Printed copies are not controlled. Confirm version status through the F4E document management system (idm@F4E)Generated on 16 May 2014
idm@F4E UID / VERSION
25TS67 / 2.3
VERSION CREATED ON / STATUS
05 May 2014 / ApprovedEXTERNAL REFERENCE
Technical Specification
Technical Specification for the Independent Concrete Test for ITER Building
Annex B Technical Specification for the Independent Concrete Test for ITER Building
Approval Process Name Action Affiliation
Author Tardif T. 05 May 2014:signed F4E-A10Co-AuthorsReviewers van de Ven N. 15 May 2014:recommended F4E-ADM02Approver Schmieder L. 16 May 2014:approved F4E-A10
RO: van de Ven Niels (F4E)Read Access RO, project administrator, LG: Buildings Support Team, LG: IAS, AD: IDM_F4E, AD: IDM DI-LG-LS-00 Legal Support, AD: IDM AD-CP-
PP-00 Project Procurement
Printed copies are not controlled. Confirm version status through the F4E document management system (idm@F4E)Generated on 16 May 2014
Change LogTitle (Uid) Version Latest Status Issue Date Description of Change
Technical Specification for the Independent Concrete Test for ITER Building (25TS67_v2_3)
v2.3 Approved 05 May 2014
Updated version to take into account comments and improvements of wording following PPO modification.None of the technical requrements are impacted.
Technical Specification for the Independent Concrete Test for ITER Building (25TS67_v2_2)
v2.2 Approved 25 November 2013
Following PPO comment clarification given in each section title of technical requirements (3.1.1 to 3.1.6) and in section 3.1.7.
Technical Specification for the Independent Concrete Test for ITER Building (25TS67_v2_1)
v2.1 Revision Required
06 November 2013
Version updated following recommendation of Gonçalo Serra: breakdown of requirements in each section in order to facilitate the follow-up,applicable document updated with section 4 input.
Technical Specification for the Independent Concrete Test for ITER Building (25TS67_v2_0)
v2.0 Approved 19 August 2013
Comments from reviewers taken into account (note that the one from SAO regarding action to be done when result is not compliant has not been integrated_ internal action of F4E following result report of the laboratory).
Option added for concrete test, cracks monitoring and verification of rebar placement by radar (see 3.1.4).
Technical Specification for the Independent Concrete Test for ITER Building (25TS67_v1_0)
v1.0 Signed 10 July 2013
F4E_D_25TS67 v2.3
F4E_D_25TS67 v.2.3 F4E-OPE-439 - ANNEX B – TECHNICAL SPECIFICATION Page 1/21
Unlimited
ANNEX B – Technical Specification
TECHNICAL SPECIFICATION
FOR THE
INDEPENDENT CONCRETE TESTING FOR ITER BUILDINGS
idm@F4E Reference: F4E_D_25TS67 v.2.3 Call No F4E-OPE-439
Abstract
This Technical Specification concerns the supply of independent concrete testing and additional services from the mix concrete trials performed by the “construction Contractor” under supervision of the Engineer through the Construction phase until final completion of concrete phase for reinforced concrete buildings important for safety.
Template: F4E_D_22EVAD v1.14
F4E_D_25TS67 v2.3
F4E_D_25TS67 v.2.3 F4E-OPE-439 - ANNEX B – TECHNICAL SPECIFICATION Page 2/21
Unlimited
Table of Contents
1. INTRODUCTION .................................................................................................................................. 5
1.1. INTRODUCTION TO ITER & FUSION FOR ENERGY .......................................................................................... 5 1.2. SUBJECT OF THIS TECHNICAL SPECIFICATION ................................................................................................. 5
2. SCOPE OF THE WORK .......................................................................................................................... 6
2.1. SCOPE OF SERVICES .................................................................................................................................. 6 2.1.1. General ......................................................................................................................................... 6
2.1.2. Scope of the Works ...................................................................................................................... 7
2.1.3. List of Buildings and areas ........................................................................................................... 7
2.1.4. Services ........................................................................................................................................ 8
2.1.5. Miscellaneous .............................................................................................................................. 8
2.2. ITEMS SUPPLIED BY F4E ............................................................................................................................ 9 2.3. BOUNDARIES .......................................................................................................................................... 9 2.4. WBS ................................................................................................................................................... 10
3. TECHNICAL REQUIREMENTS .............................................................................................................. 11
3.1. ACTIVITIES ............................................................................................................................................ 11 3.1.1. Follow-up of Mix concrete Trials _ OPTION ............................................................................... 11
3.1.2. Assessment of concrete procedure _ OPTION............................................................................ 11
3.1.3. Test on concrete _ BASELINE ..................................................................................................... 11
3.1.4. Test on heavy concrete _ OPTION .............................................................................................. 14
3.1.5. Additional test on concrete samples _ OPTION ......................................................................... 14
3.1.6. Audit of batching plan _ OPTION ............................................................................................... 15
3.1.7. Product assurance requirements ............................................................................................... 15
4. APPLICABLE CODES AND STANDARDS ............................................................................................... 16
5. DELIVERABLES AND SCHEDULING ...................................................................................................... 16
6. QUALITY ASSURANCE PROVISIONS ................................................................................................... 16
F4E_D_25TS67 v2.3
F4E_D_25TS67 v.2.3 F4E-OPE-439 - ANNEX B – TECHNICAL SPECIFICATION Page 3/21
Unlimited
Terms and Definitions
Acronym Term Definition
ADP Acceptance Data Package
Is the documentation package linked with a deliverable to be submitted by the supplier
CMx Compliance Matrix
Matrix showing the propagation of the requirements to the level below
F4E Fusion for Energy
The European Joint Undertaking for ITER and the Development of Fusion Energy
IO ITER IO ITER International Organisation, sometimes referred to as ITER or IO
KOM KOM Kick-Off Meeting of the Contract
QAO Quality Officer F4E’s responsible officer for QA for the Contract
RMV Requirements Management & Verification
Process to control and verify the requirements
SoCMx Statement of Compliance matrix
Matrix where the tenderer/bidder commits its compliance in front of each requirement
TRO Technical Responsible Officer
F4E’s responsible officer for communicating all technical contractual actions and decisions to the Supplier
VI Verification Item
Verification effort produced in order to verify one or several requirements. (Can be a test, an analysis, an engineering document or an inspection)
--- Subcontractor
All economic operators who supply items to the Supplier under the Contract
---
Supplier
The supplier is either:
1. the Contractor as defined in the supply or service Contract, or
2. the Beneficiary as defined in the Grant Agreement.
The successful Bidder is referred in the document as the “Supplier”.
The supply-chain follows the scheme below
Supplier -> Organization (F4E) -> Customer (e.g. IO )
Construction Contractor
The Contractor who is responsible for the Construction of the buildings referred to in this contract
PIC Protection Important Component
Component identified as important in order to ensure a nuclear safety or environmental function.
Construction Site
Refers to the Construction Site of the buildings in Cadarache
Batching Plant
Plant to mix and prepare concrete batches for pouring by the Construction Contractor
Legal Inspection
Means the assessment of compliance with French Building Laws and ITER requirements
Table 1: Terms and Definitions
F4E_D_25TS67 v2.3
F4E_D_25TS67 v.2.3 F4E-OPE-439 - ANNEX B – TECHNICAL SPECIFICATION Page 4/21
Unlimited
Applicable Documents
<# AD-0001
IO Structural Design Code for Buildings
ITER_D_283B24 - ITER Structural Design Code for Buildings (I-SDCB) - Part1: Design Criteria Part I – Design Criteria
ITER_D_2E2U9X - ITER Structural Design Code for Buildings (II-SDCB) - Part 2: Construction Part II – Technical Specifications
#>
<# AD-0002
ITER_D_2E4KSJ - Safety Requirements for ITER Facility BuildingsSafety requirements for SIC buildings
#>
<# AD-0003
F4E CMx - template (25K2BN) #>
<# AD-0004
F4E VCD - template (25K74A) , #>
<# AD-0005
F4E RMV template - Bidder SoCMx (25FD7V) #>
<# AD-0006
On site requirements:
APA_65_GC_0H0003_HS_
Health and Safety General Coordination Plan
(PGCSPS) - Vol 1 - General disposition for F4E
Activity
APA_65_GC_0H0002_HS_ Rules of cooperation between HSPC and Contractors
APA_65_FT_0H0001_HS_ Particular Safety Plan (PPSPS) template
APA_65_GC_0H0004_HS_ Intercompagny Health and Safety Committee
regulation for F4E activity -
ITER_D_43QPRE Alerts and Accidents on the ITER worksite -Emergency
Organization
ENG_66_PZ_0C0020_CO_ Site Organization Rules
ENG_66_PZ_0C0013_CO_ Personnel, vehicle and equipment flow management
rules
ENG_66_PZ_0C0008_CO_ Environmental Protection Requirements – ITER
Worksite
#>
F4E_D_25TS67 v2.3
F4E_D_25TS67 v.2.3 F4E-OPE-439 - ANNEX B – TECHNICAL SPECIFICATION Page 5/21
Unlimited
1. INTRODUCTION
1.1. Introduction to ITER & Fusion for Energy
The ITER project aims to build a fusion device twice the size of the largest current devices,
with the goal of demonstrating the scientific and technical feasibility of fusion power. It is a
joint project between the European Union, China, India, Japan, South Korea, the Russian
Federation and the USA. ITER is being constructed in Europe, at Cadarache in the south of
France.
Most of the components that make up the ITER device are to be manufactured by each of
the participating countries and contributed in kind through so-called Domestic Agencies
including Fusion for Energy. In many cases the engineering and technologies required to
manufacture these components are very advanced.
The European Joint Undertaking for ITER and the Development of Fusion Energy or 'Fusion
for Energy' is a type of European organisation known as a Joint Undertaking created under
the Euratom Treaty by a decision of the Council of the European Union.
'Fusion for Energy' has three main objectives:
Providing European contributions to the ITER international fusion energy research project being built in Cadarache, France;
Providing European contributions to a number of joint projects with Japan that aim to accelerate the development of fusion - the "Broader Approach";
Coordinating a programme of activities to prepare for the first demonstration fusion reactors that can generate electricity (DEMO).
1.2. Subject of this Technical Specification
This Technical Specification sets out the scope of the Services to be provided by the
Supplier, the technical requirements and the expected deliverables of the Contract.
This Technical Specification establishes the role of an independent concrete laboratory in the
context of ITER project during construction of reinforced concrete buildings that perform a
nuclear safety function by:
Participating in confinement function
Housing, supporting or protecting PIC components and or system
Providing shielding
F4E_D_25TS67 v2.3
F4E_D_25TS67 v.2.3 F4E-OPE-439 - ANNEX B – TECHNICAL SPECIFICATION Page 6/21
Unlimited
2. SCOPE OF THE WORK
2.1. Scope of services
2.1.1. General
The Contractor shall be involved in the project from the mix concrete trials performed by the
Construction Contractor under supervision of the Engineer through the time of the
construction of the buildings until final completion of concrete phase for reinforced concrete
buildings important for safety.
This Technical Specification defines
(i) the Services to be performed by the Supplier during the mix concrete trials phase and
the Construction Phase, up to the final completion of concrete phase for reinforced
concrete buildings important for safety, the services are considered as a Safety
Important Activity (surveillance),
(ii) the authority entrusted to the Supplier by F4E with respect to all parties participating
in the Project, and
(iii) the means to be made available to the Supplier for the performance of the Services.
The Technical Specification includes:
project interfaces for concrete phase and stakeholders
list of reinforced concrete buildings important for safety
concrete criteria for reinforced concrete buildings important for safety
provisional construction schedule
The following activity is excluded from the scope of the contract:
control of aggregates at their production point
Responsibilities for the different concrete phase are as follow:
Concrete phase Responsible Supervision
Final concrete design requirements
Engineer F4E + Legal Inspection
Concrete formula Construction Contractors Engineer + Legal Inspection
Batching plant Construction Contractors Engineer
Concrete production Construction Contractors Engineer + Legal Inspection
F4E_D_25TS67 v2.3
F4E_D_25TS67 v.2.3 F4E-OPE-439 - ANNEX B – TECHNICAL SPECIFICATION Page 7/21
Unlimited
2.1.2. Scope of the Works
2.1.3. List of Buildings and areas
No. Building/ Area Within the
scope Construction Contractors
11 Tokamak Building X TB03
12 Tokamak Complex Excavation Support Structure
13 Assembly Building
14 Tritium Building X TB03
15 RF Heating Building
16 HVAC Building (for Tokamak Complex)
17 Cleaning Facility Building
19 Seismic Isolation Basemat
21 Hot Cell Building X TB09
23 Rad Waste Building X TB09
24 Personnel Access Control Building X TB09
31 SF6 Equipment Area
32 Magnet Power Conversion Building 1
33 Magnet Power Conversion Building 2
34 NB Power supply Building
35 Pulsed Power High Voltage Substation Area
36 Main Alternating Current Distribution Building
37 NB High Voltage Power Supply Building
F4E_D_25TS67 v2.3
F4E_D_25TS67 v.2.3 F4E-OPE-439 - ANNEX B – TECHNICAL SPECIFICATION Page 8/21
Unlimited
38 Reactive Power Control Building
39 Reactive Power Compensator Area
41 Steady State Power High Voltage Substation
42 Fuel Storage Tanks (EPS train A)
43 Fuel Storage Tanks (EPS train B)
44 Emergency Power Supply Building (train A)
45 Emergency Power Supply Building (train B)
46 Medium Voltage Distribution Building LC/ 1A
47 Medium Voltage Distribution Building LC/ 2B
48 R.T.E Switchyard Area
49 R.T.E Control Building
51 Cryoplant Compressor Building
52 Cryoplant Coldbox Building
53 Cryoplant Infrastructure
55 PF Coil Fabrication Building
61 Site Services Building
62 Fuel Tanks
67 Cold Basin & Cooling Towers
68 Cooling Water Pumping Station
69 Heat Exchangers
71 Control Building X TB03
72 Office Building
73 Assembly Area
74 Diagnostics Building X TB03
75 FD and Switching Network Resistor Building (PIC PART of the building) X
TB03
Buildings within the scope are buildings in reinforced concrete important for safety.
2.1.4. Services
The following services shall be included in the supply:
Follow-up of mix concrete trials
Assessment of concrete procedures and reporting
Test on concrete and heavy concrete (including additional test on request)
Supervision and reporting of all the test to be performed
Audit of batching plant and reporting
2.1.5. Miscellaneous
The Supplier shall provide all tools required for the performance of the Services (including but not
limited to: monitoring equipment, manufacture of test pieces, storage conditions of samples,
machine laboratory…).
The Supplier shall provide all vehicles and communication equipment required for the performance
of the Services.
F4E_D_25TS67 v2.3
F4E_D_25TS67 v.2.3 F4E-OPE-439 - ANNEX B – TECHNICAL SPECIFICATION Page 9/21
Unlimited
The Supplier shall provide its personnel with all safety and protective equipment required for the performance of the Services. Such safety and protective equipment shall include, but is not limited to:
Safety shoes and boots;
Safety helmets;
Noise protection equipment;
Protective goggles;
Appropriate clothes, parkas, etc.;
The Supplier shall make available:
All human resources required for the performance of the Services; and
All secretarial and support staff required to carry out document management.
2.2. Items supplied by F4E
F4E shall provide the following to the Supplier
Copies of the applicable documents mentioned in the Technical Specifications;
A list of names, functions and contact details of person involved in the construction activities linked to services , and
Construction schedules for the Works and any update when approved;
Production schedule for the Batching Plant and any update when approved;
The Supplier shall be automatically invited to all meetings organized by F4E without the need for a formal invitation and shall receive copies of all meeting reports.
2.3. Boundaries
Construction Contractors are responsible to provide concrete for construction of buildings of the ITER project under the Engineer’s Supervision.
To perform this task the Construction Contractors will supply concrete mainly from the onsite batching plant and also from offsite batching plants close to the worksite.
Onsite Batching plant implemented by the Construction Contractors is under operational responsibility of these Construction Contractors but F4E is the operator in accordance with French regulation (Batching plant is an ICPE- “Installation Classée pour la Protection de l’Environnement”).
Construction Contractors shall ensure their own concrete test according to F4E requirements by implementing their own concrete laboratory.
The Supplier shall perform its services taking into account:
production concrete rules of batching plant defined by Construction Contractor
environmental and safety rules defined by F4E and Construction Contractor
F4E_D_25TS67 v2.3
F4E_D_25TS67 v.2.3 F4E-OPE-439 - ANNEX B – TECHNICAL SPECIFICATION Page 10/21
Unlimited
2.4. WBS
The following table defines the base Work Breakdown Structure (WBS) of the works
WBS Activity
EU.01.62.02w.57.18
Independent Concrete Testing:
Quality Plan
Follow up of mix concrete trials
Assessment of concrete procedures
Test on concrete
Test on heavy concrete
Audit of batching plant
Table 3: WBS
F4E_D_25TS67 v2.3
F4E_D_25TS67 v.2.3 F4E-OPE-439 - ANNEX B – TECHNICAL SPECIFICATION Page 11/21
Unlimited
3. TECHNICAL REQUIREMENTS
3.1. Activities
3.1.1. Follow-up of Mix concrete Trials _ OPTION
<# REQ-0001
The Supplier shall follow the concrete trials of concrete formula (3 formula) defined by the Construction Contractors in charge of the construction of buildings in reinforced concrete important for safety in ITER Worksite.
In this respect the Supplier shall in compliance with the norms (as mentioned in 4.1): - Perform test on aggregates and components used in concrete - Perform Fresh concrete slump tests - Perform Fresh concrete density tests
- Perform Hard concrete density tests - Manufacture test pieces for compression tests at 7, 28 and 90 days - Perform Compression tests at 7,28 and and on request after 90 days - Handle, transport and store in compliance with the norms the test pieces for compression
tests; - Perform tests with calibrated devices/machines when required; - Assess mix concrete process (e.g. water/cement) - Submit a test report to F4E
#>
3.1.2. Assessment of concrete procedure _ OPTION
<# REQ-0002
The Supplier shall assess the concrete working procedures of the Construction Contractors in charge of the construction of buildings in reinforced concrete important for safety in ITER Worksite (Cadarache).
- Procedures for extreme weather conditions - Procedures for concrete production - Submit a assessment report to F4E (5 copies) and copy in electronic format.
#>
3.1.3. Test on concrete _ BASELINE
<# REQ-0003
The Supplier shall perform concrete testing on fresh concrete poured by the Construction Contractors in charge of the construction of buildings in reinforced concrete important for safety on the ITER Worksite.
These checks are independent from the ones performed by the Construction Contractors according to norm NF EN 206 and F4E's requirements for Constructions Contractors tests.
In this respect the Supplier shall in compliance with the norms (as mentioned in 4.1): - Perform control of aggregates and components used for concrete - Perform independent concrete testing every 1000 m³ of poured concrete including
Supplier Fresh concrete slump test
Fresh concrete density
Hard concrete density
Manufacture of test pieces for compression tests at 7, 28 and 90 days
Compression tests at 7, 28 (100%) and on request after 90 days (50%) #>
F4E_D_25TS67 v2.3
F4E_D_25TS67 v.2.3 F4E-OPE-439 - ANNEX B – TECHNICAL SPECIFICATION Page 12/21
Unlimited
<# REQ-0004
In this respect the Supplier shall - Handle, transport and store in compliance with the norm the test pieces for compression
test; - Perform the test with calibrated devices/machines when required; - Submit a test report (five copies) on the result of the tests, summarizing the observations
made and setting out those aspects of the Works which, to the best of their knowledge, remain non-compliant. This report shall be submitted to F4E on a quarterly basis.
Samples at 90 days not tested by the Supplier shall be returned to the F4E worksite. The Supplier shall ensure sustainable identification of these samples.
#>
<# REQ-0005
These concrete tests shall be performed for buildings in reinforced concrete important for safety in ITER Worksite according to the following volume of concrete:
F4E_D_25TS67 v2.3
F4E_D_25TS67 v.2.1 F4E-OPE-439 - ANNEX B – TECHNICAL SPECIFICATION Page 13/21
Unlimited
Buildings in reinforced concrete important for safety in ITER Worksite
VOLUME OF STRUCTURAL CONCRETE ONLY ( EXCLUDES BLINDING & EXCLUDES CONCRETE IN JOINT TREATMENT)
BUILDING
Construction Contractors M3
11/14/74 TB03 91,000
71 TB03 7,000
75 TB03
21 TB09 45,000
23 TB09 6,500
24 TB09 1,000
TOTAL
150,500
#>
F4E_D_25TS67 v2.3
F4E_D_25TS67 v.2.1 F4E-OPE-439 - ANNEX B – TECHNICAL SPECIFICATION Page 14/21
Unlimited
3.1.4. Test on heavy concrete _ OPTION
<# REQ-0006
The Supplier shall perform concrete testing on fresh concrete poured by the Construction Contractors in charge of the construction of buildings in reinforced concrete important for safety on the ITER Worksite.
These checks are independent from the ones performed by the Construction Contractors according to norm NF EN 206 and F4E's requirements for Constructions Contractors tests.
In this respect the Supplier shall in compliance with norm (as mentioned in 4.1): - Perform control of aggregates and components used for heavy concrete - Perform independent concrete testing every 300 m³ of poured heavy concrete including:
Supplier Fresh concrete slump test
Fresh concrete density
Hard concrete density
Manufacture of test pieces for compression tests at 7, 28 and 90 days
Compression tests at 7, 28 (100%) and on request after 90 days (50%) #>
<# REQ-0007
In this respect the Supplier shall - Handle, transport and store in compliance with the norm the test pieces for compression
test; - Perform test with calibrated devices/machines; - Submit a test report (five copies) on the result of the tests, summarizing the observations
made and setting out those aspects of the Works which, to the best of their knowledge, remain non-compliant. This report shall be submitted to F4E on a quarterly basis.
#>
<# REQ-0008
Samples at 90 days not tested by the Supplier shall be returned to F4E worksite. The Supplier shall ensure sustainable identification of these samples.
#>
<# REQ-0009
These concrete tests shall be performed for buildings in reinforced concrete important for safety on the ITER Worksite following previous table (concrete volume) taking into account an average volume of 5% of the total quantity of concrete.
#>
3.1.5. Additional test on concrete samples _ OPTION
<# REQ-0010
The Supplier shall perform additional tests on concrete poured by the Construction Contractors in charge of the construction of buildings in reinforced concrete important for safety on the ITER Worksite.
These tests are independent from the ones performed by the Construction Contractors. The Supplier shall in compliance with the norms (as mentioned in 4.1):
Perform tests on concrete (max quantity: 30 per tests):
F4E_D_25TS67 v2.3
F4E_D_25TS67 v.2.1 F4E-OPE-439 - ANNEX B – TECHNICAL SPECIFICATION Page 15/21
Unlimited
- Durability _ exposure class
- Durability _ water porosity
- Durability _ gas permeability
- Durability _ alkali-Reaction
- Durability _ cement’s heat of hydratation
- Durability _ % chloride contributed by all components of the concrete
- Durability _ ∆ Temperature (between core and surface of massive plots pours)
- Durability _ concrete Maximum temperature
Perform onsite tests for the detection of transvers cracks and size monitoring (max quantity: 150 tests)
Perform onsite test for radiographic rebars detection, depth localisation and size inside normal or heavy concrete structure (max quantity 50 tests for area of 2 m²)
#>
<# REQ-0011
The Supplier shall - Handle, transport and store the test pieces in compliance with the norm for test laboratory; - Perform test with calibrated devices/machines when required;
- Submit a test report (five copies) on the result of the tests, summarizing the observations made and setting out those aspects of the Works which, to the best of their knowledge, remain non-compliant. This report shall be submitted to F4E one week after the tests results have been obtained.
#>
3.1.6. Audit of batching plan _ OPTION
<# REQ-0012
The Supplier shall perform an audit of the batching plant onsite based on:
- The Certification standard - The Batching plant quality plan - The Batching plant procedures
The Supplier shall:
- Prepare audit - Notify audit to the Construction Contractors - Carry out the audit - Draft the audit report and ensure a follow-up of actions if required - Close actions in audit report as they are performed by the Construction Contractors - The audit report (5 copies) shall be submitted to F4E.
#>
3.1.7. Product assurance requirements
<# REQ-0013
- The Supplier shall demonstrate that activities are performed by a certified laboratory for standard test foreseen in the baseline (3.1.3) and in the options (3.1.1, 3.1.4, 3.1.5).
#>
F4E_D_25TS67 v2.3
F4E_D_25TS67 v.2.1 F4E-OPE-439 - ANNEX B – TECHNICAL SPECIFICATION Page 16/21
Unlimited
4. APPLICABLE CODES AND STANDARDS
The tests shall be performed according to the norm attached in annex 1.
5. DELIVERABLES AND SCHEDULING
The following Milestones/Deliverables shall be included in the Testing Plan.
List of Deliverables
No. Name / Nature Description Type* Delivery date (month)
2 Mix concrete trials report Contract
TBD according to schedule of TB03 and TB09
3 Assessment report of concrete production procedure
Technical
4 Quarterly report for concrete test Contract
5 Quarterly report for heavy concrete test Contract
6 Audit report Contract
7 Final report Contract
6. QUALITY ASSURANCE PROVISIONS
The Quality Assurance provisions are regulated by the “Management Specification” (see Annex A
of the Contract) which is part of the Supplier’s proposal.
F4E_D_25TS67 v2.3
F4E_D_25TS67 v.2.1 F4E-OPE-439 - ANNEX B – TECHNICAL SPECIFICATION Page 17/21
Unlimited
Annex 1: Norm for concrete
Référence officielle Indice de classement Titre de la norme
"Porosité" - source AFNOR
NF P 18-459 P18-459 Béton - Essai sur béton durci - Essai de porosité et de masse volumique
FD P 18-663 P18-663 Granulats - Modalités d'application des normes NF EN d'essai sur les granulats
Liste issue des pages 14 à 17 de: NF EN 206-1 (2005)
NF EN 206-1 P18-325-1 Béton - Partie 1 : spécification, performances, production et conformité (2ème tirage - 01/06-2006)
NF EN 206-1/A1 P18-325-1/A1 Béton - Partie 1 : spécification, performances, production et conformité
NF EN 206-1/A2 P18-325-1/A2 Béton - Partie 1 : spécification, performances, production et conformité
NF EN 196-2 P15-471-2 Méthodes d'essais des ciments - Partie 2 : analyse chimique des ciments
NF EN 450-2 P18-050-2 Cendres volantes pour béton - Partie 2 : évaluation de la conformité
NF EN 450-1+A1 P18-050-1 Cendres volantes pour béton - Partie 1 : définition, spécifications et critères de conformité
NF EN 450-1/IN1 P18-050-1/IN1 Cendres volantes pour béton - Partie 1 : définition, spécifications et critères de conformité
NF EN 1097-3 P18-650-3 Essais pour déterminer les caractéristiques mécaniques et physiques des granulats - Partie 3 : méthode pour la détermination de la masse volumique en vrac et de la porosité intergranulaire
NF EN 45501 E12-000 Aspects métrologiques des instruments de pesage à fonctionnement non automatique
NF EN 197-1 P15-101-1 Ciment - Partie 1 : composition, spécifications et critères de conformité des ciments courants
NF EN 933-1 P18-622-1 Essais pour déterminer les caractéristiques géométriques des granulats - Partie 1 : détermination de la granularité - Analyse granulométrique par tamisage
NF EN 934-2 P18-341-2 Adjuvants pour béton, mortier et coulis - Partie 2 : adjuvants pour bétons - Définitions, exigences, conformité, marquage et étiquetage
NF EN 934-2/A1 P18-341-2/A1 Adjuvants pour béton, mortier et coulis - Partie 2 : adjuvants pour béton - Définitions, exigences, conformité, marquage et étiquetage
NF EN 1008 P18-211 Eau de gâchage pour bétons - Spécifications d'échantillonnage, d'essais et d'évaluation de l'aptitude à l'emploi, y compris les eaux des processus de l'industrie du béton, telle que l'eau de gâchage pour béton
NF EN 1097-6 P18-650-6 Essais pour déterminer les caractéristiques mécaniques et physiques des granulats - Partie 6 : détermination de la masse volumique réelle et du coefficient d'absorption d'eau
F4E_D_25TS67 v2.3
F4E_D_25TS67 v.2.1 F4E-OPE-439 - ANNEX B – TECHNICAL SPECIFICATION Page 18/21
Unlimited
Référence officielle Indice de classement Titre de la norme
NF EN 1097-6/A1 P18-650-6/A1 Essais pour déterminer les caractéristiques mécaniques et physiques des granulats - Partie 6 : détermination de la masse volumique réelle et du coefficient d'absorption d'eau
NF EN 12350-1 P18-431-1 Essais pour béton frais - Partie 1 : prélèvement
NF EN 12350-2 P18-431-2 Essais pour béton frais - Partie 2 : essai d'affaissement
NF EN 12350-3 P18-431-3 Essais pour béton frais - Partie 3 : essai Vébé
NF EN 12350-4 P18-431-4 Essais pour béton frais - Partie 4 : indice de serrage
NF EN 12350-5 P18-431-5 Essais pour béton frais - Partie 5 : essai d'étalement à la table à choc
NF EN 12350-6 P18-431-6 Essais pour béton frais - Partie 6 : masse volumique
NF EN 12350-7 P18-431-7 Essais pour béton frais - Partie 7 : teneur en air - Méthode de la compressibilité
NF EN 12390-1 P18-430 Essai pour béton durci - Partie 1 : forme, dimensions et autres exigences relatives aux éprouvettes et aux moules
NF EN 12390-2 P18-430-2 Essais pour béton durci - Partie 2 : confection et conservation des éprouvettes pour essais de résistance
NF EN 12390-3 P18-430-3 Essais pour béton durci - Partie 3 : résistance à la compression des éprouvettes
NF EN 12390-6 P18-430-6 Essais pour béton durci - Partie 6 : détermination de la résistance en traction par fendage d'éprouvettes
NF EN 12390-7 P18-430-7 Essais pour béton durci - Partie 7 : masse volumique du béton durci
NF EN 12620+A1 P18-601 Granulats pour béton
NF EN 12620/IN1 P18-601/IN1 Granulats pour béton
NF EN 12878 T31-209 Pigments de coloration des matériaux de construction à base de ciment et/ou de chaux - Spécifications et méthodes d'essai
EN 13055-1 P18-603-1 Granulats légers - Partie 1 : granulats légers pour bétons et mortiers
NF EN 13263-1+A1 P18-502-1 Fumée de silice pour béton - Partie 1 : définitions, exigences et critères de conformité
NF EN 13263-1/IN1 P18-502-1/IN1 Fumée de silice pour béton - Partie 1 : définitions, exigences et critères de conformité
NF EN 13263-2+A1 P18-502-2 Fumée de silice pour béton - Partie 2 : évaluation de la conformité
NF EN 13263-2/IN1 P18-502-2/IN1 Fumée de silice pour béton - Partie 2 : évaluation de la conformité
NF EN 13577 P18-449 Attaque chimique du béton - Détermination de la teneur en dioxyde de carbone agressif de l'eau
F4E_D_25TS67 v2.3
F4E_D_25TS67 v.2.1 F4E-OPE-439 - ANNEX B – TECHNICAL SPECIFICATION Page 19/21
Unlimited
Référence officielle Indice de classement Titre de la norme
NF ISO 2859-1 X06-022-1 Règles d'échantillonnage pour les contrôles par attributs - Partie 1 : procédures d'échantillonnage pour les contrôles lot par lot, indexés d'après le niveau de qualité acceptable (NQA) (2ème tirage - 2001-06-01)
NF ISO 2859-1/A1 X06-022-1/A1 Règles d'échantillonnage pour les contrôles par attributs - Partie 1 : procédures d'échantillonnage pour les contrôles lot par lot, indexés d'après le niveau de qualité acceptable (NQA)
PR NF ISO 3951-2 X06-013-2PR Règles d'échantillonnage pour les contrôles par mesures - Partie 2 : spécification générale pour les plans d'échantillonnage simples indexés par une limite de qualité acceptable (LQA) pour le contrôle lot par lot de caractéristiques-qualité indépendantes
ISO 4316:1977 Pas Agents de surface. Détermination du pH des solutions aqueuses. Méthode potentiométrique
ISO 7150-1:1984 Pas Qualité de l'eau. Dosage de l'ammonium. Partie 1 : méthode spectrométrique manuelle.
NF EN ISO 7980 T90-005 Qualité de l'eau - Dosage du calcium et du magnésium - Méthode par spectrométrie d'absorption atomique
FD P18-011 P18-011 Béton - Définifion et classification des environnements chimiquement agressifs - Recommandations pour la formulation des bétons (2ème tirage - 2010-03-01)
NF P18-201 P18-201 DTU 21 - Travaux de bâtiment - Exécution des ouvrages en béton - Cahier des clauses techniques
FD P18-326 P18-326 Béton - Zones de gel en France
XP P18-420 P18-420 Béton - Essai d'écaillage des surfaces de béton durci exposées au gel en présence d'une solution saline
NF P18-454 P18-454 Béton - Réactivité d'une formule de béton vis-à-vis de l'alcali-réaction - Essai de performance
NF P18-508 P18-508 Additions pour béton hydraulique - Additions calcaires - Spécifications et critères de conformité (2ème tirage - 2012-02-01)
NF P18-509 P18-509 Additions pour béton hydraulique - Additions siliceuses - Spécifications et critères de conformité
NF P95-102 P95-102 Ouvrages d'art - Réparation et renforcement des ouvrages en béton et en maçonnerie - Béton projeté - Spécifications relatives à la technique et aux matériaux utilisés
NF P98-170 P98-170 Chaussées en béton de ciment - Exécution et contrôle
NF EN 13369 P19-800 Règles communes pour les produits préfabriqués en béton (2ème tirage - 2007-01-01)
NF EN 13369 COMPIL P19-800COMPIL Règles communes pour les produits préfabriqués en béton - Texte compilé de la norme NF EN 13369 de décembre 2004 et de son amendement 1 de juillet 2006 (2ème tirage - 2007-03-01)
NF EN 13369/A1 P19-800/A1 Règles communes pour les produits préfabriqués en béton
F4E_D_25TS67 v2.3
F4E_D_25TS67 v.2.1 F4E-OPE-439 - ANNEX B – TECHNICAL SPECIFICATION Page 20/21
Unlimited
Référence officielle Indice de classement Titre de la norme
NF EN 13877-1 P98-870-1 Chaussées en béton - Partie 1 : matériaux (2ème tirage - 2006-04-01)
NF EN 14487-1 P18-510-1 Béton projeté - Partie 1 : définitions, spécifications et conformité
NF EN 14487-2 P18-510-2 Béton projeté - Partie 2 : exécution
NF P15-314 P15-314 Liants hydrauliques - Ciment prompt naturel
NF P15-317 P15-317 Liants hydrauliques - Ciments pour travaux à la mer
NF P15-318 P15-318 Liants hydrauliques - Ciments à teneur en sulfures limitée pour béton précontraint
NF P15-319 P15-319 Liants hydrauliques - Ciments pour travaux en eaux à haute teneur en sulfates
NF P18-545 P18-545 Granulats - Éléments de définition, conformité et codification
NF P18-424 P18-424 Bétons - Essai de gel sur béton durci - Gel dans l'eau - Dégel dans l'eau
NF P18-425 P18-425 Bétons - Essai de gel sur béton durci - Gel dans l'air - Dégel dans l'eau
NF EN 13263-1+A1 P18-502-1 Fumée de silice pour béton - Partie 1 : définitions, exigences et critères de conformité
NF EN 13263-1/IN1 P18-502-1/IN1 Fumée de silice pour béton - Partie 1 : définitions, exigences et critères de conformité
NF EN 13263-2+A1 P18-502-2 Fumée de silice pour béton - Partie 2 : évaluation de la conformité
NF EN 13263-2/IN1 P18-502-2/IN1 Fumée de silice pour béton - Partie 2 : évaluation de la conformité
FD P18-542 P18-542 Granulats - Critères de qualification des granulats naturels pour béton hydraulique vis-à-vis de l'alcali-réaction
XP P18-594 P18-594 Granulats - Méthodes d'essai de réactivité aux alcalis
Liste issue des parges 49 à 89 de : ITER-code partie 2 IDM-2E2U9X.v1.1
NF EN 196-2 P15-471-2 Méthodes d'essais des ciments - Partie 2 : analyse chimique des ciments
NF EN 933-2 P18-622-2 Essais pour déterminer les caractéristiques géométriques des granulats - Partie 2 : détermination de la granularité - Tamis de contrôle, dimensions nominales des ouvertures.
NF EN 933-3 P18-622-3 Essais pour déterminer les caractéristiques géométriques des granulats - Partie 3 : détermination de la forme des granulats - Coefficient d'aplatissement
NF EN 933-4 P18-622-4 Essais pour déterminer les caractéristiques géométriques des granulats - Partie 4 : détermination de la forme des granulats - Indice de forme
NF EN 933-5 P18-622-5 Essais pour déterminer les caractéristiques géométriques des granulats - Partie 5 : détermination du pourcentage de surfaces cassées dans les gravillons
F4E_D_25TS67 v2.3
F4E_D_25TS67 v.2.1 F4E-OPE-439 - ANNEX B – TECHNICAL SPECIFICATION Page 21/21
Unlimited
Référence officielle Indice de classement Titre de la norme
NF EN 933-5/A1 P18-622-5/A1 Essais pour déterminer les caractéristiques géométriques des granulats - Partie 5 : détermination du pourcentage de surfaces cassées dans les gravillons
NF EN 933-6 P18-622-6 Essais pour déterminer les caractéristiques géométriques des granulats - Partie 6 : évaluation des caractéristiques de surface - Coefficient d'écoulement des granulats (3ème tirage - 2009-10-01)
NF EN 933-7 P18-622-7 Essais pour déterminer les propriétés géométriques des granulats - Partie 7 : détermination de la teneur en éléments coquilliers - Pourcentage des coquilles dans les gravillons
NF EN 933-8 P18-622-8 Essais pour déterminer les caractéristiques géométriques des granulats - Partie 8 : évaluation des fines - Équivalent de sable
NF EN 933-9 P18-622-9 Essais pour déterminer les caractéristiques géométriques des granulats - Partie 9 : qualification des fines - Essai au bleu de méthylène
NF EN 1744-1 P18-660-1 Essais visant à déterminer les propriétés chimiques des granulats - Partie 1 : analyse chimique
NF EN 1097-1 P18-650-1 Essais pour déterminer les caractéristiques mécaniques et physiques des granulats - Partie 1 : détermination de la résistance à l'usure (micro-Deval)
NF EN 1097-2 P18-650-2 Essais pour déterminer les caractéristiques mécaniques et physiques de granulats - Partie 2 : méthodes pour la détermination de la résistance à la fragmentation
NF EN 1097-5 P18-650-5 Essais pour déterminer les caractéristiques mécaniques et physiques des granulats - Partie 5 : détermination de la teneur en eau par séchage en étuve ventilée
P18-576 P18-576 Granulats - Mesure du coefficient de friabilité des sables
NF P18-545 P18-545 Granulats - Éléments de définition, conformité et codification
FD P18-542 P18-542 Granulats - Critères de qualification des granulats naturels pour béton hydraulique vis-à-vis de l'alcali-réaction
P18-556 P18-556 Granulats - Détermination de l'indice de continuité
P18-557 P18-557 Granulats - Éléments pour l'identification des granulats