24
ISO TC 204 Intelligent Transport Systems Global ITS standards with a focus on Cooperative Communication Systems 2nd ETSI TC ITS workshop Sophia Antipolis 11/02/2010 András Csepinszky ISO TC204 WG16

ISO TC 204 Intelligent Transport Systems · 2010-02-11 · ISO TC 204 Intelligent Transport Systems Global ITS standards with a focus on Cooperative Communication Systems 2nd ETSI

  • Upload
    others

  • View
    16

  • Download
    0

Embed Size (px)

Citation preview

ISO TC 204Intelligent Transport Systems

Global ITS standards with a focus on Cooperative Communication on Cooperative Communication

Systems

2nd ETSI TC ITS workshopSophia Antipolis

11/02/2010

András CsepinszkyISO TC204 WG16

Agenda

• Introduction of ISO/TC 204

• Introduction of WG16

• Status of WG16 work items

• Next steps• Next steps

• Standardization needs

Purpose of ISO (International Organization for Standardization)

• To facilitate international exchange of materials and services

• To encourage international cooperation of intellectual, scientific, technical, and economical intellectual, scientific, technical, and economical activities

ISO Process Preliminary Stage

Proposal Stage

Working Stage

Draw up and Examine WD (Working Draft) at WG

CD (Committee Draft (s))-Discuss the advise from TG -CD voting

PWI (Preliminary Work Item)-Examine the item for the standardization at WG

NP (New work item Proposal)-Examine the apply range for standardization at WG-NP voting

Committee Stage

Inquiry Stage

Approval Stage

Publication Stage

Published

Proofreading and Printing

-CD voting

DIS (Draft International Standard)-Send DIS to the countries concerned -5 month voting

FDIS (Final DIS)-Enroll FDIS -2 month voting

Voting ProcedureName Member Term Remarks

PWI (Preliminary

stage)P Member - Greater part of P member

NP Voting(Proposal

stage)P Member

Within 3 month

Greater part of voted P member and the declaration of positive participation from more than 5 P member

CD Voting(Committee

stage)P Member

3 – 4 month

There is a consensus as the principle. If it is not obtain, it is necessary to obtain more than 2/3 approval of P member

DIS Voting(Inquiry

stage)

Represent-atives of All countries

Within 5 month

More than 2/3 approval of P member voting and less than 1/4 opposite of total voting

FDIS Voting(Approval

stage)

Represent-atives of All countries

Within 2 month

More than 2/3 approval of P member voting and less than 1/4 opposite of total voting

Note: P member is participating member, O member is observing member.

Structure of ISO/TC204

UK

日本

Norway

Sweden

Canada

ISO/TC204Chairman (U.S.)

WG1:Architecture

WG3:ITSデータベース技術

WG4:Automatic Vehicle Identification

WG5:Electronic Fee Collection

WG7:General Fleet Management

Secretariat:TIA(U.S.)(Telecommunications Industry Association)

WGWGWGWG namenamenamenameConvener Convener Convener Convener ccccountryountryountryountry

JapanWG3:ITS Database Technology

USA

Australia

Germany

Vacant seat

Japan

Germany

KoreaKoreaKoreaKorea

WG8:Public Transport

WG9:Integrated Transport Information Management

WG10:旅行者情報

WG11:Route Guidance and Navigation Systems

WG14:Vehicle/Roadway Warning and Control Systems

WG15:Dedicated Short-Range Communications

WG16:広域通信

WG17:ノーマディックデバイス

WG10:Traveler Information Systems

USAWG16:Wide Area Communication

WG17:Nomadic device Korea

WG18:Cooperative Systems Germany

Members of ISO/TC204

Participating members (25): Take part in conferences and play an active role in operations with a voting requirement

Algeria, Australia, Austria, Belgium, Brazil, Canada, China, Czech, France, Germany, Hungary, India, Italy, Japan, SouthKorea, Malaysia, Netherlands, Norway, Russia, South Africa, Spain, Sweden, Switzerland, United Kingdom, United StateSweden, Switzerland, United Kingdom, United State

Observing members (29): Follow operations as an observer with the right to submit comments and take part in conferences

Benin, Chile, Colombia, Croatia, Cuba, Cyprus, Denmark, Egypt, Finland, Greece, Hong Kong, Indonesia, Iran, Ireland,Israel, New Zealand, Pakistan, Philippines, Poland, Romania, Serbia, Singapore, Slovakia, Sri Lanka, Thailand,Trinidad and Tobago, Turkey, Ukraine, Uruguay

Structure of ISO/TC204 WG16

K. Evensen

日本

H. Wakayama

M. Sato

M. Ohyama

ISO/TC204 WG16Chairman (U.S.)

SWG0:Architecture

WG3:ITSデータベース技術

SWG2:Networking

SWG3:Probe Data

SWG4:Application Management

SSSSWGWGWGWG namenamenamename ConvenerConvenerConvenerConvener

H-J. FischerSWG1:Media

M. Ohyama

B. Williams

S. Takaaki

S. Cadzow

SWG4:Application Management

SWG5:Emergency Communications

SWG6:Non-IP Networking

WG10:旅行者情報SWG7:LI Security

Family of standards at ISO/TC204 WG16

ISO/TC204 WG16 SWG16.0Architecture

ISO Work Item

Title Current Stage

Target Dates Started Current Stage

Project Leader Project Control

FDIS 21217 CALM Architecture 50.20 FDIS: 2010-03-14IS: 2010-09-14

2010-01-14 K [email protected]

FDIS ballot was started on 14 January 2010.

DIS 24102 CALM Management

40.99 FDIS:2010-05-13IS: 2010-11-13

2009-10-20 K [email protected]

DIS ballot ended on 24 September 2009. Results: Yes 13; Yes with comments 5; Abstain 4; No 2. Next step: FDIS ballot.

ISO/TC204 WG16 SWG16.1Media I.

ISO Work Item

Title Current Stage

Target Dates Started Current Stage

Project Leader Project Control

NP 13183 CALM receiving public broadcast communications

10.60 2009-09-15 R [email protected]

NP/CD ballot ended on 4 September 2009. Results: Yes 9; Yes with comments 4; Abstain 6; No 1. Next step: DIS ballot.

IS 21212 CALM using 2G Cellular Systems

60.60 2008-10-22 R [email protected]

Published standard

IS 21213 CALM using 3G Cellular Systems

60.60 2008-10-23 R [email protected]

Published standardCellular Systems [email protected]

IS 21214 CALM IR 90.92 2008-04-11 R [email protected]

Standard is under revision

PWI 21214 CALM IR Rev.1 00.20 2008-04-11 R [email protected]

CD ballot was approved by TC 204 Barcelona plenary. Next step: CD ballot.

DIS 21215 CALM M5 40.99 FDIS: 2010-08-04IS: 2011-02-04

2009-10-20 K Evensen [email protected]

DIS ballot ended on 24 September 2009. Results: Yes 12; Yes with comments 6; Abstain 3; No 3. Next step: FDIS ballot.

DIS 21216-1 CALM Millimetre, Physical Layer

40.20 FDIS:2010-01-24IS: 2010-07-24

2009-04-24 M [email protected]

DIS ballot ended on 24 September 2009. Results: Yes 18; Yes with comments 0; Abstain 6; No 1. Next step: FDIS ballot.

ISO/TC204 WG16 SWG16.1Media II.

ISO Work Item

Title Current Stage

Target Dates Started Current Stage

Project Leader Project Control

PWI 21216-2 CALM Millimetre, MAC-related Parameters

00.00 2007-11-01 A [email protected]

PWI has been registered by ISO CS. Form4 should be retransmitted to ISO CS.

IS 21218 CALM Networking - Lower Layer SAPs

60.60 2008-08-05 HJ [email protected]

Published standard

IS 24103 CALM MAIL 60.60 2009-05-26 K [email protected]

Published standard

[email protected]

IS 25111 CALM ITS using Public Wireless Networks -General requirement

60.60 2009-10-30 H [email protected]

Published standard

PRF 25112 CALM MWB using IEEE 802.16

50.00 IS: 2010-09-04 2009-11-10 H [email protected]

Direct publication was approved by TC204 Chiang Mai plenary. Draft was submitted to TC204 on 25 October 2009. Proof is under review.

PRF 25113 CALM MWB using HC-SDMA

50.00 IS: 2010-09-04 2009-11-10 K [email protected]

Direct publication was approved by TC204 Chiang Mai plenary. Draft was submitted to TC204 on 22 October 2009. Proof is under review.

PWI 21216-2 CALM Millimetre, MAC-related Parameters

00.00 2007-11-01 A [email protected]

PWI has been registered by ISO CS. Form4 should be retransmitted to ISO CS.

ISO/TC204 WG16 SWG16.1Media III.

ISO Work Item

Title Current Stage

Target Dates Started Current Stage

Project Leader Project Control

CD 29282 CALM Applications using Satellite

30.99 DIS: 2010-06-29FDIS: 2011-06-29IS: 2011-12-29

2009-09-18 R [email protected]

Next step: DIS ballot.

DIS 29283 CALM Applications using 802.20

40.20 FDIS: 2011-03-02IS: 2011-09-02

2009-11-20 K [email protected]

DIS ballot ends on 20 April 2010

ISO/TC204 WG16 SWG16.2Networking

ISO Work Item

Title Current Stage

Target Dates Started Current Stage

Project Leader Project Control

DIS 21210 CALM IPv6 Networking

40.20 FDIS: 2010-10-27IS: 2011-04-27

2009-11-09 H [email protected]

DIS re-ballot ended on 9 January 2010.

ISO/TC204 WG16 SWG16.3Probe data

ISO Work Item

Title Current Stage

Target Dates Started Current Stage

Project Leader Project Control

IS 22837 Vehicle Probe Data for Wide Area Communication

60.60 2009-01-15 T [email protected]

Published standard

FDIS 24100 Basic Principles for personal data protection in probe vehicle information systems

50.20 FDIS: 2010-03-04IS: 2010-09-04

2010-02-08 Y [email protected]

FDIS Ballot started on 8 February 2010.

CD TS 25114 Probe Data 30.99 FDIS: 2010-05-13 2009-10-20 S Sprouffske DTS ballot ended 30 CD TS 25114 Probe Data Reporting Management

30.99 FDIS: 2010-05-13IS: 2010-11-13

2009-10-20 S [email protected]

DTS ballot ended 30 December 2008. Results: Yes 14; Yes with comments 1, Abstain 4, No 0. Direct publication was approved by TC204 Barcelona plenary. Draft and figures were submitted to TC204 on 18 November 2009. Waiting for proof.

NP 29284 Event based Probe Vehicle Data

10.99 CD: 2009-09-12DIS: 2010-03-12FDIS: 2011-03-12IS: 2011-09-12

2008-09-12 M [email protected]

CD ballot was approved by TC204 Chiang May plenary. CD ballot time extension was approved by TC204 Barcelona plenary. New CD ballot target date was requested by TC204 on 9 December 2009. New target date is 12 February 2010.

ISO/TC204 WG16 SWG16.4Application management

ISO Work Item

Title Current Stage

Target Dates Started Current Stage

Project Leader Project Control

IS 15662 TICS Wide Area Communication Message Management Information

90.93 2009-05-15 H [email protected]

ISO CS extended the life time of the standard

IS 24101-1:2008

CALM Application Management

60.60 2008-03-10 M [email protected]

Published standard

DIS 24101-2 CALM Application 40.60 FDIS: 2010-09-03 2009-11-24 M Ohyama DIS ballot ended on 22 DIS 24101-2 CALM Application Management –Conformance Test

40.60 FDIS: 2010-09-03IS: 2011-03-03

2009-11-24 M [email protected]

DIS ballot ended on 22 November 2009. Results: Yes 13; Yes with comments 1; Abstain 9; No 0. Next step: direct publication.

ISO/TC204 WG16 SWG16.5Emergency communication

ISO Work Item

Title Current Stage

Target Dates Started Current Stage

Project Leader Project Control

IS 24978 ITS Safety and Emergency Notifications using any Available Wireless Media -Data Registry

60.60 2009-09-29 R [email protected]

Published standard

ISO/TC204 WG16 SWG16.6Non-IP networking

ISO Work Item

Title Current Stage

Target Dates Started Current Stage

Project Leader Project Control

DIS 29281 CALM non-IP Communication Mechanisms

40.20 FDIS:2010-05-22IS: 2010-11-22

2009-08-24 T [email protected]

DIS ballot ended on 24 January 2010

ISO/TC204 WG16 SWG16.7LI Security

ISO Work Item

Title Current Stage

Target Dates Started Current Stage

Project Leader Project Control

PRF TR 11766Lawful Interception in ITS and CALM

50.00 FDIS: 2010-08-10IS: 2011-02-10

2009-11-11 S Cadzow [email protected]

Direct publication was approved by TC204 Chiang Mai plenary. Draft was submitted to TC204 on 22 October 2009. Title change was requested by ISO CS and approved by editor on 10 November 2009. Waiting for proof.

CD TR 11769 Data retention for 30.99 FDIS: 2010-08-10 2009-10-20 S Cadzow Direct publication was CD TR 11769 Data retention for law enforcement in ITS and CALM

30.99 FDIS: 2010-08-10IS: 2011-02-10

2009-10-20 S Cadzow [email protected]

Direct publication was approved by TC204 Barcelona plenary. Draft is circulated internally.

PWI 13181-1 CALM Security Part 1: Framework

00.00 2008-11-14 S Cadzow [email protected]

Item registered by ISO CS 11 December 2008. Form4 should be retransmitted to ISO CS.

PWI 13181-2 CALM Security Part 2: Threat Vulnerability and Risk Analysis

00.00 2008-11-14 S Cadzow [email protected]

Item registered by ISO CS 11 December 2008. Form4 should be retransmitted to ISO CS.

PWI 13181-3 CALM Security Part 3: Objectives and Requirements

00.00 2008-11-14 S Cadzow [email protected]

Item registered by ISO CS 11 December 2008. Form4 should be retransmitted to ISO CS.

PWI 13181-4 CALM Security Part 4: Countermeasures

00.00 2008-11-14 S Cadzow [email protected]

Item registered by ISO CS 11 December 2008. Form4 should be retransmitted to ISO CS.

ISO/TC204 WG16 development summary I.

1996: first work item registered2001: 5 new work items registered2005: 7 new work items registered2006: 8 new work items registered2006: 8 new work items registered2007: 7 new work items registered2008: 7 new work items registered2010: 4 new work items are expected to be registered

ISO/TC204 WG16 development summary II.

• Published standards� 2006: ISO published 2 WG16 standards

15662, 21214

� 2008: ISO published 4 WG16 standards21212, 21213, 21218, 24101-121212, 21213, 21218, 24101-1

� 2009: ISO published 4 WG16 standards22837, 24103, 24978, 25111

• Number of expected publications for 2010� 11 WG16 standards are expected to be published

11766, 11769, 21210, 21215, 21216-1, 21217, 24102, 25112, 25113, 25114, 29281

ISO/TC204 WG16 objectives for 2010

• To wrap up the work on the draft work items• To get the standards published

ISO/TC204 WG16 needs for the future

• Reliable test standards for the published WG16 standards such as:� ETSI TS 102669 for ISO/IS 21214� ETSI TS 102760 for ISO/IS 21218� ETSI TS 102797 for ISO/IS 24102

Make standardization experience available to stakeholders

Building on the past eSafety Support activities „Intelligent Car Support” will support the implementation of actions and recommendations of the eSafety Forum and the Intelligent Car Initiatives

• Follow-up the deployment of eSafety and Intelligent Car • Follow-up the deployment of eSafety and Intelligent Car key technologies

• Organise eSafety Forum and Intelligent Car meetings• Monitor the implementation of eSafety recommendations

• Support & coordinate ITS standardisation activities

• Launch minor studies on topics identified by the eSafety Forum

• Support the EeIP and contribute to the deployment of eCall service