Sl. no Activity W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 1.0 Civil work 1.1 Footings 1.2 Plinth beam 1.3 1 st slab to 5th slab 1.4 Brick work 1.5 Internal celling&wall plastering 1.6 External plasting 1.7 Scaffolding work 1.8 Railings fitting 1.9 Wood frames making 1.10 Doors and windows fittings 2 Electrical work 2.1 Groove cutting and conduit laying 2.2 Wiring work 2.3 Board fitting (switch board) 3 Plumbing work 3.1 Groove cutting and conduit laying 3.2 Wash basin and comord fixing 3.3 External water supply & drainage work 4 Tiling work 4.1 Toilets wall tiling 4.2 Floor tiling 4.3 Common area marble tiles all floors & staircase 4.4 External wall cladding 5 Paint work 5.1 walls and Doors putty 1st coat painting 5.2 2nd coat painting wall, doors and grills 5.3 External texture and paint work 6 Other works 6.1 compound wall 6.2 septic tank 6.3 gates fixins 6.4 basement flooring 6.5 DG 6.6 Transformer 6.7 Panel board 6.8 solar 6.9 R O water plant 6.1 Rain water harvesting system 6.2 Jogging track 6.3 plants&garden work 6.4 Lift work May-15 Jun-15 Jul-15 Aug-15 Oct-12 Feb-15 Mar-15 Apr-15 Site: Jupiter ( Area - 43560 Sq Ft) BAR CHART Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Jul-14 Jun-14

Jupiter Bar Chart

Embed Size (px)

Citation preview

Page 1: Jupiter Bar Chart

Sl. no Activity

W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1

1.0 Civil work

1.1 Footings

1.2 Plinth beam

1.3 1 st slab to 5th slab

1.4 Brick work

1.5 Internal celling&wall plastering

1.6 External plasting

1.7 Scaffolding work

1.8 Railings fitting

1.9 Wood frames making

1.10 Doors and windows fittings

2 Electrical work

2.1 Groove cutting and conduit laying

2.2 Wiring work

2.3 Board fitting (switch board)

3 Plumbing work

3.1 Groove cutting and conduit laying

3.2 Wash basin and comord fixing

3.3

External water supply & drainage

work

4 Tiling work

4.1 Toilets wall tiling

4.2 Floor tiling

4.3

Common area marble tiles all floors

& staircase

4.4 External wall cladding

5 Paint work

5.1

walls and Doors putty 1st coat

painting

5.2

2nd coat painting wall, doors and

grills

5.3 External texture and paint work

6 Other works

6.1 compound wall

6.2 septic tank

6.3 gates fixins

6.4 basement flooring

6.5 DG

6.6 Transformer

6.7 Panel board

6.8 solar6.9 R O water plant

6.1 Rain water harvesting system

6.2 Jogging track

6.3 plants&garden work

6.4 Lift work

May-15 Jun-15 Jul-15 Aug-15 Oct-12 Nov-12Feb-15 Mar-15 Apr-15

Site: Jupiter ( Area - 43560 Sq Ft)

BAR CHART

Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15Jul-14Jun-14

Page 2: Jupiter Bar Chart

W2 W3 W4 W1 W2 W3 W4

Dec-12Nov-12

Page 3: Jupiter Bar Chart

Week 33

Dates37 Columns for 3rd Phase leaving 8 columns at

Tank area.

11th Digging and laying PCC for Plinths.

12th Marking for Plint

13th Rod Bending

13th and 14th Centring

15th Concrete

16th Mud Filling in Room Areas

17th Watering in Room areas

18th Mud Levelling in Room areas

19th PCC in Room Areas and Setbacks

20th Survey

21st Column Concrete

22nd Column Concrete Completion

24th Bottoms Raising Start for Flats (21,22,23,24)

14th Start of Bottom Slab for Four Flats

5,18,19,20

Page 4: Jupiter Bar Chart

Sl. no Activity

W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4

1 Civil work

1.1 Footings

1.2 Plinth beem

1.3 Ground Slab (Raising Bottoms till Slab)

1st Slab

2nd Slab

3rd Slab

4th Slab

1.4 Brick work

1st Floor

2nd Floor

3rd Floor

4th Floor

1.5 Internal celling&wall plastering

1.6 External plasting

1.7 Scaffolding work

1.8 Railings fitting

1.9 Wood frames making

1.1 Doors and windows Fittings

2 Electrical work

2.1

Groove cutting and conduit

laying

BAR CHART

Site : Jupiter - Panathur

1-Jun-14 1-Jul-14 1-Aug-14

Page 5: Jupiter Bar Chart

2.2 Wiring work

2.3 Board fitting (switch board)

3 Plumbing work

3.1

Groove cutting and conduit

laying

3.2 Wash basin and comord fixing

3.3

External water supply &

drainage work

4 Tiling work

4.1 Toilets wall tiling

4.2 Floor tiling

4.3

Common area marble tiles

all floors & staircase

4.4 External wall cladding

5 Paint work

5.1

walls and Doors putty 1st

coat painting

5.2

2nd coat painting wall,

doors and grills

5.3 External texture and paint work

6 Other works

6.1 compound wall

6.2 septic tank

6.3 gates fixins

6.4 basement flooring

6.5 DG

6.6 Transformer

6.7 Panel board

6.8 solar

6.9 R O water plant

6.1 Rain water harvesting system

6.2 Jogging track

6.3 plants&garden work

6.4 Lift work

Page 6: Jupiter Bar Chart
Page 7: Jupiter Bar Chart
Page 8: Jupiter Bar Chart
Page 9: Jupiter Bar Chart

W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2

BAR CHART

Site : Jupiter - Panathur

1-Sep-14 1-Oct-14 1-Nov-14 1-Dec-14 1-Jan-15

Page 10: Jupiter Bar Chart
Page 11: Jupiter Bar Chart
Page 12: Jupiter Bar Chart
Page 13: Jupiter Bar Chart
Page 14: Jupiter Bar Chart

W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4

BAR CHART

Site : Jupiter - Panathur

1-Jan-15 1-Feb-15 1-Mar-15 1-Apr-15 1-May-15

Page 15: Jupiter Bar Chart
Page 16: Jupiter Bar Chart
Page 17: Jupiter Bar Chart
Page 18: Jupiter Bar Chart
Page 19: Jupiter Bar Chart

W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4

1-Aug-15 1-Sep-151-Jun-15 1-Jul-15

Page 20: Jupiter Bar Chart
Page 21: Jupiter Bar Chart
Page 22: Jupiter Bar Chart
Page 23: Jupiter Bar Chart