Kings Fleet & Falkenham IDB Abstraction Licence Application Yield Assessment 0 200 400 600 800 1000 1200 29/01/2016 00:00 03/02/2016 00:00 08/02/2016 00:00 13/02/2016 00:00 18/02/2016 00:00

Kings Fleet & Falkenham IDB Abstraction Licence Application...29/01/2016 00:00 03/02/2016 00:00 08/02/2016 00:00 13/02/2016 00:00 18/02/2016 00:00. Conjunctive use or Farm reservoir

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Kings Fleet & Falkenham IDB Abstraction Licence Application...29/01/2016 00:00 03/02/2016 00:00 08/02/2016 00:00 13/02/2016 00:00 18/02/2016 00:00. Conjunctive use or Farm reservoir

Kings Fleet & Falkenham IDB Abstraction

Licence Application Yield Assessment

0

200

400

600

800

1000

1200

29/01/2016 00:00 03/02/2016 00:00 08/02/2016 00:00 13/02/2016 00:00 18/02/2016 00:00

Page 2: Kings Fleet & Falkenham IDB Abstraction Licence Application...29/01/2016 00:00 03/02/2016 00:00 08/02/2016 00:00 13/02/2016 00:00 18/02/2016 00:00. Conjunctive use or Farm reservoir

Conjunctive use or Farm

reservoir – yield Dependent

Current Constraints

• Estimated average yield 1500-2000Ml.

• 600-800 Ml demand for irrigation

• 1000Ml+ demand for P.W.S

• 188 Ml currently licenced

• Design year yield unknown

• Lack of local reliable flow data

• Currently two pumping stations Kings fleet and Falkenham

• Possible to move water from Kings Fleet to Falkenham

• Water Quality constraints

• Freshwater flow to Estuary

Page 3: Kings Fleet & Falkenham IDB Abstraction Licence Application...29/01/2016 00:00 03/02/2016 00:00 08/02/2016 00:00 13/02/2016 00:00 18/02/2016 00:00. Conjunctive use or Farm reservoir

Assessing Yield

Hydrological models

Catchment Hydrology

• Available Methods include Low Flows Enterprise; NEAC model ; Catchment comparison; Rainfall run off modelling .

• Catchmod Rainfall runoff modelmost suited to this application .

• Catchment divided into hydrological zones.

• Water moves vertically through a series of conceptual stores in each zone

• Inputs Potential Evaporation and Rainfall 1970-2015.

• Calibrated with catchment observed flow data

Page 4: Kings Fleet & Falkenham IDB Abstraction Licence Application...29/01/2016 00:00 03/02/2016 00:00 08/02/2016 00:00 13/02/2016 00:00 18/02/2016 00:00. Conjunctive use or Farm reservoir

Kings Fleet – Falkenham

model Build

Inputs

• Potential Evaporation MORECS weekly .

• 1970-2015 Rainfall Locally gauged for Calibration – Levington for P.O.R. (inc other gauges for infilling).

• Flows – gauged at Falkenham and kings fleet Pumps . Check with other gauges , Holesley, Brantham, Playford etc.

• Hydrological zones; superficial Aquifer 35%, Alluvium 32%, London clay 25%, Hard surface rapid 8%

• Single unit calibration

Page 5: Kings Fleet & Falkenham IDB Abstraction Licence Application...29/01/2016 00:00 03/02/2016 00:00 08/02/2016 00:00 13/02/2016 00:00 18/02/2016 00:00. Conjunctive use or Farm reservoir

IDB Pump data

0

200

400

600

800

1000

1200

01/01/2016 00:0006/01/2016 00:0011/01/2016 00:0016/01/2016 00:0021/01/2016 00:0026/01/2016 00:0031/01/2016 00:0005/02/2016 00:0010/02/2016 00:0015/02/2016 00:0020/02/2016 00:00

Kings fleet hourly Discharge 01/01/2016 to 11/03/2015

Series1

168 per. Mov. Avg. (Series1)

24 per. Mov. Avg. (Series1)

• Significant periodicity @ 24 hour and 7 day – not hydrological – cost minimisation

• Correction required for calibration . Maximum period of 7 day selected as filter .

• Model output's reported to 7 day rolling output .

• Uncertainty regarding the more rapid response functions of the catchment .

• Local gauge and model checks indicate good accuracy of gauged data (next slide)

Page 6: Kings Fleet & Falkenham IDB Abstraction Licence Application...29/01/2016 00:00 03/02/2016 00:00 08/02/2016 00:00 13/02/2016 00:00 18/02/2016 00:00. Conjunctive use or Farm reservoir

IDB Gauging Plausibility

checks

0

50

100

150

200

250

300

350

400

450

0

20

40

60

80

100

120

15/07/2015 03/09/2015 23/10/2015 12/12/2015 31/01/2016 21/03/2016 10/05/2016

run

off

mm

Kings Fleet & Falkenham IDB pumped cumulative runoff compared to L.F.E. Mean monthly runoff. Data shown for Time period September 2015 to March 2016 - 96 % L.T.A. Rainfall

L.F.E gauged

L.T.A. Rainfall 2015/2016 Rainfall

Series5 Poly. (L.F.E)

Poly. (L.T.A. Rainfall) Poly. (2015/2016 Rainfall)

• Early monitoring data Sep 2015 –Mar 2016 run off compared to gauge and existing steady state models .

• Sep 2015 – Mar 2016 Rainfall 96 % of L.T.A.

• Sep 2015 – Mar 2016 Measured run off 99 % L.T.A compared to L.F. E model . (95mm)

• Very encouraging checks for accurate metering .

Page 7: Kings Fleet & Falkenham IDB Abstraction Licence Application...29/01/2016 00:00 03/02/2016 00:00 08/02/2016 00:00 13/02/2016 00:00 18/02/2016 00:00. Conjunctive use or Farm reservoir

IDB Pump Totals 2015-2016

0

200000

400000

600000

800000

1000000

1200000

1400000

1600000

1800000

2000000

CU

BIC

ME

TR

ES

Cumulative Pumped Volume

Kings fleet Falkenham 2 Falkenham 1

• Total Measured

discharge 01/08/2015 to

31/06/2016. Approx.

2800000m3

• Runoff 57 % Kings fleet: 43% Falkenham

• Area 61% king fleet: 39%

Falkenham

• Rainfall Aug to June 114

% L.T.A.

Page 8: Kings Fleet & Falkenham IDB Abstraction Licence Application...29/01/2016 00:00 03/02/2016 00:00 08/02/2016 00:00 13/02/2016 00:00 18/02/2016 00:00. Conjunctive use or Farm reservoir

Catchmod Rainfall runoff

model Calibration

• Calibrate to individual

hydrological zones .

• Soil moisture profiles

• Flow statistics including flow

duration curves .

• Catchment yield.

• Total flow

0

20

40

60

80

100

120

140

160

180

2000.00

0.05

0.10

0.15

0.20

0.25

0.30

Rain

fall

(m

m)

Flo

w (

cu

mecs)

Date

Contribution to Flows by Area (Kings fleet)

Observed Rainfall Simulated

Area 1: Gravel crag Area 2: Alluvium Area 3: London clay

Area 4: Urban 8 per. Mov. Avg. (Observed) 7 per. Mov. Avg. (Simulated)

Page 9: Kings Fleet & Falkenham IDB Abstraction Licence Application...29/01/2016 00:00 03/02/2016 00:00 08/02/2016 00:00 13/02/2016 00:00 18/02/2016 00:00. Conjunctive use or Farm reservoir

Total flow Calibration

0

20

40

60

80

100

120

140

160

180

2000.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

Rain

fall (

mm

)

Flo

w (

cu

mecs)

Date

Model Fit (Kings Fleet & Falkenham)

Observed Rainfall Simulated Flow 7 per. Mov. Avg. (Observed ) 7 per. Mov. Avg. (Simulated Flow)

• 7 day rolling output to remove

periodicity.

• Removes probable urban

peaks- attenuated by storage

• Good calibration of observed

aquifer baseflow trends.

• Probable 10-15 %

underestimate of long term

average yield

• Underestimate associated with

run off from marsh area , too

high S.M.D. in shoulder months.

?

Page 10: Kings Fleet & Falkenham IDB Abstraction Licence Application...29/01/2016 00:00 03/02/2016 00:00 08/02/2016 00:00 13/02/2016 00:00 18/02/2016 00:00. Conjunctive use or Farm reservoir

Catchmod calibration ‘v’

existing models. L..F E

0.004

0.003 0.003

0.0020.002

0.002

0.003

0.005

0.005

0.007

0.007

0.005

0.005

0.004

0.003

0.003 0.003

0.003

0.004

0.005

0.006

0.007

0.006

0.005

APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR

Modelled Run off M3/s/km2 - L.F.E. and Catchmod

Catchmod Low Flows Enterprise

• Good calibration of seasonal

runoff with steady state

models .

• Baseflow months Consistently

10-15 % lower . Runoff

dominated months 10-15 5

higher.

• Consistent with

conceptualisation that L. f. E.

model overestimates baseflow

index @ 0.82 .

Page 11: Kings Fleet & Falkenham IDB Abstraction Licence Application...29/01/2016 00:00 03/02/2016 00:00 08/02/2016 00:00 13/02/2016 00:00 18/02/2016 00:00. Conjunctive use or Farm reservoir

Calibration flow Duration

statistics

0.000

0.050

0.100

0.150

0.200

0.250

0.300

0.350

0.400

0.000 10.000 20.000 30.000 40.000 50.000 60.000 70.000 80.000 90.000 100.000

m3

/se

c

Percentile

Catchmod and L.F.E. Mean Daily flow Duration curves

Modelled 1973-2015

L.F.E

model calibration 7 day

IDB gauged 7day

• Good Calibration with

observed

• Modelled and observed flow

expected to exceed L.T.A.

• Monitoring period generated

significantly more run off than

Long term 1970-2014 modelled

• Long term modelled conforms

to conceptualisation of

greater runoff and lower

baseflow relative to existing

model .

• Catchmod Modelled mean

yield believed to be 10-15 %

below actual .

Page 12: Kings Fleet & Falkenham IDB Abstraction Licence Application...29/01/2016 00:00 03/02/2016 00:00 08/02/2016 00:00 13/02/2016 00:00 18/02/2016 00:00. Conjunctive use or Farm reservoir

Catchmod Aquifer zone

Calibration

5.9

6.4

6.9

7.4

7.9

8.4

8.9

9.4

9.9

0.000

0.020

0.040

0.060

0.080

0.100

0.120

0.140

18/02/1982 11/08/1987 31/01/1993 24/07/1998 14/01/2004 06/07/2009 27/12/2014 18/06/2020

Gro

un

dw

ate

r Le

ve

l M

ao

d

mo

de

lle

d f

low

m3

/se

c

Axis Title

Catchmod Calibration - Aquifer flows and Observed groundwater hydrographs

Gravel sim flows elm cottage levels

Mill lane Boyton

• Aquifer 35 % of total runoff. Major summer component .

• Longer term Calibration with local groundwater levels , extends calibration period beyond flow monitoring .

• Very good trend calibration with Elm Cottage Hollesley and mill Lane Boyton.

Page 13: Kings Fleet & Falkenham IDB Abstraction Licence Application...29/01/2016 00:00 03/02/2016 00:00 08/02/2016 00:00 13/02/2016 00:00 18/02/2016 00:00. Conjunctive use or Farm reservoir

Catchmod Final

Calibration

0.000

0.100

0.200

0.300

0.400

0.500

0.600

0.700

0.800

0.900

1.000

01

/0

5/1

97

0

01

/0

5/1

97

1

01

/0

5/1

97

2

01

/0

5/1

97

3

01

/0

5/1

97

4

01

/0

5/1

97

5

01

/0

5/1

97

6

01

/0

5/1

97

7

01

/0

5/1

97

8

01

/0

5/1

97

9

01

/0

5/1

98

0

01

/0

5/1

98

1

01

/0

5/1

98

2

01

/0

5/1

98

3

01

/0

5/1

98

4

01

/0

5/1

98

5

01

/0

5/1

98

6

01

/0

5/1

98

7

01

/0

5/1

98

8

01

/0

5/1

98

9

01

/0

5/1

99

0

01

/0

5/1

99

1

01

/0

5/1

99

2

01

/0

5/1

99

3

01

/0

5/1

99

4

01

/0

5/1

99

5

01

/0

5/1

99

6

01

/0

5/1

99

7

01

/0

5/1

99

8

01

/0

5/1

99

9

01

/0

5/2

00

0

01

/0

5/2

00

1

01

/0

5/2

00

2

01

/0

5/2

00

3

01

/0

5/2

00

4

01

/0

5/2

00

5

01

/0

5/2

00

6

01

/0

5/2

00

7

01

/0

5/2

00

8

01

/0

5/2

00

9

01

/0

5/2

01

0

01

/0

5/2

01

1

01

/0

5/2

01

2

01

/0

5/2

01

3

01

/0

5/2

01

4

m3

/se

c

Kings Fleet modelled Total flow and Crag/gravel Baseflow

• Mean Daily flow data sets 1970-2015 ( calibrated to weekly)

• Winter run off more significant than other models B.F.I. 0.62 ‘v’ 0.85 L.F.E

• Vulnerability to dry winters

• Significant hard surface runoff component.

• Crag/gravel baseflow providing significant summer yield . Model believed to underestimate crag flows in dry years . Q(bf) mean = 0.025m3/sec . Probable 0.030m3/sec

• Calibration Mean run off - low 119mm, MORECS/HOST gridded 127mm (baseflow component)

Page 14: Kings Fleet & Falkenham IDB Abstraction Licence Application...29/01/2016 00:00 03/02/2016 00:00 08/02/2016 00:00 13/02/2016 00:00 18/02/2016 00:00. Conjunctive use or Farm reservoir

IDB pumped Catchment

Design Year

• IDB estimated mean

yield 2000 Ml

• Modelled mean yield

1930 Ml

• Lowest 661Ml in 1990

• Highest 5141 Ml in 2000

24

81

25

51

97

8

86

6

20

50

13

65

23

54

12

85

19

09

15

50

15

91 1

83

3

14

47 16

57

21

99

17

41

20

53

46

18

19

02

10

35

73

2 87

0

11

91

23

02 2

54

2

11

35

66

1

10

13

14

22

15

63

51

41

27

93

26

13

11

12

14

19

77

8

22

53

22

91

27

47

16

36

16

23

80

3

38

46

26

20

35

55

25

24

19

70

19

71

19

72

19

73

19

74

19

75

19

76

19

77

19

78

19

79

19

80

19

81

19

82

19

83

19

84

19

85

19

86

19

87

19

88

19

89

19

90

19

91

19

92

19

93

19

94

19

95

19

96

19

97

19

98

19

99

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

20

14

20

15

IDB POTENTIAL GROSS YIELD KINGS FLEET & FALKENHAM

Modelled gross yield

Catchmod Mean Gross yield

IDB Estimated Mean yield

Page 15: Kings Fleet & Falkenham IDB Abstraction Licence Application...29/01/2016 00:00 03/02/2016 00:00 08/02/2016 00:00 13/02/2016 00:00 18/02/2016 00:00. Conjunctive use or Farm reservoir

Scheme Reliability

0

1000

2000

3000

4000

5000

6000

0.0 20.0 40.0 60.0 80.0 100.0 120.0

Po

ten

tia

l y

ield

Ml

% Probability Of Available yield

Yield /Probability Curve - 1970-2015

Irrigation Only Scheme Multi use Scheme

• Assuming Resource can be

fully optimised. Unrestricted

infrastructure capability

• Multi use Scheme – 2100 Ml- 65

% chance of non-availability

in any year.

• Irrigation Scheme – 800 Ml - 4

% risk of non- availability.

• Irrigation Scheme – 600 Ml –

100 % reliable.

• Precautionary model

calibration Reasonable

assumption to increase dry

year yield by 10-15%

Page 16: Kings Fleet & Falkenham IDB Abstraction Licence Application...29/01/2016 00:00 03/02/2016 00:00 08/02/2016 00:00 13/02/2016 00:00 18/02/2016 00:00. Conjunctive use or Farm reservoir

Further constraint

0.000

0.050

0.100

0.150

0.200

0.250

0.300

01

/0

5/1

99

5

01

/0

6/1

99

5

01

/0

7/1

99

5

01

/0

8/1

99

5

01

/0

9/1

99

5

01

/1

0/1

99

5

01

/1

1/1

99

5

01

/1

2/1

99

5

01

/0

1/1

99

6

01

/0

2/1

99

6

01

/0

3/1

99

6

01

/0

4/1

99

6

01

/0

5/1

99

6

01

/0

6/1

99

6

01

/0

7/1

99

6

01

/0

8/1

99

6

01

/0

9/1

99

6

01

/1

0/1

99

6

01

/1

1/1

99

6

01

/1

2/1

99

6

01

/0

1/1

99

7

01

/0

2/1

99

7

01

/0

3/1

99

7

01

/0

4/1

99

7

01

/0

5/1

99

7

01

/0

6/1

99

7

01

/0

7/1

99

7

01

/0

8/1

99

7

01

/0

9/1

99

7

01

/1

0/1

99

7

01

/1

1/1

99

7

01

/1

2/1

99

7

01

/0

1/1

99

8

01

/0

2/1

99

8

01

/0

3/1

99

8

01

/0

4/1

99

8

m3

/se

c

Kings Fleet modelled Total flow and Crag/gravel Baseflow Design year 1995-1997

• Infrastructure to transfer

high flows.

• Freshwater flow to tide –

(S.P.A.) 0.6 Ml/day could

reduce deployable output

by 33%.

• Freshwater flow to tide

TRAC waterbody whole

estuary target. W.F.D.

assessment required .

• Salinity

• Access arrangements for

new point of abstraction .