Mike Stasiuk, P.Eng.Engineering CoordinatorJanuary 18, 2018
2018 Capital ConstructionCEA Partnering With Industry Symposium
City of Fort Saskatchewan Budget Process
• Two phase budgeting
• Phase 1: Design budget based on Class 5 estimate
• Phase 2: Construction budget based on Class 2 estimate developed during Phase 1
City Hall Space Development
• $700,000 – Design & Construction
• Scope includes design and construction of open-concept work space
Turner Park Playground Replacement
• $130,000 – Design & Construction
• Replacement of playground structure to meet CSA standards
Bulk Water Station Modernization
• $37,500 - Design
• Improvements to the existing Bulk Water Station
Local Road Rehabilitation
• $60,000 - Construction
• Rehabilitation of various streets and locations throughout Fort Saskatchewan
Neighbourhood Rehabilitation
• $2,000,000 - Design and Construction
• Rehabilitating a section of “Old Fort” to bring underground and surface infrastructure up to current standards
Water Reservoir Lifecycle Renewal
• $56,250 - Design
• Renewal of the water reservoir infrastructure over the next 3 years
Sump Pump Retrofit Program
• $300,000 - Construction
• Connecting homes to storm services to protect public and private property from water damage
Water Meter Replacement Project
• $2,900,000 (over 3 years) – Design & Construction
• Remote monitoring and monthly billing, includes meters and tower system