19
EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010 Page 1 ITER welcomes EPICS WD Klotz ITER int. Organiztion That’s me

ITER welcomes EPICS WD Klotz ITER int. Organiztion

  • Upload
    halden

  • View
    38

  • Download
    0

Embed Size (px)

DESCRIPTION

ITER welcomes EPICS WD Klotz ITER int. Organiztion. That’s me. ITER – a Global Challenge. „The stakes are considerable, not to say vital for our planet.“ Manuel Barroso, Former President of the European Commission. - PowerPoint PPT Presentation

Citation preview

Page 1: ITER welcomes EPICS WD Klotz ITER int. Organiztion

EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010 Page 1

ITER welcomes EPICS

WD KlotzITER int. Organiztion

That’s me

Page 2: ITER welcomes EPICS WD Klotz ITER int. Organiztion

Page 2EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010

ITER – a Global Challenge

• „The stakes are considerable, not to say vital for our planet.“ Manuel Barroso, Former President of the European Commission

Page 3: ITER welcomes EPICS WD Klotz ITER int. Organiztion

Page 3EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010

Fusion powers the sun and the starsFusion powers the sun and the stars“…Prometheus steals fire from the heaven”“…Prometheus steals fire from the heaven”

• Essentially limitless fuel, available all over the world

• No greenhouse gases

• Intrinsic safety

• No long-lived radioactive waste

• Large-scale energy production

On Earth,

fusion could provide:

Page 4: ITER welcomes EPICS WD Klotz ITER int. Organiztion

EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010 Page 4

The Fusion Reaction on Earth“... is not the same as in the Sun“

CH4 + 2O2 --> CO2 + 2H2O + 5.5 eV (chemical)41H + 2e --> 4He + 2 + 6 + 26.7 MeV (solar process)

+ 3.5 MeV

+ 14.1 MeV

Page 5: ITER welcomes EPICS WD Klotz ITER int. Organiztion

Page 5EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010

Why D-T: Cross section

Page 6: ITER welcomes EPICS WD Klotz ITER int. Organiztion

Page 6EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010

Fusion FuelRaw fuel of a fusion reactor is water and lithium*

Lithium in one laptop battery + half a bath-full of ordinary water (-> one egg cup full of heavy water) 200,000 kW-hours = (current UK electricity production)/(population of the UK) for 30 years

* Deuterium/hydrogen = 1/6700+ tritium from: neutron (from fusion) + lithium tritium + helium

Page 7: ITER welcomes EPICS WD Klotz ITER int. Organiztion

Page 7EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010

Basic Principle of Stable Motion of Ions in Magnetically confined Plasma

Page 8: ITER welcomes EPICS WD Klotz ITER int. Organiztion

Page 8EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010

Reactor conditions

ITER

Progress in fusion performance

Page 9: ITER welcomes EPICS WD Klotz ITER int. Organiztion

Page 9EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010

Major technical elements of ITER

Nb3Sn-SC

Nb3Sn-SC

NbTi-SC

Be- S/Steel

S/Steel

CFC-W-S/Steel

film

Page 10: ITER welcomes EPICS WD Klotz ITER int. Organiztion

Page 10

EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010

ITER Tokamak – Mass Comparison

ITER Machine mass: ~23000 t

28 m diameter x 29 m tall

Charles de Gaulle mass: ~38000 t (empty)

856 ft (261 m) long(Commissioned 2001)

Page 11: ITER welcomes EPICS WD Klotz ITER int. Organiztion

Page 11

EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010

Vacuum Vessel Mass Comparison

VV & In-vessel components mass: ~8000 t19.4 m outside diameter x 11.3 m tall

Eiffel Tower mass: ~7300 t324 m tall(Completed 1889)

Page 12: ITER welcomes EPICS WD Klotz ITER int. Organiztion

Page 12

EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010

TF Coil – Mass ComparisonTF Coil – Mass Comparison

Mass of (1) TF Coil: ~360 t16 m Tall x 9 m Wide

D8 Caterpillar Bulldozer~35 t

Page 13: ITER welcomes EPICS WD Klotz ITER int. Organiztion

Page 13

EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010

Cryostat Size ComparisonCryostat Size Comparison

ITER Cryostat~28 m Tall x 29 m Wide Jefferson Memorial (Washington

DC)~29 m Tall (floor to top of dome)

Page 14: ITER welcomes EPICS WD Klotz ITER int. Organiztion

Page 14

EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010

EPICS for ITER

Decision taken about 16 month ago

Consequences:– We have to convince and sell to achieve acceptance– We don’t have very much time …

Page 15: ITER welcomes EPICS WD Klotz ITER int. Organiztion

Page 15

EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010

Overview of Schedule to 2019 First Plasma

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

First Plasma

ITER Construction

TF Coils (EU)

Tokamak Assembly

Tokamak Basic Machine Assembly

Ex Vessel Assembly

In Vessel Assembly

Start Install CS Start Cryostat Closure

Pump Down & Integrated Commissioning

Start Machine Assembly

2021 2022

ITER Operations

Assembly Phase 2

Assembly Phase 3

Plasma Operations

2023

Buildings & Site

Central Solenoid (US)

Case Winding Mockups Complete TF10 TF15

VV Fabrication Contract Award VV 05 VV09 VV07

Vacuum Vessel (EU)

CS Final Design Approved CS3L CS3U CS Ready for Machine Assembly

Construction Contract Award Tokamak Bldg 11 RFE

Integrated Commissioning

Page 16: ITER welcomes EPICS WD Klotz ITER int. Organiztion

Page 16

EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010

Overview of Operation up to DT

2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029

ITER Construction

Assembly Phases II and III

2030 2031 2032

ITER OperationsIntegrated Commissioning

Hydrogen-Helium Operations Campaign

Deuterium Operations Campaign

Assembly Phase 2

Assembly Phase 3

First Plasma

Start Torus Pump Down

Pump Down & Integrated Commissioning

Magnet Commissioning

Commission, Cool & Vacuum

Plasma Development & H&CD Commissioning

Full H&CD, TBM & Diagnostics Commissioning

Pre-Nuclear Shutdown & Divertor Change

Q=10 Short Pulse

Planned Shutdown

Start DT

Deuterium-Tritium Operations Campaign

Deuterium-Tritium Operations

Q=10 Long Pulse Achieved

Nominal Plasma Hydrogen-Helium Complete Start Tritium Q=10 Long Pulse Achieved

Deuterium Operations

Page 17: ITER welcomes EPICS WD Klotz ITER int. Organiztion

Page 17

EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010

EPICS for ITER

Decision taken about 16 month agoConsequences:

– We have to convince and sell to achieve acceptance– We don’t have very much time …– We have to learn from the community to use it the good way– We have to show ITER to the community– We organized the spring collaboration meeting 2010 in AIX– We are happy to have received:

• 113 registrations• 52 affiliations• 9 companies • 33 contributions

Page 18: ITER welcomes EPICS WD Klotz ITER int. Organiztion

Page 18

EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010

Collaboration

Collaborating means taking and giving• Giving

– ITER surely will contribute to the community – We could become an active contributor to CSS and an OO

service layer– Today ITER disseminates EPICS to the fusion community– … more to come

• Taking– For a fast start up we take what the community has produced– …and we thank the community for giving us this possibility

Having said that …

Page 19: ITER welcomes EPICS WD Klotz ITER int. Organiztion

Page 19

EPICS Collaboration Meeting – Aix-en-Provence - 1.-3. June 2010

Enjoy the Meeting !