Laboratory Pilots/Deployment May 15, 2012 1

Laboratory Pilots/Deployment May 15, 2012 1. Participants Coordination of Effort Validation Suite Vocabulary Group Implementation Guide Analysis Support

Embed Size (px)

Citation preview

Page 1: Laboratory Pilots/Deployment May 15, 2012 1. Participants Coordination of Effort Validation Suite Vocabulary Group Implementation Guide Analysis Support

Laboratory Pilots/Deployment

May 15, 2012

1

Page 2: Laboratory Pilots/Deployment May 15, 2012 1. Participants Coordination of Effort Validation Suite Vocabulary Group Implementation Guide Analysis Support

Participants

Coordination of Effort• Validation Suite• Vocabulary Group• Implementation Guide Analysis• Support Team

2

Pilot I Project Participants• Atlas Development• CAP• Halfpenny Technologies• KHIE• LabLynx

Pilot II Project Participants Conversations• Lab System and EHR Vendor (2)• Lab System Vendor (1)• EHR Vendor (3)• Commercial Laboratories (2)• Provider Based Commercial Labs (3)

Pilot II Project Participants• Allscripts• athenahealth• Cerner• OptumInsight• RML

Page 3: Laboratory Pilots/Deployment May 15, 2012 1. Participants Coordination of Effort Validation Suite Vocabulary Group Implementation Guide Analysis Support

LRI Validation Suite WGTest Cases -- Review

May 15, 2012

Page 4: Laboratory Pilots/Deployment May 15, 2012 1. Participants Coordination of Effort Validation Suite Vocabulary Group Implementation Guide Analysis Support

NIST Validation Suite Considerations

Reporting Scenarios

1) Preliminary Report2) Partial Report3) Final Report4) Cumulative Report (for recurring draws?)5) Corrected Report / Amended Report6) Cancel due to ………….. (e.g. specimen quality)7) Error conditions (e.g. R, RE, C,CE misuse invalid syntax)8) Reflex Testing9) Add-on Tests/results10) Addenda Report (is this a valid HL7 report type/status?

4

Test Types

1) Single numeric result with reference range A1

2)Single alpha result from limited response list (e.g. Positive, Negative, …) A2

3) Panel testing with combinations of 1) and 2) A1&A24) Textual Results A45) PDF as payload A46) Textual with tabular data A47) Combinations of 1) and 2) e.g. susceptibility MIC and Interp A3

Errata

1) NTE2) PID text3) Multiple OBR4) Addon5) Multiple OBR6) Additional OBX7) Reflex testing8) Multiple OBR9) Additional OBX10) Add OBX for specific result types from order (e.g. total urine volume)11) Multiple testing locations12) Non-standard abnormal flags

Page 5: Laboratory Pilots/Deployment May 15, 2012 1. Participants Coordination of Effort Validation Suite Vocabulary Group Implementation Guide Analysis Support

Needed from all participants

Testers and feedback for current version of Validation Suite tool

http://lri.sipilotdevelopment.org/lri-dstu/

Volunteers for 1-on-1 Webex testing– Especially EHR systems– Validation Suite to be ready in June 2012

Page 6: Laboratory Pilots/Deployment May 15, 2012 1. Participants Coordination of Effort Validation Suite Vocabulary Group Implementation Guide Analysis Support

Laboratory Pilot/Deployment Overview The goal of the Laboratory Pilot/Deployment effort is to create reference

implementations (e.g. production or pre-production versions) of the laboratory results, orders and test compendium transactions based on the specifications in the LRI, LOI, and eDOS implementation guides. The purpose of these reference implementations is to:

Verify the specifications in the implementation guides in an operational setting to determine and document any exceptions, errors, or omissions that will facilitate the future revisions of the guide.

Validate and enhance the validation tools that will be used to aid in certification testing of these interfaces

Verify interoperability of the these reference implementations outside of the proposed ecosystems

Take the reference implementations to production use/deployment in 2012/2013

6

Page 7: Laboratory Pilots/Deployment May 15, 2012 1. Participants Coordination of Effort Validation Suite Vocabulary Group Implementation Guide Analysis Support

Ecosystem Each participant will propose a complete ecosystem for reference

implementation purposes

The recommended ecosystem should consist of a laboratory, LIS/interface vendor (may be in-house effort) , provider organization, and EHR vendor

To the extent third parties integrators are required to create and/or support the reference implementation, they will be considered part of the proposed ecosystem

If participants are unable to assemble the entire ecosystem, Laboratory Pilot/Deployment leadership will assist in making introductions where possible

7

Page 8: Laboratory Pilots/Deployment May 15, 2012 1. Participants Coordination of Effort Validation Suite Vocabulary Group Implementation Guide Analysis Support

Laboratory Results Interface (LRI)

Each participant shall develop/implement and test a production or pre-production interface compliant with the Draft Standard for Trial Use (DSTU) version of the LRI IG for the exchange of laboratory results between the LIS and EHR.

Utilize the online validation suite to test all supported use cases applicable to the specific ecosystem.

Each laboratory/LIS and EHR should participate in an S&I Laboratory Pilot coordinated virtual interoperability forum to be established among the Laboratory Pilot II participants.

The resulting pre-productions LRI implementations are expected to be taken to production use by the end of 2012 and where possible rolled out to additional implementations in early 2013.

8

Page 9: Laboratory Pilots/Deployment May 15, 2012 1. Participants Coordination of Effort Validation Suite Vocabulary Group Implementation Guide Analysis Support

Laboratory Orders Interface (LOI)

Contribute to the LOI workgroup effort to develop the DSTU specification for LOI IG.

Each participant shall develop/implement and test a production or pre-production interface compliant with the DSTU version of the LOI IG for the exchange of laboratory orders between the EHR and LIS.

Utilize the online validation suite to test all supported use cases applicable to the specific ecosystem.

Each EHR and laboratory/LIS should participate in an S&I Laboratory Pilot coordinated virtual interoperability forum to be established among the Laboratory Pilot II participants

The resulting pre-productions LOI implementations are expected to be taken to production use by the end of 2012 and where possible, rolled out to additional implementation in early 2013

9

Page 10: Laboratory Pilots/Deployment May 15, 2012 1. Participants Coordination of Effort Validation Suite Vocabulary Group Implementation Guide Analysis Support

Electronic Directory of Services (eDOS)

Contribute to the LOI/eDOS sub-workgroup effort to align the eDOS and LOI specifications.

Each participant shall develop/implement and test a production or pre-production interface compliant with the current Informative version of the eDOS IG for the exchange of Test Compendium between the LIS and EHR.

If available, utilize the online validation suite to test all supported use cases applicable to the specific ecosystem.

Each EHR and laboratory/LIS should participate in an S&I Laboratory Pilot coordinated virtual interoperability forum to be established among the Laboratory Pilot II participants

The resulting pre-productions eDOS implementations are expected to be taken to production use by the end of 2012 and where possible, rolled out to additional implementations in early 2013

10

Page 11: Laboratory Pilots/Deployment May 15, 2012 1. Participants Coordination of Effort Validation Suite Vocabulary Group Implementation Guide Analysis Support

Value to ParticipantsWhile the Laboratory Pilot II effort is a significant commitment of time and resources on the part of each participant, it

provides each organization with the opportunity to take a leadership role in establishing interoperability standards for the laboratory testing industry. Broad adoption of these standards will substantially reduce the cost and time to implement and support electronic interfaces to communicate test compendiums, laboratory orders and results.

 

Specifically the value to each of the participants includes:• Prepare for Meaningful Use 2 (MU2) and the 2014 EHR certification requirements• Feed-back on the specific uses cases and testing scenarios for the online validation suite before it is incorporated

as part of the official EHR certification process• Participate in the validation and implementation process to provide valuable feedback on the implementation

guides to ensure that laboratory requirements are full represented• Substantially reduced time and cost via national standardization to implement laboratory interfaces for test

compendium, orders and results• Reduced order errors based on electronic exchange of test compendium • Minimize ongoing interface maintenance effort and cost • Increase the number of implemented electronic interfaces between laboratories and ambulatory provider EHRs to

reduce cost and errors introduced by manual processes• Improve turn-around-time (TAT) for the delivery of laboratory results to the ordering/using clinician• Improved patient care through the reduction in errors and reduced TAT • Reduction in the management cost to support multiple different interfaces for EHRs• Early market presence with laboratory interfaces compliant with ONC S&I Framework standards

11

Page 12: Laboratory Pilots/Deployment May 15, 2012 1. Participants Coordination of Effort Validation Suite Vocabulary Group Implementation Guide Analysis Support

Next Steps / Questions

• Next Steps• Continue recruiting Pilot II participants• Work on expanded scenarios for validation suite

• Schedule• Pilot calls for coordination every other week at same time next call 5/29• Continue work with Validation Suite on 5/22• Start participation in LOI and compendium effort based on LOI calendar

• For questions, please feel free to contact • Bob Dieterle: [email protected]

12