JSW STEEL LTD., Salem Works FORM – I Proposal to obtain Amendment on existing Terms of Reference (ToR: F.No. IA-J-11011/281/2016-IA. II(I) dated 09.11.2018) for waste utilization, environment quality improvement and customer requirement facilities at JSW Salem works, Pottaneri, M. Kalipatti Village, Salem, Tamil Nadu. March 2019 Project Proponent Better Everyday JSW Steel Ltd; Salem Works Tamilnadu Better Everyday

JSW STEEL LTD., Salem Works - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/modification/... · 2019. 3. 16. · JSW STEEL LTD., Salem Works FORM – I Proposal

  • Upload
    others

  • View
    11

  • Download
    1

Embed Size (px)

Citation preview

  • JSW STEEL LTD., Salem Works

    FORM – I

    Proposal to obtain Amendment on existing Terms of Reference (ToR: F.No. IA-J-11011/281/2016-IA. II(I) dated

    09.11.2018) for waste utilization, environment quality improvement and customer requirement facilities at JSW

    Salem works, Pottaneri, M. Kalipatti Village, Salem, Tamil Nadu.

    March 2019

    Project Proponent

    Better Everyday JSW Steel Ltd; Salem Works Tamilnadu

    Better Everyday

  • FORM 1 (As per New Notification of MoEF dated 1-12-2009 vide SO 3067 (E)

    BASIC INFORMATION Sl. No. Item Details

    1 Name of the Project/s

    Proposal to obtain Amendment on existing Terms of Reference ToR: F.No. IA-J-11011/281/2016-IA. II(I) dated 09.11.2018 due to addition of waste utilization, environment quality improvement and customer requirement facilities at JSW Salem works.

    2 S. No. in the schedule 3(a). Metallurgical industries (ferrous & nonferrous)

    3

    Proposed capacity/ area/ length/ tonnage to be handled/ command area/ lease area/ number of wells to be drilled

    The ToR obtained on 09.11.2018 for additional facilities like BF slag grinding unit (Ground Granulated Blast Furnace Slag-GGBS) and other technological upgradation of auxiliary systems are proposed with no increase in pollution load. Presently requesting to amend the ToR due to addition of facilities without increasing the pollution load. The facility details are given in Table 01. All the above proposed modifications are within the complex of JSW Salem works. For Emergency requirement four numbers of bore wells are planned and approval obtained from state PWD.

    4 New/expansion/modernization Addition of waste utilization, environment quality improvement and customer requirement facilities

    5 Existing capacity/Area etc. 1.0 MTPA/Total Available area 237.28 hectares. EC obtained for 1 to 1.3 MTPA 6 Category of Project i.e ‘A’ or ‘B’ A

    7 Does it attract the general condition? If yes please specify.

    No.

    8 Does it attract the specific condition? If yes please specify.

    No.

    9 Location

    The project site is located at M. Kallipatti & Pottaneri village, Mecheri panchayat, Mettur taluk, Salem district of Tamil Nadu., Salem city is located at about 35 km in SE. Mettur town is located at a distance of 13 km in SW direction. NH7 is passing in Eastern direction of plant site at about 22 Km.

    Plot/Survey/Khasra No

    The plant site falls in two villages Namely M. Kalipatti and Pottaneri village. Survey numbers: Pottaneri village: 75B,76B,77B,80B,81B, 83 to 86, 89 to 95, 98 to 103,104B, 105, 303 to 305, 308 to 321,106B. M.Kallipatti :189 to 191,197 to199,203,205, 298 to 317.

  • Village Pottaneri, M. Kalipatti Village Tehsil Mettur District Salem State Tamilnadu

    10 Nearest railway station/ airport along with distance in Kms.

    Mecheri Road – 2 km, Omalur Junction – 20 km, Salem Airport – 22 km. Bangalore Int. Airport - 200 km.

    11 Nearest town, city, district headquarters along with distance in Kms.

    Mecheri – 4 km, Salem - 35 km District Head quarter Salem - 35 km

    12

    Village panchayaths, Zillaparishad, Municipal Corporation, Local body (Complete postal addresses with telephone no’s to be given)

    M.Kallipatti & Pottaneri village, Mecheri - Panchayat Mettur - Taluk, Salem - District, Tamilnadu - 636 453 India Tel : +91-4298-272000

    13 Name of the applicant Mr. B.N.S. Prakash Rao

    14 Registered address

    JSW Steel Limited, JSW Center, Bandra Kurla Complex, Mandra East, Mumbai 400051, India. Tel : +91 -22-42861000 Fax : +91 -22-42863000

    15

    Address for correspondence Name Dr. Vinod Nowal Designation (Owner /Partner/ CEO) Deputy Managing Director

    Address

    M/S. JSW Steel Limited, JSW Centre, Opp. MMRDA Grounds, BandraKurla Complex, Bandra (East), Mumbai.

    Pincode 400 051 E-mail [email protected]

    Telephone no. 022 42861000 Fax no. 022 42863000

    16

    Details of Alternative sites examined, if any location of these sites should be shown on a topo sheet.

    Not Applicable

    17 Interlinked projects None

    18 Whether separate application of interlinked project has been submitted?

    Not applicable

    19 If Yes, date of submission Not Applicable 20 If No, reason -

    21

    Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. (a) The Forest

    (Conservation)Act, 1980 (b) The Wild Life

    Not applicable

  • (Protection)Act, 1972 (c) The CRZ Notification, 1991

    22 Whether there is any Government Order/ Policy relevant/ relating to the site?

    Nil

    23 Forest land involved (hectares) Nil

    24

    Whether there is any litigation pending against the project and/or land in which the project is propose to be set up?

    (a) Name of the court (b) Case No (c) Orders/directions of the

    court, if any and its relevance with the proposed project.

    Nil

    (I)ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will

    cause physical changes in the locality (topography, land use, changes in water bodies, etc.,)

    Sl. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data

    1.1

    Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan)

    Yes

    The proposed facilities planned in the ToR amendment is located within the existing facilities of JSW Steel Ltd., Salem works. Paver block making facility: Approx. 5000 sq.m, located adjacent to coke oven weigh bridge (south). Etching Lab: Approx. 350 sq.m, located near pickling plant ETP (South) area. SMS slag grinding plant: Approx. 5000 sq.m, located in the south side of coke oven road and North side of railway track. Batching plant: Approx. 1600 sq.m, located in opposite of Coke oven plant (south) and RS gate area. Dedusting system in coke oven plant (coke cutter area) Approx. 250 sq.m, located in opposite of Coke oven plant weigh bridge area. The above locations are shown in Fig. 01 of Pre-Feasibility Report.

  • 1.2 Clearance of existing land, vegetation and buildings? No No vegetation or buildings are located within the proposed area identified for the above projects.

    1.3 Creation of new land uses? Yes The proposed expansion facilities will be planned within the existing facilities of JSW Steel works.

    1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes

    Detailed land survey, topographical surveys and soil testing/investigation studies have been carried out earlier for existing plant. The soil investigation study will be augmented if necessary.

    1.5 Construction works? Yes The details of proposed addition facilities are shown in Table 01.

    1.6 Demolition works? No Demolition work will not be required as the site does not have any existing structures/constructions.

    1.7 Temporary sites used for construction works or housing of construction workers?

    No

    Local unskilled/semi-skilled/skilled workers will be deployed from local for construction works. Temporary space will be allocated for contractor’s material storage, site office. Temporary housing for workers, within the project site is not envisaged.

    1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations

    Yes

    The proposed project includes construction of buildings, e.g. Plant area including storage, handling facilities etc. The construction area is fairly flat and site grading is not necessary. No major cut & fill is envisaged.

    1.9 Underground works including mining or tunneling? No

    No mining/tunneling is involved. However, some underground works limited to foundation etc. will be done within the proposed plant shops.

    1.10 Reclamation works? No Not applicable 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable

    1.13 Production and manufacturing processes? Yes

    Waste utilization, environment quality improvement and customer requirement facilities will be proposed to install and the process details are given in the Pre-Feasibility report

    1.14 Facilities for storage of goods or materials? Yes

    During construction period, temporary storage facilities will be provided for construction material. During operation phase, existing permanent raw material storage facilities will be used. Finished product w.r.t. Paver block facility, SMS slag crusher unit will be stored in existing storage facilities. Batching plant product will be stored in silos.

  • 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? No

    Paver block and slag crushing units are waste to wealth projects for enhancing the solid waste utilization. Dust collected from the coke cutter dedusting will be reused in sinter plant. Other than that no solid waste will be generated Washed acid from etching and scrubber effluents from acid fume extraction system will be will be treated in the existing pickling plant ETP plant. Treated water is reused and the chemical sludge will be disposed authorized vendor

    1.16 Facilities for long term housing of operational workers? No Not Applicable

    1.17 New road, rail or sea traffic during construction or operation? No Existing road & railway will be used.

    1.18

    New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc.,?

    No Existing facilities will be used.

    1.19

    Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements?

    No -

    1.20 New or diverted transmission lines or pipelines? No -

    1.21

    Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers?

    No -

    1.22 Stream crossings? No -

    1.23 Abstraction or transfers of water from ground or surface waters? No

    No groundwater extraction is envisaged. Surface water is proposed to be withdrawn from existing downstream facilities of Mettur dam to the project site as per the existing practice. However, to cater emergency requirement permission has been obtained from SPWD for four numbers of bore wells.

    1.24 Changes in water bodies or the land surface affecting drainage or run-off? No

    Existing drainage pattern will not be altered. The plant storm water drainage network will be designed in such way that there is no significant alteration in the existing drainage pattern.

    1.25 Transport of personnel or materials for construction, operation or decommissioning?

    Yes

    During construction phase, all construction material will be transported through road and transportation of personnel will involve transportation of local workers to the site.

  • During operation phase, raw material w.r.t. Paver Block making facility, SMS slag crushing plant will be transported by road as per the requirement.

    1.26 Long-term dismantling or decommissioning or restoration works?

    No In general life of the plant is 40 years.

    1.27 Ongoing activity during decommissioning which could have an impact on the environment?

    No -

    1.28 Influx of people to an area in either temporarily or permanently? No Temporarily during construction phase. 1.29 Introduction of alien species? No -

    1.30 Loss of native species or genetic diversity? No -

    1.31 Any other actions? No - 2. Use of Natural resources for construction or operation of the Project (such as land, water,

    materials or energy, especially any resources which are non-renewable or in short supply):

    Sl. No. Information/checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data

    2.1 Land especially undeveloped or agricultural land (ha). No -

    2.2 Water (expected source & competing users) unit: KLD Yes

    Fresh water requirement would be 100Ltrs/day due to etching lab requirement which will be drawn from the existing water network and for other facilities (paver block, slag crusher, batching plant) treated waste water will be used which is about 30 KLD. Coke cutter dedusting system is a dry dust extraction process.

    2.3 Minerals (MT) No -

    2.4 Construction material – stone, aggregates, sand / soil (expected source – MT)

    Yes The construction material required for the project will be sourced from licensed vendors.

    2.5 Forests and timber (source – MT) No -

    2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW)

    Yes The power requirement for the proposed project will be 0.5 MVA and will be sourced from the existing plant.

    2.7 Any other natural resources (use appropriate standard units) No -

    3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

    Sl. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

    3.1

    Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies)

    No

    Furnace Oil (FO), HSD for steel plant startup application of 1.0 MTPA

    Requirement: FO: 20 KL/Day during startup HSD: 15 KL/Day during startup

    OISD norms will be followed for storing FO &

  • LSHSD

    3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases)

    No -

    3.3 Affect the welfare of people e.g. by changing living conditions? No The socio-economic status of the surrounding population will be further improved.

    3.4

    Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc.,

    No -

    3.5 Any other causes No - 4. Production of solid wastes during construction or operation or decommissioning

    (MT/month)

    Sl. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

    4.1 Spoil, overburden or mine wastes No -

    4.2 Municipal waste (domestic and or commercial wastes) No -

    4.3 Hazardous wastes (as per Hazardous Waste Management Rules) No

    Additional hazardous waste of chemical sludge generated from the pickling plant ETP (where etching lab effluents will be treated) will be sold to authorized vendors

    4.4 Other industrial process wastes No - 4.5 Surplus product No -

    4.6 Sewage sludge or other sludge from effluent treatment No No sewage will be generated from the proposed facilities.

    4.7 Construction or demolition wastes No - 4.8 Redundant machinery or equipment No - 4.9 Contaminated soils or other materials No -

    4.10 Agricultural wastes No - 4.11 Other solid wastes No -

    5.0 Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr)

    Sl. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

    5.1 Emissions from combustion of fossil fuels from stationary or mobile sources

    Yes

    Due to the additional value added facilities it is not anticipated any increase of PM10 & PM2.5 etc. in ambient air. Stationary Sources: During operation, dust emissions from

    SMS slag crushing plant and Batching plant are expected. Adequate APC measures & Road wetting will be adopted to suppress the fugitive emissions. Wind net will be provided in the peripheral area of the facilities.

    In the etching lab, it is proposed to install an acid fume extraction system with

  • scrubber as a APC measure and cleaned exhaust will be let out through a stack

    Mobile Sources: During construction phase it will be from

    movement of material transport vehicles & earth moving machineries, equipment, etc. will generate fugitive dust. This will be for a short period limited to construction phase. Road wetting will be adopted to suppress the fugitive dust.

    During operation phase it will be from transport of materials, which will be mostly by road.

    5.2 Emissions from production processes Yes

    Emitted quantity from production processes - stationary sources (Kg/hr): Overall Stack emissions reduction (At present proposal stage i.e. deletion of 105 TPH coal based boiler (proposal withdrawn) and addition of coke cutter de-dusting)

    PM = 36.39 kg/hr. SO2= 17.04 kg/hr.

    NOx = 19.94 kg/hr.

    5.3 Emissions from materials handling including storage or transport Yes

    Fugitive emissions are expected from loading of SMS slag on to trucks. Dust suppression and sprinkler systems will be installed during handling of raw material. Acid fumes are expected from etching lab and scrubber cum acid fumes extraction system will be installed in etching lab.

    5.4 Emissions from construction activities including plant and equipment Yes

    There will be some emission from construction activities. However, these emissions will last for a very short period and it will be temporary & restricted within the plant boundary. The impact will be reversible, marginal, and temporary in nature. Control measures like wind screen, wetting are planned.

    5.5 Dust or odours from handling of materials including construction materials, sewage and waste

    No -

    5.6 Emissions from incineration of waste No -

    5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris)

    No -

    5.8 Emissions from any other sources No - 6.0 Generation of Noise and Vibration, and Emissions of Light and Heat:

  • Sl. No. Information/Checklist confirmation Yes/No

    Details thereof (with approximate quantities/rates, wherever possible) with source of information data with source of information data

    6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes

    The noise generation sources from the proposed facilities of Paver block, SMS slag crushing plant & Batching plant are expected. The noise level generated will be restricted in the range of 75-90 dB (A) at 1m from source.

    6.2 From industrial or similar processes Yes The noise level generated will be restricted to the range of 75-90 dB (A) at 1m from source.

    6.3 From construction or demolition Yes The noise level generated will be restricted to the range of 75 dB (A). 6.4 From blasting or piling No -

    6.5 From construction or operational traffic

    Yes

    Noise will be generated from the movement of trucks and other vehicles used during construction and operational phase. Use of horns near human habitat and other sensitive receptors will be restricted.

    6.6 From lighting or cooling systems No - 6.7 From any other sources No -

    7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

    S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

    7.1 From handling, storage, use or spillage of hazardous materials No -

    7.2

    From discharge of sewage or other effluents to water or the land (expected mode and place of discharge)

    No No sewage is generated from the proposed facilities.

    7.3 By deposition of pollutants emitted to air into the land or into water No

    Ambient Air Quality norms and waste water quality discharge limits are being complied. Zero discharge is ensured. Thus contamination of land and water bodies is not envisaged

    7.4 From any other sources No -

    7.5 Is there a risk of long term build up of pollutants in the environment from these sources?

    No -

    8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

    S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

    8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances

    No It is not anticipated from the proposed facilities.

    8.2 From any other causes No -

  • 8.3

    Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)?

    No

    Not Applicable as the proposed project falls under Seismic Zone II (as per the seismic zoning map published by Bureau of Indian Standards 2002). This zone is referred to as low damage less risk zone. Flooding levels are not recorded in this area.

    9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

    Sl. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data

    9.1

    Lead to development of supporting. Facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: • Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) • housing development • extractive industries • supply industries • other

    Yes

    It is anticipated that the project would bring following benefits to the people of the surrounding villages: Improvement in environmental quality Waste to wealth management improve. The infrastructure facilities improve. Will comply with customer requirement

    9.2 Lead to after-use of the site, which could have an impact on the environment

    No -

    9.3 Set a precedent for later developments Yes Paver block using steel slag is considered as value addition as it will be used in pavements and area development.

    9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects

    No -

    (II)ENVIRONMENTAL SENSITIVITY

    Sl. No. Areas Name/ Identity

    Aerial distance (within 15 km.)

    Proposed project location boundary

    1

    Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value

    No -

  • 2

    Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests

    No

    Mettur Dam (Stanley) is located at about 12 km in SW direction. Dam details are given below:

    1) Total capacity: 95 TMC

    2) Top level of parapets: +804.5 m (from MSL)

    3) Maximum water level: +796 m (from MSL)

    4) FRL: +790 m (from MSL) 5) Sill: +790 m (from MSL)

    River bed level: +625 m (from MSL)

    3

    Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration

    No -

    4 Inland, coastal, marine or underground waters No -

    5 State, National boundaries Yes Tamil Nadu – Karnataka 30.0 km

    6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas

    Yes

    State Highway (SH- 20) connecting Thoppur-Mettur Dam – Bhavani –

    Erode. 0.5 KM

    National Highway (NH-7) connecting Salem –

    Dharmapuri. 25 KM

    7 Defense installations No - 8 Densely populated or built-up area Yes Salem ,31.0 km

    9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities)

    Yes Primary, middle and high schools are present in 5 km radius. Similarly, health centres and public health sub-centers and dispensaries are also present.

    10

    Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)

    No -

    11

    Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded)

    No -

    12

    Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

    No

  • Table 01

    Proposed facilities for waste utilization, environment quality improvement and customer requirement

    S.No. Name of

    the unit Production

    capacity envisaged

    Purpose

    i. Paver block making facility

    25000 Nos. of paver block/day

    The utilization of the steel slag has been a major challenge in all integrated steel plants. Our R&D has successfully developed a technology for using steel slag in the manufacture of paver blocks. The study has established successful production paver blocks at 30% lower costs than with natural aggregates with lower use of cement and use of steel slag. It is proposed to install a paver block making facility for 25000 Nos. of paver block/day for demonstration purposes. It is intended with its installation; entrepreneurs will utilize this to supply good quality pavers for use in construction purposes.

    ii. Etching Lab Nil We are receiving requests from our customers of special steels for the results of macro structure of steel products to assess its internal soundness. In order to carry out this test, the test samples of 25 mm thick will be collected from 160 to 310 mm round, 130 to 340/400 square and rectangle of bar products. The samples are to be immersed in hydrochloric acid in a tank of 100-liter volume for preparing the sample for further testing. It is proposed to install an acid fume extraction with scrubbing system to improve the work area for the laboratory personnel.

    iii. SMS slag crushing plant

    Crushing unit of 50 TPH capacity

    It is proposed to install a crushing unit of 50 TPH Capacity with suitable air pollution control facilities for crushing and separation of iron bearing material from slag.

    iv. Batching plant

    Batching plant of 30 m3/hr capacity

    The construction activity for the expansion units in the 1.3 MTPA steel plant expansion is under progress. For this purpose, it is proposed to install a batching plant within the steel works with suitable air pollution control facilities for catering to the ready mix concrete for construction

  • Amendment in existing Terms of Reference (ToR) of 1.0 to 1.3 MTPA EC due to addition of Waste utilisation, Environment quality improvement and Customer

    requirement facilities at JSW Salem works

    Page 1 Pre-Feasibility Report

    JSW STEEL LTD., Salem Works

    PRE-FEASIBILITY REPORT

    Proposal to obtain Amendment in existing Terms of Reference (ToR: F.No. IA-J-11011/281/2016-IA. II(I) dated 09.11.2018) for

    Waste utilisation, Environment quality improvement and Customer requirement at JSW Salem works,

    Pottaneri, M. Kalipatti Village, Salem, Tamil Nadu.

    March 2019

    Project Proponent

    JSW Steel Ltd., Salem Works Tamil Nadu

    Better Everyday

  • Amendment in existing Terms of Reference (ToR) of 1.0 to 1.3 MTPA EC due to addition of Waste utilisation, Environment quality improvement and Customer

    requirement facilities at JSW Salem works

    Page 2 Pre-Feasibility Report

    1.0 INTRODUCTION 1.1 Project proponent

    The JSW Group is amongst the leading conglomerates in India, with presence across the vital sectors of the Indian economy. The flagship company of JSW Group, JSW Steel is one of India's leading integrated steel manufacturers with a capacity of over 18 MTPA. It is one of the fastest growing companies in India with footprints in over 140 countries.

    From humble beginnings with a single plant in 1982, JSW Steel is now India's leading manufacturer of value-added and high-end steels. With state-of-the-art manufacturing facilities located in Karnataka, Tamil Nadu and Maharashtra, it is recognised for its innovation and quality. JSW produces a wide range of steel products that include hot rolled, cold rolled, pre-coated galvanised & Galvalume, TMT re-bars, wire rods and special steel. JSW Steel is scaling up existing steel plants and opening new ones to take the production figure to 40 MTPA.

    The integrated steel plant at Salem is currently at a production capacity of 1.0 Million Ton annual steel production located on the southern part of India to meet the special alloy steels for automobile industries.

    JSW, Salem works is one among the India’s largest special steel producer, in long products category, ranging from 5.5 to 200 mm used in gears, crank shafts and bearings. It also manufactures ultra-low-sulphur steel for sour-gas pipelines and alloy steels for boilers and ventured into aerospace applications.

    At present, JSW Salem works is partially catering to the existing automobile market and it is ranked No.1 in special steel sector in India. In order to, bridge the gap of demand and supply of special steels. JSW Salem works has obtained EC for enhancing the capacity from 1.0 to 1.3 MTPA. The construction activities related to expansion is under progress. As a part of value addition, it is proposed to set up a 0.8 MTPA slag grinding unit and other few value added facilities. In this connection JSW Salem works approached MoEF&CC to EC Amendment. Ministry has accorded Terms of Reference (ToR) Letter no. IA- J-11011/281/2016-IA. II (I) dated 9/11/2018 to us for preparation of EIA report for installation of 0.8 MTPA Slag Grinding Unit within the existing plant located at Mecheri, Taluk Mettur, District Salem, Tamil Nadu.

    It may be noted that EIA study for the project cited above is under progress. In addition to the 0.8 MTPA slag granulation unit and other facilities, M/s. JSW Steel Limited is now intending to carry out the following waste utilization, environment quality improvement and customer requirement facilities without increasing the ultimate capacity of the integrated steel plant i.e., 1.30 MTPA. In light of the above, JSW Salem works, is planned to approach MoEF&CC to obtain amendment on the ToR for addition and regularization of facilities.

    1.2 Location of the project The proposed facilities for value addition will be located within the existing steel plant area of JSW steel works at M. Kalipatti & Pottaneri village, Mecheri panchayat, Mettur Taluk, Salem district of Tamil Nadu state. The site is about 13 km SW of Mettur town and about 35 km from district head quarters of Salem. The general layout for existing units and proposed value additional facilities is shown in Fig. 01.

    The latitude and longitude of the existing site is as follows:

    Latitude : 110 48’ 16” N to 110 49’ 2” N Longitude: 770 54” E to 770 55’ 43” E

  • Amendment in existing Terms of Reference (ToR) of 1.0 to 1.3 MTPA EC due to addition of Waste utilisation, Environment

    quality improvement and Customer requirement facilities at JSW Salem works

    Page 3 Pre- Feasibility Report

    Fig. 01 General layout of existing and proposed amendment facilities

  • Amendment in existing Terms of Reference (ToR) of 1.0 to 1.3 MTPA EC due to addition of Waste utilisation, Environment quality improvement and Customer

    requirement facilities at JSW Salem works

    Page 4 Pre-Feasibility Report

    1.3 Present plant configuration JSW Steel Ltd, Salem Works has been granted Environmental Clearance (EC) for expansion of its integrated steel plant from 1.0 to 1.3 MTPA of special steel product vide letter no. J-11011/281/2006-IA.II (I) Dated: 7th July 2017. The copy of the EC letter is attached as Annexure 1. Status of facilities approved in the EC for expansion of capacity from 1.0 to 1.30 MTPA are given in Table 01.

    Table 01

    Status of facilities approved in the EC for expansion of capacity of crude steel from 1.0 to 1.30 MTPA

    Sl. No. Manufacturing facilities

    Capacity in MTPA

    proposed in the expansion

    Current status

    1 Sinter Plant – 3 (90 Square Meter) 1.06 Construction Yet to start

    2 Blast Furnace – 1 (402 to 650 Cubic Meter)* 0.316 Construction Yet to start

    3 Blast Furnace – 2 (550 to 650 Cubic Meter) 0.105 Commissioning by April 2019

    4 Energy Optimizing Furnace – 1 (45 T to 65 T) 0.23 Commissioning by April 2019

    5 Ladle Furnace - 1 with Common VD (45 T to 65 T) 20 T/heat Commissioning by April 2019

    6 Continuous Casting Machine - 3 0.45 Commissioning by April 2019

    7 Bar & Rod Mill Augmentation 0.08 Commissioning by April 2019

    8 Blooming Mill Augmentation 0.12 Commissioning by April 2019

    9 Pickling and Annealing Steel unit 0.06 Commissioning by April 2019

    10 Peeled and ground 0.04 Commissioning by April 2019

    11 Air Separation Plant 3 – 250 Ton/Day 250 T/day Construction Yet to start

    12 Captive Power Plant 3 (1 x 30) 30 MW Commissioning by April 2019

    1.4 ToR issued for EC Amendment:

    As a part of value addition, some additional facilities and modification of existing facilities were planned in the existing plant and the Environment Appraisal Committee in its 36th meeting held on 9th Oct 2018, approved for the amendment and issued ToR F.No. IA-11011/281/2016-IA. II (I) 09.11.2018 for the following units which is shown in Table-02. The base line data generation is under progress as a part of the EIA report.

  • Amendment in existing Terms of Reference (ToR) of 1.0 to 1.3 MTPA EC due to addition of Waste utilisation, Environment quality improvement and Customer

    requirement facilities at JSW Salem works

    Page 5 Pre-Feasibility Report

    Table 02 Production capacity of various units before and after expansion

    Manufacturing Facilities

    Existing Capacity

    Proposed Expansion

    for which EC has been

    issued

    Total Capacity

    after Expansion

    Modification

    Coke Oven Plant -1 (Non – Recovery Type)

    0.50 - 0.5

    The existing weakened 80m RCC chimney of Battery 1, is being replaced with two nos. of MS refractory lined chimney of 75m height.

    Sinter Plant – 2 (90 Square Meter) 1.06 - 1.06

    Waste heat utilization: About 6,00,000 m3/hr of hot air (2750C) planned to be diverted from sinter cooler of SP 2 & 3 to GGBS grinding unit to recover the sensible heat which is presently vented into atmosphere. Emission reduction: At present, Sinter machine-2 waste gas stack is operating at an average of 110 mg/Nm3 of SPM as against the norm of 150 mg/Nm3, which is planned to be revamped to meet 50 mg/Nm3 as a voluntary APC measures.

    Sinter Plant – 3 (90 Square Meter) - 1.06 1.06

    Blast Furnace – 1 (402 to 650 Cubic Meter)

    0.367 0.316 0.683 It is proposed to install 0.8 MTPA slag grinding unit to produce Ground Granulated Blast furnace Slag (GGBS) as a value added facility.

    Blast Furnace – 2 (550 to 650 Cubic Meter)

    0.578 0.105 0.683

    Ladle Furnace - 1 with Common VD (45 T to 65 T)

    45 T/heat 20 T/heat 65 T/heat

    The existing primary de-dusting system of LRF 1 (38000 m3/hr) has been taken to common secondary de-dusting system of LRF’s which is having designed capacity of 5,50,000 m3/hr but working at 4,00,000 m3/hr.

    The existing LRF-1 primary de-dusting stack of 30m height became redundant and planned to be used for CCM-3 billet grinding (surface preparation) fume extraction.

    Ladle Furnace – 5 (65 T with VD) - -

    65 T/heat (New)

    Additional facility planned now. Since JSW Salem is producing special steels, the per heat

  • Amendment in existing Terms of Reference (ToR) of 1.0 to 1.3 MTPA EC due to addition of Waste utilisation, Environment quality improvement and Customer

    requirement facilities at JSW Salem works

    Page 6 Pre-Feasibility Report

    Manufacturing Facilities

    Existing Capacity

    Proposed Expansion

    for which EC has been

    issued

    Total Capacity

    after Expansion

    Modification

    process time increased from 30 min to 105 min due to vacuum degassing. Hence, additional LRF-5 is envisaged.

    Continuous Casting Machine - 1 0.35 - 0.35

    Additional stacks

    Since, CCM-2 is provided with auto cutter fume extraction system with stack, it is planned to provide the same facility to CCM-1 & 3 APC measures. The height of the chimney will be 20m.

    In addition, grinding fume extraction facility will be provided with bag filters for CCM 1 to 3 with stack height of 30m.

    Continuous Casting Machine - 2 0.5 - 0.5

    Continuous Casting Machine - 3 - 0.45 0.45

    Pickling and Annealing Steel unit

    - 0.06 0.06

    A wet scrubber is envisaged to scrub the acid fumes generated from the acid bath as APC measures.

    Three hot water generators are envisaged to meet the following process requirement to minimize fresh acid consumption and to ensure ZLD in the proposed ETP. 1) To maintain the acid

    temperature of 550 in the pickling bath.

    2) To maintain the treated spent acid temp. of 550 for reuse.

    3) To supply hot water to thermal fluidic system of evaporator for ETP to ensure ZLD

    Captive Power Plant 2 (2 x 30 MW)

    2X30 MW - 2X30 MW

    One coal-based boiler installed in the year 2006 with a capacity of 127 TPH is operating at emission concentration of SPM, SO2 & NOx with 70, 1000 and 600 mg/Nm3 respectively. This unit has been planned to be upgraded, to meet the revised emission standard as per CPCB letter dated 16.04.2018 of 50, 600 and 300 mg/Nm3 respectively.

  • Amendment in existing Terms of Reference (ToR) of 1.0 to 1.3 MTPA EC due to addition of Waste utilisation, Environment quality improvement and Customer

    requirement facilities at JSW Salem works

    Page 7 Pre-Feasibility Report

    Manufacturing Facilities

    Existing Capacity

    Proposed Expansion

    for which EC has been

    issued

    Total Capacity

    after Expansion

    Modification

    DG sets 3x625 KVA 1x1250 KVA

    3x625 KVA and

    1x1250 KVA

    2x1250 KVA 1x1750 KVA 3x275 KVA 1x650 KVA 1x400 KVA

    The above DG sets are envisaged to meet the emergency conditions of plant black out requirements.

    From the above proposal, new facilities are indicated in 1.5.1 and modifications are indicated in 1.5.2.

    1.5.1 New facilities

    (i) 0.8 MTPA slag grinding unit for manufacturing of GGBS, (ii) 65 TPH of LRF-5 with Vacuum Degassing facility, (iii) 2x20 TPH BF gas fired boiler for steam to VD of LRF, (iv) DG sets for emergency operations,

    1.5.2 Modification of existing facilities

    (i) Upgradation of Sinter Plant -2 to reduce the emission from 150 mg/Nm3 to less than 50 mg/Nm3

    (ii) Revamping ESP of 127 TPH coal fired boiler to meet SPM level of 50 mg/Nm3 and installation of lime dosing system to meet SO2 level of 600 mg/Nm3

    (iii) Replacement of existing 80m dilapidated RCC waste gas emergency stack with 2 nos. of 75m MS refractory lining stack

    (iv) Hooking of LRF-1 primary de-dusting flow to already commissioned secondary de-dusting of LRF -1 to 5,

    (v) Work area improvement in auto cutting machine and billet grinding area in CCM by installing fume extraction system

    (vi) Fume extraction system & hot water generators for pickling operations and effluent treatment

    2.0 PROPOSAL AND DETAILS FOR ToR AMENDMENT

    2.1 Introduction In addition to the above, it is proposed to carry out the following modernization activities for waste utilization, environment quality improvement and customer requirements without increasing the ultimate consented capacity of EC to the integrated steel plant i.e., 1.3 MTPA.

    2.2 Proposed changes

    The proposed changes are described below:

    Paver Block making: The utilisation of the steel slag has been a major challenge in all integrated steel plants. Our R&D has successfully developed a technology for

  • Amendment in existing Terms of Reference (ToR) of 1.0 to 1.3 MTPA EC due to addition of Waste utilisation, Environment quality improvement and Customer

    requirement facilities at JSW Salem works

    Page 8 Pre-Feasibility Report

    using steel slag in the manufacture of paver blocks. The study has established successful production paver blocks at 30% lower costs than with natural aggregates with lower use of cement and use of steel slag. It is proposed to install a paver block making facility for 25000 Nos. of paver block/day for demonstration purposes. It is intended with its installation, entrepreneurs will utilise this to supply good quality pavers for use in construction purposes. Etching Lab: We are receiving requests from our customers of special steels for the results of macro structure of steel products to assess internal soundness. In order to carry out this test, the test samples of 25 mm thick will be collected from 160 to 310 mm round, 130 to 340/400 square and rectangle of bar products. The samples are to be immersed in hydrochloric acid/Sulphuric acid in a tank of 100 litre volume for preparing the sample for further testing. To improve the work area for the laboratory personnel, it is proposed to install an acid fume extraction system with scrubber as a APC measure and cleaned exhaust will be let out through a stack. Neutralised water from the scrubber and washed acid, used lime solution and rinse water from etching lab will be connected with pickling plant ETP for treatment and ensure Zero Discharge. The chemical sludge from ETP will be disposed through authorised vendor. SMS slag crushing plant: It is proposed to install a crushing unit of 50 TPH Capacity with adequate air pollution control measures for crushing and separation of iron bearing material from slag. Iron bearing material will be reused in SMS process and crushed slag will be reused in steel plant, paver block unit and sold. Batching plant: The construction activity for the expansion units in the 1.3 MTPA steel plant expansion is under progress. For this purpose, it is proposed to install a batching plant of 30 m3/hr capacity within the steel works with suitable air pollution control facilities for catering to the ready mix concrete for construction. Control of fugitive emissions in Coke ovens: In the existing Coke oven, fugitive emissions are observed while transporting coke through conveyors (width:1200mm). In order to control this dust emission, it is proposed to install a bag filter with associated equipment to capture the dust emission which will be resulting in reduction of air pollution load on the atmosphere. Dust collected from the bag filter will be reused.

    2.3 Raw material requirement

    In the proposed amendment, the steel production capacity remains the same. Hence, no change in raw material is expected.

    2.4 Water requirement

    The total estimated water requirement for 1.3 MTPA expansion is 4.4 MGD (20245 m3/day) against the sanctioned capacity of 5 MGD. The additional water requirement will be about 100 ltr/day to the requirement of etching lab. For other facilities like paver block unit, batching plant and Slag crusher unit process treated waste water will be reused where by fresh water consumption will be reduced. Since, Bag house to the coke cutter is dry dust collection system, water requirement will not be there.

  • Amendment in existing Terms of Reference (ToR) of 1.0 to 1.3 MTPA EC due to addition of Waste utilisation, Environment quality improvement and Customer

    requirement facilities at JSW Salem works

    Page 9 Pre-Feasibility Report

    2.5 Land requirement For the proposed changes, no additional land will be required. The foot prints of the proposed units are shown in Fig. 01 of general layout.

    2.6 Power requirement

    The estimated power requirement for the above facilities is about 0.5 MVA. The same will be met from existing captive power generation.

    2.7 Reduction in air pollution load

    There is no air pollution from the proposed facilities. However, in the etching lab it is proposed to install an acid fume extraction system with scrubber as a APC measure and cleaned exhaust will be let out through a stack. In coke cutter to reduce the fugitive emission load a bag filter will be provided to reduce the impact on the ambient air quality. A cartridge bag filter will be provided in the batching unit & slag crushing unit to capture air emissions during unloading of cement and slag. Apart from the above wind net arresters and water sprinklers will be provided to supress dust emission in batching unit & slag crushing unit. Since, Coal based boiler (105 TPH) is not being implemented (withdrawn) there will be reduction in air pollution load.

    2.8 Effluents generation

    A small quantity of effluent will be generated from etching lab will be taken to existing pickling plant ETP for treatment and zero discharge will be ensured.

    2.9 Solid waste generation

    As a waste to wealth project, paver making facility is planned to produce steel slag bricks for demonstration purposes. Dust collection expected from the coke cutter will be reused in sinter plant. There is no other solid waste generated from the above facilities

    2.10 Project cost

    The capital cost of the above facilities is estimated to be Rs. 4.2 Crore.

    3.0 Impacts on Land The proposed amendment will be taken within the existing JSW premises as shown in general layout. No additional land is required. Therefore, no additional impacts on land environment is expected due to proposed facilities.

    5.0 COMPLIANCE OF EXISTING EC CONDITIONS

    The recent compliance status of EC conditions is given in Annexure-2.

  • Amendment in existing Terms of Reference (ToR) of 1.0 to 1.3 MTPA EC due to addition of Waste utilisation, Environment quality improvement and Customer

    requirement facilities at JSW Salem works

    Page 10 Pre-Feasibility Report

    6.0 CONCLUSION The assessment of environmental impact of the proposed Waste utilisation, Environment quality improvement and Customer requirement facilities mainly covers pollution control measures w.r.t. air, water and solid waste.

    o No increase in pollution loads in respect of PM, SO2 & NOx. There will be

    acid fume emission after scrubbing system and will be within the applicable emission standards

    o No impact on fresh water consumption and acidic water generation from the etching lab will be treated in the existing pickling plant ETP.

    o No impact on land environment

  • Amendment in existing Terms of Reference (ToR) of 1.0 to 1.3 MTPA EC due to addition of Waste utilisation, Environment quality improvement and Customer

    requirement facilities at JSW Salem works

    Page 11 Pre-Feasibility Report

    ANNEXURE #1

    Environment Clearance obtained for expansion of Integrated Steel Plant from 1.0 to 1.30 MTPA dated

    07.07.2017

  • Amendment in existing Terms of Reference (ToR) of 1.0 to 1.3 MTPA EC due to addition of Waste utilisation, Environment quality improvement and Customer

    requirement facilities at JSW Salem works

    Page 12 Pre-Feasibility Report

    ANNEXURE #2

    Copy of compliance report submitted for

    Environment Clearance obtained for expansion of Integrated Steel Plant from 1.0 to 1.30 MTPA dated

    07.07.2017

  • JSW STEEL LTD., Salem Works Pottaneri, M. Kalipatti Village, Mecheri

    Mettur Taluk, Salem – Tamilnadu

    Half Yearly Compliance Report

    for the Environmental Clearance for the period January 2018 to June 2018

    ( F.No.J-11011/281/2006-IA.II (I) dated 07.07.2017 ) issued for 1 to 1.3 MTPA Expansion

  • 1

    Contents

    S.No. Clause Description Page No.

    1 1.1 Compliance Statement 2 - 13

    2 1.2 Annexure to environmental clearance 14 - 32

    3 1.2.1 Annexure – A: Production details from January to June 2018 14

    4 1.2.2 Annexure – B: Enterprise Social Commitment (ESC) expenses 15

    5 1.2.3 Annexure – C: TNPCB survey report summary 16 - 17

    6 1.2.4 Annexure – D: Environment Analysis report by NABL lab for the period January to June 2018 18 - 22

    7 1.2.5 Annexure – E: Ambient Air Quality results for the period January to June 2018 23 - 24

    8 1.2.6 Annexure – F: Stacks and Air pollution control measures details 25 - 26

    9 1.2.7 Annexure – G: Greenery development details 27

    10 1.2.8 Annexure – H: CREP compliance report 28 - 30

    11 1.2.9 Annexure – I: CSR long term plan 31

    12 1.2.10 Annexure – J: Noise level (Source and Ambient) report for the period January to June 2018 32

  • 2

    COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE (EC)

    (i) F.No.J-11011/281/2006-IA.II (I) dated 07.07.2017 (ii) F.No.J-11011/281/2006-IA.II (I) dated 02.01.2007 (iii) No, J.11011/28/98-IA II dated 23.11.1998

    SIX MONTHLY COMPLIANCE REPORT

    PRESENT STATUS OF THE PROJECT: With respect to the EC F.No.J-11011/281/2006-IA.II (I) dated 7th July 2017, few units are under establishment and the remaining units will be established in a phased manner. For this purpose, Consent to Establish (CTE) was obtained from Tamil Nadu Pollution Control Board (Consent Order # 170629163265 dated 23.09.2017) and valid up to 31.03.2024. For the units under operation, Consent to Operate renewal (Consent Order # 170827952301 dated 21.04.2017) has been obtained and is valid up to 31.03.2022. The details of the existing units and the proposed expansion units along with the present status are given below:

    S.No Manufacturing facilities UOM Existing capacity

    Proposed Expansion

    Total Capacity

    after Expansion

    Present status

    1 Coke Oven Plant (Non – Recovery type ) MTPA 0.5 - 0.5 Nil

    2 Sinter Plant - 1 (20 m2) MTPA 0.175 - 0 Nil

    3 Sinter Plant - 2 (90 m2) MTPA 1.06 - 1.06 Nil

    4 Sinter Plant - 3 (90 m2) MTPA - 1.06 1.06 Construction yet to start

    5 Blast Furnace - 1 (402 to 650 m3) MTPA 0.367 0.316 0.683 Construction yet to start

    6 Blast Furnace - 2 (550 to 650 m3) MTPA 0.578 0.105 0.683 Will be

    commissioned by March 2019

    7 Energy Optimizing Furnace-1 (45 to 65 T) MTPA 0.41 0.23 0.64 Will be

    commissioned by March 2019

  • 3

    S.No Manufacturing facilities UOM Existing capacity

    Proposed Expansion

    Total Capacity

    after Expansion

    Present status

    8 Energy Optimizing Furnace- 2 (45 T) MTPA 0.62 0 0.62 Nil

    9 Ladle Furnace - 1 (45 to 65 T) Tons/heat 45 20 65 Will be

    commissioned by March 2019

    10 Ladle Furnace - 2 (65 T) Tons/heat 65 - 65 Nil

    11 Ladle Furnace - 3 (65 T) Tons/heat 65 - 65 Nil

    12 Ladle Furnace - 4 (65 T) Tons/heat 65 - 65 Nil

    13 Continuous Casting Machine - 1 MTPA 0.35 - 0.35 Nil

    14 Continuous Casting Machine - 2 MTPA 0.5 - 0.5 Nil

    15 Continuous Casting Machine - 3 MTPA - 0.45 0.45 Will be

    commissioned by March 2019

    16 Bar & Rod Mill augmentation MTPA 0.4 0.08 0.48 Construction yet to

    start

    17 Blooming Mill augmentation MTPA 0.36 0.12 0.48 Construction yet to

    start

    18 Pickling & Annealing steel unit MTPA - 0.06 0.06 Closer to

    commissioning stage

    19 Peeled & ground MTPA - 0.04 0.04 Construction yet to start

    20 Air Separation Plant - 1 (150 T/day) Tons/day 150 - 150 Nil

    21 Air Separation Plant - 2 (390 T/day) Tons/day 390 - 390 Nil

    22 Air Separation Plant - 3 (250 T/day) Tons/day - 250 250 Construction yet to

    start

    23 Captive power plant - 1 MW 7 - 7 Nil

    24 Captive power plant - 2 MW 2 x 30 - 2 x 30 Nil

    25 Captive power plant - 3 MW - 1 x 30 1 x 30 Will be

    commissioned by December 2018

    The compliance status for the conditions of entire Steel complex for the EC Dated 07.07.2018 is given in this report.

  • 4

    A. SPECIFIC CONDITIONS: COMPLIANCE STATUS

    i.

    The occupational health survey of the active workmen involved shall be carried as per the ILO guidelines and all the employees shall cover in every 5 years @ 20% every year.

    Occupational health survey of the active workmen involved is being carried out as per the ILO guidelines and all the employees will be covered in every 5 years @ 20% every year.

    ii.

    The amount allocated for ESC i.e. Rs 13 Crores shall be provided as CAPEX and the ESC shall be treated as project and monitored annually and the report of same shall be submitted to Regional office of MoEF&CC.

    Enterprise Social Commitment provided as CAPEX and monitoring is in progress. The details are attached in Annexure – B.

    iii.

    The project proponent shall provide for solar light system for all common areas, street lights, villages, parking around project area and maintain the same regularly.

    Solar panel system for Street Lighting at the capacity of 5 KW is installed and for further installation, feasibility study is under progress.

    iv. The project proponent shall provide for LED lights in their offices and residential areas.

    LED based lightings are installed about 296 KW and further installation will be done in a phased manner.

    v.

    The project proponent should install 24X7 air monitoring devices to monitor air emission and submit report to Ministry and its Regional Office.

    Total number of stacks in the Steel plant including power plant is 46 nos. The gaseous emission from the stacks attached to the process units are monitored through online stack monitoring equipment and the real time data of SPM, SO2 & NOx (as per the condition) is transmitted to the Care Air Centre of Tamil Nadu Pollution Control Board. Apart from that, TNPCB is conducting bi-annual survey and manual monitoring is being conducted by NABL approved external laboratory on a monthly basis. All the monitoring results are well within the permissible limits.

    vi. The ETP for Blast furnace effluent should be designed to meet Cyanide standards as notified by the MoEFCC.

    Presence of Cyanide level is not detected in Blast Furnace effluent and the same is periodically ensured with external NABL accredited lab analysis.

    vii. No effluent shall be discharged outside the plant premises and 'zero' discharge shall be adopted.

    RO plant of 4 MLD Capacity is installed in the upstream of the raw water thereby the existing Cycles of concentration (CoC) in cooling towers is increased to optimum level thereby conserving raw water and also high TDS effluent generation is eliminated. Trade effluent generated from the processes (blow down water from Bar and Rod Mill, BF 1 & 2, Continuous Casting Machine 1 & 2 Direct Cooling Water, BLM DCW, Air Separation Plant 1 & 2 & CPP II) is collected in the guard pond and after the pretreatment,

  • 5

    the treated water 100% is reused in BF 1 & 2 Slag Granulation Plant, Gas Cleaning Plant of EOF 1 & II, slag quenching & Coke quenching. Thus, Zero Liquid Discharge (ZLD) is ensured and no effluent is discharged outside the plant premises. To ensure the same, dedicated EMFM and CCTV camera are installed and the real time values are connected to TNPCB & CPCB server.

    viii. The ETP for coke oven by-product should be designed to meet EPA notified standards especially the cyanide and phenol.

    Our Coke Oven plant is non-recovery type. Hence, ETP plant is not envisaged.

    ix. Coke oven plant should meet visible emission standards notified by the MoEF&CC.

    Our coke oven process works on negative pressure and adequate measures are being taken during coal charging (stamped wet coal charging which is side loading to the ovens) and coke pushing (water spraying) to minimise emission, thereby no visible emission is evidenced.

    x.

    The standards issued by the Ministry vide G.S.R. 277(E) dated 31st March 2012 shall be strictly adhered to and the standards prescribed for the Coke oven plant shall be monitored and the report should be submitted along with the six-monthly compliance report.

    The standards issued by the Ministry vide G.S.R. 277(E) dated 31st March 2012 are adhered and our Coke Oven plant is of non-recovery type. Emission standards with respect to stack and fugitive for Non recovery type coke oven plant are monitored and the results are being submitted along with half-yearly compliance report. The six months monitoring results (maximum, minimum and average) by both Advanced Environmental Laboratory of TNPCB (Annexure – C) and NABL accredited laboratory (Annexure – D) consisting of stack emission, ambient air quality and noise are enclosed.

    xi.

    The emission standards specified in the Environmental (Protection) Amendment Rules, 2015 issued by vide S.O. 3305 (E) dated 7th December 2015 for the Thermal Power Plant shall be strictly adhered to.

    The parameters of SPM, Mercury & Specific water consumption are well within the standards and actions are initiated for complying SO2 and NOx emission as per the standard. (SO2 by December 2018 & NOx by 2020) Fly ash generated is 100% disposed to fly ash brick manufacturers.

  • 6

    xii.

    The National Ambient Air Quality Emission Standards issued by the Ministry vide G.S.R. No. 826(E) dated 16th November 2009 shall be followed.

    We have installed four numbers of Continuous Ambient Air Quality monitoring stations (2 in the upstream and 2 in the downstream) in the plant premises in consultation with the TNPCB. One station installed to monitor PM 10, PM 2.5, SO2, NOx and CO and other 3 stations are installed to monitor PM 10, PM 2.5, SO2 as per the CTO condition. The real time data of above parameters are connected to Care Air Centre of TNPCB. Ambient Air Quality is monitored in the surrounding villages by TNPCB during the bi annual survey and also monitored by authorized third party every week for the defined locations. Results (maximum, minimum & average) for the past 6 months are enclosed via Annexure – E.

    xiii.

    On-line ambient air quality monitoring and continuous stack monitoring facilities for all the stacks shall be provided and sufficient air pollution control devices viz. Electrostatic precipitator (ESP), and bag filters etc. shall be provided.

    We have installed 4 nos. of Continuous Ambient Air Quality monitoring stations in the plant premises. Online continuous monitoring systems are installed in stacks to monitor SPM, SO2 & NOx as per the condition. The gaseous emission from the stacks attached to the process units are monitored through online stack monitoring equipment and the real time data of SPM, SO2 & NOx (as per the condition) is transmitted to Care Air Centre of Tamil Nadu Pollution Control Board. Air Pollution Control devices are installed in the respective processes and the details are given below: ESP, Bag filters are installed in sintering system for process and raw material handling emission control system. Quenching tower with grit arrestor is provided to control emission during coke quenching (wet type). Bag filters are provided to extract dust from Blast Furnace stock house, Wet & Dry Gas Cleaning Systems are provided in BF I & II respectively for control of dust emission from Blast Furnace. Wet gas cleaning system comprising of quenching chambers, Venturi scrubber and cyclone separator for cleaning of waste gas

  • 7

    from Energy Optimizing Furnace, fumes Extraction System with Bag Filters to control fumes from Ladle furnaces& Adequate control system such as Steam exhaust systems are provided in continuous casting machine (CCM) process. As a continual improvement, additional new secondary dedusting systems are installed in Energy Optimizing Furnace (EOF), Ladle Refining Furnace (LRF) and in Blast furnace. The details of Stack and Air Pollution Control measures provided are enclosed vide Annexure – F

    xiv.

    A statement on carbon budgeting including the quantum of equivalent CO2 being emitted by the existing plant operations, the amount of carbon sequestered annually by the existing green belt and the proposed green belt and the quantum of equivalent CO2 that will be emitted due to the proposed expansion shall be prepared by the project proponent and submitted to the Ministry and the Regional Office of the Ministry. This shall be prepared every year by the project proponent. The first such budget shall be prepared within a period of 6 months and subsequently it should be prepared every year.

    Statement on Carbon budgeting is prepared as per the condition and detailed report is submitted to the Ministry and the Regional Office of the Ministry on 02.02.2018.

    xv.

    For the employees working in high temperature zones falling in the plant operation areas, the total shift duration will be 4 hrs or less per day where the temperature is more than 50oC. Moreover, the jobs of these employees will be alternated in such a way that no employee is subjected to working in high temperature area for more than 1 hr continuously. Such employees would be invariably provided with proper protective equipment, garments and gears such as head gear, clothing, gloves, eye protection etc. There should also be an arrangement for sufficient drinking water at site to prevent dehydration etc.

    Employees working in high temperature zones are provided with proper protective equipment, garments and gears such as head gear, clothing, gloves, eye protection, etc and arrangements are made for sufficient drinking water, butter milk and lime juice at plants to prevent dehydration.

    xvi.

    In-plant control measures and dust suppression system shall be provided to control fugitive emissions from all the vulnerable sources. Dust extraction and suppression system shall be provided at all the transfer points, coal handling plant and coke sorting plant of coke oven plant. Bag filters shall be provided to hoods and dust collectors to coal and coke handling to control dust

    Dust/Fugitive emission suppression systems like water sprinklers, wind screens, tarpaulin covers are provided at raw material storage yards of coal, Iron ore, Lime stone, dolomite, etc. Bag filters are provided to extract dust in the raw material transfer points and Dry &Wet fog systems are installed in all the transfer

  • 8

    emissions. Water sprinkling system shall be provided to control secondary fugitive dust emissions generated during screening, loading, unloading, handling and storage of raw materials etc.

    points of coal and coke handling systems for dust suppression. Water sprinkler systems are installed in various locations to control of secondary fugitive dust emissions generated during screening, loading, unloading, handling and storage of raw materials etc. at a cost of 9.7 crores.

    xvii.

    Gaseous emission levels including secondary fugitive emissions from all the sources shall be controlled within the latest permissible limits issued by the Ministry vide G.S.R. 414(E) dated 30th May, 2008 and regularly monitored. Guidelines / Code of Practice issued by the CPCB shall be followed.

    The G.S.R. 414(E) dated 30th May, 2008 is related to sponge iron plant. Hence, it is not applicable. In this connection, a representation is submitted to MoEFCC dated 22.07.17.

    xviii.

    Hot gases from DRI Kiln should be passed through dust settling chamber (DSC) to remove coarse solids and After Burning Chamber (ABC) to burn CO completely and used in Waste Heat Recovery (WHRB). The gas then shall be cleaned in ESP before dispersion out into the atmosphere through ID fan and stack. ESP shall be installed to control the particulate emission from WHRB.

    The existing and expansion of the steel plant is following blast furnace route and there is no DRI process in our operations. Hence, it is not applicable. In this connection, a representation is submitted to MoEFCC dated 22.07.17.

    xix.

    Efforts shall further be made to use maximum water from the rain water harvesting sources. If needed, capacity of the reservoir shall be enhanced to meet the maximum water requirement.

    Rain water harvesting ponds are provided inside the plant and township area to store rain water. Capacity of the reservoir shall be enhanced based on the needs and requirement.

    xx.

    Risk and Disaster Management Plan along with the mitigation measures shall be prepared and a copy submitted to the Ministry's Regional Office, SPCB and CPCB within 3 months of issue of environment clearance letter.

    Study on Risk and Disaster Management Plan was conducted and detailed report submitted to Ministry’s Regional Office, SPCB, and CPCB on 01.02.2018.

    xxi.

    All the blast furnace (BF) slag shall be granulated and provided to cement manufacturers for further utilization. Flue dust from sinter plant and SMS and sludge from BF shall be re-used in sinter plant. Coke breeze form coke oven plant shall be used in sinter and pellet plant. SMS slag shall be given for metal recovery and properly utilized. All the other solid waste including broken refractory mass shall be properly disposed off in environment-friendly manner.

    All the Blast Furnace Slag is converted to Granulated slag and sold to cement industries. Flue dust from sinter plant & SMS and sludge from BF and Coke breeze from coke oven plant is re-used in sinter plant. Pellet plant is not installed in our process. SMS slag is sent for metal recovery system and after crushing, it is reused in cement industries/internal applications. Broken refractory mass is sold to customers involved with recycling and the disposal is in environment friendly manner.

  • 9

    xxii.

    Coal and coke fines shall be recycled and reused in the process. The breeze coke and dust from the air pollution control system shall be reused in sinter plant. The waste oil shall be properly disposed of as per the Hazardous and Other Waste (Management and Transboundary Movement) Rules, 2016.

    Coal and coke fines are recycled and reused in the Sinter plant and Blast Furnace. Coke breeze and dust from the Air Pollution Control systems are collected and reused in the Sinter Plant. The waste oil generated is being disposed to authorized vendor as per the Hazardous and Other Waste (Management and Transboundary Movement) Rules, 2016.

    xxiii.

    Green belt shall be developed in 33 % of plant area. Selection of plant species shall be as per the CPCB guidelines in consultation with the DFO.

    Green belt development is more than 33 % of the total plant areas and so far, 193795 trees exist throughout the plant premises. Some of the important species of trees are Gulmohar, Bamboo, Pungan, Nawar pazham, Neem, Eucalyptus, Ficus, Mahogany, Vaagai, Teak, Puvarasu, Baniyan, Vila, Banana, Casuarina, Fabaceae, tectona, saraca asoca.Bamboo,etc.The details are given in Annexure – G.

    xxiv.

    All the recommendations made in the Charter on Corporate Responsibility for Environment Protection (CREP) for the Steel plants and Coke Oven Plants shall be implemented.

    Complied. All the recommendations of the Charter on the Corporate Responsibility for the Environmental Protection (CREP) issued for the steel plants are implemented. Compliance report of CREP is enclosed vide Annexure – H.

    xxv.

    At least 2.5% of the total cost of the project shall be earmarked towards the Enterprise Social Commitment based on Public Hearing issues, locals need and item-wise details along with time bound action plan shall be prepared and submitted to the Ministry's Regional Office. Implementation of such program shall be ensured by constituting a Committee comprising of the proponent, representatives of village Panchayat and District Administration. Action taken report in this regard shall be submitted to the Ministry's Regional Office.

    As per the EC (point no. 24), funds towards ESC social commitments have been earmarked and actions are being taken in a time bound manner as indicated in the Annexure – I.

  • 10

    xxvi.

    The proponent shall prepare a detailed CSR plan for every year for the next 5 years for the existing-cum-expansion project, which includes village-wise, sector-wise (Health, Education, Sanitation, Health, Skill Development and infrastructure requirements such as strengthening of village roads, avenue plantation, etc) activities in consultation with the local communities and administration. The CSR plan will include the amount of 2% retain annual profits as provided for in Clause 135 of the Companies Act, 2013 which provides for 2% of the average net profits of previous 3 years towards CSR activities for life of the project. A separate budget head shall be created and the annual capital and revenue expenditure on various activities of the plan shall be submitted as part of the compliance report to RO. The details of the CSR plan shall also be uploaded on the company website and shall also be provided in the Annual Report of the company. The plan so prepared shall be based on SMART (Specific, Measurable, Achievable, Relevant and Time bound) concept. The expenditure should be aimed at sustainable development and direct free distribution and temporary relief should not be included.

    CSR plan for the next 5 years is prepared and actions are initiated for compliance. The details are enclosed vide Annexure - I.

    xxvii

    All the commitments made to the public during the Public Hearing /Public Consultation meeting shall be satisfactorily implemented and a separate budget for implementing the same shall be allocated and information submitted to the Ministry's Regional Office at Bhubaneswar.

    The issues raised during the public hearing have been addressed. Budget for the projects has been earmarked as given in the Annexure – I and projects are in progress.

    xxviii.

    Provision shall be made for the housing of construction labour within the site with all necessary infrastructure and facilities such as fuel for cooking, mobile toilets, mobile STP, Safe drinking water, medical health care, crèche etc. The housing may be in the form of temporary structures to be removed after the completion of the project.

    Provisions are made for the expansion project activities and as per the condition temporary structure will be removed after the completion of expansion activities

  • 11

    B. GENERAL CONDITIONS COMPLIANCE STATUS

    i.

    The project authorities must strictly Adhere to the stipulations made by the concerned State Pollution Control Board and the State Government.

    This is being followed as per the conditions.

    ii.

    No further expansion or modifications in the plant shall be carried out without prior approval of the Ministry of Environment, Forests and Climate Change (MoEF&CC).

    There is no further expansion or modification in the plant is carried out without prior approval.

    iii.

    At least four ambient air quality monitoring stations should be established in the downward direction as well as where maximum ground level concentration of PM10, PM2.5, SO2 and NOX are anticipated in consultation with the SPCB. Data on ambient air quality and stack emission shall be regularly submitted to this Ministry including its Regional Office at Chennai and the SPCB/CPCB once in six months.

    Four Continuous Ambient Air Quality monitoring stations are installed in the plant premises and one station installed to monitor PM 10, PM 2.5, SO2, NOx and CO and other 3 stations installed to monitor PM 10, PM 2.5, SO2 as per the CTO. The real time data are connected to Care Air Centre of TNPCB. Ambient Air Quality and Stack emission are monitored by TNPCB during the bi annual survey and also Ambient Air Quality and stack emission is monitored by NABL approved external laboratory on monthly basis. The reports are being submitted to Regional Office at Chennai and the SPCB/CPCB once in six months.

    iv.

    Industrial waste water shall be properly collected, treated so as to conform to the standards prescribed under GSR 422 (E) dated 19th May, 1993 and 31st December 1993 or as amended from time to time. The treated waste water shall be utilized for plantation purpose.

    Industrial waste water is being collected, treated and reused 100 % in the processes for cooling application and parameters conform the prescribed standards under GSR 422 (E) dated 19th May, 1993 and 31st December 1993.

    v.

    The overall noise levels in and around the plant shall be kept well within the standards (85 dB(A)) by providing noise control measures including acoustic hoods, silencers, enclosures etc. on all sources of noise generation. The ambient noise levels should conform to the standards prescribed under EPA Rules, 1989 viz. 75 dB(A) during day time and 70 dB(A) during night time.

    Source and Ambient noise levels are measured in and around the plant areas and control measures like acoustic hoods, silencers, and enclosures are provided wherever required. The noise levels of source and ambient is well within the standards prescribed under EPA Rules, 1989. The noise monitoring results by NABL approved laboratory is enclosed vide Annexure - F

    vi. Occupational health surveillance of the workers shall be done on a regular basis and records maintained as per the Factories Act.

    Annual Health Check-ups are conducted for all employees on regular basis and records are being maintained in the Occupational Health Centre.

    vii.

    The company shall develop rain water harvesting structures to harvest the rain water for utilization in the lean season besides recharging the ground water table.

    Rain water and water from the storm water drains are diverted to rainwater harvesting ponds for recharging the ground water table. Collected rain water is reused in the process.

  • 12

    viii.

    The project proponent shall also comply with all the environmental protection measures and safeguards recommend in the EIA/EMP report. Further, the company must undertake socio-economic development activities in the surrounding villages like community development programmes, educational programmes, drinking water supply and health care etc.

    Environmental protection measures and safeguards recommend in the EIA/EMP report are being implemented.

    ix.

    Requisite funds shall be earmarked towards capital cost and recurring cost/annum for environment pollution control measures to implement the conditions stipulated by the Ministry of Environment, Forest and Climate Change (MoEF&CC) as well as the State Government. An implementation schedule for implementing all the conditions stipulated herein shall be submitted to the Regional Office of the Ministry at Chennai. The funds so provided shall not be diverted for any other purpose.

    Capital cost and recurring cost/annum for environment pollution control measures are being initiated as stated in the EIA report.

    x.

    A copy of clearance letter shall be sent by the proponent to concerned Panchayat, Zila Parishad/ Municipal Corporation, Urban Local Body and the local NGO, if any, from whom suggestions/representations, if any, were received while processing the proposal. The clearance letter shall also be put on the website of the company by the proponent.

    Copy of clearance letter is submitted to local administration on 14.07.2017 and EC copy is uploaded in our website.

    xi.

    The project proponent shall upload the status of compliance of the stipulated environment clearance conditions, including results of monitored data on their website and shall update the same periodically. It shall simultaneously be sent to the Regional Office of the MoEF&CC at Chennai. The respective Zonal Office of CPCB and the SPCB. The criteria pollutant levels namely; PM10, SO2, NOX (ambient levels as well as stack emissions) or critical sectoral parameters, indicated for the projects shall be monitored and displayed at a convenient location near the main gate of the company in the public domain.

    The compliance of the stipulated environment clearance conditions including results of monitored data on our website is periodically uploaded. The criteria pollutant levels namely; PM10, SO2, NOX are displayed near the entrance of main gates of our company in the public domain.

  • 13

    xii.

    The project proponent shall also submit six monthly reports on the status of the compliance of the stipulated environmental conditions including results of monitored data (both in hard copies as well as by e-mail) to the Regional Office of MoEF&CC, the respective Zonal Office of CPCB and the SPCB. The Regional Office of this Ministry at Chennai/CPCB/SPCB shall monitor the stipulated conditions.

    Environmental conditions and compliance status report including results of monitored data is being submitted to the Regional Office of MoEF &CC, Chennai, CPCB and SPCB once in six months.

    xiii.

    The environmental statement for each financial year ending 31st March in Form-V as is mandated to be submitted by the project proponent to the concerned State Pollution Control Board as prescribed under the Environment (Protection) Rules, 1986, as amended subsequently, shall also be put on the website of the company along with the status of compliance of environmental conditions and shall also be sent to the respective Regional Office of the MoEF&CC at Chennai by e-mail.

    The environmental statement for each financial year ending 31st March in Form-V and status of compliance of environmental conditions is being sent to the Regional Office of the MoEF & CC at Chennai. For the FY 2017-18, the report was submitted on 06.07.2018

    xiv

    The project proponent shall inform the public that the project has been accorded environmental clearance by the Ministry and copies of the clearance letter are available with the SPCB and may also be sent at website of the Ministry of Environment, Forests, and Climate Change (MoEF&CC) at http:/envfor.nic.in. This shall be advertised within seven days from the date of issue of the clearance letter, at least in two local newspapers that are widely circulated in the region of which one shall be in the vernacular language of the locality concerned and a copy of the same should be forwarded to the Regional office at Bhubaneshwar.

    Environmental Clearance accorded details have been advertised in Dinamani and The Indian Express on 14.07.2017 and a copy of the same submitted to the Regional office at Chennai on 15.07.2017.

    xv

    Project authorities shall inform the Regional Office as well as the Ministry, the date of financial closure and final approval of the project by the concerned authorities and the date of commencing the land development work.

    Date of financial closure and land development work is informed to Regional Office vide letter dated 12.10.2017.

  • ANNEXURE # A

    Production details from January to June 2018

    Month Pig Iron (Metric Ton)

    Steel production (Metric Ton)

    Power generation (MW)

    January 18 2343 89192 3.47

    February 18 1326 78603 3.25

    March 18 769 94561 3.51

    April 18 4443 77666 3.14

    May 18 1980 76997 2.90

    June 18 2307 81897 3.25

    Total 13168 498916 19.51

    Consent order quantity 0.3 MTPA 1.0 MTPA 7.0 MW

    January to June 2018 production 0.013 MT 0.498 MT 3.25 MW

    Note:

    MTPA – Million Ton Per Annum MT – Million Ton

  • Total

    B Description of activities NumbersPlan for

    Year I

    Spent for Year I (from 07.07.2017 to till 31Dec

    17)

    Spent for Year I (from 01.01.2018 to

    till 30.06.2018)II III IV V

    1 Toilets 2000 0.50 0.32 - 0.75 0.75 0.50 0.50 3.32

    2 Health centre 1 0.25 - - 0.25 0.25 0.25 1.00

    3 commmunity hall 2 0.50 0.50 1.00

    4 Hospital 1 0.50 - - 0.50 0.50 0.25 0.25 2.00

    5 Modern school New with GYM and Play ground

    1 1.00 0.50 0.50 2.00

    6 Watershed program 1 0.24 0.25 0.25 0.25 0.25 1.24

    7 Water body strengthening 0.25 0.25 0.25 0.25 1.00

    8 Drainage 0.25 0.25 0.25 0.25 1.00

    9 Government school improvement 1 0.44 0.03 0.25 0.25 0.25 0.25 1.47

    1.50 0.76 0.27 3.00 4.00 2.50 2.00 14.03

    Fund Allocation for each area In crs Commitment period (Year)

    Total

    ANNEXURE # B

    Enterprise Social Commitment (ESC) Expenses

  • Annexure # C

    TNPCB survey report summary (Dated: 28.03.2018)

    I. Ambient Air Quality Survey Results

    Sl. No. Location

    Pollutants Concentration (μg/m3)

    PM10 SO2 NOX 01. New Land area (Opp. to BF-II Stack) 54 8 14

    02. Malamanoor 40 7 12

    03. Goundanoor 61 8 15

    04. Solaiyur 52 8 13

    05. Mecheri Road, R.S. 78 10 28

    06. New Guest house 62 8 23

    07. Kuttapatty Pudur 54 8 20

    08. Ervadi. 62 8 17

    09. Amarathankadu 94 12 35

    10. Kaattuvalavu 48 9 15

    11. Pottaneri 85 12 30 National Ambient Air Quality Standards: PM10 – 100 µg/m3, SO2 – 80 µg/m3, NOx – 80 µg/m3. II. Stack Monitoring Survey Results (March 2018)

    Sl. No Stack attached to

    Dis

    char

    ge

    rate

    in

    (Nm

    3 /Hr)

    Pollutants Concentration

    (mg/Nm3)

    PM SO2 NOx 1 Sinter Plant - I - Sinter Machine 83560 70 37 17.7

    2 Sinter Plant – I - Cooling System 70342 62 16 0.28

    3 Sinter Plant – I Dedusting System 179273 55 NR NR

    4 Sinter Plant – I RMHS 23644 72 NR NR

    5 Sinter Plant - II - Sinter Machine 386306 62 27 2.8

    6 Sinter Plant - II - Cooling & De-dusting System 493675 53 NR NR

    7 Sinter Plant - II - RMHS 120430 41 NR NR

    8 Blast Furnace - I - Hot stove 90831 27 21 1.9

  • Sl. No Stack attached to

    Dis

    char

    ge

    rate

    in

    (Nm

    3 /Hr)

    Pollutants Concentration

    (mg/Nm3)

    PM SO2 NOx

    9 Blast Furnace - I - Stock House 51577 81 NR NR

    10 Blast Furnace - I - RMHS 17852 47 NR NR

    11 Blast Furnace - I - Cast House 205225 89 NR NR

    12 Blast Furnace - II - Hot stove 123277 42 19 4.1

    13 Blast Furnace - II - Stock House 131401 61 NR NR

    14 Blast Furnace - II - Cast House 340949 67 13.3 0.29

    15 Blast Furnace - II - PCI 31424 65 24 1.7

    16 CPP - I - Boiler 70725 29 59 2.3

    17 VD boiler 9067 25 32 19.9

    18 Energy Optimizing Furnace -I 44603 81 51 4.3

    19 Energy Optimizing Furnace -II 69672 33 56 3.9

    20 EOF Secondary dedusting system I & II 320410 79 NR NR

    21 Ladle Refining Furnace - 1 29212 45 10.7 2.3

    22 Ladle Refining Furnace - 2,3,4 88312 63 18.7 3.6

    23 CCM-I Steam Exhaust NR 77 NR NR

    24 CCM-II Steam Exhaust - I 15908 33 NR NR

    25 CCM-II Steam Exhaust - II 15474 72 NR NR

    26 CCM-II Cut fumes Exhaust 48950 39 NR NR

    27 BRM – Re Heating Furnace 37635 61 120 5.3

    28 BLM – Re Heating Furnace -I 36335 32 34.7 4.1

    29 LRF –secondary de dusting system 430130 65 1.5 0.23

    30 Coke Oven - WHRB -II 52942 43 170 3.2

    31 Coke Oven - WHRB -III 34341 47 200 7.8

    32 Coke Oven Chimney - III 176123 40 37.6 10.6

    33 BF Gas Fired Boiler 34265 21 85 22

    34 DG Set (625 KVA) 596 40 16 8.3

  • ANNEXURE # D

    Environment Analysis Report by NABL lab for the period January to June 2018

    I. Ambient air quality results for the period from January to June 2018

    Month AQ-1 AQ-2 PM 10 PM 2.5 NOx SO2 PM 10 PM 2.5 NOx SO2 JAN -18 56.5 24 17.7 8.275 57.3 24.5 18.4 8.05 FEB-18 58 25 18.7 8.68 60.3 26.8 18.6 8.7

    MAR -18 59 25.25 18.9 8.88 59.3 25.5 18.7 9.18 APR-18 62.75 27.25 19 9.1 59.8 25.5 18.7 9 MAY-18 56.25 21.75 18.3 8.28 53.8 20.3 17.9 7.68 JUN-18 56.7 21.5 18.4 7.68 57.8 21.8 18.5 8.63 Average 59.01 23.35 18.24 8.11 56.81 24.35 17.1 8.1

    Month AQ-3 AQ-4 PM 10 PM 2.5 NOx SO2 PM 10 PM 2.5 NOx SO2 JAN -18 57.3 21.5 17.8 8.225 53.25 21.25 17.7 7.85 FEB-18 58.3 23.3 18.4 8.63 56.75 22.5 18.1 8.38

    MAR -18 59 23.8 18.5 8.95 55.8 21.5 18.4 8.68 APR-18 59.5 26.3 18.8 8.85 57.5 21.5 17.9 8.38 MAY-18 57 22.3 18.2 7.95 56.25 23.5 18 7.5 JUN-18 59.8 21 18.3 8.6 55.5 19.5 17.7 8.33 Average 55.65 22.4 18.4 8.8 55.4 21.7 17.7 8.07

    Month AQ-5 AQ-6 PM 10 PM 2.5 NOx SO2 PM 10 PM 2.5 NOx SO2 JAN -18 55.8 24 17.7 7.53 52.5 19.75 17.8 7.55 FEB-18 58.5 25.8 18.3 8.13 55 21.3 18 8.48

    MAR -18 59.5 24.3 18.1 8.23 53.5 22.8 18.1 8.73 APR-18 57.5 24 18.3 8.5 52.8 20.5 18.4 8.8 MAY-18 50.8 18.5 18.5 7.28 56.3 20.8 17.9 7.93 JUN-18 54 17.5 17.9 8.2 58.8 23 17.4 7.4 Average 56.01 22.35 18.24 9.11 54.81 24.35 17.95 8.11

    Month AQ-7 AQ-8 PM 10 PM 2.5 NOx SO2 PM 10 PM 2.5 NOx SO2 JAN -18 51.75 18 17.3 7.45 58 25 17.4 8.05 FEB-18 55 20.3 18 8.48 61 26.5 18.4 8.2

    MAR -18 54.8 20.8 17.7 8.45 62.5 27.5 18.7 9.2 APR-18 55.25 22 18.3 8.58 63 27 18.2 8.88 MAY-18 55.5 21 16.6 6.95 57.5 19.25 16.6 6.95 JUN-18 55.75 20.8 16.7 7.23 54.75 23 17.2 7.18 Average 54.65 20.2 18.2 7.65 62.1 25.6 17.9 8.2

    Tolerance limit: PM 10: 100 µg/m3, PM 2.5: 60 µg/m3, NOx: 80 µg/m3, SO2: 80 µg/m3 AQ1- Udayanur, AQ2-Temple Gate, AQ3-Township STP, AQ4- Kuttapattipudur AQ5- Parry Nagar, AQ6- Guest House, AQ7- Pottaneri, AQ8- Pump House

  • I. A. Analysis of Ambient Air Quality Results

    Location AQ-1 AQ-2 AQ-3 AQ-4 AQ-5 AQ-6 AQ-7 AQ-8 PM 10 in µg/m3

    Min 50.8 52.5 51.8 54.8 50.80 52.50 51.75 54.75 Max 59.5 58.8 55.8 63.0 59.50 58.80 55.75 63.00 Mean 55.2 54.8 54.7 58.9 55.18 54.82 54.68 58.92 Std. dev. 4.1 2.9 1.5 4.1 4.06 2.92 1.54 4.06 98th percentile 59.4 58.6 55.7 63.0 59.40 58.55 55.73 62.95

    Location AQ-1 AQ-2 AQ-3 AQ-4 AQ-5 AQ-6 AQ-7 AQ-8 PM 2.5 in µg/m3

    Min 17.5 19.8 18.0 19.2 17.50 19.75 18.00 19.23

    Max 25.8 23.0 203.0 27.5 25.80 23.00 203.00 27.50

    Mean 21.3 21.4 50.9 23.7 21.27 21.36 50.93 23.74

    Std. dev. 3.8 1.5 74.5 4.0 3.83 1.46 74.51 4.00

    98th percentile 25.7 23.0 184.9 27.5 25.65 22.98 184.90 27.45

    Location AQ-1 AQ-2 AQ-3 AQ-4 AQ-5 AQ-6 AQ-7 AQ-8 NOx in µg/m3

    Min 17.7 17.4 16.6 16.6 17.70 17.40 16.60 16.60 Max 19.0 18.4 18.3 18.7 18.97 18.40 18.30 18.70 Mean 18.2 17.9 17.3 17.6 18.25 17.87 17.32 17.62 Std. dev. 0.5 0.5 0.8 1.0 0.54 0.45 0.83 0.99 98th percentile 18.9 18.4 18.3 18.7 18.92 18.37 18.27 18.67

    Location AQ-1 AQ-2 AQ-3 AQ-4 AQ-5 AQ-6 AQ-7 AQ-8 SO2 in µg/m3

    Min 7.3 7.4 7.0 7.0 7.28 7.40 6.95 6.95 Max