8
P T t r B T p 5 j i i P c M l c l u I 4 t u we Pan Purpose The purpose test method reference co Background The introduc process in qu 568C.1 (TIAumper meth ncluding the s recommen Per ANSI/TIA consists of fe MPO based h inks are upg connectors. inks deploye utilizing TIAn addition t40GBASESR to this fixed used, but ins eb: www.pand T nMPO Re of this docu procedure d ords with the d ction of the M ualifying a li52614B an hods, the on e permanennded to save A568C.17 emale MPO horizontal in graded to 40 With this ge ed in the fiel 568C.1 (TIA o the compl 4 permanen gender intestead the tw duit.com e Testing 40 ference C ument is to d described in e JDSU CertiMPO in the nk via the on nd IEC 61280 e jumper m t link connec e the referen a 10GBASES connectors. nfrastructure GBASESR4 ender dispar ld. Testing t A52614B an exity of the nt link can on rface, there wo or three ju e-mail: cs@pa 0GBASES Cords & t describe how TIA568C.1 fier40G cabl end to end h ne jumper so 041 Ed.2). A ethod is rec ctions in the nce value usSR standardPer the sam e is comprislinks, they w rity, there w these links w nd IEC 61280 cabling infra nly be manu have been i umper meth anduit.com SR Links u he JDSU w to test a 4 1 (TIA52614 e certifier. horizontal ca ource/powe Although the ommended e loss measu ed to qualify s compliant me standard ed of male M will consist o ill be a mix o with the diffe 041 Ed.2) M astructure, t factured wit nstances wh hod had to b phone: 800- utilizing P Certifier4 40GBASESR4 4B and IEC 6 abling infras er meter test e standards for perman rement. No y the tested MPO based d, the 40GBA MPO connec of nonstand of MPO gend erent gendeMethod B, o the test equi th one gend here the one e used to qu -777-3300 p Panduit 40G Cabl4 channel us 6128041Etructure has ting method do mention ent link test matter wha links. horizontal i ASESR4 stan ctors. When ardsbased der types in r types can p one jumper m ipment used er type of M e jumper me ualify the lin page 1 Technica l e certifiesing the one d.2) using Pa s complicate as describe the two and ing due to it at method is nfrastructur ndards comp n the 10GBAfemale MPO the 40GBAS prove to be method. d to qualify a MPO interfac ethod canno ks. l Referenc e TR11 8 r jumper anMPO ed the ed in TIAd three t used, it re pliant SESR O SESR4 difficult a ce. Due t be e 8

JDSU with PanMPO testing 120313 · P W s w I r a F P g c p N m M we ermanent hen testing ource/powe ith the Pan t is importan eference co t the end of igure 1 show anMPO refe

Embed Size (px)

Citation preview

P

Ttr

B

Tp5jii

PcMlclu

I4tu

 

we

Pan

Purpose 

The purposetest method reference co

Background

The introducprocess in qu568‐C.1 (TIA‐umper methncluding thes recommen

Per ANSI/TIAconsists of feMPO based hinks are upgconnectors.  inks deployeutilizing TIA‐

n addition to40GBASE‐SRto this fixed used, but ins

eb: www.pand

TnMPO Ref

 of this docuprocedure d

ords with the

ction of the Mualifying a lin‐526‐14B anhods, the one permanentnded to save

A‐568‐C.1‐7 aemale MPO horizontal ingraded to 40With this geed in the fiel568‐C.1 (TIA

o the compl4 permanengender interstead the tw

duit.com e

Testing 40ference C

ument is to ddescribed ine JDSU Certif

MPO in the enk via the onnd IEC 61280e jumper mt link connece the referen

a 10GBASE‐Sconnectors.nfrastructureGBASE‐SR4 ender disparld.  Testing tA‐526‐14B an

exity of the nt link can onrface, there 

wo or three ju

e-mail: cs@pa

0GBASE‐SCords & t

describe how TIA‐568‐C.1fier40G cabl

end to end hne jumper so0‐4‐1 Ed.2). Aethod is recctions in thence value use

SR standards  Per the same is compriselinks, they writy, there wthese links wnd IEC 61280

cabling infranly be manuhave been iumper meth

anduit.com

SR Links uthe JDSU 

w to test a 41 (TIA‐526‐14e certifier. 

horizontal caource/poweAlthough theommended e loss measued to qualify

s compliant me standarded of male Mwill consist oill be a mix o

with the diffe0‐4‐1 Ed.2) M

astructure, tfactured witnstances whhod had to b

phone: 800-

utilizing PCertifier4

40GBASE‐SR44B and IEC 6

abling infraser meter teste standards for permanrement. Noy the tested 

MPO based d, the 40GBAMPO connecof non‐standof MPO genderent genderMethod B, o

the test equith one gendhere the onee used to qu

-777-3300 p

Panduit  40G Cable

4 channel us61280‐4‐1 Ed

tructure hasting methoddo mention ent link testmatter whalinks. 

 horizontal iASE‐SR4 stanctors.  Whenards‐based fder types in r types can pone jumper m

ipment useder type of Me jumper meualify the lin

page 1

T e c h n i c a l

e certifier

sing the one d.2) using Pa

s complicate as describethe two anding due to itat method is 

nfrastructurndards compn the 10GBASfemale MPOthe 40GBASprove to be dmethod.   

d to qualify aMPO interfacethod cannoks. 

l R e f e r e n c e

T R 1 1 8

jumper anMPO 

ed the ed in TIA‐d three t used, it 

re pliant SE‐SR O SE‐SR4 difficult 

a ce.  Due t be 

e 8

 

BMT

M1n

Mac

Trir

S

Pqdl

 Ptrf TImIn 

Jtpbc

 

we

Beyond the gMPO based hThis paper si

Method A em1 throughouneeds to be 

Method B emarray to “flipchannel. 

Trying to charecommenden the field isreplace the c

Solution 

Panduit and qualificationdescribed in ink. 

Panduit has that can havrisk of damagface.   

The PanMPOEC‐61754‐7 male or femat provides anecessary to

DSU has intto the markeperformed eboth the polcustom limit

eb: www.pand

gender of thhorizontal camply addres

mploys key‐ut the permaan array flip

mploys key‐up” from one 

ange the gened due to ths extremely dconnector ho

JDSU have w of any 40BATIA‐568‐C.1

introduced te the gendege to the int

O is a multipland EIA/TIAale in genden all‐inclusivo test your ho

roduced MPet. Native Meliminating tharity and thes.  

duit.com e

he MPO connabling; Methsses Method

up to key‐donent link.  Ap or Method 

up to key‐upend of the 4

nder or polahe complex cdifficult andousing. 

worked togeASE‐SR4 per1 (TIA‐526‐14

the PanMPOr and polaritternal ribbon

le‐fiber pushA‐604‐5 (FOCer or key up ove connectoorizontal inf

PO modules fPO testing ohe need for e loss for all 

e-mail: cs@pa

nector, therehods A, B ands A and B.

own adapterAs a result, wB cable intro

p adapters to40G channel 

rity associatconstruction may lead to

ether to provmanent link 4B and IEC 6

O, a universaty changed in fiber or the

h‐on/pull‐offCIS 5) complior key downr that can befrastructure.

for the Certiof 12‐fiber Mfan‐out cab12 fibers wi

anduit.com

e are three dd C, which a

rs for array cwhen construoduced to th

o connect thto the other

ed with the of the conno damage to

vide a complutilizing the

61280‐4‐1 Ed

al MPO connin the field we connector

f connector iant and cann in housing e configured   

ifier40G NexMPO links andles. A 5‐secoith pass/fail 

phone: 800-

different polare also discu

connectivityucting a Methe channel.

he array connr to utilize M

standard Mnector.  Tryino the fiber ex

lete testing se one jumped.2) regardle

nector with no r’s end 

that is n be either polarity oried to any gend

xt‐Generatiod channels cond auto‐testo standard

-777-3300 p

larity methoussed in ANS

to maintainthod A chan

nectivity, whMethod B ca

PO connectng to changexposed when

solution thaer test methoess of the ge

entation.   der 

on Certifier can now be st can verify s‐based or 

page 2

T e c h n i c a l

ods associateSI/TIA‐568‐C

n registrationnel for 40G, 

hich allows fbles through

or in the fiele this characn attempting

t will allow fod procedurender in the 

l R e f e r e n c e

T R 1 1 8

ed with C.1‐7.  

n of Fiber there 

for the hout the 

ld is not cteristic g to 

for the re fiber 

e 8

 

P

Wsw

Ira

FPgcp

 

 

NmM

 

 

 

 

 

 

 

 

we

Permanent 

When testingsource/powewith the Pan

t is importanreference coat the end of

Figure 1 showPanMPO refegender this wcord will be spolarity of th

Figure 1.  O

Note:  the JDSmethod.  TherMethod B sys

eb: www.pand

Link Testin

g a Method er meter tesnMPO and th

nt to ensureords, and thef this paper t

ws how to seerence cord way enablesset to Methohe link unde

One‐Jumper Refe

SU Certifier40refore, to tesstem, set the 

duit.com e

ng a Female

A or Methodsting methodhe Certifier4

e that all the e test equipmto ensure pr

et up the onis set up so  a direct conod A (Key Upr test.   

erence Setup wh

0G will learn st a Method Areference wi

e-mail: cs@pa

e‐Based MP

d B female‐Md described 0G cable cer

end faces ament are freroper cleanin

ne‐jumper reboth ends onnection betp to Key Dow

hen Testing Met

the polarity oA system, set th a Method 

anduit.com

PO Infrastru

MPO‐based in TIA‐568‐Crtifier, the fo

ssociated we of contamng and inspe

eference utilof the cord atween the sown) or Meth

thod A or Metho

of the link wht the referencB cord. 

phone: 800-

ucture – M

infrastructuC.1 (TIA‐526‐ollowing set

ith the permmination.  Seeection tools 

lizing Methoare female (pource and pohod B (Key U

od B Female Bas

hen setting thce with a Met

-777-3300 p

Method A or

ure using the‐14B and IECup applies. 

manent link be “Cleaning are being ut

od A or Methpins retracteower meterp to Key Up

sed Horizontal C

he reference thod A cord. L

page 3

T e c h n i c a l

r Method B

e one jumpeC 61280‐4‐1 

being testedRecommendtilized. 

hod B polarited).  Setting.  The polarit), depending

Cabling Infrastru

and test to tLikewise, to t

l R e f e r e n c e

T R 1 1 8

r Ed.2) 

d, the dations” 

ty.  The the cord ty of the g on the 

ucture 

that test a 

e 8

 

APFsta

we

After settingPanMPO refeFigure 2 and specificationtotal IL is >0.above 0.25 d

eb: www.pand

g the referenerence cord Figure 3).  T

ns.  Note:  If t.25 dB inspedB, discard t

duit.com e

nce, referencset to the pThis will test the total IL ict and re‐clehe cord and 

Figure 3.  

Figure 2.  M

e-mail: cs@pa

ce cord verifproper polarithe additions ≤0.25 dB, tean the MPOdo not use 

MPO Reference

MPO Reference C

anduit.com

fication can bity for the linnal cord to ethen the corO end face oit as a refere

e Cord Verificatio

Cord Verification

phone: 800-

be completenk under tesensure that ird is useableof the cord aence cord. 

on (Method B C

n (Method A Cor

-777-3300 p

ed by addingst (Method Ait is within ree for testing nd retest.  If

Cords) 

rds)

page 4

T e c h n i c a l

g the additioA or Methodeference grapurposes. Iff the value r

l R e f e r e n c e

T R 1 1 8

onal d B) (See ade f the emains 

e 8

 

OMM

 

we

Once the corMPO adapteMethod B fe

eb: www.pand

rd is qualifieer can be chamale MPO h

Figu

Figu

duit.com e

d for test, thanged so thehorizontal lin

re 4.  Test setup

ure 5.  Test setup

e-mail: cs@pa

he permanee gender is nnk as shown

p for Method A 4

p for Method B 4

anduit.com

nt link can bnow male anin Figure 4 a

40GBASE‐SR4 Fe

 

40GBASE‐SR4 Fe

phone: 800-

be tested.  Thd can be useand Figure 5

emale MPO Hor

emale MPO Hor

-777-3300 p

he PanMPO ed to test th5. 

rizontal Cabling 

rizontal Cabling 

page 5

T e c h n i c a l

connectorshe Method A

l R e f e r e n c e

T R 1 1 8

at the A or 

 

 

e 8

 

P

Wsw

Frtctt

 

As

 

 

 

 

 

we

Permanent 

When testingsource/powewith the Pan

Figure 6 showreference cothis way, direcord will be sthe polarity othe polarity o

After settingshown in Fig

eb: www.pand

Link Testin

g a Method er meter tesnMPO and th

ws how to seord is setup sect connectiset to Methoof the link uof the refere

Figure 6.  One‐J

g the referenure 2 or Figu

duit.com e

ng a Male‐B

A or Methodsting methodhe Certifier4

et up the onso both endsion betweenod A (Key Upnder test.  Aence cord be

Jumper Referen

nce, referencure 3 depen

e-mail: cs@pa

Based MPO

d B Male‐Md as describe0G cable cer

ne‐jumper res of the cordn the source p to Key DowAs discussed eing used. 

nce Setup for Tes

ce cord verifding on the 

anduit.com

O Infrastruc

PO‐based ined in TIA‐568rtifier the fo

eference utild are Femaleand power wn) or Methearlier, the 

 

sting Male MPO

fication can bpolarity of t

phone: 800-

cture – Met

frastructure8‐C.1 (TIA‐52ollowing setu

lizing Methoe (pins retracmeter can bhod B (Key UJDSU will lea

O Based Horizon

be completethe MPO cab

-777-3300 p

thod A or M

e utilizing the26‐14B and up applies. 

od A or Methcted).  With be made.  Thp to Key Uparn the pola

 

ntal Cabling Infra

ed by followbling. 

page 6

T e c h n i c a l

Method B 

e one jumpeIEC 61280‐4

hod B.  The Pthe cords gehe polarity o) dependingarity of the li

astructure 

ing the proc

l R e f e r e n c e

T R 1 1 8

er 4‐1 Ed.2) 

PanMPO ender set f the g upon nk by 

cess 

e 8

 

Osl

we

Once the corset to femaleink as shown

eb: www.pand

rd is qualifiee and will ben in Figure 7

Figu

Figu

duit.com e

d for test, the able to be 7 or Figure 8

ure 7.  Test Setu

ure 8.  Test Setu

e-mail: cs@pa

he permaneutilized to te. 

up for Method A

up for Method B

anduit.com

nt link can best the Meth

A 40GBASE‐SR4 M

B 40GBASE‐SR4 M

phone: 800-

be tested.  Bohod A or Me

Male MPO Horiz

Male MPO Horiz

-777-3300 p

oth PanMPOethod B male

zontal Cabling 

zontal Cabling 

page 7

T e c h n i c a l

O connectorse MPO horiz

l R e f e r e n c e

T R 1 1 8

s can be ontal 

e 8

 P 

FF

 J 

NNN  C 

T3oIa          S 

TlT 

Po4o

we

Panduit Par

FRBXR7‐R7MFMTPFCT = P

JDSU Part N

NGC‐4500‐MNGC‐4500‐MNGC‐4500‐M

Cleaning Re

TIA standard3‐35, which iof defects ornspection Mallows techn

Summary 

The introducink qualificaTIA‐568‐C.1 

Panduit and of PanMPO r40BASE‐SR4 or polarity of

eb: www.pand

rt Numbers

M02 = 2m PaPanduit reel‐

Numbers: 

MM‐NA = CeMPO‐S = MPOMPO‐PM = M

equirement

ds including Tin turn requr scratches. TMicroscope wnicians to qu

ction of the Mtion process(TIA‐526‐14

JDSU have wreference copermanent f the MPO in

duit.com e

s: 

anMPO refer‐type cleane

rtifier40G CoO 850nm LigMPO 850nm 

ts 

TIA‐526‐14Bires the endThese requirwith MPO adickly and eas

MPO in the es via the oneB and IEC 61

worked togeords and Cerlink utilizingn the horizon

e-mail: cs@pa

rence cord aer for MPO c

opper/Multight Source APower Mete

B require tha faces be surements alsodapters comsily meet thi

end‐to‐end e‐jumper sou1280‐4‐1 Ed.

ether to provtifier40G cag the one jumntal cabling 

anduit.com

assembly connectors 

imode kit wiAdapter for Cer Adapter fo

at fiber end fbjected to ao apply to Mbined with tis requireme

horizontal caurce/power 2).  

vide a complble certifier mper test meinfrastructu

phone: 800-

ith North AmCertifier40Gor Certifier4

faces be insp non‐subjec

MPO connectthe Certifer4ent in the fie

abling infrasmeter testin

lete testing sthat will alloethod proceure. 

-777-3300 p

merican Pow

40G 

pected accorctive test to etors. The JDS40G and Paneld.  

structure hang method d

solution witow for the qedure regard

page 8

T e c h n i c a l

wer Cords 

rding to IEC ensure they SU P5000i Diduit MPO cl

s complicatedescribed in 

h the combiqualification dless of the g

l R e f e r e n c e

T R 1 1 8

61300‐are free igital eaners 

ed the          

ination of any gender 

e 8