 $42

0

50

100

150

200

250

300

350

400

$450

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

LCOE($/MWh)

Levelized Cost of Energy Comparison—Historical Renewable Energy LCOE Declines

L A Z A R D ’ S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S — V E R S I O N 1 4 . 0

In light of material declines in the pricing of system components and improvements in efficiency, among other factors, wind and utility-scale solar PV have exhibited dramatic LCOE declines; however, as these industries have matured, the rates of decline have diminished

Source: Lazard estimates.(1) Represents the average percentage decrease of the high end and low end of the LCOE range.(2) Represents the average compounded annual rate of decline of the high end and low end of the LCOE range.

LCOE Version 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0

Crystalline Utility-Scale Solar LCOE Range

Crystalline Utility-Scale Solar LCOE Mean

Unsubsidized Wind LCOE

$101 $99

$50 $48 $45 $37 $32 $32 $30 $29 $28 $26

$169

$148

$92 $95 $95 $81 $77

$62 $60 $56 $54 $54

0

50

100

150

200

$250

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

LCOE($/MWh)

Unsubsidized Solar PV LCOE

Wind 2009 – 2020 Percentage Decrease: (71%)(1)

Wind 2009 – 2020 CAGR: (11%)(2)

Wind LCOE Range

Wind LCOE Mean

Utility-Scale Solar 2009 – 2020 Percentage Decrease: (90%)(1)

Utility-Scale Solar 2009 – 2020 CAGR: (19%)(2)

Wind 2015 – 2020 CAGR: (5%)(2) Utility-Scale Solar 2015 – 2020 CAGR: (11%)(2)

LCOE Version 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0

9

Page 11: Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

Copyright 2020 Lazard

This study has been prepared by Lazard for general informational purposes only, and it is not intended to be, and should not be construed as, financial or other advice. No part of this material may be copied, photocopied or duplicated in any form by any means or redistributed without the prior consent of Lazard.

Solar PV(2)

versus Gas Peaker(3)

Wind(4)

versus Gas Combined

Cycle(5)

Unsubsidized LCOE

Solar PV versus Gas Peaking and Wind versus CCGT—Global Markets(1)

L A Z A R D ’ S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S — V E R S I O N 1 4 . 0

Solar PV and wind have become increasingly competitive with conventional technologies with similar generation profiles; without storage, however, these resources lack the dispatch characteristics, and associated benefits, of such conventional technologies

Source: Lazard estimates.Note: The analysis presented on this page assumes country-specific or regionally applicable tax rates. (1) Equity IRRs are assumed to be 10.0% – 12.0% for Australia, 15.0% for Brazil and South Africa, 13.0% – 15.0% for India, 8.0% – 10.0% for Japan, 7.5% – 12.0% for Europe and 7.5% – 9.0% for

the U.S. Cost of debt is assumed to be 5.0% – 5.5% for Australia, 10.0% – 12.0% for Brazil, 12.0% – 13.0% for India, 3.0% for Japan, 4.5% – 5.5% for Europe, 12.0% for South Africa and 4.0% –4.5% for the U.S.

(2) Low end assumes crystalline utility-scale solar with a single-axis tracker. High end assumes rooftop C&I solar. Solar projects assume illustrative capacity factors of 21% – 28% for the U.S., 26% –30% for Australia, 26% – 28% for Brazil, 22% – 23% for India, 27% – 29% for South Africa, 16% – 18% for Japan and 13% – 16% for Europe.

(3) Assumes natural gas prices of $3.45 for the U.S., $4.00 for Australia, $8.00 for Brazil, $7.00 for India, South Africa and Japan and $6.00 for Europe (all in U.S.$ per MMBtu). Assumes a capacity factor of 10% for all geographies.

(4) Wind projects assume illustrative capacity factors of 38% – 55% for the U.S., 29% – 46% for Australia, 45% – 55% for Brazil, 25% – 35% for India, 31% – 36% for South Africa, 22% – 30% for Japan and 33% – 38% for Europe.

(5) Assumes natural gas prices of $3.45 for the U.S., $4.00 for Australia, $8.00 for Brazil, $7.00 for India, South Africa and Japan and $6.00 for Europe (all in U.S.$ per MMBtu). Assumes capacity factors of 55% – 70% on the high and low ends, respectively, for all geographies.

Levelized Cost ($/MWh)Solar PV WindGas Peaker CCGT

$31$151

$29$124

$30$146

$43$209

$55$210

$45$200

$40$158

$50$164

$26$44

$23$41

$27$47

$31$77

$49$71

$47$70

$36$65

$34$60

$179$198

$107$162

$98$188

$130$248

$162$255

$136$242

$125$186

$172$200

$54$73

$46$61$61

$70$53

$107$95

$103$77

$100$72

$87$54

$84$0 $25 $50 $75 $100 $125 $150 $175 $200 $225 $250 $275

LCOE v14

U.S.

Australia

Brazil

India

South Africa

Japan

Europe

LCOE v14

U.S.

Australia

Brazil

India

South Africa

Japan

Europe

10

Page 12: Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

Copyright 2020 Lazard

This study has been prepared by Lazard for general informational purposes only, and it is not intended to be, and should not be construed as, financial or other advice. No part of this material may be copied, photocopied or duplicated in any form by any means or redistributed without the prior consent of Lazard.

Renewable Energy

Conventional

$2,525

$1,600

$1,300

$825

$825

$6,000

$4,500

$1,050

$700

$7,675

$2,900

$700

$2,825

$2,825

$1,500

$975

$975

$9,090

$6,050

$1,450

$925

$12,500

$6,225

$1,250

$0 $1,500 $3,000 $4,500 $6,000 $7,500 $9,000 $10,500 $12,000 $13,500

Solar PV–Rooftop Residential

Solar PV–Rooftop C&I

Solar PV–Community

Solar PV–Crystalline Utility Scale

Solar PV–Thin Film Utility Scale

Solar Thermal Tower with Storage

Geothermal

Wind

Gas Peaking

Nuclear

Coal

Gas Combined Cycle

Capital Cost ($/kW)

Capital Cost Comparison

L A Z A R D ’ S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S — V E R S I O N 1 4 . 0

In some instances, the capital costs of renewable energy generation technologies have converged with those of certain conventional generation technologies, which coupled with improvements in operational efficiency for renewable energy technologies, have led to a convergence in LCOE between the respective technologies

Source: Lazard estimates.(1) Represents the estimated midpoint of the total capital cost for offshore wind.

$3,138(1)

11

Page 13: Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

Copyright 2020 Lazard

This study has been prepared by Lazard for general informational purposes only, and it is not intended to be, and should not be construed as, financial or other advice. No part of this material may be copied, photocopied or duplicated in any form by any means or redistributed without the prior consent of Lazard.

Renewable Energy

Conventional

Levelized Cost of Energy Components—Low End

L A Z A R D ’ S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S — V E R S I O N 1 4 . 0

Certain renewable energy generation technologies are already cost-competitive with conventional generation technologies; a key factor regarding the continued cost decline of renewable energy generation technologies is the ability of technological development and industry scale to continue lowering operating expenses and capital costs for renewable energy generation technologies

Source: Lazard estimates.

$140

$68

$56

$26

$25

$113

$49

$21

$105

$101

$44

$18

$10

$6

$7

$5

$4

$13

$2

$6

$8

$15

$6

$2

$9

$4

$4

$3

$3

$34

$9

$13

$21

$150

$74

$63

$31

$29

$126

$59

$26

$151

$129

$65

$44

$0 $25 $50 $75 $100 $125 $150 $175

Solar PV–Rooftop Residential

Solar PV–Rooftop C&I

Solar PV–Community

Solar PV–Crystalline Utility Scale

Solar PV–Thin Film Utility Scale

Solar Thermal Tower with Storage

Geothermal

Wind

Gas Peaking

Nuclear

Coal

Gas Combined Cycle

Levelized Cost ($/MWh)

Capital Cost Fixed O&M Variable O&M Fuel Cost

12

Page 14: Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

Copyright 2020 Lazard

This study has been prepared by Lazard for general informational purposes only, and it is not intended to be, and should not be construed as, financial or other advice. No part of this material may be copied, photocopied or duplicated in any form by any means or redistributed without the prior consent of Lazard.

$211

$167

$83

$37

$33

$132

$75

$42

$139

$168

$121

$40

$16

$12

$11

$5

$5

$23

$2

$12

$26

$17

$15

$4

$24

$6

$4

$5

$5

$28

$9

$18

$24

$227

$179

$94

$42

$38

$156

$101

$54

$198

$198

$159

$73

$0 $25 $50 $75 $100 $125 $150 $175 $200 $225 $250 $275

Solar PV–Rooftop Residential

Solar PV–Rooftop C&I

Solar PV–Community

Solar PV–Crystalline Utility Scale

Solar PV–Thin Film Utility Scale

Solar Thermal Tower with Storage

Geothermal

Wind

Gas Peaking

Nuclear

Coal

Gas Combined Cycle

Levelized Cost ($/MWh)

Capital Cost Fixed O&M Variable O&M Fuel Cost

Renewable Energy

Conventional

Levelized Cost of Energy Components—High End

L A Z A R D ’ S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S — V E R S I O N 1 4 . 0

Certain renewable energy generation technologies are already cost-competitive with conventional generation technologies; a key factor regarding the continued cost decline of renewable energy generation technologies is the ability of technological development and industry scale to continue lowering operating expenses and capital costs for renewable energy generation technologies

Source: Lazard estimates.13

Page 15: Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

Copyright 2020 Lazard

This study has been prepared by Lazard for general informational purposes only, and it is not intended to be, and should not be construed as, financial or other advice. No part of this material may be copied, photocopied or duplicated in any form by any means or redistributed without the prior consent of Lazard.

Year 0 1 2 3 4 5 20 Key Assumptions

Capacity (MW) (A) 175 175 175 175 175 175 Capacity (MW) 175

Capacity Factor (B) 38% 38% 38% 38% 38% 38% Capacity Factor 38%

Total Generation ('000 MWh) (A) x (B) = (C)* 583 583 583 583 583 583 Fuel Cost ($/MMBtu) $0.00

Levelized Energy Cost ($/M Wh) (D) $53.7 $53.7 $53.7 $53.7 $53.7 $53.7 Heat Rate (Btu/kWh) 0

Total Revenues (C) x (D) = (E)* $31.3 $31.3 $31.3 $31.3 $31.3 $31.3 Fixed O&M ($/kW-year) $39.5

Variable O&M ($/MWh) $0.0

Total Fuel Cost (F) -- -- -- -- -- -- O&M Escalation Rate 2.25%

Total O&M (G)* 6.9 7.0 7.2 7.3 7.5 10.7 Capital Structure

Total Operating Costs (F) + (G) = (H) $6.9 $7.0 $7.2 $7.3 $7.5 $10.7 Debt 60.0%

Cost of Debt 8.0%

EBITDA (E) - (H) = (I) $24.4 $24.3 $24.1 $23.9 $23.8 $20.6 Equity 40.0%

Cost of Equity 12.0%

Debt Outstanding - Beginning of Period (J) $152.3 $149.2 $146.0 $142.4 $138.6 $14.1

Debt - Interest Expense (K) (12.2) (11.9) (11.7) (11.4) (11.1) (1.1) Taxes and Tax Incentives:

Debt - Principal Payment (L) (3.0) (3.3) (3.5) (3.8) (4.1) (14.1) Combined Tax Rate 40%

Levelized Debt Service (K) + (L) = (M) ($15.2) ($15.2) ($15.2) ($15.2) ($15.2) ($15.2) Economic Life (years) 20

MACRS Depreciation (Year Schedule) 5

EBITDA (I) $24.4 $24.3 $24.1 $23.9 $23.8 $20.6 Capex

Depreciation (MACRS) (N) (50.8) (81.2) (48.7) (29.2) (29.2) -- EPC Costs ($/kW) $1,450

Interest Expense (K) (12.2) (11.9) (11.7) (11.4) (11.1) (1.1) Additional Ow ner's Costs ($/kW) $0

Taxable Income (I) + (N) + (K) = (O) ($38.5) ($68.9) ($36.3) ($16.7) ($16.5) $19.4 Transmission Costs ($/kW) $0

Total Capital Costs ($/kW) $1,450

Tax Benefit (Liability) (O) x (tax rate) = (P) $15.4 $27.6 $14.5 $6.7 $6.6 ($7.8)

Total Capex ($mm) $254

After-Tax Net Equity Cash Flow (I) + (M) + (P) = (Q) ($101.5) $24.6 $36.6 $23.4 $15.4 $15.2 ($2.4)

IRR For Equity Investors 12.0%

Source: Lazard estimates.Note: Wind—High LCOE case presented for illustrative purposes only.* Denotes unit conversion.(1) Assumes half-year convention for discounting purposes.(2) Assumes full monetization of tax benefits or losses immediately. (3) Reflects initial cash outflow from equity investors.(4) Reflects a “key” subset of all assumptions for methodology illustration purposes only. Does not reflect all assumptions.(5) Economic life sets debt amortization schedule. For comparison purposes, all technologies calculate LCOE on a 20-year IRR basis.

Levelized Cost of Energy Comparison—Methodology($ in millions, unless otherwise noted)

L A Z A R D ’ S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S — V E R S I O N 1 4 . 0

Lazard’s LCOE analysis consists of creating a power plant model representing an illustrative project for each relevant technology and solving for the $/MWh value that results in a levered IRR equal to the assumed cost of equity (see subsequent “Key Assumptions” pages for detailed assumptions by technology)

Technology-dependent

Levelized

(1)Unsubsidized Wind — High Case Sample Illustrative Calculations

(5)

(2)

(4)

(3)

14

Page 16: Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

Copyright 2020 Lazard

This study has been prepared by Lazard for general informational purposes only, and it is not intended to be, and should not be construed as, financial or other advice. No part of this material may be copied, photocopied or duplicated in any form by any means or redistributed without the prior consent of Lazard.

Energy Resources—Matrix of Applications

L A Z A R D ’ S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S — V E R S I O N 1 4 . 0

Despite convergence in the LCOE of certain renewable energy and conventional generation technologies, direct comparisons must take into account issues such as location (e.g., centralized vs. distributed) and dispatch characteristics (e.g., baseload and/or dispatchable intermediate capacity vs. those of peaking or intermittent technologies)• This analysis does not take into account potential social and environmental externalities or reliability-related considerations

Source: Lazard estimates.(1) Represents the full range of solar PV technologies.(2) Qualification for RPS requirements varies by location.

Carbon Neutral/

REC Potential

Location Dispatch

Distributed Centralized Geography Intermittent PeakingLoad-

Following Baseload

Renewable Energy

Solar PV(1) Universal(2)

Solar Thermal Rural

Geothermal Varies

Onshore Wind Rural

Conventional

Gas Peaking Universal

Nuclear Rural

Coal Co-located or rural

Gas Combined Cycle Universal

15

Page 17: Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

Copyright 2020 Lazard

This study has been prepared by Lazard for general informational purposes only, and it is not intended to be, and should not be construed as, financial or other advice. No part of this material may be copied, photocopied or duplicated in any form by any means or redistributed without the prior consent of Lazard.

Levelized Cost of Energy—Key Assumptions

L A Z A R D ’ S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S — V E R S I O N 1 4 . 0

Source: Lazard estimates.(1) The “Low Case” represents assumptions used to calculate the low end of the LCOE range, representing a project with single-axis tracking. The “High Case” represents assumptions used to

calculate the high end of the LCOE range, representing a project with fixed-tilt design.

Solar PV

Rooftop—Residential Rooftop—C&I Community Utility Scale—Crystall ine(1)

Utility Scale—Thin Film(1)

Units LowCase

High Case

LowCase

High Case

LowCase

High Case

LowCase

High Case

LowCase

High Case

Net Facility Output MW 0.005 0.005 1 1 5 5 150 150 150 150

EPC Cost $/kW $2,525 $2,825 $1,600 $2,825 $1,300 $1,500 $975 $825 $975 $825

Capital Cost During Construction $/kW –– –– –– –– –– –– –– –– –– ––

Total Capital Cost $/kW $2,525 $2,825 $1,600 $2,825 $1,300 $1,500 $975 $825 $975 $825

Fixed O&M $/kW-yr $15.00 $18.00 $11.75 $18.00 $12.00 $16.00 $13.50 $9.50 $9.50 $13.50

Variable O&M $/MWh –– –– –– –– –– –– –– –– –– ––

Heat Rate Btu/kWh –– –– –– –– –– –– –– –– –– ––

Capacity Factor % 18% 13% 23% 17% 21% 17% 34% 21% 36% 23%

Fuel Price $/MMBtu –– –– –– –– –– –– –– –– –– ––

Construction Time Months 3 3 3 3 4 4 9 9 9 9

Facility Life Years 25 25 25 25 30 30 30 30 30 30

CO2 Emissions lb/MWh –– –– –– –– –– –– –– –– –– ––

Levelized Cost of Energy $/MWh $150 $227 $74 $179 $63 $94 $31 $42 $29 $38

16

Page 18: Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

Copyright 2020 Lazard

This study has been prepared by Lazard for general informational purposes only, and it is not intended to be, and should not be construed as, financial or other advice. No part of this material may be copied, photocopied or duplicated in any form by any means or redistributed without the prior consent of Lazard.

L A Z A R D ’ S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S — V E R S I O N 1 4 . 0

Source: Lazard estimates.(1) The “Low Case” represents assumptions used to calculate the low end of the LCOE range, representing a project with 18 hours of storage capacity. The “High Case” represents

assumptions used to calculate the high end of the LCOE range, representing a project with eight hours of storage. (2) Includes capitalized financing costs during construction for generation types with over 12 months of construction time.

Levelized Cost of Energy—Key Assumptions (cont’d)

Solar Thermal Tower with Storage(1) Geothermal Wind—Onshore Wind—Offshore

Units LowCase

High Case

LowCase

High Case

LowCase

High Case

LowCase

High Case

Net Facility Output MW 110 150 20 50 175 175 210 385

EPC Cost $/kW $7,950 $5,250 $3,950 $5,300 $1,050 $1,450 $2,600 $3,675

Capital Cost During Construction $/kW $1,150 $750 $550 $750 –– –– –– ––

Total Capital Cost(2) $/kW $9,090 $6,000 $4,500 $6,050 $1,050 $1,450 $2,600 $3,675

Fixed O&M $/kW-yr $75.00 $80.00 $13.00 $14.00 $27.00 $39.50 $67.25 $81.75

Variable O&M $/MWh –– –– $9.00 $24.00 –– –– –– ––

Heat Rate Btu/kWh –– –– –– –– –– –– –– ––

Capacity Factor % 68% 39% 90% 80% 55% 38% 52% 48%

Fuel Price $/MMBtu –– –– –– –– –– –– –– ––

Construction Time Months 36 36 36 36 12 12 12 12

Facility Life Years 35 35 25 25 20 20 20 20

CO2 Emissions lb/MWh –– –– –– –– –– –– –– ––

Levelized Cost of Energy $/MWh $126 $156 $59 $101 $26 $54 $69 $104

17

Page 19: Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

Copyright 2020 Lazard

This study has been prepared by Lazard for general informational purposes only, and it is not intended to be, and should not be construed as, financial or other advice. No part of this material may be copied, photocopied or duplicated in any form by any means or redistributed without the prior consent of Lazard.

L A Z A R D ’ S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S — V E R S I O N 1 4 . 0

Source: Lazard estimates.(1) Includes capitalized financing costs during construction for generation types with over 12 months of construction time.(2) CO2 emissions calculated based on U.S. Energy Information Administration estimates of CO2 emission coefficients by fuel type and the plant heat rates indicated above.(3) Reflects a coal plant with 2,522 lb/MWh of CO2 emissions operating with a 90% carbon capture and storage system.

Levelized Cost of Energy—Key Assumptions (cont’d)

Gas Peaking Nuclear (New Build) Coal (New Build) Gas Combined Cycle (New Build)

Units LowCase

High Case

LowCase

High Case

LowCase

High Case(3)

LowCase

High Case

Net Facility Output MW 240 50 2,200 2,200 600 600 550 550

EPC Cost $/kW $675 $875 $6,025 $9,800 $2,350 $4,925 $650 $1,150

Capital Cost During Construction $/kW $25 $50 $1,650 $2,700 $550 $1,300 $50 $100

Total Capital Cost(1) $/kW $700 $925 $7,675 $12,500 $2,900 $6,225 $700 $1,250

Fixed O&M $/kW-yr $7.25 $22.75 $119.00 $133.25 $39.75 $83.00 $14.50 $18.50

Variable O&M $/MWh $4.25 $5.75 $3.75 $4.25 $2.75 $5.00 $2.75 $5.00

Heat Rate Btu/kWh 9,800 8,000 10,450 10,450 8,750 12,000 6,150 6,900

Capacity Factor % 10% 10% 92% 89% 83% 63% 70% 50%

Fuel Price $/MMBtu $3.45 $3.45 $0.85 $0.85 $1.45 $1.45 $3.45 $3.45

Construction Time Months 12 18 69 69 60 66 24 24

Facility Life Years 20 20 40 40 40 40 20 20

CO2 Emissions(2) lb/MWh 1,147 936 –– –– 1,839 252(3) 720 807

Levelized Cost of Energy $/MWh $151 $198 $129 $198 $65 $159 $44 $73

18

Page 20: Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

Copyright 2020 Lazard

This study has been prepared by Lazard for general informational purposes only, and it is not intended to be, and should not be construed as, financial or other advice. No part of this material may be copied, photocopied or duplicated in any form by any means or redistributed without the prior consent of Lazard.

L A Z A R D ’ S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S — V E R S I O N 1 4 . 0

Levelized Cost of Energy—Key Assumptions (cont’d)

Nuclear (Operating) Coal (Operating) Gas Combined Cycle (Operating)

Units LowCase

High Case

LowCase

High Case

LowCase

High Case

Net Facility Output MW2,200 2,200 600 600 550 550

EPC Cost $/kW –– –– –– –– –– ––

Capital Cost During Construction $/kW –– –– –– –– –– ––

Total Capital Cost $/kW –– –– –– –– –– ––

Fixed O&M $/kW-yr $82.80 $103.10 $23.20 $40.30 $9.40 $11.70

Variable O&M $/MWh $2.50 $3.50 $2.70 $6.00 $0.70 $1.50

Heat Rate Btu/kWh 10,400 10,400 10,075 11,275 6,900 7,475

Capacity Factor % 97% 89% 35% 65% 69% 45%

Fuel Price $/MMBtu $0.70 $0.80 $1.90 $2.50 $2.60 $3.20

Construction Time Months –– –– –– –– –– ––

Facility Life Years 40 40 40 40 20 20

CO2 Emissions(1) lb/MWh –– –– 2,118 2,370 807 875

Levelized Cost of Energy $/MWh $25 $32 $34 $48 $23 $32

Source: Lazard estimates.(1) CO2 emissions calculated based on U.S. Energy Information Administration estimates of CO2 emission coefficients by fuel type and the plant heat rates indicated above.

19

Page 21: Lazard’s Levelized Cost of Energy Analysis—Version 13...Note: Here and throughout this presentation, unless otherwise indicated, the analysis assumes 60% debt at 8% interest rate

Copyright 2020 Lazard

This study has been prepared by Lazard for general informational purposes only, and it is not intended to be, and should not be construed as, financial or other advice. No part of this material may be copied, photocopied or duplicated in any form by any means or redistributed without the prior consent of Lazard.

Summary Considerations

L A Z A R D ’ S L E V E L I Z E D C O S T O F E N E R G Y A N A L Y S I S — V E R S I O N 1 4 . 0

Lazard has conducted this analysis comparing the LCOE for various conventional and renewable energy generation technologies in order to understand which renewable energy generation technologies may be cost-competitive with conventional generation technologies, either now or in the future, and under various operating assumptions. We find that renewable energy technologies are complementary to conventional generation technologies, and believe that their use will be increasingly prevalent for a variety of reasons, including to mitigate the environmental and social consequences of various conventional generation technologies, RPS requirements, carbon regulations, continually improving economics as underlying technologies improve and production volumes increase, and supportive regulatory frameworks in certain regions.

In this analysis, Lazard’s approach was to determine the LCOE, on a $/MWh basis, that would provide an after-tax IRR to equity holders equal to an assumed cost of equity capital. Certain assumptions (e.g., required debt and equity returns, capital structure, etc.) were identical for all technologies in order to isolate the effects of key differentiated inputs such as investment costs, capacity factors, operating costs, fuel costs (where relevant) and other important metrics. These inputs were originally developed with a leading consulting and engineering firm to the Power & Energy Industry, augmented with Lazard’s commercial knowledge where relevant. This analysis (as well as previous versions) has benefited from additional input from a wide variety of Industry participants and is informed by Lazard’s many client interactions on this topic.

Lazard has not manipulated the cost of capital or capital structure for various technologies, as the goal of this analysis is to compare the current levelized cost of various generation technologies, rather than the benefits of financial engineering. The results contained herein would be altered by different assumptions regarding capital structure (e.g., increased use of leverage) or the cost of capital (e.g., a willingness to accept lower returns than those assumed herein).

Key sensitivities examined included fuel costs, tax subsidies, carbon pricing and costs of capital. Other factors would also have a potentially significant effect on the results contained herein, but have not been examined in the scope of this current analysis. These additional factors, among others, could include: capacity value vs. energy value; network upgrades, transmission, congestion or other integration-related costs; significant permitting or other development costs, unless otherwise noted; and other costs of complying with various environmental regulations (e.g., carbon emissions offsets or emissions control systems). This analysis also does not address potential social and environmental externalities, including, for example, the social costs and rate consequences for those who cannot afford distributed generation solutions, as well as the long-term residual and societal consequences of various conventional generation technologies that are difficult to measure (e.g., nuclear waste disposal, airborne pollutants, greenhouse gases, etc.).

20