ITS SSD in 2003. SSD modules on ladder. highlights in 2003. start of module production assembly robot for ladders control, read-out, DAQ beam test. HAL25 status. Design parameters ‘on the edge’ -> highly sensitive to process parameters -> MPW yield 50, 98, 8 % - PowerPoint PPT Presentation

Citation preview

Page 1: ITS SSD in 2003

17 december 2003 Gert-Jan Nooren 1

Page 2: ITS SSD in 2003

17 december 2003 Gert-Jan Nooren 2

ITS SSD in 2003

Page 3: ITS SSD in 2003

17 december 2003 Gert-Jan Nooren 3

SSD modules on ladder

Page 4: ITS SSD in 2003

17 december 2003 Gert-Jan Nooren 4

start of module production

assembly robot for ladders

control, read-out, DAQ

beam test

highlights in 2003

Page 5: ITS SSD in 2003

17 december 2003 Gert-Jan Nooren 5

• Design parameters ‘on the edge’ -> highly sensitive to process parameters -> MPW yield 50, 98, 8 % • Improved process control -> Engineering run yield 85 - 95 %• Thinning down to 150µm for better radiation length in progress

HAL25 status

55

45

35

25

95

85

75

65

15

05

54

44

34

24

94

84

74

64

14

04

57

47

37

27

97

87

77

67

17

07

56

46

36

26

96

86

76

66

16

06

51

41

31

21

91

81

71

61

11

01

50

40

30

20

90

80

70

60

10

00

53

43

33

23

93

83

73

63

13

03

52

42

32

22

92

82

72

62

12

02

59

49

39

29

99

89

79

69

19

09

58

48

38

28

98

88

78

68

18

08

NO DIGITAL

00 01 02 03 04 05 06 07 08 09 0A 0B

10 11 12 13 14 15 16 17 18 19 1A 1B

20 21 22 23 24 25 26 27 28 29 2A 2B

30 31 32 33 34 35 36 37 38 39

40 41 42 43 44 45 46 47 48 49

50 51 52 53 54 55 56 57 58 59 5A

60 61 62 63 64 65 66 67 68 69 6A 6B

70 71 72 73 74 75 76 77 78 79 7A 7B

80 81 82 83 84 85 86 87 88 89 8A 8B

90 91 92 93 94 95 96 97 98 99 9A 9B

3A 3B

4A

Page 6: ITS SSD in 2003

17 december 2003 Gert-Jan Nooren 6

components of the modules

1. HAL25-chip TAB-bonded on its Al chipcable (6 chips/hybrid)

3.sensor (768 strips/side)

2.Hybrids (2 hybrids/mod)

Page 7: ITS SSD in 2003

17 december 2003 Gert-Jan Nooren 7

ALICE SSD Module

Page 8: ITS SSD in 2003

17 december 2003 8

Module scanner• laser 1.06 m wavelength• positioning ~1.5 m• spot diameter < 20 m

Aleksey Sokolov

Page 9: ITS SSD in 2003

17 december 2003 Gert-Jan Nooren 9

Readout of the modules

P-Hybrid

N-Hybrid

control

ALCAPONE

ALCAPONE

ALCAPONE

EndCap

ALABUF

analog out

SensorVbias

FEROM

Page 10: ITS SSD in 2003

17 december 2003 Gert-Jan Nooren 10

Assembly robot

Pick & place robot for modulesAutomatic positioning to a few

micrometersAcceptance test 19 December

Page 11: ITS SSD in 2003

17 december 2003 Gert-Jan Nooren 11

September 2003 beam testPrototype 4-module EndCap

Page 12: ITS SSD in 2003

17 december 2003 Gert-Jan Nooren 12

September 2003 beam test5 module telescope

Page 13: ITS SSD in 2003

17 december 2003 Gert-Jan Nooren 13

September 2003 beam testsS/N for 4 modules

N

P

N

P

N

P

N

P

Very preliminary - provided by Trieste team

Module SN0002 Module SN0003 Module HN0001 Module HN0002

Canberra sensor ITC sensor

Page 14: ITS SSD in 2003

17 december 2003 Gert-Jan Nooren 14

Beam tests• Integration in real Cern environment: read-out chain proven up to ADC• Sensor quality problem revealed: Canberra takes action• ITS = SPD + SDD + SSD beamtest end 2004

Status and plans

Page 15: ITS SSD in 2003

17 december 2003 Gert-Jan Nooren 15

Beam tests• Integration in real Cern environment: read-out chain proven up to ADC• Sensor quality problem revealed: Canberra takes action• ITS = SPD + SDD + SSD beamtest end 2004Module production• Helsinki is bonding chips at production speed• 2 + 7 modules produced, yield and speed ‘unknown’• Testing infrastructure for chips and hybrids fully operational• Strasbourg and Trieste (MIPOT) starting in Q1

Status and plans

Page 16: ITS SSD in 2003

17 december 2003 Gert-Jan Nooren 16

Beam tests• Integration in real Cern environment: read-out chain proven up to ADC• Sensor quality problem revealed: Canberra takes action• ITS = SPD + SDD + SSD beamtest end 2004Module production• Helsinki is bonding chips at production speed• 2 + 7 modules produced, yield and speed ‘unknown’• Testing infrastructure for chips and hybrids fully operational• Strasbourg and Trieste (MIPOT) starting in Q1Read-out• EndCap ready for mass production• FEROM design ready, first prototype Q2• Patchpanels and cables layout almost frozen

Status and plans

Page 17: ITS SSD in 2003

17 december 2003 Gert-Jan Nooren 17

Beam tests• Integration in real Cern environment: read-out chain proven up to ADC• Sensor quality problem revealed: Canberra takes action• ITS = SPD + SDD + SSD beamtest end 2005Module production• Helsinki is bonding chips at production speed• 2 + 7 modules produced, yield and speed ‘unknown’• Testing infrastructure for chips and hybrids fully operational• Strasbourg and Trieste (MIPOT) starting in Q1Read-out• EndCap ready for mass production• FEROM design ready, first prototype Q2• Patchpanels and cables layout almost frozenAssembly• First ladder Q1/Q2• Module testing with laser set-up

Status and plans

Page 18: ITS SSD in 2003

17 december 2003 Gert-Jan Nooren 18

June 2003 beam testsmodule SN0003

Charge matching

N

P