January 29, 2019 Mr. Bruce De Terra, Division Chief California Department of Transportation Division of Transportation Programming Office of Federal Transportation Management Program P.O. Box 942874 Sacramento, CA 94274-0001 Attn: Lima Huy
SUBJECT: Amendment No. 1 (Type 3) to the KCAG 2019 Federal Transportation Improvement Program
Dear Mr. De Terra: Enclosed for your review and approval is Amendment No. 1 (Type No.3 – Exempt Projects) to the federally- approved 2019 FTIP. Amendment No. 1 to the 2019 FTIP adds, removes, and adjusts the cost, and scope of federally funded or regionally significant projects within the four-year element of the 2019 FTIP as indicated in Attachment 1. This Amendment is consistent with the metropolitan transportation planning regulations per 23 CFR Part 450 and 40 CFR Part 93. The changes made by Amendment No. 1 are consistent with the description of a Type 3 Formal Amendment in the 2008 Revised Federal – Statewide Transportation Improvement Program (FSTIP) Amendment and Administrative Modification Procedures, the 2011 addendum to those procedures, and the 2018 Kings County Regional Transportation Plan (RTP). The proposed project changes have been determined to be exempt from the requirement that any additional regional conformity determination and/or regional emissions analysis be performed per 40 CFR 93.126, 93.127, or 93.128. This amendment does not affect the regional emissions analysis for the FTIP and conforms to the applicable State Implementation Plan (SIP). Amendment No. 1 does not affect the timely implementation of any Transportation Control Measures (TCM) and no projects in this amendment are in common with any other amendment currently out for public review or approval.
The public participation process for Amendment No. 1 to the 2019 FTIP is consistent with KCAG’s adopted Public Participation Plan (PPP). On January 14, 2019, KCAG began a 14-day public review and interagency consultation period which concluded on January 28, 2019. No comments was received during the public review and interagency consultant period. On January 29, 2019, through delegated authority from the KCAG board, the KCAG Executive Director approved Amendment No. 1. State and Federal approval is required for Amendment No. 1. An electronic copy of the amendment and a four year financial plan in Excel format will be sent via email. The 2019 FTIP and all related amendments are available online on KCAG’s website at http://www.kingscog.org/ If you have any questions regarding this modification, please contact Yunsheng Luo of my staff at [email protected] or (559) 852-2584. KINGS COUNTY ASSOCIATION OF GOVERNMENTS
Terri King, Executive Director cc: Scott Carson, Federal Highway Administration Stephen Tracey, Caltrans District 6 Ted Matley, Federal Transit Administration James Perrault, Caltrans DLAE Sharri Bender-Ehlert, Caltrans District 6 Matthew Lakin, EPA
ATTACHMENT 1
Project Listings
Summary of Changes KCAG 2019 FTIP Amendment Number - 01
Project
No.
Existing
/ NewCTIPS ID PROJECT TITLE Phase
CTIPS Fund
Type
PRIOR
CTIPS Amt.
CURRENT
CTIPS Amt.FFY
Financial Table
Fund Source
Net Increase /
DecreaseNet Change % Change Comments
FTA5339 $66,000 $0 FTA5339 ($66,000)
TDA $17,000 $0 TDA ($17,000)
FTA5339 $104,000 $0 FTA5339 ($104,000)
TDA $26,000 $0 TDA ($26,000)
FTA5339 $0 $170,000 FTA5339 $170,000
TDA $0 $43,000 TDA $43,000
$0 $1,700,000 2018/19 $1,700,000
$0 $5,200,000 2019/20 $5,200,000
6 Existing 216-0000-0153 HSIP CON HSIP $0 $934,600 2021/22 HSIP $934,600 $934,600 32%New HSIP Projects added to 2019 FTIP.
See grouped project listings for detailed
project descriptions.
$1,420,907 $3,329,907 2020/21 $1,909,000
$3,271,477 $1,362,477 2022/23 ($1,909,000)
CMAQ $357,000 $0 2019/20 CMAQ ($357,000)
City Funds $46,000 $0 2019/20 Local Funds ($46,000)
CMAQ $0 $357,000 2022/23 CMAQ $357,000
City Funds $0 $46,000 2022/23 Local Funds $46,000
CMAQ $0 $543,582 2019/20 CMAQ $543,582
City Funds $0 $70,427 2019/20 Local Funds $70,427
18/19 19/20 20/21 21/22 22/23 Total
FTA5307 $239,773 $0 $0 $0 $0 $239,773
FTA 5339 $0 $0 $0 $0 $0 $0
SHOPP $1,700,000 $5,200,000 $0 $0 $0 $6,900,000
HSIP $0 $0 $0 $934,600 $0 $934,600
HBP $0 $0 $1,909,000 $0 ($1,909,000) $0
CMAQ $0 $186,582 $0 $0 $357,000 $543,582
City Funds $0 $24,427 $0 $0 $46,000 $70,427
TDA $0 $0 $0 $0 $0 $0
Total $1,939,773 $5,411,009 $1,909,000 $934,600 ($1,506,000) $8,688,382
Summary of Changes by Funding Source and Federal Fiscal Year
CON
$403,000
-89%
89%
19%
The CON phase of the project will be
postponed to outer year. Funding shown in
2022/23 for information purpose.
9 NEW 216-0000-0220 CMAQ CON $614,009 100% New project added to 2019 FTIP.
8 Existing 216-0000-0208 CMAQ CON
($403,000)
4 NEW 216-0000-0219FTA5339 Purchase New Bus for
Service Extension$213,000 2018/19CON
3 Existing 216-0000-0218FTA5339 Purchase CNG Engine
for Bus RehabilitationCON
2 2018/19 ($83,000) -100% Project sponsor deleted project.
Cost change. Add $239,773 to CON. $239,773
New SHOPP Roadway Preservation Project
added to 2019 FTIP. See grouped project
listings for detailed project descriptions.
Existing 216-0000-0217FTA5339 Transit Facility
MaintenanceCON
2018/19 ($130,000) -100% Project sponsor deleted project.
100% New project added to 2019 FTIP.
Existing 316-0000-0000Grouped Project Listing for
SHOPP - Roadway Preservation
$2,500,000 $2,739,773 2018/19
HBP 0%
SHOPP
FTA5307-Urbanized
Area Formula Grants$239,773 10%
SHOPP-AC
Change of schedule for the project. See
grouped project listings for detailed project
description.
$0
$6,900,000
1 Existing 216-0000-0044Kings County Area Public Transit
Agency FTA-Urban (5307)
Operating Assistance
FTA5307-Urbanized
Area Formula ProgramCON
Existing7 216-0000-0033 HBP CON HBP
5
Kings County - Federal Transportation Improvement Program(Dollars in Whole)
Transit SystemDIST:06
PPNO:
EA:
CTIPS ID:216-0000-0044
CT PROJECT ID:
MPO ID.:KCAPTA031
COUNTY:Kings County
ROUTE:
PM:
TITLE (DESCRIPTION):KCAPTA - FTA 5307 - Operating (Kings County AreaPublic Transit AgencyFTA-Urban (5307) Operating Assistance)
MPO Aprv: 08/22/2018
State Aprv: 11/02/2018
Federal Aprv: 12/17/2018
EPA TABLE II or III EXEMPT CATEGORY
Transit operating assistance.
IMPLEMENTING AGENCY: Kings County Area Public Transit Agency PROJECT MANAGER: ANGIE DOW PHONE: (559) 582-3211 EMAIL:
PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)
Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE
22 Official 08/22/2018 YLUO Adoption - Carry Over 0 39,758,000
21 Official 11/15/2018 YLUO Amendment - Cost/Scope/Sch. Change 14 39,998,000
20 Official 11/29/2017 YLUO Amendment - Cost/Scope/Sch. Change 7 39,758,000
19 Official 09/28/2016 TKING Adoption - Carry Over 0 39,611,000
18 Official 07/11/2016 TKING Amendment - Cost/Scope/Sch. Change 10 35,222,000
17 Official 11/18/2015 TKING Amendment - Cost/Scope/Sch. Change 8 32,618,000
16 Official 07/30/2014 BABANATH Adoption - Carry Over 0 34,551,000
15 Official 09/22/2014 BABANATH Amendment - Cost/Scope/Sch. Change 11 32,445,000
14 Official 07/08/2013 BABANATH Amendment - Cost/Scope/Sch. Change 4 34,551,000
* FTA Funds - * Fund Source 1 of 2 * Fund Type: FTA5307 - Urbanized Area FormulaProgram * Funding Agency: Kings County Area Public TransitAgency
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 13,543,000 2,500,000 2,500,000 2,500,000 2,500,000 23,543,000
Total: 13,543,000 2,500,000 2,500,000 2,500,000 2,500,000 23,543,000
* Local Funds - * Fund Source 2 of 2 * Fund Type: Local Transportation Funds * Funding Agency: Kings County Area Public TransitAgency
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 16,215,000 16,215,000
Total: 16,215,000 16,215,000
Project Total: PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 29,758,000 2,500,000 2,500,000 2,500,000 2,500,000 39,758,000
Total: 29,758,000 2,500,000 2,500,000 2,500,000 2,500,000 39,758,000
Comments:******** Version 1 - 05/03/18 ********Project data transfered from 2016 FTIP.
******** Version 20 - 11/29/2017 **************** Version 1 - 07/18/16 ********Includes Toll Credit Match each yearProject data transfered from 2014 FTIP.******** Version 18 - 07/01/2016 ********Adds $1,302,236 Toll Credits to FY 16/17******** Version 17 - 11/09/2015 ********Adds $1,283,423 Toll Credits to FY 15/16
******** DFTIP Version 1 - 05/02/2014 **************** Version 14 - 06/18/2013 ********Includes $1,525,000 Toll Credits matching******** DFTIP Version 1 - 04/25/2012 ********RTP page: 6-372% escalation each year of 4-year element******** Version 11 - 06/27/2011 **************** Version 10 - 06/27/2011 **************** Version 9 - 07/12/2010 **************** Version 8 - 05/12/2010 **************** Version 7 - 11/26/2008 **************** Version 6 - 05/01/2008 ********
Products of CTIPS Page 1 01/04/2019 02:50:06
Kings County - Federal Transportation Improvement Program(Dollars in Whole)
Transit SystemDIST:06
PPNO:
EA:
CTIPS ID:216-0000-0044
CT PROJECT ID:
MPO ID.:KCAPTA031
COUNTY:Kings County
ROUTE:
PM:
TITLE (DESCRIPTION):KCAPTA - FTA 5307 - Operating (Kings County AreaPublic Transit AgencyFTA-Urban (5307) Operating Assistance)
MPO Aprv:
State Aprv:
Federal Aprv:
EPA TABLE II or III EXEMPT CATEGORY
Transit operating assistance.
IMPLEMENTING AGENCY: Kings County Area Public Transit Agency PROJECT MANAGER: ANGIE DOW PHONE: (559) 582-3211 EMAIL:
PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)
Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE
23 Active 01/07/2019 YLUO Amendment - Cost/Scope/Sch. Change 1 39,998,000
22 Official 08/22/2018 YLUO Adoption - Carry Over 0 39,758,000
21 Official 11/15/2018 YLUO Amendment - Cost/Scope/Sch. Change 14 39,998,000
20 Official 11/29/2017 YLUO Amendment - Cost/Scope/Sch. Change 7 39,758,000
19 Official 09/28/2016 TKING Adoption - Carry Over 0 39,611,000
18 Official 07/11/2016 TKING Amendment - Cost/Scope/Sch. Change 10 35,222,000
17 Official 11/18/2015 TKING Amendment - Cost/Scope/Sch. Change 8 32,618,000
16 Official 07/30/2014 BABANATH Adoption - Carry Over 0 34,551,000
15 Official 09/22/2014 BABANATH Amendment - Cost/Scope/Sch. Change 11 32,445,000
* FTA Funds - * Fund Source 1 of 2 * Fund Type: FTA5307 - Urbanized Area FormulaProgram * Funding Agency: Kings County Area Public TransitAgency
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 13,543,000 2,740,000 2,500,000 2,500,000 2,500,000 23,783,000
Total: 13,543,000 2,740,000 2,500,000 2,500,000 2,500,000 23,783,000
* Local Funds - * Fund Source 2 of 2 * Fund Type: Local Transportation Funds * Funding Agency: Kings County Area Public TransitAgency
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 16,215,000 16,215,000
Total: 16,215,000 16,215,000
Project Total: PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 29,758,000 2,740,000 2,500,000 2,500,000 2,500,000 39,998,000
Total: 29,758,000 2,740,000 2,500,000 2,500,000 2,500,000 39,998,000
Products of CTIPS Page 1 01/07/2019 02:35:47
Kings County - Federal Transportation Improvement Program(Dollars in Whole)
Local Highway SystemDIST:06
PPNO:
EA:
CTIPS ID:216-0000-0217
CT PROJECT ID:
MPO ID.:FTA5339A
COUNTY:Kings County
ROUTE:
PM:
TITLE (DESCRIPTION):Transit Facility Maintenance (KCAPTATransit Facility Maintenance)
MPO Aprv: 08/22/2018
State Aprv: 11/02/2018
Federal Aprv: 12/17/2018
EPA TABLE II or III EXEMPT CATEGORY
Reconstruction of transit structures.
IMPLEMENTING AGENCY: Kings County Area Public Transit Agency PROJECT MANAGER: Angie Dow PHONE: EMAIL:
PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)
Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE
1 Official 08/22/2018 YLUO Adoption - 0 83,000
* FTA Funds - * Fund Source 1 of 2 * Fund Type: Bus and Bus Facilities Program - FTA 5339 * Funding Agency:
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 66,000 66,000
Total: 66,000 66,000
* Local Funds - * Fund Source 2 of 2 * Fund Type: TDA * Funding Agency:
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 17,000 17,000
Total: 17,000 17,000
Project Total: PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 83,000 83,000
Total: 83,000 83,000
Comments:******** Version 1 - 06/08/2018 ********
Products of CTIPS Page 1 01/07/2019 02:19:13
Kings County - Federal Transportation Improvement Program(Dollars in Whole)
Local Highway SystemDIST:06
PPNO:
EA:
CTIPS ID:216-0000-0217
CT PROJECT ID:
MPO ID.:FTA5339A
COUNTY:Kings County
ROUTE:
PM:
TITLE (DESCRIPTION):Transit Facility Maintenance (KCAPTATransit Facility Maintenance)
MPO Aprv:
State Aprv:
Federal Aprv:
EPA TABLE II or III EXEMPT CATEGORY
Reconstruction of transit structures.
IMPLEMENTING AGENCY: Kings County Area Public Transit Agency PROJECT MANAGER: Angie Dow PHONE: EMAIL:
PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)
Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE
2 Active 01/07/2019 YLUO Amendment - Delete Project 1
1 Official 08/22/2018 YLUO Adoption - 0 83,000
Fund Source 0 of 0
Fund Type
Funding Agency
PRIOR 08/09 09/10 10/11 11/12 12/13 13/14 BEYOND TOTALPE RW CON Total:
Comments:******** Version 2 - 01/07/2019 **************** Version 1 - 06/08/2018 ********
Products of CTIPS Page 1 01/07/2019 02:37:23
Kings County - Federal Transportation Improvement Program(Dollars in Whole)
Local Highway SystemDIST:06
PPNO:
EA:
CTIPS ID:216-0000-0218
CT PROJECT ID:
MPO ID.:FTA5339B
COUNTY:Kings County
ROUTE:
PM:
TITLE (DESCRIPTION):Purchase CNG Engine for Bus Rehabilitation (KCAPTAPurchase CNG Engine for Bus Rehabilitation)
MPO Aprv: 08/22/2018
State Aprv: 11/02/2018
Federal Aprv: 12/17/2018
EPA TABLE II or III EXEMPT CATEGORY
Purchase of vehicle operating equipment.
IMPLEMENTING AGENCY: Kings County Area Public Transit Agency PROJECT MANAGER: Angie Dow PHONE: EMAIL:
PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)
Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE
1 Official 08/22/2018 YLUO Adoption - 0 130,000
* FTA Funds - * Fund Source 1 of 2 * Fund Type: Bus and Bus Facilities Program - FTA 5339 * Funding Agency:
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 104,000 104,000
Total: 104,000 104,000
* Local Funds - * Fund Source 2 of 2 * Fund Type: TDA * Funding Agency:
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 26,000 26,000
Total: 26,000 26,000
Project Total: PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 130,000 130,000
Total: 130,000 130,000
Comments:******** Version 1 - 06/08/2018 ********
Products of CTIPS Page 1 01/04/2019 02:51:36
Kings County - Federal Transportation Improvement Program(Dollars in Whole)
Local Highway SystemDIST:06
PPNO:
EA:
CTIPS ID:216-0000-0218
CT PROJECT ID:
MPO ID.:FTA5339B
COUNTY:Kings County
ROUTE:
PM:
TITLE (DESCRIPTION):Purchase CNG Engine for Bus Rehabilitation (KCAPTAPurchase CNG Engine for Bus Rehabilitation)
MPO Aprv:
State Aprv:
Federal Aprv:
EPA TABLE II or III EXEMPT CATEGORY
Purchase of vehicle operating equipment.
IMPLEMENTING AGENCY: Kings County Area Public Transit Agency PROJECT MANAGER: Angie Dow PHONE: EMAIL:
PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)
Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE
2 Active 01/07/2019 YLUO Amendment - Delete Project 1
1 Official 08/22/2018 YLUO Adoption - 0 130,000
Fund Source 0 of 0
Fund Type
Funding Agency
PRIOR 08/09 09/10 10/11 11/12 12/13 13/14 BEYOND TOTALPE RW CON Total:
Comments:******** Version 2 - 01/07/2019 **************** Version 1 - 06/08/2018 ********
Products of CTIPS Page 1 01/07/2019 02:38:13
Kings County - Federal Transportation Improvement Program(Dollars in Whole)
Transit SystemDIST:06
PPNO:
EA:
CTIPS ID:216-0000-0219
CT PROJECT ID:
MPO ID.:FTA5339
COUNTY:Kings County
ROUTE:
PM:
TITLE (DESCRIPTION):Bus Purchase (KCAPTA Purchase New Bus for ServiceExtension )
MPO Aprv:
State Aprv:
Federal Aprv:
EPA TABLE II or III EXEMPT CATEGORY
Purchase of support vehicles.
IMPLEMENTING AGENCY: Kings County Area Public Transit Agency PROJECT MANAGER: Angie Dow PHONE: EMAIL:
PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)
Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE
1 Active 01/07/2019 YLUO Amendment - New Project 1 213,000
* FTA Funds - * Fund Source 1 of 2 * Fund Type: Bus and Bus Facilities Program - FTA 5339 * Funding Agency:
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 170,000 170,000
Total: 170,000 170,000
* Other State - * Fund Source 2 of 2 * Fund Type: TDA * Funding Agency:
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 43,000 43,000
Total: 43,000 43,000
Project Total: PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 213,000 213,000
Total: 213,000 213,000
Comments:******** Version 1 - 01/07/2019 ********
Products of CTIPS Page 1 01/07/2019 02:45:20
Kings County - Federal Transportation Improvement Program(Dollars in Whole)
State Highway SystemDIST:06
PPNO:16LUMP
EA:
CTIPS ID:316-0000-0000
CT PROJECT ID:
MPO ID.:SHOPP-RP
COUNTY:Kings County
ROUTE:Var
PM:0.0 / 0.0
TITLE (DESCRIPTION):SHOPP - GP for Roadway Preservation (At VariousLocations, Grouped Projects for Pavement Resurfacingand/or Rehabilitation - SHOPP Roadway PreservationProgram(Non-Capacity Increasing Projects))
MPO Aprv: 08/22/2018
State Aprv: 11/02/2018
Federal Aprv: 12/17/2018
EPA TABLE II or III EXEMPT CATEGORY
Pavement resurfacing and/or rehabilitation.
IMPLEMENTING AGENCY: Caltrans PROJECT MANAGER: Stephen Tracey PHONE: EMAIL:
PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)
Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE
22 Official 08/22/2018 YLUO Adoption - Carry Over 0 29,225,000
21 Official 09/05/2018 YLUO Amendment - Cost/Scope/Sch. Change 13 36,125,000
20 Official 12/01/2017 YLUO Amendment - Cost/Scope/Sch. Change 6 29,225,000
19 Official 04/07/2017 YLUO Amendment - Cost/Scope/Sch. Change 2 28,714,000
18 Official 09/28/2016 TKING Adoption - Carry Over 0 28,464,000
17 Official 07/11/2016 TKING Amendment - Cost/Scope/Sch. Change 10 1,700,000
16 Official 07/30/2014 BABANATH Adoption - Carry Over 0 111,495,000
15 Official 09/25/2013 BABANATH Amendment - Cost/Scope/Sch. Change 6 111,495,000
14 Official 09/28/2012 MPOBAGDE Adoption - Carry Over 0 88,679,000
* SHOPP - Roadway Preservation - * Fund Source 1 of 1 * Fund Type: SHOPP Advance Construction (AC) * Funding Agency: Caltrans
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 29,225,000 29,225,000
Total: 29,225,000 29,225,000
Comments:******** Version 1 - 05/02/18 ********Project data transfered from 2016 FTIP.
******** Version 20 - 11/14/2017 **************** Version 19 - 03/16/2017 **************** Version 1 - 07/18/16 ********Project data transfered from 2014 FTIP.******** Version 17 - 07/01/2016 **************** DFTIP Version 1 - 04/29/2014 **************** Version 15 - 08/26/2013 ********Amend 6 adds two projects with toll credits******** DFTIP Version 1 - 05/14/2012 ********RTP page: 4-40******** Version 12 - 09/16/2011 **************** Version 11 - 05/13/2010 **************** Version 10 - 03/26/2010 **************** Version 9 - 03/18/2010 **************** Version 8 - 03/10/2009 **************** Version 7 - 05/01/2008 **************** Version 6 - 05/01/2007 **************** Version 5 - 08/22/2006 **************** Version 4 - 05/16/2006 **************** Version 3 - 06/18/04 ********Re-Generated SHOPP Lump Sum Project
******** Version 2 - 04/30/02 ********Re-Generated SHOPP Lump Sum Project
******** Version 1 - 08/10/01 ********New SHOPP Lump Sum ProjectProjects are consistent with 40 CFR Part 93.126, 127, 128, exempt Tables 2 and 3.
Products of CTIPS Page 1 01/04/2019 02:34:55
Kings County - Federal Transportation Improvement Program(Dollars in Whole)
State Highway SystemDIST:06
PPNO:16LUMP
EA:
CTIPS ID:316-0000-0000
CT PROJECT ID:
MPO ID.:SHOPP-RP
COUNTY:Kings County
ROUTE:Var
PM:0.0 / 0.0
TITLE (DESCRIPTION):SHOPP - GP for Roadway Preservation (At VariousLocations, Grouped Projects for Pavement Resurfacingand/or Rehabilitation - SHOPP Roadway PreservationProgram(Non-Capacity Increasing Projects))
MPO Aprv:
State Aprv:
Federal Aprv:
EPA TABLE II or III EXEMPT CATEGORY
Pavement resurfacing and/or rehabilitation.
IMPLEMENTING AGENCY: Caltrans PROJECT MANAGER: Stephen Tracey PHONE: EMAIL:
PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)
Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE
23 Active 01/08/2019 YLUO Amendment - Cost/Scope/Sch. Change 1 36,125,000
22 Official 08/22/2018 YLUO Adoption - Carry Over 0 29,225,000
21 Official 09/05/2018 YLUO Amendment - Cost/Scope/Sch. Change 13 36,125,000
20 Official 12/01/2017 YLUO Amendment - Cost/Scope/Sch. Change 6 29,225,000
19 Official 04/07/2017 YLUO Amendment - Cost/Scope/Sch. Change 2 28,714,000
18 Official 09/28/2016 TKING Adoption - Carry Over 0 28,464,000
17 Official 07/11/2016 TKING Amendment - Cost/Scope/Sch. Change 10 1,700,000
16 Official 07/30/2014 BABANATH Adoption - Carry Over 0 111,495,000
15 Official 09/25/2013 BABANATH Amendment - Cost/Scope/Sch. Change 6 111,495,000
* SHOPP - Roadway Preservation - * Fund Source 1 of 1 * Fund Type: SHOPP Advance Construction (AC) * Funding Agency: Caltrans
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 29,225,000 1,700,000 5,200,000 36,125,000
Total: 29,225,000 1,700,000 5,200,000 36,125,000
Comments:******** Version 23 - 01/08/2019 **************** Version 1 - 05/02/18 ********Project data transfered from 2016 FTIP.
******** Version 20 - 11/14/2017 **************** Version 19 - 03/16/2017 **************** Version 1 - 07/18/16 ********Project data transfered from 2014 FTIP.******** Version 17 - 07/01/2016 **************** DFTIP Version 1 - 04/29/2014 **************** Version 15 - 08/26/2013 ********Amend 6 adds two projects with toll credits******** DFTIP Version 1 - 05/14/2012 ********RTP page: 4-40******** Version 12 - 09/16/2011 **************** Version 11 - 05/13/2010 **************** Version 10 - 03/26/2010 **************** Version 9 - 03/18/2010 **************** Version 8 - 03/10/2009 **************** Version 7 - 05/01/2008 **************** Version 6 - 05/01/2007 **************** Version 5 - 08/22/2006 **************** Version 4 - 05/16/2006 **************** Version 3 - 06/18/04 ********Re-Generated SHOPP Lump Sum Project
******** Version 2 - 04/30/02 ********Re-Generated SHOPP Lump Sum Project
******** Version 1 - 08/10/01 ********New SHOPP Lump Sum ProjectProjects are consistent with 40 CFR Part 93.126, 127, 128, exempt Tables 2 and 3.
Products of CTIPS Page 1 01/08/2019 10:33:22
Kings County - Federal Transportation Improvement Program(Dollars in Whole)
Local Highway SystemDIST:06
PPNO:
EA:
CTIPS ID:216-0000-0153
CT PROJECT ID:
MPO ID.:HSIP
COUNTY:Kings County
ROUTE:
PM:
TITLE (DESCRIPTION):GP for Safety Improvements - HSIP (At VariousLocations,Grouped Projects for Safety Improvements - HSIPProgram)
MPO Aprv:
State Aprv:
Federal Aprv:
EPA TABLE II or III EXEMPT CATEGORY
Safety Improvement Program.
IMPLEMENTING AGENCY: Various Agencies PROJECT MANAGER: PHONE: EMAIL:
PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)
Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE
9 Active 01/04/2019 YLUO Amendment - Cost/Scope/Sch. Change 1 2,882,000
8 Official 08/22/2018 YLUO Adoption - Carry Over 0 2,882,000
7 Official 04/07/2017 YLUO Amendment - Cost/Scope/Sch. Change 2 2,882,000
6 Official 09/28/2016 TKING Adoption - Carry Over 0 2,881,000
5 Official 09/09/2015 UPARRY Amendment - Cost/Scope/Sch. Change 5 2,881,000
4 Official 07/30/2014 BABANATH Adoption - Carry Over 0 2,881,000
3 Official 04/14/2014 BABANATH Amendment - Cost/Scope/Sch. Change 8 2,881,000
2 Official 09/28/2012 MPOBAGDE Adoption - Carry Over 0 165,000
1 Official 10/03/2011 BABANATH Amendment - New Project 7 165,000
* Other Fed - * Fund Source 1 of 2 * Fund Type: Highway Safety Improvement Program * Funding Agency: Various Agencies
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 1,975,000 1,975,000
Total: 1,975,000 1,975,000
* Local Funds - * Fund Source 2 of 2 * Fund Type: Local Transportation Funds * Funding Agency: Various Agencies
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 907,000 907,000
Total: 907,000 907,000
Project Total: PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 2,882,000 2,882,000
Total: 2,882,000 2,882,000
Comments:******** Version 9 - 01/04/2019 **************** Version 1 - 05/03/18 ********Project data transfered from 2016 FTIP.
******** Version 7 - 03/17/2017 **************** Version 1 - 07/18/16 ********Project data transfered from 2014 FTIP.******** Version 5 - 09/01/2015 ********Toll Credits used for Local Match******** DFTIP Version 1 - 04/29/2014 **************** Version 3 - 03/21/2014 **************** DFTIP Version 1 - 04/25/2012 ********RTP page: 4-65******** Version 1 - 09/15/2011 ********
Products of CTIPS Page 1 01/04/2019 02:47:55
Kings County - Federal Transportation Improvement Program(Dollars in Whole)
Local Highway SystemDIST:06
PPNO:
EA:
CTIPS ID:216-0000-0153
CT PROJECT ID:
MPO ID.:HSIP
COUNTY:Kings County
ROUTE:
PM:
TITLE (DESCRIPTION):GP for Safety Improvements - HSIP (At VariousLocations,Grouped Projects for Safety Improvements - HSIPProgram)
MPO Aprv:
State Aprv:
Federal Aprv:
EPA TABLE II or III EXEMPT CATEGORY
Safety Improvement Program.
IMPLEMENTING AGENCY: Various Agencies PROJECT MANAGER: PHONE: EMAIL:
PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)
Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE
9 Active 01/14/2019 YLUO Amendment - Cost/Scope/Sch. Change 1 3,817,000
8 Official 08/22/2018 YLUO Adoption - Carry Over 0 2,882,000
7 Official 04/07/2017 YLUO Amendment - Cost/Scope/Sch. Change 2 2,882,000
6 Official 09/28/2016 TKING Adoption - Carry Over 0 2,881,000
5 Official 09/09/2015 UPARRY Amendment - Cost/Scope/Sch. Change 5 2,881,000
4 Official 07/30/2014 BABANATH Adoption - Carry Over 0 2,881,000
3 Official 04/14/2014 BABANATH Amendment - Cost/Scope/Sch. Change 8 2,881,000
2 Official 09/28/2012 MPOBAGDE Adoption - Carry Over 0 165,000
1 Official 10/03/2011 BABANATH Amendment - New Project 7 165,000
* Other Fed - * Fund Source 1 of 2 * Fund Type: Highway Safety Improvement Program * Funding Agency: Various Agencies
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 1,975,000 935,000 2,910,000
Total: 1,975,000 935,000 2,910,000
* Local Funds - * Fund Source 2 of 2 * Fund Type: Local Transportation Funds * Funding Agency: Various Agencies
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 907,000 907,000
Total: 907,000 907,000
Project Total: PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 2,882,000 935,000 3,817,000
Total: 2,882,000 935,000 3,817,000
Comments:******** Version 9 - 01/04/2019 **************** Version 1 - 05/03/18 ********Project data transfered from 2016 FTIP.
******** Version 7 - 03/17/2017 **************** Version 1 - 07/18/16 ********Project data transfered from 2014 FTIP.******** Version 5 - 09/01/2015 ********Toll Credits used for Local Match******** DFTIP Version 1 - 04/29/2014 **************** Version 3 - 03/21/2014 **************** DFTIP Version 1 - 04/25/2012 ********RTP page: 4-65******** Version 1 - 09/15/2011 ********
Products of CTIPS Page 1 01/14/2019 01:40:11
Kings County - Federal Transportation Improvement Program(Dollars in Whole)
Local Highway SystemDIST:06
PPNO:
EA:
CTIPS ID:216-0000-0033
CT PROJECT ID:
MPO ID.:KIN-HBP
COUNTY:Kings County
ROUTE:
PM:
TITLE (DESCRIPTION):HBP - Grouped Projects for Bridge (At various locations,Grouped Projects for Bridge Rehabilitation andReconstruction - HBP projects. Non-capacity increasingprojects only (includes seismic retrofit).)
MPO Aprv: 08/22/2018
State Aprv: 11/02/2018
Federal Aprv: 12/17/2018
EPA TABLE II or III EXEMPT CATEGORY
Non capacity widening or bridge reconstruction.
IMPLEMENTING AGENCY: Kings County PROJECT MANAGER: KEVIN MCALISTER PHONE: EMAIL:
PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)
Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE
26 Official 08/22/2018 YLUO Adoption - Carry Over 0 6,649,000
25 Official 04/09/2018 YLUO Amendment - Cost/Scope/Sch. Change 8 6,649,000
24 Official 04/07/2017 YLUO Amendment - Cost/Scope/Sch. Change 2 4,570,000
23 Official 09/28/2016 TKING Adoption - Carry Over 0 4,585,000
22 Official 07/11/2016 TKING Amendment - Cost/Scope/Sch. Change 10 2,980,000
21 Official 11/18/2015 TKING Amendment - Cost/Scope/Sch. Change 8 2,405,000
20 Official 01/20/2015 TKING Amendment - Cost/Scope/Sch. Change 2 12,325,800
19 Official 07/30/2014 BABANATH Adoption - Carry Over 0 12,280,000
18 Official 04/14/2014 BABANATH Amendment - Cost/Scope/Sch. Change 8 12,280,000
* Local HBRR - Local FHWA - HBRR * Fund Source 1 of 2 * Fund Type: Highway Bridge Program * Funding Agency: Caltrans
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 983,000 1,421,000 478,000 3,271,000 6,153,000
Total: 983,000 1,421,000 478,000 3,271,000 6,153,000
* Local Funds - * Fund Source 2 of 2 * Fund Type: County Funds * Funding Agency: Various Agencies
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 73,000 184,000 62,000 177,000 496,000
Total: 73,000 184,000 62,000 177,000 496,000
Project Total: PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 1,056,000 1,605,000 540,000 3,448,000 6,649,000
Total: 1,056,000 1,605,000 540,000 3,448,000 6,649,000
Comments:******** Version 1 - 05/02/18 ********Project data transfered from 2016 FTIP.
******** Version 25 - 04/06/2018 **************** Version 24 - 03/16/2017 **************** Version 1 - 07/18/16 ********Project data transfered from 2014 FTIP.******** Version 22 - 07/01/2016 **************** Version 21 - 09/30/2015 **************** Version 20 - 01/02/2015 **************** DFTIP Version 1 - 04/29/2014 **************** Version 18 - 01/27/2014 **************** Version 17 - 06/18/2013 **************** Version 16 - 12/26/2012 ********Toll Credits used for off-system, bridges******** DFTIP Version 1 - 04/25/2012 ********RTP page: 4-65******** Version 14 - 01/30/2012 **************** Version 13 - 05/09/2011 **************** Version 12 - 12/27/2010 ********Toll Credits matching reduced in Prior years and added in FY's 10/11, 11/12, and 13/14******** Version 11 - 07/06/2010**************** Version 10 - 04/15/2010 **************** Version 9 - 03/01/2010 ******Version 8 -05/01/2008 ******* Version 7 - 03/05/2007 ******** Version 6 - 05/16/2006 ******** Version 5 - 04/15/2005 ******** Version 4 - 12/28/2004 *******Version 3 - 06/16/2004 ******** Version 2 - 02/08/2002 ********
Products of CTIPS Page 1 01/04/2019 01:55:20
Kings County - Federal Transportation Improvement Program(Dollars in Whole)
Local Highway SystemDIST:06
PPNO:
EA:
CTIPS ID:216-0000-0033
CT PROJECT ID:
MPO ID.:KIN-HBP
COUNTY:Kings County
ROUTE:
PM:
TITLE (DESCRIPTION):HBP - Grouped Projects for Bridge (At various locations,Grouped Projects for Bridge Rehabilitation andReconstruction - HBP projects. Non-capacity increasingprojects only (includes seismic retrofit).)
MPO Aprv:
State Aprv:
Federal Aprv:
EPA TABLE II or III EXEMPT CATEGORY
Non capacity widening or bridge reconstruction.
IMPLEMENTING AGENCY: Kings County PROJECT MANAGER: KEVIN MCALISTER PHONE: EMAIL:
PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)
Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE
27 Active 01/07/2019 YLUO Amendment - Cost/Scope/Sch. Change 1 6,649,000
26 Official 08/22/2018 YLUO Adoption - Carry Over 0 6,649,000
25 Official 04/09/2018 YLUO Amendment - Cost/Scope/Sch. Change 8 6,649,000
24 Official 04/07/2017 YLUO Amendment - Cost/Scope/Sch. Change 2 4,570,000
23 Official 09/28/2016 TKING Adoption - Carry Over 0 4,585,000
22 Official 07/11/2016 TKING Amendment - Cost/Scope/Sch. Change 10 2,980,000
21 Official 11/18/2015 TKING Amendment - Cost/Scope/Sch. Change 8 2,405,000
20 Official 01/20/2015 TKING Amendment - Cost/Scope/Sch. Change 2 12,325,800
19 Official 07/30/2014 BABANATH Adoption - Carry Over 0 12,280,000
* Local HBRR - Local FHWA - HBRR * Fund Source 1 of 2 * Fund Type: Highway Bridge Program * Funding Agency: Caltrans
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 983,000 3,330,000 478,000 1,362,000 6,153,000
Total: 983,000 3,330,000 478,000 1,362,000 6,153,000
* Local Funds - * Fund Source 2 of 2 * Fund Type: County Funds * Funding Agency: Various Agencies
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 73,000 184,000 62,000 177,000 496,000
Total: 73,000 184,000 62,000 177,000 496,000
Project Total: PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 1,056,000 3,514,000 540,000 1,539,000 6,649,000
Total: 1,056,000 3,514,000 540,000 1,539,000 6,649,000
Comments:******** Version 27 - 01/07/2019 **************** Version 1 - 05/02/18 ********Project data transfered from 2016 FTIP.
******** Version 25 - 04/06/2018 **************** Version 24 - 03/16/2017 **************** Version 1 - 07/18/16 ********Project data transfered from 2014 FTIP.******** Version 22 - 07/01/2016 **************** Version 21 - 09/30/2015 **************** Version 20 - 01/02/2015 **************** DFTIP Version 1 - 04/29/2014 **************** Version 18 - 01/27/2014 **************** Version 17 - 06/18/2013 **************** Version 16 - 12/26/2012 ********Toll Credits used for off-system, bridges******** DFTIP Version 1 - 04/25/2012 ********RTP page: 4-65******** Version 14 - 01/30/2012 **************** Version 13 - 05/09/2011 **************** Version 12 - 12/27/2010 ********Toll Credits matching reduced in Prior years and added in FY's 10/11, 11/12, and 13/14******** Version 11 - 07/06/2010**************** Version 10 - 04/15/2010 **************** Version 9 - 03/01/2010 ******Version 8 -05/01/2008 ******* Version 7 - 03/05/2007 ******** Version 6 - 05/16/2006 ******** Version 5 - 04/15/2005 ******** Version 4 - 12/28/2004 *******
Products of CTIPS Page 1 01/07/2019 04:09:02
Kings County - Federal Transportation Improvement Program(Dollars in Whole)
Local Highway SystemDIST:06
PPNO:
EA:
CTIPS ID:216-0000-0208
CT PROJECT ID:
MPO ID.:CM5091D
COUNTY:Kings County
ROUTE:
PM:
TITLE (DESCRIPTION):Signal at 12th and Hume (In Hanford,At the intersection of 12th Ave. and Hume Ave.Install Traffic Signal)
MPO Aprv: 08/22/2018
State Aprv: 11/02/2018
Federal Aprv: 12/17/2018
EPA TABLE II or III EXEMPT CATEGORY
Intersection signalization projects.
IMPLEMENTING AGENCY: Hanford, City of PROJECT MANAGER: Lou Camara PHONE: EMAIL:
PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)
Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE
2 Official 08/22/2018 YLUO Adoption - Carry Over 0 403,000 50,000
1 Official 04/07/2017 YLUO Amendment - New Project 2 403,000 50,000
* CMAQ - * Fund Source 1 of 2 * Fund Type: Congestion Mitigation * Funding Agency:
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE 44,000 44,000
RW
CON 357,000 357,000
Total: 401,000 401,000
* Local Funds - * Fund Source 2 of 2 * Fund Type: Developer Fees * Funding Agency:
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE 6,000 6,000
RW
CON 46,000 46,000
Total: 52,000 52,000
Project Total: PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE 50,000 50,000
RW
CON 403,000 403,000
Total: 453,000 453,000
Comments:******** Version 1 - 05/02/18 ********Project data transfered from 2016 FTIP.
******** Version 1 - 03/16/2017 ********
Products of CTIPS Page 1 01/08/2019 11:49:54
Kings County - Federal Transportation Improvement Program(Dollars in Whole)
Local Highway SystemDIST:06
PPNO:
EA:
CTIPS ID:216-0000-0208
CT PROJECT ID:
MPO ID.:CM5091D
COUNTY:Kings County
ROUTE:
PM:
TITLE (DESCRIPTION):Signal at 12th and Hume (In Hanford,At the intersection of 12th Ave. and Hume Ave.Install Traffic Signal)
MPO Aprv:
State Aprv:
Federal Aprv:
EPA TABLE II or III EXEMPT CATEGORY
Intersection signalization projects.
IMPLEMENTING AGENCY: Hanford, City of PROJECT MANAGER: Lou Camara PHONE: EMAIL:
PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)
Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE
3 Active 01/08/2019 YLUO Amendment - Cost/Scope/Sch. Change 1 403,000 50,000
2 Official 08/22/2018 YLUO Adoption - Carry Over 0 403,000 50,000
1 Official 04/07/2017 YLUO Amendment - New Project 2 403,000 50,000
* CMAQ - * Fund Source 1 of 2 * Fund Type: Congestion Mitigation * Funding Agency:
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE 44,000 44,000
RW
CON 357,000 357,000
Total: 44,000 357,000 401,000
* Local Funds - * Fund Source 2 of 2 * Fund Type: Developer Fees * Funding Agency:
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE 6,000 6,000
RW
CON 46,000 46,000
Total: 6,000 46,000 52,000
Project Total: PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE 50,000 50,000
RW
CON 403,000 403,000
Total: 50,000 403,000 453,000
Comments:******** Version 3 - 01/08/2019 **************** Version 1 - 05/02/18 ********Project data transfered from 2016 FTIP.
******** Version 1 - 03/16/2017 ********
Products of CTIPS Page 1 01/08/2019 04:00:33
Kings County - Federal Transportation Improvement Program(Dollars in Whole)
Local Highway SystemDIST:06
PPNO:
EA:
CTIPS ID:216-0000-0220
CT PROJECT ID:
MPO ID.:CM5091C
COUNTY:Kings County
ROUTE:
PM:
TITLE (DESCRIPTION):Purchase PM-10 Street Sweepers (In Hanford, PurchasePM-10 Street Sweepers)
MPO Aprv:
State Aprv:
Federal Aprv:
EPA TABLE II or III EXEMPT CATEGORY
Non construction related activities.
IMPLEMENTING AGENCY: Hanford, City of PROJECT MANAGER: Lou Camara PHONE: EMAIL:
PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole)
Version Status Date Updated By Change Reason Amend No. Prog Con Prog RW PE
1 Active 01/08/2019 YLUO Amendment - New Project 1 615,000
* CMAQ - * Fund Source 1 of 2 * Fund Type: Congestion Mitigation * Funding Agency:
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 545,000 545,000
Total: 545,000 545,000
* Local Funds - * Fund Source 2 of 2 * Fund Type: City Funds * Funding Agency:
PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 70,000 70,000
Total: 70,000 70,000
Project Total: PRIOR 18-19 19-20 20-21 21-22 22-23 23-24 BEYOND TOTAL
PE
RW
CON 615,000 615,000
Total: 615,000 615,000
Comments:******** Version 1 - 01/08/2019 ********
Products of CTIPS Page 1 01/08/2019 04:01:57
ATTACHMENT 2
Updated Financial Summary
TABLE 1: REVENUE
Funding Source
Prior Current Prior Current Prior Current Prior Current
No. 00 No. 01 No. 00 No. 01 No. 00 No. 01 No. 00 No. 01
Sales Tax
City
County
Gas Tax
Gas Tax (Subventions to Cities)
Gas Tax (Subventions to Counties)
Other Local Funds $239 $239 $93 $117 $391 $391 $263 $263 $1,010
County General Funds $136 $136 $17 $17 $320 $320 $62 $62 $535
City General Funds $103 $103 $18 $42 $71 $71 $144 $144 $360
Street Taxes and Developer Fees $58 $58 $57 $57 $115
RSTP Exchange funds
Transit
Transit Fares
Other (See Appendix 1) $573 $573 $1,375 $1,375 $492 $492 $467 $467 $2,907
Local Total $812 $812 $1,468 $1,492 $883 $883 $730 $730 $3,917
Tolls
Bridge
Corridor
Regional Sales Tax
Other (See Appendix 2)
Regional Total
State Highway Operations and Protection Program (SHOPP) 1 $6,093 $7,793 $21,507 $26,707 $6,400 $6,400 $27,894 $27,894 $68,794
SHOPP $6,093 $7,793 $21,507 $26,707 $6,400 $6,400 $27,894 $27,894 $68,794
SHOPP Prior
State Minor Program
State Transportation Improvement Program (STIP) 1
$298 $298 $298
STIP $298 $298 $298
STIP Prior
State Bond
Proposition 1A (High Speed Passenger Train Bond Program)
Proposition 1B (Highway Safety, Traffic Reduction, Air Quality, and Port Security Bond Act of 2006)
Active Transportation Program (ATP) 1
Highway Maintenance (HM) Program 1
Highway Bridge Program (HBP) 1 $1,421 $3,330 $478 $478 $3,808
Road Repair and Accountability Act of 2017 (SB1)
Traffic Congestion Relief Program (TCRP)
State Transit Assistance (STA)(e.g., population/revenue based, Prop 42)
Other (See Appendix 3)
State Total $6,093 $7,793 $21,805 $27,005 $7,821 $9,730 $28,372 $28,372 $72,900
5307 - Urbanized Area Formula Grants $2,500 $2,740 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $10,240
5309 - Fixed Guideway Capital Investment Grants
5309b - New and Small Starts (Capital Investment Grants)
5309c - Bus and Bus Related Grants
5310 - Enhanced Mobility of Seniors and Individuals with Disabilities
5311 - Formula Grants for Rural Areas $370 $370 $410 $410 $410 $410 $410 $410 $1,600
5311f - Intercity Bus
5337 - State of Good Repair Grants
5339 - Bus and Bus Facilities Formula Grants $170 $170 $170
FTA Transfer from Prior FTIP
Other (See Appendix 4)
Federal Transit Total $3,040 $3,280 $2,910 $2,910 $2,910 $2,910 $2,910 $2,910 $12,010
Congestion Mitigation and Air Quality (CMAQ) Improvement Program $1,918 $1,922 $1,956 $1,956 $1,955 $1,955 $1,955 $1,955 $7,788
Construction of Ferry Boats and Ferry Terminal Facilities (Ferry Boat Program)
Coordinated Border Infrastructure Program
Federal Lands Access Program
Federal Lands Transportation Program
GARVEE Bonds Debt Service Payments
Highway Infrastructure Program (HIP) $397 $397 $397
Highway Infrastructure Program (HIP) - PRIOR
High Priority Projects (HPP) and Demo
Highway Safety Improvement Program (HSIP) $935 $935
National Highway Freight Program (NHFP)
Nationally Significant Freight and Highway Projects (FASTLANE/INFRA Grants)
Railway-Highway Crossings Program
Recreational Trails Program
SAFETEA-LU Safe Routes to School (SRTS)
Surface Transportation Block Grant Program (STBGP/RSTP)
Other (see Appendix 5)
Federal Highway Total $1,918 $1,922 $1,956 $1,956 $2,352 $2,352 $1,955 $2,890 $9,120
Other Federal Railroad Administration (see Appendix 6)
Federal Railroad Administration Total
Federal Total $4,958 $5,202 $4,866 $4,866 $5,262 $5,262 $4,865 $5,800 $21,130
TIFIA (Transportation Infrastructure Finance and Innovation Act)
Other (See Appendix 7)
Innovative Financing Total
$11,863 $13,807 $28,139 $33,363 $13,966 $15,875 $33,967 $34,902 $97,947
Financial Summary Notes:1 State Programs that include both state and federal funds
N
O
T
E
S
TOTAL
CURRENT
Amendment Amendment Amendment Amendment
FY 2019
KINGS COUNTY ASSOCIATION OF GOVERNMENTS
2019 Federal Transportation Improvement Program
Amendment 01
($'s in 1,000)
REVENUE TOTAL
FE
DE
RA
L
RA
ILS
TA
TE
LO
CA
LF
ED
ER
AL
TR
AN
SIT
INN
OV
AT
IVE
FIN
AN
CE
RE
GIO
NA
LF
ED
ER
AL
HIG
HW
AY
FY 2020 FY 2021 FY 2022
4 YEAR (FTIP Period)
Caltrans, Division of Transportation Programming
Office of Federal Transportation Management Program
LG: Revised 6/5/2018
TABLE 1: REVENUE - APPENDICES
KINGS COUNTY ASSOCIATION OF GOVERNMENTS
2019 Federal Transportation Improvement Program
Amendment 01
($'s in 1,000)
Appendix 1 - Local Other
CURRENT
Prior Current Prior Current Prior Current Prior Current TOTAL
Local Transportation Fund (LTF) $530 $530 $1,375 $1,375 $492 $492 $467 $467 $2,864
State Transit Assistance $43 $43 $43
Local Other Total $573 $573 $1,375 $1,375 $492 $492 $467 $467 $2,907
Appendix 2 - Regional Other
CURRENT
Prior Current Prior Current Prior Current Prior Current TOTAL
Regional Other Total
Appendix 3 - State Other
CURRENT
Prior Current Prior Current Prior Current Prior Current TOTAL
State Other Total
Appendix 4 - Federal Transit Other
CURRENT
Prior Current Prior Current Prior Current Prior Current TOTAL
Federal Transit Other Total
Appendix 5 - Federal Highway Other
CURRENT
Prior Current Prior Current Prior Current Prior Current TOTAL
Federal Highway Other Total
Appendix 6 - Federal Railroad Administration Other
CURRENT
Prior Current Prior Current Prior Current Prior Current TOTAL
Federal Railroad Administration Other Total
Appendix 7 - Innovative Other
CURRENT
Prior Current Prior Current Prior Current Prior Current TOTAL
Innovative Other Total
FY 2019 FY 2020 FY 2021 FY 2022
FY 2019FY 2020 FY 2021 FY 2022
FY 2022
FY 2019 FY 2020 FY 2021 FY 2022
FY 2019 FY 2022FY 2020 FY 2021
Federal Railroad Administration Other
FY 2019 FY 2020 FY 2021 FY 2022
FY 2019 FY 2020 FY 2021 FY 2022
FY 2019 FY 2020 FY 2021
Innovative Other
Local Other
Regional Other
State Other
Federal Transit Other
Federal Highway Other
Page 2 of 5
TABLE 2: PROGRAMMED
FUNDING SOURCES
Prior Current Prior Current Prior Current Prior Current
No. 00 No. 01 No. 00 No. 01 No. 00 No. 01 No. 00 No. 01
Local Total $812 $812 $1,468 $1,492 $883 $883 $730 $730 $3,917
Tolls
Bridge
Corridor
Regional Sales Tax
Other (See Appendix A)
Regional Total
State Highway Operations and Protection Program (SHOPP) 1 $6,093 $7,793 $21,507 $26,707 $6,400 $6,400 $27,894 $27,894 $68,794
SHOPP $6,093 $7,793 $21,507 $26,707 $6,400 $6,400 $27,894 $27,894 $68,794
SHOPP Prior
State Minor Program
State Transportation Improvement Program (STIP) 1 $298 $298 $298
STIP $298 $298 $298
STIP Prior
State Bond
Proposition 1A (High Speed Passenger Train Bond Program)
Proposition 1B (Highway Safety, Traffic Reduction, Air Quality, and Port Security Bond Act of 2006)
Active Transportation Program 1
Highway Maintenance (HM) Program 1
Highway Bridge Program (HBP) 1 $1,421 $3,330 $478 $478 $3,808
Road Repair and Accountability Act of 2017 (SB1)
Traffic Congestion Relief Program (TCRP)
State Transit Assistance (STA)(e.g., population/revenue based, Prop 42)
Other (See Appendix B)
State Total $6,093 $7,793 $21,805 $27,005 $7,821 $9,730 $28,372 $28,372 $72,900
5307 - Urbanized Area Formula Grants $2,500 $2,740 $2,500 $2,500 $2,500 $2,500 $2,500 $2,500 $10,240
5309 - Fixed Guideway Capital Investment Grants
5309b - New and Small Starts (Capital Investment Grants)
5309c - Bus and Bus Related Grants
5310 - Enhanced Mobility of Seniors and Individuals with Disabilities
5311 - Formula Grants for Rural Areas $370 $370 $410 $410 $410 $410 $410 $410 $1,600
5311f - Intercity Bus
5337 - State of Good Repair Grants
5339 - Bus and Bus Facilities Formula Grants $170 $170 $170
FTA Transfer from Prior FTIP
Other (See Appendix C)
Federal Transit Total $3,040 $3,280 $2,910 $2,910 $2,910 $2,910 $2,910 $2,910 $12,010
Congestion Mitigation and Air Quality (CMAQ) Improvement Program $1,816 $1,816 $1,770 $1,956 $1,944 $1,944 $1,805 $1,805 $7,521
Construction of Ferry Boats and Ferry Terminal Facilities (Ferry Boat Program)
Coordinated Border Infrastructure Program
Federal Lands Access Program
Federal Lands Transportation Program
GARVEE Bonds Debt Service Payments
Highway Infrastructure Program (HIP)
Highway Infrastructure Program (HIP) - PRIOR
High Priority Projects (HPP) and Demo
Highway Safety Improvement Program (HSIP) $935 $935
National Highway Freight Program (NHFP)
Nationally Significant Freight and Highway Projects (FASTLANE/INFRA Grants)
Railway-Highway Crossings Program
Recreational Trails Program
SAFETEA-LU Safe Routes to School (SRTS)
Surface Transportation Block Grant Program (STBGP/RSTP)
Other (see Appendix D)
Federal Highway Total $1,816 $1,816 $1,770 $1,956 $1,944 $1,944 $1,805 $2,740 $8,456
Other Federal Railroad Administration (see Appendix E)
Federal Railroad Administration Total
Federal Total $4,856 $5,096 $4,680 $4,866 $4,854 $4,854 $4,715 $5,650 $20,466
TIFIA (Transportation Infrastructure Finance and Innovation Act)
Other (See Appendix F)
Innovative Financing Total
$11,761 $13,701 $27,953 $33,363 $13,558 $15,467 $33,817 $34,752 $97,283
MPO Financial Summary Notes:1
State Programs that include both state and federal funds.
FY 2019
PROGRAMMED TOTAL
INN
OV
AT
IVE
FIN
AN
CE
RE
GIO
NA
LF
ED
ER
AL
HIG
HW
AY
FE
DE
RA
L T
RA
NS
ITS
TA
TE
KINGS COUNTY ASSOCIATION OF GOVERNMENTS2019 Federal Transportation Improvement Program
Amendment 01
($'s in 1,000)
FE
DE
RA
L
RA
ILL
OC
AL
FY 2020 FY 2021 FY 2022
4 YEAR (FTIP Period)N
O
T
E
S
TOTAL
CURRENT
Amendment Amendment Amendment Amendment
Caltrans, Division of Transportation Programming
Office of Federal Transportation Management Program
LG: Revised 6/5/2018
TABLE 2: PROGRAMMED - APPENDICES
KINGS COUNTY ASSOCIATION OF GOVERNMENTS
2019 Federal Transportation Improvement Program
Amendment 01
($'s in 1,000)
Appendix A - Regional Other
CURRENT
Prior Current Prior Current Prior Current Prior Current TOTAL
Regional Other Total
Appendix B - State Other
CURRENT
Prior Current Prior Current Prior Current Prior Current TOTAL
State Other Total
Appendix C - Federal Transit Other
CURRENT
Prior Current Prior Current Prior Current Prior Current TOTAL
Federal Transit Other Total
Appendix D - Federal Highway Other
CURRENT
Prior Current Prior Current Prior Current Prior Current TOTAL
Federal Highway Other Total
Appendix E - Federal Railroad Administration Other
CURRENT
Prior Current Prior Current Prior Current Prior Current TOTAL
Federal Railroad Administration Other Total
Appendix F - Innovative Finance Other
CURRENT
Prior Current Prior Current Prior Current Prior Current TOTAL
Innovative Other Total
FY 2019 FY 2020 FY 2021 FY 2022
FY 2019 FY 2020 FY 2021 FY 2022
FY 2019 FY 2020 FY 2021 FY 2022
FY 2019 FY 2020 FY 2021 FY 2022
FY 2019 FY 2020 FY 2021 FY 2022
FY 2019 FY 2020 FY 2021 FY 2022
Innovative Other
Regional Other
State Other
Federal Transit Other
Federal Highway Other
Federal Railroad Administration Other
Page 4 of 5
TABLE 3: REVENUE-PROGRAMMED
FUNDING SOURCES Amendment Amendment Amendment Amendment
Prior Current Prior Current Prior Current Prior Current
No. 00 No. 01 No. 00 No. 01 No. 00 No. 01 No. 00 No. 01
Local Total
Tolls
Bridge
Corridor
Regional Sales Tax
Other
Regional Total
State Highway Operations and Protection Program (SHOPP) 1
SHOPP
SHOPP Prior
State Minor Program
State Transportation Improvement Program (STIP) 1
STIP
STIP Prior
State Bond
Proposition 1A (High Speed Passenger Train Bond Program) Proposition 1B (Highway Safety, Traffic Reduction, Air Quality, and Port Security Bond Act of 2006)
Active Transportation Program 1
Highway Maintenance (HM) Program 1
Highway Bridge Program (HBP) 1
Road Repair and Accountability Act of 2017 (SB1)
Traffic Congestion Relief Program (TCRP)
State Transit Assistance (STA)(e.g., population/revenue based, Prop 42)
Other
State Total
5307 - Urbanized Area Formula Grants
5309 - Fixed Guideway Capital Investment Grants
5309b - New and Small Starts (Capital Investment Grants)
5309c - Bus and Bus Related Grants
5310 - Enhanced Mobility of Seniors and Individuals with Disabilities
5311 - Formula Grants for Rural Areas
5311f - Intercity Bus
5337 - State of Good Repair Grants
5339 - Bus and Bus Facilities Formula Grants
FTA Transfer from Prior FTIP
Other
Federal Transit Total
Congestion Mitigation and Air Quality (CMAQ) Improvement Program $102 $106 $186 $11 $11 $150 $150 $267
Construction of Ferry Boats and Ferry Terminal Facilities (Ferry Boat Program)
Coordinated Border Infrastructure Program
Federal Lands Access Program
Federal Lands Transportation Program
GARVEE Bonds Debt Service Payments
Highway Infrastructure Program (HIP) $397 $397 $397
Highway Infrastructure Program (HIP) - PRIOR
High Priority Projects (HPP) and Demo
Highway Safety Improvement Program (HSIP)
National Highway Freight Program (NHFP)
Nationally Significant Freight and Highway Projects (FASTLANE/INFRA Grants)
Railway-Highway Crossings Program
Recreational Trails Program
SAFETEA-LU Safe Routes to School (SRTS)
Surface Transportation Block Grant Program (STBGP/RSTP)
Other
Federal Highway Total $102 $106 $186 $408 $408 $150 $150 $664
Other Federal Railroad Administration
Federal Railroad Administration Total
Federal Total $102 $106 $186 $408 $408 $150 $150 $664
TIFIA (Transportation Infrastructure Finance and Innovation Act)
Other
Innovative Financing Total
$102 $106 $186 $408 $408 $150 $150 $664REVENUE - PROGRAM TOTAL
LO
CA
LR
EG
ION
AL
FE
DE
RA
L H
IGH
WA
YIN
NO
VA
TIV
E
FIN
AN
CE
FE
DE
RA
L T
RA
NS
ITF
ED
ER
AL
RA
ILS
TA
TE
KINGS COUNTY ASSOCIATION OF GOVERNMENTS2019 Federal Transportation Improvement Program
Amendment 01
($'s in 1,000)
TOTAL
CURRENT
4 YEAR (FTIP Period)
FY 2019 FY 2020 FY 2021 FY 2022
Caltrans, Division of Transportation Programming
Office of Federal Transportation Management Program
LG: Revised 6/5/2018
ATTACHMENT 3
Grouped Project Listings
2016/17-2021/22 Highway Bridge Program
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides VERY detailed backup information to support the lump sum amounts programmed in the FTIP.
1) This list provides a very detailed history of how a project’s programming has changed over time.
2) Summary, project level, grouped backup lists are available on the local assistance web site:
http://www.dot.ca.gov/hq/LocalPrograms/hbrr99/HBP_FSTIP.html
3) Financial constraint of LOCAL matching funds (including regional STIP funds) and LOCAL Advance Construction (AC) is theresponsibility of the MPOs and their local agencies.
4) Some projects show that they are programmed using State STP funds. These funds are HBP funds transferred to the STP forbridge work that is not ordinarily eligible for HBP funds. See the HB Program Guidelines for details. Do not confuse these STPfunds with Regional STP funds.
5) Corrections to this report should be addressed to the District Local Assistance Engineer:
http://www.dot.ca.gov/hq/LocalPrograms/dlae.htm
Note id: 31
Notes:
10/26/2018, 9:28 AM
Caltrans, Division of Local Assistance Page 110/26/2018, 9:28 AM Det2 FL4 SmlTxt
2016/17-2021/22 Highway Bridge Program
District: County:Responsible Agency
06 KingsTotal
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides VERY detailed backup information to support the lump sum amountsprogrammed in the FTIP.
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
Kings County BRIDGE NO. 45C0118, 16TH AVE, OVER TULARE LAKE CANAL, 0.3 MI N NEVADA AVE. Replace 2 lane Bridge with 2 lane Bridge 8/13/2010: Toll Credits programmed for PE, R/W, & CON.
Fund Source Summary:
PER/W
Total
75,000
421,000
CON
Total
1,909,000 1,909,000
346,000
75,000
1,909,000 2,330,000
346,000
Phase Summary:
Fed $
Local AC
Local Match
Total 421,000
LSSRP Bond
Total1,909,000 2,330,000
1,909,000 2,330,000
421,000
BRLO-5945(081)Fed Proj:
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
PE Summary:
Proj id Funds Src TotalPhase
Phase Funding Details:
Fed $
Local AC
Local Match
Total 346,000
LSSRP Bond
Total346,000
346,000
346,000
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
3578 HBP PELocal Match
Total:Fed. Reimb. Rate: 100.00% 9/29/2012 Tom Glaski: Move PRE Funds to FFY 12/13 as requested by Agency in September 7, 2012 Survey. 8/21/2015 DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2012/13-17/18 to 2014/15-19/20. This does not impact funds in the current FTIP cycle.
3578 HBP 271,000PE 271,000Local Match
Total: 271,000Fed. Reimb. Rate: 100.00% 8/23/2012 Tom Glaski: Postprogammatic increase, Agency’s August 14, 2012 6A package
3578 HBP 75,000PE 75,000Local Match
Total: 75,000Fed. Reimb. Rate: 100.00% 8/13/2010 Tom Glaski: Reimbursement changed to 100% (Toll Credits).8/13/2010 Tom Glaski: Enter New Project
Caltrans, Division of Local Assistance Page 210/26/2018, 9:28 AM Det2 FL4 SmlTxt
2016/17-2021/22 Highway Bridge Program
District: County:Responsible Agency
06 KingsTotal
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides VERY detailed backup information to support the lump sum amountsprogrammed in the FTIP.
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
R/W Summary:
Proj id Funds Src TotalPhase
Phase Funding Details:
Fed $
Local AC
Local Match
Total 75,000
LSSRP Bond
Total75,000
75,000
75,000
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
3578 HBP R/WLocal Match
Total:Fed. Reimb. Rate: 100.00% 4/16/2015 Kirk Anderson: Agency requests funds in 14/15. KA 8/17/2017 DLA-Admin: Fundline zeroed out due to FTIP cycle migration:2014/15-19/20 to 2016/17-21/22. This does not impact funds in the current FTIP cycle.
3578 HBP R/WLocal Match
Total:Fed. Reimb. Rate: 100.00% 3/28/2014 DLA-Admin: Not ready to ad within 6 months. RW funds moved from FFY 13/14 to 15/16. NEPA not yet clear. 8/17/2017DLA-Admin: Fundline zeroed out due to FTIP cycle migration: 2014/15-19/20 to 2016/17-21/22. This does not impact funds in thecurrent FTIP cycle.
3578 HBP 65,000R/W 65,000Local Match
Total: 65,000Fed. Reimb. Rate: 100.00% 8/23/2012 Tom Glaski: Increase in RoW funding and push out program year to reflect Agency’s August 14, 2012 6A package
3578 HBP 10,000R/W 10,000Local Match
Total: 10,000Fed. Reimb. Rate: 100.00% 8/13/2010 Tom Glaski: Reimbursement changed to 100% (Toll Credits).8/13/2010 Tom Glaski: Enter New Project
CON Summary:
Proj id Funds Src TotalPhase
Phase Funding Details:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total1,909,000 1,909,000
1,909,000 1,909,000
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
3578 HBP CON -1,909,000 1,909,000Local Match
Total:Fed. Reimb. Rate: 100.00%
New!
10/24/2018 DLA-Admin: NEARLY Ready to Advertise. CON funds moved from FFY 19/20 to 20/21. Action taken to financially constrainthe FTIP (PUSH). Attempt will be made to program this project in year shown.
Caltrans, Division of Local Assistance Page 310/26/2018, 9:28 AM Det2 FL4 SmlTxt
2016/17-2021/22 Highway Bridge Program
District: County:Responsible Agency
06 KingsTotal
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides VERY detailed backup information to support the lump sum amountsprogrammed in the FTIP.
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
3578 HBP CON 1,909,000Local Match
Total:Fed. Reimb. Rate: 100.00%
New!
9/28/2018 Kirk Anderson: NEARLY Ready to Advertise. CON funds moved from FFY Beyond to 19/20. As requested in September 2018Survey.
-1,909,000
3578 HBP CON -1,909,000Local Match
Total:Fed. Reimb. Rate: 100.00% 10/24/2017 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 21/22 to Beyond. Action taken to financiallyconstrain the FTIP (PUSH). Attempt will be made to program this project in year shown.
1,909,000
3578 HBP CON -1,909,000 1,909,000Local Match
Total:Fed. Reimb. Rate: 100.00% 10/24/2017 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 20/21 to 21/22. Action taken to financiallyconstrain the FTIP (PUSH). Attempt will be made to program this project in year shown.
3578 HBP CON -1,909,000 1,909,000Local Match
Total:Fed. Reimb. Rate: 100.00% 10/24/2017 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 19/20 to 20/21. Action taken to financiallyconstrain the FTIP (PUSH). Attempt will be made to program this project in year shown.
3578 HBP -1,909,000CON 1,909,000Local Match
Total:Fed. Reimb. Rate: 100.00% 10/23/2017 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 18/19 to 19/20. Action taken to financiallyconstrain the FTIP (PUSH). Attempt will be made to program this project in year shown.
3578 HBP -1,909,000 1,909,000CONLocal Match
Total:Fed. Reimb. Rate: 100.00% 10/23/2017 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 17/18 to 18/19. Action taken to financiallyconstrain the FTIP (PUSH). Attempt will be made to program this project in year shown.
3578 HBP 1,909,000CONLocal Match
Total:Fed. Reimb. Rate: 100.00% 9/15/2017 Kirk Anderson: NEARLY Ready to Advertise. CON funds moved from FFY Beyond to 17/18. As requested in September 2017Survey.
-1,909,000
3578 HBP CON -1,909,000Local Match
Total:Fed. Reimb. Rate: 100.00% 10/25/2016 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 19/20 to Beyond. Action taken to financially constrain the FTIP (PUSH). Attempt will be made to program this project in year shown.
1,909,000
3578 HBP -1,909,000CON 1,909,000Local Match
Total:Fed. Reimb. Rate: 100.00% 10/25/2016 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 18/19 to 19/20. Action taken to financiallyconstrain the FTIP (PUSH). Attempt will be made to program this project in year shown.
Caltrans, Division of Local Assistance Page 410/26/2018, 9:28 AM Det2 FL4 SmlTxt
2016/17-2021/22 Highway Bridge Program
District: County:Responsible Agency
06 KingsTotal
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides VERY detailed backup information to support the lump sum amountsprogrammed in the FTIP.
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
3578 HBP -1,909,000 1,909,000CONLocal Match
Total:Fed. Reimb. Rate: 100.00% 10/25/2016 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 17/18 to 18/19. Action taken to financiallyconstrain the FTIP (PUSH). Attempt will be made to program this project in year shown.
3578 HBP -1,909,000 1,909,000CONLocal Match
Total:Fed. Reimb. Rate: 100.00% 10/25/2016 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 16/17 to 17/18. Action taken to financiallyconstrain the FTIP (PUSH). Attempt will be made to program this project in year shown.
3578 HBP 1,909,000CON -1,909,000Local Match
Total:Fed. Reimb. Rate: 100.00% 10/29/2015 DLA-Admin: Ready to Advertise. CON funds moved from FFY 15/16 to 16/17. Action taken to financially constrain the FTIP(PUSH). Attempt will be made to program this project in year shown.
3578 HBP -1,909,000CON 1,909,000Local Match
Total:Fed. Reimb. Rate: 100.00% 10/22/2015 DLA-Admin: NEARLY Ready to Advertise. CON funds moved from FFY 16/17 to 15/16. Project ready to advertise.
3578 HBP 1,909,000CONLocal Match
Total:Fed. Reimb. Rate: 100.00% 2/5/2015 Kirk Anderson: NEPA was cleared 08/13/14. The Type Selection and Hydraulic Report are approved. The construction fundsare ready to be programmed. Estimated submittal of construction authorization request is 04/2015. An attempt will be made by theagency to meet their construction window in the Fall of 2015.
-1,909,000
3578 HBP 1,209,000CONLocal Match
Total: 1,209,000Fed. Reimb. Rate: 100.00% 8/23/2012 Tom Glaski: Increase in Construction/CE funding to reflect Agency’s August 14, 2012 6A package
1,209,000
3578 HBP 700,000CONLocal Match
Total: 700,000Fed. Reimb. Rate: 100.00% 8/13/2010 Tom Glaski: Reimbursement changed to 100% (Toll Credits).8/13/2010 Tom Glaski: Enter New Project
700,000
Caltrans, Division of Local Assistance Page 510/26/2018, 9:28 AM Det2 FL4 SmlTxt
2016/17-2021/22 Highway Bridge Program
District: County:Responsible Agency
06 KingsTotal
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides VERY detailed backup information to support the lump sum amounts programmed in the FTIP.
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
Kings County BRIDGE NO. PM00144. Bridge Preventive Maintenance Program (BPMP) various bridges in the County of Kings. See Caltrans LocalAssistance HBP website for backup list of projects.
Fund Source Summary:
PER/W
Total
CON
Total
1,605,000 1,605,000
560,000 560,000
560,000 1,605,000 2,165,000
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total495,768 1,420,907 1,916,675
64,232 184,094 248,326
560,000 1,605,000 2,165,000
BPMP-5945(102)Fed Proj:
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
PE Summary:
Proj id Funds Src TotalPhase
Phase Funding Details:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total495,768 495,768
64,232 64,232
560,000 560,000
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
4340 HBP 495,768 495,768PELocal Match 64,232 64,232
Total: 560,000Fed. Reimb. Rate: 88.53% 3/7/2016 Linda Newton: New eligible BPMP Plan project.
Caltrans, Division of Local Assistance Page 610/26/2018, 9:28 AM Det2 FL4 SmlTxt
2016/17-2021/22 Highway Bridge Program
District: County:Responsible Agency
06 KingsTotal
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides VERY detailed backup information to support the lump sum amountsprogrammed in the FTIP.
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
CON Summary:
Proj id Funds Src TotalPhase
Phase Funding Details:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total1,420,907 1,420,907
184,094 184,094
1,605,000 1,605,000
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
4340 HBP CON -1,420,907 1,420,907Local Match -184,094 184,094
Total:Fed. Reimb. Rate: 88.53% 3/29/2018 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 19/20 to 20/21. Action taken to financiallyconstrain the FTIP (PUSH). Attempt will be made to program this project in year shown.
4340 HBP -1,420,907CON 1,420,907Local Match -184,094 184,094
Total:Fed. Reimb. Rate: 88.53% 3/22/2017 DLA-Admin: Not ready to ad within 6 months. CON funds moved from FFY 18/19 to 19/20. NEPA not yet clear.
4340 HBP 1,420,907 1,420,907CONLocal Match 184,094 184,094
Total: 1,605,000Fed. Reimb. Rate: 88.53% 3/7/2016 Linda Newton: New eligible BPMP Plan project.
Caltrans, Division of Local Assistance Page 710/26/2018, 9:28 AM Det2 FL4 SmlTxt
2016/17-2021/22 Highway Bridge Program
District: County:Responsible Agency
06 KingsTotal
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides VERY detailed backup information to support the lump sum amounts programmed in the FTIP.
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
Kings County BRIDGE NO. PM00182, Bridge Preventive Maintenance Program (BPMP) various bridges in Kings County. See Caltrans Local Assistance HBPwebsite for backup list of projects.
Fund Source Summary:
PER/W
Total
CON
Total
1,539,000
540,000 540,000
540,000 2,079,0001,539,0001,539,000
Phase Summary:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total478,062 1,840,539
61,938 238,461
540,000 2,079,000
1,362,477
176,523
1,539,000
Fed Proj:
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
PE Summary:
Proj id Funds Src TotalPhase
Phase Funding Details:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total478,062 478,062
61,938 61,938
540,000 540,000
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
4606 HBP 478,062PE 478,062Local Match 61,93861,938
Total: 540,000Fed. Reimb. Rate: 88.53% 1/22/2018 Linda Newton: New eligible project.
Caltrans, Division of Local Assistance Page 810/26/2018, 9:28 AM Det2 FL4 SmlTxt
2016/17-2021/22 Highway Bridge Program
District: County:Responsible Agency
06 KingsTotal
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides VERY detailed backup information to support the lump sum amounts programmed in the FTIP.
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
CON Summary:
Proj id Funds Src TotalPhase
Phase Funding Details:
Fed $
Local AC
Local Match
Total
LSSRP Bond
Total1,362,477
176,523
1,539,000
1,362,477
176,523
1,539,000
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
4606 HBP 1,362,477CONLocal Match 176,523
Total: 1,539,000Fed. Reimb. Rate: 88.53% 1/22/2018 Linda Newton: New eligible project.
1,362,477176,523
Caltrans, Division of Local Assistance Page 910/26/2018, 9:28 AM Det2 FL4 SmlTxt
2016/17-2021/22 Highway Bridge Program
District: County:Responsible Agency
06 KingsTotal
See the appropriate FTIP/FSTIP for current funding commitments. This listing provides VERY detailed backup information to support the lump sum amounts programmed in the FTIP.
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
Number of Projects:
MPO Summary:
Fed $
Local AC
Local Match
Total for all Phases 421,000
LSSRP Bond
Total
495,768 3,329,907 478,062 6,087,213
64,232 184,094 61,938 486,787
560,000 3,514,000 540,000 6,574,000
421,000 1,362,477
176,523
1,539,000
Total Costs:
Kings County Association of Governments
Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond
3
Caltrans, Division of Local Assistance Page 1010/26/2018, 9:28 AM Det2 FL4 SmlTxt
(Dollars rounded to $1,000's)
Unique Project
IDDistrict Agency MPO Project Location Description of Work
Current Total
Project Cost
Estimate
Approved Federal
Funds
Other/ Local
Funds
Federal Funds
Programmed in
2021/22
H9-06-014 6Kings
CountyKCAG
Various Locations
on Avenal Cutoff
Intersections of 13th Avenue at Front Street,
16th Avenue at Flint Avenue, 6th Avenue at
Excelsior Avenue, 16th Avenue at
Grangeville Boulevard, 14th Avenue at
Idaho Ave and 14th Avenue at Hanford
Armona Road.
$567,900 $567,900 $ - $567,900
H9-06-015 6Kings
CountyKCAG
Various Locations in
Kings County
Intersection of 22nd Avenue and Grangeville
Boulevard.$1,466,800 $1,466,800 $ - $366,700
Total $ 2,034,700 $ 2,034,700 $ - $ 934,600
Kings County Association of Governments (KCAG)
Grouped Projects for Safety Improvements - HSIP Program
Backup List Updated On: 12/13/2018 CTIPS #: 216-0000-0153
Total (KCAG)
Dist County Route Post Miles Location/Description CT Project ID EA PPNO Prog Code FY PA&ED PS&E RW RW SUP CON CON SUP Fund Type Total
06 KIN 5 9.0
Near Lost Hills, from Kern/Kings County
line to south of Utica Avenue. Roadway
rehabilitation.
11600000254 OS490 6729 201.122 2017/18 650$ 1,300$ 35$ 140$ 25,000$ 2,100$ SHOPP-AC 29,225$
2018/19 550$ 900$ 150$ 100$ SHOPP-AC 1,700$
TOTAL 1,200$ 2,200$ 185$ 240$ 29,500$ 2,800$ 36,125$
PE RW CON
1,950$ 175$ 27,100$ 29,225$
1,450$ 250$ 1,700$
5,200$ 5,200$
3,400$ 425$ 32,300$ 36,125$
Kings County Association of Governments (KCAG)
2019/20
2017/18
Total
2018/19
4,500$
11600000264 OX390 6965 201.121
2019/20
State Highway Operation and Protection Program (SHOPP)
Roadway Preservation Grouped Listing: CTIPS 316-0000-0000
Back up Project List Updated on: 08/23/2018
(Dollars rounded to $1,000's)
06 KIN 43 3.2
In and near Corcoran, from the Tulare
County line to west of Santa Fe Avenue.
Pavement rehabilitation.
5,200$ 700$ SHOPP-AC
Kings County
SHOPP Lump Sum by Category and Fund Type
Dollars x $1000
2018
CONRWPEPRIORTOTAL 22/2321/2220/2119/2018/19
SHOPP - Bridge Preservation
$33,294 $3,100$2,300 $27,894 $5,000 $494 $27,800Bridge - State (HBRR)
$33,294 $2,300 $3,100 $27,894 $5,000 $494 $27,800TOTAL
SHOPP - Collision Reduction
$12,301 $808$5,823$1,340 $4,330 $2,580 $91 $9,630National Hwy System
$12,301 $1,340 $5,823 $808 $4,330 $2,580 $91 $9,630TOTAL
SHOPP - Emergency Response
$20,500 $16,980$3,520 $2,520 $1,130 $16,850National Hwy System
$20,500 $3,520 $16,980 $2,520 $1,130 $16,850TOTAL
SHOPP - Roadside Preservation
$2,959 $619$270 $2,070 $860 $29 $2,070National Hwy System
$2,959 $270 $619 $2,070 $860 $29 $2,070TOTAL
SHOPP - Roadway Preservation
$6,900 $5,200$1,700 $1,450 $250 $5,200National Hwy System
$6,900 $1,700 $5,200 $1,450 $250 $5,200TOTAL
$61,550 $1,994 $12,410 $27,894 $6,400 $26,707 $7,793 $7,160 $75,954 MPO TOTAL
8/23/2018 10:53:19AM
Kings County
SHOPP Lump Sum by Category and Fund Type
Dollars x $1000
2018
SHOPP - Bridge Preservation
RWPEDESCRIPTIONRouteEAMPO_ID COCTIPS ID Dist CON
In and near Stratford, from 22nd Street to Laurel Avenue at the Kings River Bridge
No. 45-0007. Replace 73 year old bridge due to extensive superstructure and
substructure distress and susceptibility to liquefaction.
11600000263 KIN 06 0V110 41 5,000 494 27,800
5,000 SHOPP - Bridge Preservation Total: 494 27,800
8/23/2018 10:53:19AM
Kings County
SHOPP Lump Sum by Category and Fund Type
Dollars x $1000
2018
SHOPP - Collision Reduction
RWPEDESCRIPTIONRouteEAMPO_ID COCTIPS ID Dist CON
In and near Lemoore and Hanford, from Route 41 to 10th Avenue Undercrossing.
Pave areas beyond gore and bridge slopes.
11600000255 KIN 06 0T290 198 1,300 53 5,300
Near Hanford, from 0.4 mile east of 10th Avenue Overcrossing to 1.5 miles east of
Route 43/198 Separation. Upgrade gore areas, construct Maintenance Vehicle
Pullouts (MVPs) and slope paving at bridges.
11600000261 KIN 06 0U790 198 1,280 38 4,330
2,580 SHOPP - Collision Reduction Total: 91 9,630
8/23/2018 10:53:19AM
Kings County
SHOPP Lump Sum by Category and Fund Type
Dollars x $1000
2018
SHOPP - Emergency Response
RWPEDESCRIPTIONRouteEAMPO_ID COCTIPS ID Dist CON
In Kings and Tulare Counties, on Routes 63, 99,137, 198 and 216. Repair and
replace stolen and damaged electrical systems and protect electrical and
irrigation facilities. The work is required to restore incident management,
11600000256 KIN 06 0U300 Var 2,520 1,130 16,850
2,520 SHOPP - Emergency Response Total: 1,130 16,850
8/23/2018 10:53:19AM
Kings County
SHOPP Lump Sum by Category and Fund Type
Dollars x $1000
2018
SHOPP - Roadside Preservation
RWPEDESCRIPTIONRouteEAMPO_ID COCTIPS ID Dist CON
In and near Hanford, from 0.3 mile west of 12th Avenue to 0.5 mile east of Route
43/198 Separation. Electrical upgrade of booster pumps, replace irrigation
mainline, valves and valve wiring.
11600000262 KIN 06 0V820 198 860 29 2,070
860 SHOPP - Roadside Preservation Total: 29 2,070
8/23/2018 10:53:19AM
Kings County
SHOPP Lump Sum by Category and Fund Type
Dollars x $1000
2018
SHOPP - Roadway Preservation
RWPEDESCRIPTIONRouteEAMPO_ID COCTIPS ID Dist CON
In and near Corcoran, from the Tulare County line to west of Santa Fe Avenue.
Pavement rehabilitation.
11600000264 KIN 06 0X390 43 1,450 250 5,200
1,450 SHOPP - Roadway Preservation Total: 250 5,200