Inventory of Major Alberta Projects

SAIT – Trades & Technology Complex

March 2012

Alberta Treasury Board and Enterprise 4th Floor, Commerce Place Edmonton, Alberta T5J 4L6

Page 2: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Inventory of Major Alberta Projects

Introduction

The Inventory of Major Alberta Projects is produced by Alberta Treasury Board and Enterprise to assist firms in identifying potential supply opportunities.

The Inventory lists construction projects in Alberta valued at $5 million or greater that are planned, underway or have recently been completed. The report also identifies projects that have been put on hold or deferred. Project data is obtained from public and private information sources. Where possible, this data has been verified with the project proponent/developer; however, users of the Inventory may wish to confirm project data with the proponent/developer.

While efforts have been made to obtain the most recent information, it should be noted that projects are being constantly re-evaluated by industry. Although the Inventory attempts to be as comprehensive as possible, some information may not be available at the time of printing, or not published due to reasons of confidentiality.

New information as of March 2012: Projects that have been on hold for two years or more (March 2010 or earlier) have been removed

The Inventory can be accessed on the Internet at

from the report. The information has been saved so that if these projects proceed at some future date, they can be included in the Inventory.

http://www.albertacanada.com/about-alberta/inventory-of-major-projects.html.

Later this year (at this point the exact date is unknown) the URL will change to http://www.albertacanada.com/business/statistics-and-publications/inventory-of-major-projects.html.

New projects and (where possible) updated information on current projects is added to the Internet database on a monthly basis. The print edition of the report is produced quarterly. New projects added to the Inventory between January 1 and March 31, 2012 are shown in the New Projects table on page (iii) and in upper case in the Project Description column in the body of the report.

If you have questions or require additional information about the Inventory of Major Alberta Projects publication, contact:

Alberta Treasury Board and Enterprise Kathy Dumaresq Phone: 780-427-6787 Fax: 780-422-0061 Email: [email protected]

Page 3: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Inventory of Major Alberta Projects Table of Contents

Page

Highlights of the March 2012 Inventory of Major Alberta Projects .................................... i

Map Showing Value of Inventory of Major Alberta Projects by Economic Region ........... iii

New Projects Added January – March 2012 ................................................................... v

Projects Completed January – March 2012 .................................................................. viii

On Hold Projects Removed from the Inventory - March 2012 ........................................ x

Summary Table ............................................................................................................. xiii

Project Sectors

Agriculture & Related ................................................................................................. 1

Biofuels ...................................................................................................................... 1

Chemicals & Petrochemicals ..................................................................................... 2

Commercial/Retail ...................................................................................................... 2

Commercial/Retail & Residential................................................................................ 7

Forestry & Related ..................................................................................................... 8

Infrastructure .............................................................................................................. 8

Institutional ............................................................................................................... 28

Mining ...................................................................................................................... 36

Oil & Gas ................................................................................................................. 37

Oil Sands ................................................................................................................. 38

Other Industrial ........................................................................................................ 43

Pipelines .................................................................................................................. 44

Power ....................................................................................................................... 46

Residential ............................................................................................................... 49

Telecommunications ................................................................................................ 56

Tourism/Recreation .................................................................................................. 56

Page 4: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

i

Highlights of the March 2012 Inventory of Major Alberta Projects Report

In March 2012, 31 IMAP projects that have been on hold for two years or more (since March 2010) were removed from the Inventory report. The value of these projects is $15.7 billion. These projects cover several sectors including commercial/retail (2 projects), commercial/retail and residential (2) infrastructure (4), institutional (3), oil sands (6), residential (13) and tourism/recreation (1).

In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current Inventory is comprised of 823 projects. The sector with the largest number of projects is Infrastructure with 264, valued at $16.8 billion. The second largest sector is institutional with 122 projects valued at close to $8.3 billion.

The sector with the largest dollar value is Oil Sands. At the end of March there are 59 oil sands projects (mines, in-situ extraction and upgraders) with an estimated value of $122.0 billion. These are projects that are either under construction or scheduled to begin construction within the next two to three years. A number of oil sands projects have additional phases, but the capital values of these future phases are not included in the current report.

As of the end of March 2012 the Inventory includes 20 projects with a value of close to $2.4 billion that are on hold. In March 2011 there were 59 deferred projects valued at $25.9 billion. Currently the residential category has the largest number of deferred projects at seven.

Ninety-eight new projects were added to the Inventory between January 1 and March 31, 2012. The estimated construction value of these new projects is nearly $6.3 billion. Of these, the three largest projects in terms of dollar value are: Cenovus Energy’s Pelican Lake Grand Rapids SAGD oil sands project phase 1 (valued at $2.0 billion); the CNRL Kirby oil sands expansion phase 1 (valued at $1.2 billion); and NOVA Chemical’s proposed polyethylene facility expansion in Lacombe County (Joffre), valued at $900 million.

These gains were offset by the cancellation of two projects: the Enbridge ‘Fort Hills’ bitumen / diluents pipeline (valued at $2 billion) and the Plasco Energy Group’s waste – to – energy plant (valued at $93 million) proposed for Red Deer County.

Forty-five per cent of the new IMAP projects are infrastructure projects (roads, bridges, water/sewer, government office buildings, RCMP/police/fire stations, LRT lines and transit centres) valued at $627 million, while another 17 per cent are commercial/retail projects (shopping centres, office towers, warehouses) with a value of $557 million.

Fourteen per cent of the new projects are institutional projects (schools, hospitals, post-secondary education, seniors lodges/continuing care/supportive housing projects) with an estimated construction value of $179 million.

Six per cent are residential projects (apartment buildings, townhouse complexes, affordable housing) valued at $255 million.

Three new projects were added to the oil sands sector this quarter, with a value of $3.2 billion. There was also one new project valued at $900 million added to the chemicals & petrochemicals sector.

The remaining 14 per cent of new projects (valued at $507 million) are shared among the agriculture, biofuels, oil/gas, pipelines, power, and tourism/recreation sectors.

Page 5: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Value of Projects ($Million) by Economic Region as of March 2012

1. Wood Buffalo -Cold 2. Athabasca-Grande Prairie 3. Edmonton Region 4. Banff-Jasper-Rocky Mtn. House 5. Red Deer Region 6. Camrose-Drumheller 7. Calgary Region 8. Lethbridge-Medicine Hat Provincial Total

iii

1

2

3

4 5 6

7

8

Note: The sum of the economic regions does not equal the provincial total. Some projects such as pipelines cover more than one region, and those are not included in this table.

$ 110,046.0 $ 13,092.6 $18,800.2 $ 1,350.7 $ 2,167.3 $ 2,704.0

$ 21,403.4 $ 2,953.4

$ 189,236.8

Page 6: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

v

New Projects Added January to March 2012

Region/ Municipality Project Description Cost In $ Millions

1. Wood Buffalo/Cold Lake County of Lac La Biche Hwy 55 Trunk Sewer $9.5

Smoky Lake 'Bar V Nock' Supportive Living Centre $7.4 Bonnyville Bonnylodge Seniors Facility Renovations / Upgrades Phase 1 $10.0 RM of Wood Buffalo Oils Sands Work Camp $27.0 RM of Wood Buffalo New Facility (Ft McMurray) $16.5 RM of Wood Buffalo Parson's Creek Interchange Utility Corridor $9.5 RM of Wood Buffalo Excavate, Salvage & Stockpile Wetland Topsoil (N of Ft. McMurray) $8.3 RM of Wood Buffalo Gateway Crossing & Pond Retaining Walls, Parsons Creek

(Ft McMurray) $9.0

RM of Wood Buffalo Kirby Expansion Phase 1 Oil Sands Project (Kirby North Phase 1 or KN1) (S of Conklin)

$1,200.0

Regional Total $1,297.2

2. Athabasca/Grande Prairie Woodlands County Chickadee Creek Generating Station (14MW) $64.0

Sprit River Administration Complex & Public Works Bldg $10.0 MD of Opportunity Pelican Lake Grand Rapids' SAGD Oil Sands Phase 1 $2,000.0

Regional Total $2,074.0

3. Edmonton Edmonton Production Plant $7.4

Edmonton Data Centre $30.0 Edmonton Infrastructure Upgrades & Streetscaping 'The Armature'

(Part Of The Quarters District) $56.0

Edmonton Warehouse $6.5 Edmonton Shaw Conference Centre Escalators $12.0 Edmonton Bridge Rehabilitation, 82 Ave Over Argyll Rd $5.9 Leduc 50 Ave Widening Between Hwy 2 & Alton Drive $6.0 Edmonton Edmonton Institute For Women Addition (40 Bed Living Unit) $6.1 Edmonton Alberta Hospital Edmonton Renovations (Bldg 12) $15.0 Edmonton Elevator Upgrades / Modernization $5.8 Edmonton 'Our Parents Home' Supportive Living Spaces $6.0 Fort Saskatchewan Ethylene Storage Facility Cavern Development $15.0 Edmonton 'The Corners I' Condo Tower, The Quarters $80.0 Edmonton Retirement Residence, Lewis Estates $20.0 Leduc County 'Courtyard By Marriott' Hotel, Edmonton International Airport $29.0 Edmonton Telus World Of Science Expansion Phase 1 $7.0

Regional Total $307.7

4. Banff/Jasper/Rocky Mtn House Clearwater County 2012 Local Roads Construction Program $5.9

Canmore Production Facility $5.5 Canmore 2012 Street Rehabilitation $7.8 Canmore Cougar Creek Erosion Mitigation $6.4

Regional Total $25.6

Page 7: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

vi

5. Red Deer Red Deer Industrial Bldg $5.0

Red Deer Modernization / Addition $7.4 Lacombe County Polyethylene Facility Expansion (Joffre) $900.0 Innisfail Main Street Reconstruction Project $8.0

Regional Total $920.4

6. Camrose/Drumheller Lloydminster Biodiesel Plant $100.0 MD of Wainwright 'Bull Creek' Wind Farm (110MW) $160.0 MD of Wainwright Thunder Alley & Sparke Rd Grade Base & Pave $11.2 Bashaw 'Bashaw Meadows' Supportive Living Facility $5.4 Strathmore New Reservoir & Pumping Station (Wildflower Reservoir) $7.0

Regional Total $283.6

7. Calgary Calgary Westmount Corporate Campus Parkade $17.0

Calgary ‘The River' Condominium Bldg $130.0 Calgary Apartment Bldg $6.3 Calgary Warehouse / Office Bldg $6.7 Calgary Westmount Corporate Campus Bldg 6 $7.4 Calgary Interior Renovations, Campus Bldg $10.0 Calgary ‘Centre 10' Office Bldg $51.5 Rocky View County Regional Distribution Centre (Balzac) $100.0 MD of Foothills Regional Field House (Near Aldersyde) $16.0 Carstairs Modernization (New Gymnasium) $37.0 Olds 'Sunrise Village 2' Supportive Living Spaces $5.3 Okotoks Westmount Square' Office Bldg $14.0 Calgary New Headquarters Bldg $13.0 Calgary Stoney Industrial Centre Warehouse 5 $13.1 Calgary Fire Station, Evergreen $7.4 Calgary Whitehorn Multiservice Centre Lifecycle Maintenance 2012 $7.0 Calgary 2012 Facility Restoration / Service Improvements $67.0 Calgary Andrew Davidson Bldg Renovation $20.0 Calgary Bearspaw Water Treatment Plant Sodium Hypochlorite $18.0 Calgary Glenmore Filter Plant Improvement Project $7.1 Calgary Manchester Bldgs Base Bldg Lifecycle Maintenance $7.0 Calgary Lakeview Storm Sewer System Upgrade Phase 2 $7.5 Calgary 2012 - 2014 Sanitary Sewer Replacement / Lining Program $16.0 Calgary Nose Creek Trunk Upgrade Phase 2 $21.0 Calgary Crestmont Pump Station $10.0 Calgary 2012 - 2014 Watermain Replacement Program $24.0 Calgary East Mackenzie Feedermain Phase 1 $7.0 Calgary Gilchrist Seniors Housing Facility Redevelopment $20.0 Calgary Auburn Bay Seniors' Residence $27.7 Calgary Evanston Continuing Care Facility (Age In Place) $17.0 Calgary Bldg Alterations (Thomas Riley Addition) $7.4 Calgary Bow View Manor Addition Phase 2 $9.0 Calgary ‘Tribeca' Condo Apartment Bldg $11.5 Calgary ‘Auburn Bay' Apartment Bldg $7.5 Calgary 7 Ave Refurbishment Phase 2 Block A Platforms & Tie - Ins $6.4

Page 8: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

vii

Calgary Bearspaw Water Treatment Plant Filter Air Scour $12.0 Calgary Bearspaw Water Treatment Plant UV Disinfection $10.0 Calgary Bearspaw Water Treatment Plant High Lift Pumps Electrical

Upgrade $9.0

Calgary Municipal Bldg Complex Base Bldg Lifecycle Maintenance $5.0 Calgary Glenmore Water Treatment Plant Filter Gallery Improvements $14.0 Calgary ‘Eighth Ave Place' Office Development Phase 2 (West Tower) $195.0 Calgary East Calgary LandFill Scalehouse & Entrance Replacement $14.0 Calgary Lincoln Park Business Centre Water Main & Sanitary Sewer $6.5 Calgary Shepard LandFill Stormwater Collection & Treatment Expansion $10.0 Calgary Occupational Work Centres (Bearspaw, Richmond Green, Saddle

Ridge, Sarcee & Shepard) $24.6

Calgary Bonnybrook Wastewater Treatment Plant Headworks Grit Removal $71.0 Calgary 16 Ave Over Bowness Rd NW & 16 Ave Over Shaganappi Tr NW

Bridge Rehabilitation $6.3

Calgary Lacrosse Complex $6.5

Regional Total $1,146.7

8. Lethbridge/Medicine Hat County of Newell Rural Potable Water Supply $51.0 Taber Water Treatment Plant Upgrades $5.3 Medicine Hat Conversion of Zellers Store to Target Store $10.0 Medicine Hat Hwy 1 / Dunmore Rd Interchange $30.0 Medicine Hat South Ridge Drive Upgrades, Kipling St to South Boundary Rd $7.6

Regional Total $103.9

9. Multiple Regions Athabasca Cty/Lac La

Biche Cty Hwy 63 Grade, Base & Pave $50.0

Northwestern Alberta Upgrades to Two Pump Stations $30.0 Northwestern Alberta Crude Oil & Condensate Capacity Expansion, Peace Pipeline $30.0

Regional Total $110.0

Provincial Total 98 New Projects $6,269.1

Page 9: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

viii

Projects Completing Construction January to March 2012

Region / Municipality

Project Description Cost in $ Millions

1. Wood Buffalo/Cold Lake

Lac la Biche County Hwy 63 Clearing & Grading 0 RM of Wood Buffalo SAGD Pilot Project, Lindbergh $50.0 RM of Wood Buffalo Saline Creek Outfall Sewer to Mills Ave (Ft. McMurray) $18.9 RM of Wood Buffalo Athletic Field, Timberlea High School Site (Ft McMurray) $15.0 RM of Wood Buffalo Gregoire East Sanitary Outfall Contract 2 (HDD Siphon) $27.0 RM of Wood Buffalo Parsons Development Area Water Transmission Main Phase 2

(Ft McMurray) $15.4

RM of Wood Buffalo 2011 Urban Infrastructure Rehab Program Contract 2 (Thickwood Hts) (Ft McMurray)

$7.5

Regional Total $133.8

2. Athabasca/Grande Prairie County of Barrhead SH 763 Pave (Hwy 18 to Hwy 3) $6.8 Grande Prairie Regional Service Centre $73.0 Grande Prairie Prairie Art Gallery Restoration $10.0 Beaverlodge New Indoor Pool / Community Centre $11.6 Westlock Westlock 'Spirit Centre' Sports Complex $15.5 Mackenzie County Hwy 58 Grade, Base & Pave (S of Negus Ck to High Level) $26.7 MD of Smoky River Grain Elevator & Crop Protection Seed Shed (W of McLennan) $13.0

Regional Total $156.6

3. Edmonton Edmonton EPCOR Office Tower $250.0

St. Albert Light Industrial Building $5.0 Edmonton Edmonton Clinic North Bldg $425.0 Fort Saskatchewan Fort Saskatchewan Community Hospital $87.0 Leduc County Aviation Complex, Edmonton International Airport $16.0 Edmonton Training Accommodation Bldg, CFB Edmonton $11.6 Edmonton Stollery Children's Hospital Emergency Dept Expansion $23.5 Edmonton Mayfair Village' Highrise Apartment Complex phase 1 (South Tower) $56.5 Edmonton North Centre Community Rec Centre, Commonwealth Stadium $95.0 Edmonton 'Nova' Hotel $8.5

Regional Total $978.1

4. Banff/Jasper/Rocky Mtn House Hinton Sawmill Equipment Upgrades $39.0

Rocky Mountain House

Westview Lodge Replacement Facility $10.0

Regional Total $49.0

5. Red Deer Red Deer Wastewater Treatment Plant Upgrade Phase 4 $80.0

Red Deer Riverside Dr Sanitary Trunk Extension Phase 3 $8.6 central Alberta Drayton Valley Trunk Line Extension $6.0 Red Deer Refurbishment of Capri Centre as Sheraton Hotel $8.0

Page 10: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

ix

Bowden Bowden Institute Min Expansion (Programs Bldg, Family Visiting Unit) $8.8

Regional Total $111.4

6. Camrose - Drumheller Drumheller New School (K to Grade 12) $13.5 Lloydminster Supportive Living Units & Community Centre $5.0

Regional Total $18.5

7. Calgary Calgary Light Industrial Building $6.2

MD of Foothills Wastewater Lagoon (Longview) $5.5 Sundre 2011 Capital Improvements $13.0 Sundre Installation of New Equipment -- Scond Planer Line $6.8 Calgary Refrigerated Warehouse Addition $20.0 Calgary Oi Kwan Place Addition / Renovations $22.1 Calgary Addition $5.0 Calgary 'Vida' Condominium Apartment Building $6.3 Calgary Phase 1 - Addition $14.0 Calgary Glenmore Water Treatment Plant Filter Plant Rehabilitation $7.5 Calgary 'Peace Bridge' Pedestrian Bridge over Bow R near Prince's Island $24.7 Calgary Radisson Calgary Airport East Hotel & Conf Centre, near Calgary Airport $19.0

Regional Total $150.1

8. Lethbridge/Medicine Hat County of Newell Transmission Line 666L (W of Brooks) $8.0 Cypress County Range Control Facility, CFB Suffield $5.1 Lethbridge Garry Drive West Road Extension $8.0 MD of Pincher Creek Waterton Natural Gas Processing Plant $40.0

Regional Total $61.1

9. Multiple Regions Fort McMurray to

Redwater 'Boreal' Natural Gas Liquids (NGL) Pipeline $283.0

Brazeau & Yellowhead Counties

Yellowhead area Reinforcement (Infrastructure Upgrades) $127.0

Regional Total $410.0

Provincial Total 51 Completed Projects $2,068.6

Page 11: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

x

On Hold Projects Removed from The Inventory of Major Alberta Projects Report March 2012

Sector/ Company Name

Project Description Project Location

Cost in $ Millions

Commercial/Retail Genco Development Corp ‘634 Genco Court' Office Building Calgary $21.0

The Ironwood Group ‘Ironwood Tower' Office Building Calgary $50.0

Commercial/Retail and Residential Harvard Developments Eau Claire Market Redevelopment Calgary $750.0

Baralot International ‘Sky Plaza' Development (Office Space & Condo Units) Calgary $66.0

Infrastructure City of Calgary Interchange at 14 St and 90 Ave SW Calgary $12.9

Red Deer Regional Airport Airport Alteration & Runway Extension Red Deer Cty $6.0 City of Calgary Widen 14 St SW from 90 Ave S to Anderson Rd Calgary $8.0 City of Calgary Road Widening Peigan Tr from Barlow Tr to 52 St SE Calgary $9.0

Institutional Wimco Properties Ltd ‘Elk Island View -- Bison Place' Assisted Living Facility Lamont $6.0

City of Red Deer Civic Centre (City Hall) Renovations/Expansion Phase 1 Red Deer $58.5 Kopernik Polish Heritage/Good Samaritan Societies

Kopernik Seniors Complex and Community Centre Edmonton $55.0

Oil Sands BP Canada/Value Creation

Inc. ‘Terre de Grace' SAGD Oil Sands Project RM of Wood

Buffalo $3,500.0

Husky Energy Inc/BP Plc ‘Sunrise Thermal Project' Phase 2 RM of Wood Buffalo

$1,900.0

Royal Dutch Shell ‘Orion' Heavy Oil Sagd Facility (phases 1 and 2) MD of Bonnyville (Hilda Lake)

$340.0

OPTI Canada/Nexen Inc ‘Long Lake South' SAGD Project Phase 2 (Kinosis) RM of Wood Buffalo

$2,790.0

Suncor Energy Inc ‘Voyageur South' Oil Sands Mining Operation RM of Wood Buffalo

$4,400.0

Suncor Energy Inc MacKay River SAGD Expansion RM of Wood Buffalo (NW of Ft McMurray)

$1,000.0

Residential Apex Lifestyle

Communities ‘Union Square' Condo Apartment Building Phase 2 Calgary $25.0

Assured Developments ‘Akoya at the Bridges' Apartment Building Phase 2 Calgary $40.1 Arcus Developments ‘Astoria on 10th' Condo Tower Calgary $60.0 Cold Lake Affordable Housing Society (CLAHS)

Apartment Complex Cold Lake $5.5

Diamond Trust Development

‘Sky Tower' Apartment Building

Calgary

$47.8

Page 12: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

xi

Luxe Developments Condo Apartment Building Calgary $32.0 Perera Shawnee Ltd ‘Highbury Tower Residences' Condos Phase 2 Calgary $40.5 Schizophrenia Society of AB

‘Iris Court' Affordable Supportive Living Facility Edmonton $5.1

Source Development Corp ‘Manchester Station' Condo Apartments Calgary $25.0 Wimco Properties Ltd ‘Elk Island View -- Swan Place' Condo Apartment Building Lamont $6.0 Winco Properties Ltd ‘Elk Island View -- Heron Place' Condo Apartment Building Lamont $6.0 Concord Pacific Inc Condo Apartment Building and Townhouses, Eau Claire Calgary $30.0

Amacon ‘St. Albert Village' Condo Towers & Urban Village, Grandin Park Plaza St. Albert $450.0

Tourism/Recreation City of St. Albert Redevelopment Red Willow Park west St. Albert $11.0

Total 31 Projects $15,756.4

Page 13: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Inventory Of Major Alberta ProjectsSummary

Project Sector# of

ProjectsValue of Projects

($ Millions)# of Projects

on Hold Value of Projects on

Hold ($ Millions)Agriculture & Related 7 $208.1 0Biofuels 10 $1,119.0 1 $210.0

Chemicals & Petrochemicals 4 $983.5 0Commercial/Retail 74 $7,584.0 1 $50.0Commercial/Retail and Residential 4 $728.3 1 $400.0Forestry & Related 8 $241.2 0Infrastructure 264 $16,827.1 4 $110.3Institutional 122 $8,260.5 2 $123.0Mining 4 $760.0 0Oil & Gas 17 $2,201.5 0Oil Sands 59 $122,025.0 1 $400.0Other Industrial 7 $1,552.0 0Pipelines 28 $6,463.2 0Power 37 $13,525.2 0Residential 98 $3,954.6 7 $1,063.5Telecommunications 1 $6.0 0Tourism/Recreation 79 $2,797.6 3 $33.0

Total 823 $189,236.8 20 $2,389.8

xiii

1. This Inventory lists projects in Alberta, valued at $5 million or greater, that have recently been completed, are currently under construction, or are proposed to start construction within two years. Not all projects over this threshold are listed due to reasons of confidentiality and/or due to information not being available at the time of printing.

2. Project data is obtained from public information sources. Although, where possible, this data

has been verified with the project proponent/developer, users of the Inventory may wish to confirm project data with the proponent/developer.

3. The Inventory does not breakdown project expenditures by any given year. The cost of a

project is the value of expenditures expected over all phases of project construction, which may span over two or more years.

4. The cost of projects listed in the Inventory are estimated values only.

Page 14: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Inventory of Major Alberta Projects

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Agriculture & Related

Alberta Infrastructure Raven Brood Trout Station Renovations / Upgrades

Clearwater County

$13.7 Proposed

BioNeutra Substitute Sugar Plant and Starch Plant

Calmar $100.0 Proposed. Planned completion by 2012.

Biosphere Technologies Inc.

Biorefinery Lacombe $32.0 Proposed for 2012 - 2013, pending regulatory approvals.

Cargill Beef Waste - to - Energy Project High River $36.0 2011-2012 Nearing completion

Cargill Inc. Grain Elevator and Crop Protection Seed Shed

MD of Smoky River (W of McLennan)

$13.0 2011-2012 Completed (grain elevator). Phase 1 (distribution centre) completed. FWS Group (Phase 1).

Radient Technologies Inc. PRODUCTION PLANT Edmonton $7.4 Proposed

Rahr Malting Co. Facility Expansion (Barley Storage) Lacombe County (Alix)

$6.0 2011-2012 Announced

Biofuels

Alberta Ethanol and Biodiesel GP

Integrated Biodiesel and Ethanol Refinery Phase 1

Red Deer County (near Innisfail)

$190.0 Proposed. Possible construction start spring 2012.

Bfuel Canada Corp. Biodiesel Plant Lethbridge County (near Chin)

$26.0 2012-2013 Announced. Planned construction start first quarter of 2012.

BioStreet Canada Biodiesel Plant Minburn County (near Vegreville)

$210.0 On hold. Trimark Engineering.

Blue Horizon Industries Inc.

'Blue Horizon' Biodiesel Facility Bruderheim $160.0 2011-2012 Nearing completion

CR Fuels Inc. Biofuel Complex (Biofuel Village) Wheatland County (N of Strathmore)

$235.0 2011-2012 Under construction. North America Construction. Technip Canada Ltd. Biodiesel, ethanol and electrical generation.

1April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 15: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Growing Power Hairy Hill / ATCO Midstream

BECii Clean Energy Facility (Integrated Biorefinery)

County of Two Hills (near Hairy Hill)

$100.0 2010-2012 Under construction

Northern Biodiesel Limited Partnership (Archer Daniels Midland Canada / Canadian Bioenergy Corp.)

BIODIESEL PLANT Lloydminster $100.0 Proposed for 2012 - 2013

Renew Bioenergy Biogas Plant Lacombe County (near Bentley)

$38.0 Proposed for 2012

The Power Alternative Inc. Biodiesel Plant MD of Big Lakes (High Prairie area)

$30.0 Proposed

The Power Alternative Inc. Biodiesel Plant Smoky Lake Coun (Smoky Lake area)

$30.0 Proposed

Chemicals & Petrochemicals

Dow Chemical Canada Inc.

Polyethylene Plant Expansion Lacombe County (Prentiss)

$41.0 2011-2012 Under construction. New rail lines and additional equipment.

Nova Chemicals POLYETHYLENE FACILITY EXPANSION

Lacombe County (Joffre)

$900.0 Proposed for 2013 - 2015. Feasibility study to be completed in 2012. Corporate decision by end of 2012.

NovaGreen Inc. Demonstration Facility Killam $7.5 Proposed for 2012

NovaGreen Inc. Commercial Facility Killam $35.0 Proposed for late 2013 or early 2014.

Commercial/Retail

Alberta Development Partners Inc.

'Stampede Trail' Retail Development, Calgary Stampede Grounds

Calgary $150.0 Proposed for 2012 - 2014. Part of Stampede Park $400M expansion.

2April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 16: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Alberta Investment Management Corp (AIMCo) / Ivanhoe Cambridge / Matco Investments Ltd.

'Eighth Avenue Place' OFFICE DEVELOPMENT PHASE 2 (WEST TOWER)

Calgary $195.0 2012-2014 Under construction.

Aspen Properties Ltd. 'Palliser Square' East and West Towers

Calgary $220.0 Proposed

ATB Financial INTERIOR RENOVATIONS, CAMPUS BUILDING

Calgary $10.0 Proposed for 2012

ATCO Electric Regional Service Centre Grande Prairie $73.0 2011-2012 Completed. Clark Builders.

Bedrock Capital Inc. INDUSTRIAL BUILDING Red Deer $5.0 Proposed

Cadillac Fairview Corp. 'Calgary City Centre' Development Phase 1 (Office Tower), Eau Claire District

Calgary $60.0 Proposed for 2012 - 2014.

Camgill Enterprises 'Century Crossing' Commercial Development

Spruce Grove $75.0 2010-2013 Under construction. Phased development.

CANA Group of Companies

NEW HEADQUARTERS BUILDING Calgary $13.0 Proposed

Canada Malting Co. Ltd. MBR Process Water Recycling Facility

Calgary $6.4 Proposed

Canada Post Storage Facility Calgary $10.4 Proposed

Canada Post New Building, Royal Vista Calgary $10.0 2011-2012 Announced

Canada Post Mail Processing Plant Re - equip and Re - tool

Calgary $55.0 2011-2013 Under construction (work package including mechanical / electrical provisions for eight mail sorting machines). Bird Construction.

Canada Post Operations and Facilities Modernization

Edmonton $86.0 Proposed to start spring 2012.

Canada Safeway Refrigerated Warehouse Addition Calgary $20.0 2011-2012 Completed

CAPP Investments Ltd. 'Skyway Professional Centre' Medical Office Building

Red Deer $6.4 2011-2012 Nearing completion. Timcon Construction.

3April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 17: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Care Factor DATA CENTRE Edmonton $30.0 2012 Announced

Centron Group of Companies

'Centre 10' OFFICE BUILDING Calgary $51.5 2012-2013 Announced. Centron Construction.

City of Calgary NE Corporate Warehouse Interior Alterations

Calgary $5.0 Proposed

City of Calgary Lincoln Park Business Centre Site Work

Calgary $5.0 2011-2012 Under construction. Chief Construction.

City of Calgary Whitehorn Multi Services Building Renovations

Calgary $5.1 2011-2013 Under construction. Stuart Olson Dominion Construction.

City of Calgary / Calgary Arts Development

Inner City Arts Hub (Renovations to King Edward School)

Calgary $20.0 Proposed to start in 2013, and be completed over several years.

City of Edmonton Oxford Stage 17 Grading and Site Servicing

Edmonton $12.9 2011-2012 Nearing completion. Rulam Contracting.

City of Edmonton INFRASTRUCTURE UPGRADES AND STREETSCAPING 'The Armature' (PART OF THE QUARTERS DISTRICT)

Edmonton $56.0 2012- Under construction (new stormwater line and pipe retrofit to handle sewage)

Edmonton Air Cargo Development Group

Aviation Complex, Edmonton International Airport

Leduc County $16.0 2011-2012 Completed. PCL Construction Management.

EECOL Electric Warehouse / Office Calgary $7.5 Proposed

Encana Office Renovations Calgary $6.8 2011-2012 Under construction. Cougar Contractors.

Fugro Seismic Imaging WAREHOUSE / OFFICE BUILDING Calgary $6.7 Proposed

GE Canada Improvements to Canada Applications Innovation Centre

Calgary $7.7 Proposed

Great West Newspaper Inc.

Light Industrial Building St. Albert $5.0 2011-2012 Completed. Fillmore Construction Management.

Gregg Distributors Ltd. Distribution Centre Edmonton $38.0 2011-2012 Nearing completion. Dawson Wallace Construction.

Grizzly Paw Brewery PRODUCTION FACILITY Canmore $5.5 2012 Nearing completion

4April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 18: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

GWL Realty Advisors WESTMOUNT CORPORATE CAMPUS BUILDING 6

Calgary $7.4 Proposed. Stuart Olsen Dominion Construction.

GWL Realty Advisors WESTMOUNT CORPORATE CAMPUS PARKADE

Calgary $17.0 Proposed

GWL Realty Advisors Westmount Corporate Campus Building 4 (Office Building)

Calgary $24.9 2011-2012 Under construction. Stuart Olson Dominion Construction.

Hopewell Development HDP Phase 2 Building 'A' Warehouse

Calgary $18.2 Proposed

Lowe's Companies Canada

New Store Edmonton $11.5 2011-2012 Under construction. Norson Construction.

Matthews Southwest Developments

'The Bow' Office Tower Calgary $1,500.0 2007-2012 Nearing completion. Ledcor Construction.

MGM Ford Lincoln Sales Ltd.

New Dealership Building Red Deer $8.0 2011-2012 Under construction. Shunda Construction.

Million Air Operator Facility, Calgary Airport Calgary $12.0 Proposed for 2011 - 2012.

Monarch Roofing and Siding Centre

Light Industrial Building Calgary $6.2 2011-2012 Completed

OPTIMUS Building Corp. 'Westmount Square' OFFICE BUILDING

Okotoks $14.0 Proposed for 2012 - 2013

Opus Corp. Shopping Centre Calgary $9.0 Proposed

Oxford Properties Oxford Airport Business Park Calgary $500.0 2011-2109 Announced. Multi - phased project will take six to eight years to complete. Planned construction first two buildings in 2011 - 2012.

PCL Group Headquarters Expansion (Building 5) Edmonton $24.0 2011-2012 Under construction

PRISM Developments 'Prism Place' Office Building Calgary $36.7 2012-2013 Announced. Graham Construction.

Qualico Developments EPCOR Office Tower Edmonton $250.0 2008-2012 Completed. Ledcor Construction. Stage 1 of Station Lands development.

Remington Development Corp.

Westwinds Business Park Phase 3 Calgary $13.0 Proposed for 2012 - 2013

5April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 19: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Remington Development Corp.

'Quarry Park' Mixed-Use Development phases 1 and 2

Calgary $1,000.0 2006-2015 Under construction. Phase 1 completed. Office buildings A and B under construction.

Ronmor Developers Inc. 'The Market at Silverado' Shopping Centre

Calgary $12.0 2011-2012 Announced

Samex Canada Inc. WAREHOUSE Edmonton $6.5 2011-2012 Nearing completion. Scott Builders.

SmartCentres Sylvan Lake Power Centre (Ten Buildings)

Sylvan Lake $50.0 2007- On hold, pending market conditions. Wal-Mart, Canadian Tire and Dollarama completed.

South Centre Volkswagen Car Dealership Calgary $5.9 Proposed

Springwood Development 'The Quarry' Commercial Development

Cochrane $75.0 Proposed. See also Town of Cochrane Centre Ave Redevelopment under Infrastructure.

Stantec Centre Office Addition Calgary $11.6 Proposed. Ledcor Construction.

Strategic Group 'Strategic on 4th' Office Building Calgary $23.9 Proposed

Strongo Corp. NEW FACILITY RM of Wood Buffalo (Ft McMurray)

$16.5 2012-2013 Announced. Planned construction start August.

Target Corp. REGIONAL DISTRIBUTION CENTRE

Rocky View County (Balzac)

$100.0 2012-2013 Announced. Graham Construction.

Target Corporation Conversion of Six Zellers Stores to Target Stores

Calgary $60.0 Proposed. Chinook Centre, Forest Lawn, Market Mall and Signal Hill 2012 - 2013. Shoppes at Shawnessy and Sunridge Mall later.

Target Corporation Conversion of Four Zellers Stores to Target Stores

Edmonton $40.0 Proposed. Bonnie Doone, Mill Woods Town Centre and West Edmonton Mall 2012 - 2013, Kingsway Garden Mall.

Target Corporation Conversion of Zellers Store to Target Store

Grande Prairie $10.0 2012-2013 Announced. Prairie Mall.

Target Corporation CONVERSION OF ZELLERS STORE TO TARGET STORE

Medicine Hat $10.0 2012-2013 Announced. Medicine Hat Mall.

Target Corporation Conversion of Zellers Store to Target Store

Red Deer $11.0 2012-2013 Announced. Bower Place.

6April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 20: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Target Corporation Conversion of Zellers Store to Target Store

St. Albert $11.0 2012-2013 Announced. St. Albert Centre.

Target Corporation Conversion of Zellers Store to Target Store

Strathcona County (Sherwood Park)

$10.0 Proposed for 2012 - 2013. Sherwood Park Mall.

Telus Building and Grounds Upgrades, Telus Tower

Edmonton $20.0 Proposed

Town of St. Paul / County of St. Paul

Wellness Centre (Medical Centre) St. Paul $6.3 2011-2012 Under construction. Dawson Wallace Construction.

Trans America Developments

'Millennium Ridge' Retail Development

Strathcona County (Sherwood Park)

$14.0 2010-2012 Under construction

Trans America Group Warehouse / Office Building Fort Saskatchewan

$10.0 2011-2012 Under construction

Wal - Mart Canada Corp. New Store Northwest (#1122) Edmonton $14.0 2011-2012 Nearing completion. Wright Construction Western Inc.

WAM Development Group STONEY INDUSTRIAL CENTRE WAREHOUSE 5

Calgary $13.1 Proposed

WAM Development Group 'Emerald Hills Centre' Shopping Centre

Strathcona County (Sherwood Park)

$60.0 2011-2013 Under construction. Includes a Super Wal-Mart, Winners, Bed Bath & Beyond, Vision Electronics and Golf Town.

WAM Development Group / AIMCo

'Stonegate Landing' Retail, Office and Industrial Development

Calgary $2,250.0 2010- Under construction. Stoney Industrial Centre warehouse 4 nearing completion. Possible construction start retail component 2013 - 3014.

Western Securities 'Hanson Square' Retail / Office Building

Calgary $17.4 2010-2012 Under construction. Stuart Olson Dominion.

Commercial/Retail and Residential

FRAM Building Group / Slokker Canada Corp. / Tricon Capital Group

Highrise and Medium Rise Buildings, East Village

Calgary $300.0 Proposed. First condo tower (FIRST) in 2012 - 2013, with possible construction start summer 2012.

Jade Developments 'Copperstone Village' Residential / Commercial Buildings Phase 1

Airdrie $11.8 2011-2012 Under construction

7April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 21: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Sylvan Lake Harbour Ltd. Marina Upgrade / Expansion and Condominium Buildings

Sylvan Lake $16.5 Proposed construction start fall 2012.

WAM Development / Opus Building Corp.

'Stampede Station' Retail / Office Space, Hotel and Residential Buildings

Calgary $400.0 2004-2011 On hold. Phase 2 (office towers).

Forestry & Related

Alberta - Pacific Forest Industries Ltd.

Biomethanol Processing Project Athabasca County

$9.0 Proposed

Alberta - Pacific Forest Industries Ltd.

Plant Upgrades Athabasca County (Boyle)

$62.9 Proposed for 2011 - 2012.

Alberta Advanced Education and Technology

Pilot Facility to Produce Nanocrystalline Cellulose (NCC)

Edmonton $5.5 2012 Announced. To be assembled in the Alberta Innovates Technology Futures building.

Millar Western Forest Products Ltd.

Bioenergy Project Whitecourt $35.0 2012 Announced

Sundre Forest Products 2011 Capital Improvements Sundre $13.0 2011-2012 Completed

West Fraser Mills Ltd. Sawmill Equipment Upgrades Hinton $39.0 2010-2012 Completed

West Fraser Mills Ltd. Installation of New Equipment -- Scond Planer Line

Sundre $6.8 2011-2012 Completed

Weyerhaeuser New Evaporator Train (New Equipment)

County of Grande Prairie

$70.0 2011-2012 Under construction

Infrastructure

Alberta Environment / Alberta Sustainable Resource Development

New Spillway at Chain Lakes Prov Park

MD of Ranchland $30.0 Proposed

Alberta Infrastructure Federal Building Redevelopment Edmonton $165.0 2008-2013 Under construction. Clark Builders.

Alberta Infrastructure Federal Building Parkade and Centennial Plaza

Edmonton $110.0 2009-2013 Under construction. Clark Builders.

Alberta Infrastructure Legislature Dome Renovations / Repairs

Edmonton $6.1 2012 Announced

8April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 22: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Alberta Infrastructure Medical Examiner Building Addition / Renovation

Edmonton $23.2 2012-2014 Announced

Alberta Infrastructure Evan Thomas Water and Wastewater Treatment Facility Expansions

Kananaskis Country

$46.2 2012-2013 Announced. Evan - Thomas Provincial Recreation Area.

Alberta Infrastructure Government Centre and Library Rebuild After Fire

Slave Lake $14.0 2011-2012 Under construction. PCL Construction Management.

Alberta Social Housing Corp.

Parsons Creek Road Construction Stage 1

RM of Wood Buffalo (Ft McMurray)

$10.0 Proposed

Alberta Transportation Highway Twinning Project (North South Trade Corridor)

across Alberta $1,900.0 1998-2012 Under construction. 500km across Alberta

Alberta Transportation Interchange Highway 55 / SH813 and Bridge

Athabasca $14.2 2011-2013 Under construction. Carmacks Enterprises.

Alberta Transportation Highway 63 Pave, Sideslope Improvements

Athabasca County (N of Wandering R - N of Lyle Ck)

$8.4 2011-2012 Announced. Sandstar Construction.

Alberta Transportation HIGHWAY 63 GRADE, BASE AND PAVE

Athabasca Cty / Lac la Biche Cty

$50.0 2012 Announced. Ledcor Alberta Ltd. N of Wandering River to S of House River.

Alberta Transportation Southeast Section Calgary Ring Road (Stoney Trail) from 17 Ave SE to Highway 2A

Calgary $769.0 2010-2013 Under construction. Chinook Roads Partnership.

Alberta Transportation Highway 201 / Nose Hill Drive Interchange

Calgary $66.8 2011-2013 Under construction. Acciona Infrastructure Canada.

Alberta Transportation SH 763 Pave County of Barrhead (Hwy 18 to Hwy 3)

$6.8 2011-2012 Completed. Sandstar Construction.

Alberta Transportation Highway 13 Grade, Base and Pave County of Camrose (Hwy 56 to SH854)

$16.6 2011-2012 Nearing completion. M Pidherney's Trucking Ltd.

9April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 23: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Alberta Transportation Highway 14 / Highway 26 / SH617 / SH834

County of Camrose / Beaver County

$16.0 2012 Announced. Sandstar Construction.

Alberta Transportation Highway 16 Base and Pave County of Vermilion River

$13.2 2011-2012 Nearing completion. Ledcor Alberta Ltd.

Alberta Transportation SH 724 Base and Pave Cty of Grande Prairie / Saddle Hills Cty

$5.9 2011-2012 Nearing completion. Wapiti Gravel Suppliers.

Alberta Transportation Highway 41 Crack Repair and Pave Cypress Cty to Special Area 3

$12.4 2011-2012 Under construction. Lahrmann Engineering. Section from N of SH545 to E of SH895.

Alberta Transportation Highway 22 Grade, Base and Pave plus Bridge over N Saskatchewan River

Drayton Valley $50.8 2011-2014 Under construction. Flatiron Constructors.

Alberta Transportation Highway 3 Pave E of Bow Island to W of Medicine Hat

$10.0 2012 Announced. Riverside Contracting.

Alberta Transportation Highway 216 Pave Edmonton (Hwy 2 to N of Terwilligar Dr)

$5.9 2012 Announced. Standard General.

Alberta Transportation Robb Road Pave (Mountain St to S of K - Lynn Site)

Hinton $6.0 Proposed for 2012.

Alberta Transportation Highway 63 Clearing and Grading Lac la Biche County

$0.0 2011-2012 Completed. Thompson Bros (Const) Ltd. $20.8 million. Part of Highway 63 twinning project.

Alberta Transportation Highway 12 Grade Lacombe County (Hwy 20 to SH792)

$5.7 2012 Announced. Northside Construction Partnership.

Alberta Transportation SH 834 Pave Lamont County (Hwy 16 to Hwy 15)

$6.0 2011-2012 Nearing completion. E Construction / Ruel Brothers.

Alberta Transportation Highway 58 Grade, Base and Pave Mackenzie County (S of Negus Ck to High Level)

$26.7 2011-2012 Completed. Knelsen Sand and Gravel.

10April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 24: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Alberta Transportation Highway 88 Grade, Base and Pave Mackenzie County (S of Wabasca R to N of Senex Ck)

$44.4 2011-2012 Under construction. Carmack Enterprises.

Alberta Transportation SH 660 and SH 892 Pave MD of Bonnyville $5.5 2012 Announced. Sandstar Construction. SH660 from E of SH882 to Hwy 28 and SH892 from N of SH659 S of Leming Lake.

Alberta Transportation Highway 55 Grade, Base and Pave MD of Bonnyville (jct Hwy 55 and Hwy 41)

$14.8 2011-2012 Under construction. E Construction / Ruel Brothers.

Alberta Transportation Overpass Connecting SH543 to Highway 2

MD of Foothills (N of High River)

$22.8 2011-2012 Announced. Graham Construction.

Alberta Transportation Highway 2 Grade, Base and Pave plus Bridge Removal

MD of Foothills (N of Nanton to S of Cayley)

$12.0 2011-2012 Nearing completion. Mesken Contracting.

Alberta Transportation Highway 40 Grade, Base and Pave MD of Greenview (Berland R to S of Muskeg Cabins)

$11.5 2011-2012 Nearing completion. Wapiti Gravel Suppliers.

Alberta Transportation Highway 49 Pave and Sideslope Improvement

MD of Smoky River (SH744 to Hwy 2A)

$21.0 Proposed

Alberta Transportation Highway 49 Pave and Sideslope Improvement

MD of Smoky River (W of SH744 to Hwy 2A)

$19.0 2011-2012 Nearing completion. Wapiti Gravel Suppliers Ltd.

Alberta Transportation SH 526 Grade, Base and Pave MD of Taber (Hwy 25 to W of Hwy 36)

$6.0 Proposed

Alberta Transportation HIGHWAY 1 / DUNMORE RD INTERCHANGE

Medicine Hat $30.0 Proposed for 2012 - 2014. Tender call summer 2012.

Alberta Transportation Highway 1 Bridge (Westbound Lanes) over South Saskatchewan River

Medicine Hat $18.7 2011-2013 Under construction. ConCreate USL.

11April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 25: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Alberta Transportation Highway 22 Grade, Base and Pave Mountain View County (S of SH580 to S of SH 582)

$5.4 2011-2012 Under construction. Richardson Bros (Olds) Ltd.

Alberta Transportation Highway 88 Base and Pave Northern Sunrise County

$10.9 2011-2012 Announced. Wapiti Gravel Services Ltd. N of Loon River Air Base to S of Wabasca R.

Alberta Transportation Highway 2 Grade, Base and Pave Peace River $10.9 2011-2012 Announced. Ledcor Alberta Ltd. Tender includes realignment of Rge Rd 222.

Alberta Transportation Highway 2 and SH 688 Grade, Base and Pave

Peace River area $10.8 2011-2012 Under construction. Ruel Bros.

Alberta Transportation SH 791 Extension from SH 590 to Highway 42

Red Deer County $14.6 Proposed. Part of Alberta Transportations three-year construction program 2012 - 2014.

Alberta Transportation PARSON'S CREEK INTERCHANGE UTILITY CORRIDOR

RM of Wood Buffalo

$9.5 Proposed for 2012.

Alberta Transportation Highway 63 / Thickwood Blvd and Highway 63 / Confederation Way Interchanges

RM of Wood Buffalo (Ft McMurray)

$300.0 2009-2012 Under construction. South Rock Ltd. Thickwood interchange completed.

Alberta Transportation Highway 63 Grade, Base and Pave RM of Wood Buffalo (Ft McMurray)

$43.7 2010-2012 Nearing completion. Graham Bros. Construction Group. N of Athabasca R to S of Thickwood Blvd.

Alberta Transportation Highway 63 Grade, Base and Pave (Morrison St to Athabasca R), Grade Separation Carrying Hwy 63 over Franklin Ave and Steinhauer Bridge Widening (Hwy 63 Southbound Lanes) over Athabasca R

RM of Wood Buffalo (Ft McMurray)

$51.6 2011-2013 Under construction. Flatiron Constructors.

Alberta Transportation Twinning Highway 63 RM of Wood Buffalo (Ft McMurray) to jct Hwy 55 (near Grassland)

$940.0 2007-2015 Under construction. Section N of Wandering River in 2010 - 2011

Alberta Transportation Highway 63 Southbound Grant MacEwan Bridge Superstructure Replacement over Athabasca R

RM of Wood Buffalo (Ft. McMurray)

$23.3 2011-2014 Under construction. Innovative Civil Constructors.

12April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 26: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Alberta Transportation EXCAVATE, SALVAGE AND STOCKPILE WETLAND TOPSOIL

RM of Wood Buffalo (N of Ft. McMurray)

$8.3 2012 Announced. Sureway Construction Management,

Alberta Transportation SH 680 Grade Plus Culvert Replacement

Saddle Hills County (SH725 to SH727)

$5.0 2011-2012 Under construction. Canadian Pipeline Construction.

Alberta Transportation Carseland - Bow River Headworks System Rehabilitation Travers Reservoir Structures Phase 2 Main Embankment Rehabilitation

Vulcan County $6.3 2011-2012 Nearing completion. Degraaf Excavating.

Alberta Transportation SH 529 Grade, Base and Pave Vulcan County (Little Bow Prov Park to SH845)

$16.3 2011-2012 Under construction. South Rock Ltd.

Alberta Transportation SH 604 Grade, Base and Pave Wetaskiwin County (SH792 to E of Hwy 2A)

$13.9 2011-2012 Under construction. Northside Construction Partnership.

Alberta Transportation Highway 40 Grade, Base and Pave Yellowhead Cty (S of Lovett R to Hwy 47)

$13.8 2012 Announced. Carmacks Enterprises Ltd.

Barrhead Water Services Commission (County of Barrhead / Town of Barrhead)

Water Treatment Plant Upgrades Barrhead $12.0 Proposed. Planned construction start March 2012.

Calgary Airport Authority North - South Parallel Runway Calgary $620.0 2011-2014 Under construction. PCL Parsons Dufferin (JV).

Calgary Airport Authority International Transborder Concourse Calgary $1,427.0 2011-2015 Under construction. EllisDon Construction.

Calgary Airport Authority 2012 FACILITY RESORATION / SERVICE IMPROVEMENTS

Calgary $67.0 2012 Announced

Calgary Municipal Land Corp. (CMLC)

Infrastructure Upgrades, The Rivers (including East Village)

Calgary $200.0 2007-2012 Under construction

Canadian National Railway

'Calgary Logistics Park' Intermodal Terminal

Rocky View County (Conrich)

$200.0 2011-2012 Under construction

City of Airdre 24 Street Extension Airdrie $7.8 2012 Announced

13April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 27: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

City of Airdrie 'Chinook Winds' Regional Waste Management Facility, Park and Operations Centre

Airdrie $11.4 2010- Announced

City of Airdrie RCMP Detachment Airdrie $10.5 2010-2012 Under construction

City of Calgary Tri - Services Station, Royal Oak Calgary $15.0 Proposed. Pending funding approval.

City of Calgary FIRE STATION, EVERGREEN Calgary $7.4 Proposed. Tender closes April 4.

City of Calgary Major Roads Reconstruction Elbow Dr SW from 50 Ave to Glenmore Tr

Calgary $8.0 Proposed

City of Calgary Mahogany Sanitary Lift Station Calgary $6.0 Proposed. Volker Stein Contracting.

City of Calgary 7 AVENUE REFURBISHMENT PHASE 2 BLOCK A PLATFORMS AND TIE - INS

Calgary $6.4 Proposed

City of Calgary Fire / Ambulance Station, Bridlewood Calgary $15.8 Proposed for 2012 - 2013.

City of Calgary Nose Creek Sanitary Trunk Phase B Calgary $32.0 On hold

City of Calgary LINCOLN PARK BUSINESS CENTRE WATER MAIN AND SANITARY SEWER

Calgary $6.5 Proposed for 2012. Planned construction start April.

City of Calgary GLENMORE FILTER PLANT IMPROVEMENT PROJECT

Calgary $7.1 Proposed. PCL Construction.

City of Calgary CRESTMONT PUMP STATION Calgary $10.0 Proposed for 2013 - 2014

City of Calgary BEARSPAW WATER TREATMENT PLANT UV DISINFECTION

Calgary $10.0 Proposed for 2014

City of Calgary 210 Ave Trunk Utilities Contract 3B Calgary $6.0 Proposed

City of Calgary Oliver Bowen Maintenance Facility Phase 2 contract A

Calgary $9.8 Proposed

City of Calgary EMERGENCY RESPONSE STATION, EVERGREEN

Calgary $10.0 Proposed. Tenders close April 4.

City of Calgary BEARSPAW WATER TREATMENT PLANT SODIUM HYPOCHLORITE

Calgary $18.0 Proposed for 2013 - 2014

14April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 28: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

City of Calgary Saddle Ridge Relief Trunk Calgary $6.0 On hold

City of Calgary Interchange Trans Canada Highway and Bowfort Rd NW

Calgary $47.0 Proposed for 2012 - 2015. In design phase.

City of Calgary BEARSPAW WATER TREATMENT PLANT FILTER AIR SCOUR

Calgary $12.0 Proposed for 2013 - 2014

City of Calgary 'Harvie Passage' Weir Reconstruction, Bow River

Calgary $16.6 2008-2012 Under construction. Degraaf Excavating Ltd.

City of Calgary LRT Extension Northeast, Westwinds to Saddle Ridge

Calgary $124.0 2009-2012 Under construction. Standard General (grading, utilities, noise barrier, park and ride). Whitehorn Station PCL Construction.

City of Calgary Emergency Operations Centre Calgary $54.0 2009-2012 Nearing completion

City of Calgary LRT Extension NW to Rocky Ridge / Tuscany

Calgary $115.0 2009-2014 Under construction. LRT overpass over Stoney Tr. Graham Construction Group. Civil works Standard General. LRT track, station construction start 2012. Request for prequalification closes January 26.

City of Calgary 96 Ave N Extension from Harvest Hills to Deerfoot Trail and Deerfoot Tr / Airport Tr Interchange

Calgary $42.0 2010-2012 Under construction. Aecon Construction.

City of Calgary 'Peace Bridge' Pedestrian Bridge over Bow R near Prince's Island

Calgary $24.7 2010-2012 Completed. Graham Infrastructure.

City of Calgary West LRT Line from Downtown to Westside Rec Centre

Calgary $1,000.0 2010-2013 Under construction. SNC Lavelin Construction (Pacific).

City of Calgary Spyhill Landfill Scale House and Entrance Replacement

Calgary $12.0 2011-2012 Under construction. Ledcor Construction.

City of Calgary Westbrook LRT Station / Tower Calgary $37.1 2011-2012 Under construction

City of Calgary Glenmore Water Treatment Plant Filter Plant Rehabilitation

Calgary $7.5 2011-2012 Completed. PCL Construction.

City of Calgary 52 St SE Bridge over CPR / WH Canal

Calgary $36.1 2011-2012 Under construction. Graham Construction and Engineering.

15April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 29: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

City of Calgary West Pine Creek Sanitary Trunk Part 1 and MacLeod Trail Feedermain Phase 2

Calgary $17.8 2011-2012 Nearing completion. Kidco Construction.

City of Calgary West LRT 69 St Station Calgary $9.9 2011-2012 Under construction

City of Calgary Shepard Operations Workplace Centre Vehicle Storage Building 2

Calgary $11.5 2011-2012 Under construction. Devitt and Forand Contractors.

City of Calgary Operational Improvement Projects 2011 - 2012

Calgary $5.0 2011-2012 Under construction. Volker Stein Contracting.

City of Calgary Fire Station, South Calgary (Replacement for Station 5)

Calgary $7.2 2011-2012 Under construction. Graham Construction and Engineering.

City of Calgary Fire Station, Symons Valley Calgary $6.0 2011-2012 Under construction. Lear Construction Management.

City of Calgary Fire Station, Douglas Glen Calgary $6.7 2011-2013 Under construction. Devitt and Forand Contractors.

City of Calgary Airport Trail Tunnel Under New Runway Phase 1

Calgary $294.8 2011-2014 Under construction. PCL Parsons Dufferin JV. Tunnel and extension of Airport Tr from Barlow Tr to 36 St NE.

City of Calgary WHITEHORN MULTISERVICE CENTRE LIFECYCLE MAINTENANCE 2012

Calgary $7.0 2012 Announced

City of Calgary LAKEVIEW STORM SEWER SYSTEM UPGRADE PHASE 2

Calgary $7.5 2012 Announced. Tenders for contract A close March 8.

City of Calgary EAST MACKENZIE FEEDERMAIN PHASE 1

Calgary $7.0 2012 Announced. Tender closes April 3.

City of Calgary BEARSPAW WATER TREATMENT PLANT HIGH LIFT PUMPS ELECTRICAL UPGRADE

Calgary $9.0 2012 Announced. Planned construction start March 2012.

City of Calgary MANCHESTER BUILDINGS BASE BUILDING LIFECYCLE MAINTENANCE

Calgary $7.0 2012 Announced

City of Calgary OCCUPATIONAL WORK CENTRES (Bearspaw, Richmond Green, Saddle Ridge, Sarcee and Shepard)

Calgary $24.6 2012 Announced

16April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 30: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

City of Calgary 16 AVE OVER BOWNESS RD NW AND 16 AVE OVER SHAGANAPPI TR NW BRIDGE REHABILITATION

Calgary $6.3 2012 Under construction. PCL Construction Management.

City of Calgary Currie Pump Station Calgary $12.7 2012 Under construction. Graham Construction.

City of Calgary ANDREW DAVIDSON BUILDING RENOVATION

Calgary $20.0 2012 Announced

City of Calgary MUNICIPAL BUILDING COMPLEX BASE BUILDING LIFECYCLE MAINTENANCE

Calgary $5.0 2012 Announced

City of Calgary GLENMORE WATER TREATMENT PLANT FILTER GALLERY IMPROVEMENTS

Calgary $14.0 2012- Announced

City of Calgary Multi - Service Station, Seton Calgary $11.3 2012-2013 Announced. Ledcor Construction.

City of Calgary Shepard Landfill Stormwater Collection and Treatment Expansion

Calgary $10.0 2012-2013 Announced

City of Calgary St. Patrick's Island Bridge and Island Redevelopment Program

Calgary $45.0 2012-2013 Announced

City of Calgary East Calgary Landfill Collection Services Depot

Calgary $23.0 2012-2013 Announced

City of Calgary EAST CALGARY LANDFILL SCALEHOUSE and ENTRANCE REPLACEMENT

Calgary $14.0 2012-2013 Announced

City of Calgary SHEPARD LANDFILL STORMWATER COLLECTION AND TREATMENT EXPANSION

Calgary $10.0 2012-2013 Announced

City of Calgary NOSE CREEK TRUNK UPGRADE PHASE 2

Calgary $21.0 2012-2014 Announced

City of Calgary 2012 - 2014 SANITARY SEWER REPLACEMENT / LINING PRROGRAM

Calgary $16.0 2012-2014 Announced

City of Calgary 2012 - 2014 WATERMAIN REPLACEMENT PROGRAM

Calgary $24.0 2012-2014 Announced

17April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 31: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

City of Calgary Spyhill Landfill Gas Collection System and Treatment

Calgary $10.0 2012-2014 Announced

City of Calgary BONNYBROOK WASTEWATER TREATMENT PLANT HEADWORKS GRIT REMOVAL

Calgary $71.0 2012-2014 Under construction. Graham Construction.

City of Camrose Wastewater Treatment Facility Camrose $55.0 On hold pending funding

City of Camrose New City Hall Camrose $16.0 Proposed

City of Camrose New Public Works Building Camrose $10.0 Proposed for 2015

City of Cold Lake 2012 Utility Infrastructure Improvements

Cold Lake $10.3 2012 Announced

City of Edmonton Eco Station (Recycling Station), Northeast

Edmonton $15.0 Proposed

City of Edmonton Fire Station, Heritage Valley Edmonton $7.6 Proposed

City of Edmonton SHAW CONFERENCE CENTRE ESCALATORS

Edmonton $12.0 Proposed

City of Edmonton Kennedale Traffic Operations Building

Edmonton $16.5 Proposed

City of Edmonton Westwood Transit Garage Expansion / Renovation

Edmonton $50.0 Proposed

City of Edmonton LRT Southeast from Downtown to Mill Woods

Edmonton $1,400.0 Proposed for 2015 - 2018.

City of Edmonton Police Station, Southwest Edmonton $20.8 2010-2012 Under construction. Clark Builders.

City of Edmonton Fulton Place and Capilano Neighbourhood Rehabilitation

Edmonton $11.5 2010-2012 Under construction. Carmacks Enterprises.

City of Edmonton Engineering Services Office and Lab Facility

Edmonton $18.0 2011-2012 Nearing completion. Chandos Construction.

City of Edmonton Anthony Henday Drive Connectors at 66 St NW

Edmonton $16.0 2011-2012 Under construction. Sureway Construction Management.

18April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 32: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

City of Edmonton Kennedale Waste Management Facility Expansion

Edmonton $14.0 2011-2012 Under construction. Synergy Projects Ltd.

City of Edmonton 17 St from 23 Ave to Silverberry Rd (contract 1118)

Edmonton $11.1 2011-2012 Under construction. Sureway Construction Management.

City of Edmonton 108 Street Capital Boulevard Streetscape between 99 Ave and 104 Ave

Edmonton $17.6 2011-2012 Under construction. Standard General Inc.

City of Edmonton Rabbit Hill Road Widening Edmonton $8.8 2011-2012 Under construction. Earthwise Contracting Ltd.

City of Edmonton Whitemud Drive / 17 St Interchange Edmonton $19.0 2011-2012 Under construction. Graham Construction.

City of Edmonton North LRT (Extension from Downtown to NAIT)

Edmonton $755.0 2011-2013 Under construction. North Link Partnership (SNC Lavelin and Graham Infrastructure). EPCOR Tower tunnel nearing completion.

City of Edmonton BRIDGE REHABILITATION, 82 AVE OVER ARGYLL RD

Edmonton $5.9 2012 Under construction. Alberco Construction.

City of Edmonton Replacement for Walterdale Bridge Edmonton $132.0 2013-2014 Announced

City of Edmonton / Edmonton Police Service

Northwest Campus (Police Station, Arrest Processing Unit and Training Facility)

Edmonton $65.0 Proposed

City of Fort Saskatchewan New RCMP Detachment Fort Saskatchewan

$12.0 Proposed for 2013

City of Fort Saskatchewan 100 Ave Downtown Improvements Program

Fort Saskatchewan

$10.0 2010-2012 Under construction. Three - year project.

City of Fort Saskatchewan Civic Office Building (City Hall) / Library

Fort Saskatchewan

$13.3 2011-2013 Under construction. Marshall - Lee Construction.

City of Grande Prairie Wastewater Treatment Plant Upgrades Phase 2

Grande Prairie $45.0 Proposed for 2012 - 2014. Tender call for general contractor anticipated early 2012.

City of Grande Prairie Fire Station #3, Centre West Industrial Park

Grande Prairie $6.3 2010-2012 Nearing completion. Clark Builders.

City of Leduc 50 AVE WIDENING BETWEEN HIGHWAY 2 AND ALTON DRIVE

Leduc $6.0 2012 Announced

19April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 33: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

City of Lethbridge Police Headquarters Expansion Lethbridge $26.7 Proposed for 2015 - 2016.

City of Lethbridge Transit Administration Centre Expansion

Lethbridge $16.0 Proposed for 2013 - 2014.

City of Lethbridge Upgrades to 28 St N Lethbridge $10.0 Proposed

City of Lethbridge North Scenic Drive Extension Lethbridge $20.0 Proposed for 2012 - 2013.

City of Lethbridge Fleet Services Building plus Other Work

Lethbridge $17.3 2010-2011 On hold. Western Construction and Combustion Services.

City of Lethbridge Water and Sanitary Storm Trunks, Bridge Drive Utility Corridor

Lethbridge $17.1 2011-2012 Under construction. Whissell Contractors.

City of Lethbridge Garry Drive West Road Extension Lethbridge $8.0 2011-2012 Completed. Sorochan Enterprises.

City of Lloydminster Water Treatment Plant Expansion Lloydminster $10.0 Proposed

City of Lloydminster Rehabilitation of 44 St between 45 Ave and 50 Ave

Lloydminster $5.2 Proposed

City of Lloydminster Sewage Treatment Plant Expansion Lloydminster $7.8 2010-2011 Announced

City of Lloydminster RCMP Detachment Building Lloydminster $13.9 2011-2013 Under construction. Dowland Contracting.

City of Lloydminster New Infrastructure Services Operations Centre

Lloydminster $40.0 2012-2013 Under construction. Ledcor Construction Ltd.

City of Medicine Hat South Ridge Drive Upgrade to Four Lanes from Highway 1 (TCH) to Strachan Road

Medicine Hat $11.7 Proposed

City of Medicine Hat Police Station Renovation / Expansion

Medicine Hat $17.0 Proposed. Planned construction start April.

City of Medicine Hat SOUTH RIDGE DRIVE UPGRADES, KIPLING ST TO SOUTH BOUNDARY RD

Medicine Hat $7.6 2012 Under construction. South Rock Ltd.

City of Medicine Hat 2012 Water and Sewer Capital Projects

Medicine Hat $12.2 2012 Announced. Of that amount, $8.2 million will be for infrastructure replacement. Tender for water main / sewer main replacement closes March 29.

20April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 34: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

City of Medicine Hat Infrastructure Upgrades / Replacement, Connaught Subdivision

Medicine Hat $9.2 2012-2014 Announced. MJB Enterprises.

City of Red Deer Sanitary Sewer and Storm Water Sewer Improvements

Red Deer $36.0 Proposed

City of Red Deer Intersection Upgrades 32 St between Spruce Drive and 40 Avenue

Red Deer $9.7 Proposed for 2012 - 2013.

City of Red Deer Riverside Dr Sanitary Trunk Extension Phase 3

Red Deer $8.6 2011-2012 Completed. M Pidherney's Trucking.

City of Red Deer North Side Highway Connector Project phase 1A

Red Deer $15.5 2011-2012 Under construction. Northside Construction Partnership (grading Gaetz Ave to 78 St).

City of Red Deer North Highway Connector Contract A2

Red Deer $42.7 2011-2013 Under construction. Pidherney's Trucking Ltd.

City of St. Albert LeClair Way Extension (Riel Dr to 137 Ave)

St. Albert $7.0 Proposed for 2012

City of St. Albert Ray Gibbon Drive Phase 3 (Giroux Rd to SH 633)

St. Albert $10.0 Proposed for 2012. Planned construction start April.

City of St. Albert Landfill Remediation Riel Park Phases 3 and 4

St. Albert $9.0 Proposed to start in 2012. Includes remove surface, install clay cap and restore the soccer, rugby and cricket facilities. Request for prequalifications closes December 19.

City of St. Albert Arterial Road Connections to Anthony Henday Drive

St. Albert $11.2 Proposed. CH2M Hill Canada. 2012 work includes LeCLair Way and Sir Winston Churchill Ave.

City of St. Albert / Alberta Capital Region Wastewater Commission

Sewage Pump Station St. Albert $19.0 2010-2012 Under construction. Alberco Construction.

City of Wetaskiwin Main Street Revitalization Project Wetaskiwin $17.0 Proposed. Four phase project.

Clearwater County Sewage Lagoon Clearwater County

$6.1 Proposed for 2012 - 2013

Clearwater County 2012 LOCAL ROADS CONSTRUCTION PROGRAM

Clearwater County

$5.9 2012 Announced. South Rock.

21April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 35: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

County of Grande Prairie 2012 Road Construction Program County of Grande Prairie

$23.3 2012 Announced

County of Grande Prairie New Administration Building plus Shop Building Expansion

County of Grande Prairie (Clairmont)

$7.5 Proposed

County of Lac la Biche HWY 55 TRUNK SEWER County of Lac la Biche

$9.5 Proposed

County of Lethbridge Park Lake Road Grade, Base and Pave

County of Lethbridge

$6.0 Proposed

County of Newell County Office Building County of Newell $13.0 2010-2012 Nearing completion. Ledcor Construction.

Cypress County Eagle Butte Road Grade, Base and Pave

Cypress County $6.0 Proposed for 2011.

Defence Construction Canada

Infrastructure Upgrades, CFB Cold Lake

Cold Lake $120.0 2006-2015 Under construction. Phase 3 Clearway Construction.

Defence Construction Canada

Fire Station, CFB Suffield Cypress County (Ralston)

$6.2 2011-2012 Nearing completion. Wahl Construction.

Defence Construction Canada

Training Accommodation Building, CFB Edmonton

Edmonton $11.6 2011-2012 Completed. Pentagon Structures.

Defence Construction Canada

Community Centre, CFB Wainwright Wainwright $5.1 Proposed for 2012 - 2013. Anticipated call for general contractor spring 2012.

Edmonton Regional Airport Authority

Edmonton International Airport Expansion

Leduc County $1,800.0 2009-2012 Under construction. Central utilities plant Stuart Olson. Apron expansion Dufferin Construction. Control tower and office building 2010 - 2012 EllisDon. Main terminal expansion 2009-2012 PCL Construction.

EPCOR North LRT Extension -- Distribution and Transmission Power Facilities

Edmonton $17.0 2010-2012 Under construction

EPCOR Water Services Inc.

WATER TREATMENT PLANT UPGRADES

Taber $5.3 2012-2013 Announced. Tritech Group Ltd.

Fort McMurray Airport Authority

Airport Expansion / Redevelopment Site Works

RM of Wood Buffalo (Ft McMurray)

$49.0 2011-2014 Under construction. E Construction / Ruel Brothers.

22April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 36: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Fort McMurray Regional Airport Authority

Fort McMurray Airport Upgrade / Expansion

RM of Wood Buffalo (Ft McMurray)

$198.0 2011-2014 Under construction. Ledcor Construction (terminal). Terminal and expanded parking.

MD of Bonnyville Wolf Lake Road Base and Pave MD of Bonnyville $7.2 Proposed

MD of Bonnyville Municipal Office Addition / Renovation

MD of Bonnyville $5.0 2011-2012 Under construction. GenMec ACL.

MD of Greenview Forestry Trunk Road Upgrading Project Phase 3

MD of Greenview $10.0 Proposed

MD of Wainwright THUNDER ALLEY AND SPARKE RD GRADE BASE AND PAVE

MD of Wainwright $11.2 2012 Announced. M Pidherney's Trucking Ltd. Schedule A: Twp Rd 442 from Hwy 41 to SH610 and jct Greenshields East access to CPR crossing and / or Sparks Rd. Schedule B from Hwy 14 to jct SH 894.

Municipality of Crowsnest Pass

Upgrades to Frank Sewer Plant Crowsnest Pass $30.0 Proposed for 2011 - 2019. To be completed in stages over eight and a half years.

Parks Canada Highway 1 Pave km 47 - 72 Banff National Park

$7.5 2011-2012 Under construction. Okanagan Aggregates.

Parks Canada Twinning Highway 1 Banff National Park (Castle Jct to BC border)

$30.3 2009-2012 Under construction. Dawson Construction. Phase 3B completed.

Public Works and Government Services Canada

RCMP Detachment Building High Level $7.8 Proposed for 2012 - 2013.

Red Deer County 2012 Road Construction Program Red Deer County $31.0 Proposed in 2012 draft budget. Bridge work $7M, paving $6M, other work $18M.

Regional Municipality of Wood Buffalo

Regional Landfill Cells 2, 3 and Stockpile Pad

RM of Wood Buffalo

$8.0 Proposed

Regional Municipality of Wood Buffalo

Replacement Bridge for Fort MacKay River Bridge

RM of Wood Buffalo

$10.0 Proposed

Regional Municipality of Wood Buffalo

Parsons Creek Water Reservoir and Pump Station

RM of Wood Buffalo

$12.4 2011-2012 Nearing completion. Bird Construction Company.

Regional Municipality of Wood Buffalo

Parsons Creek Site Grading Phase 2A

RM of Wood Buffalo

$9.3 2011-2012 Under construction. Sureway Construction Management.

23April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 37: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Regional Municipality of Wood Buffalo

Anzac Asphalt Roadside Walkway and Janvier Access Road Rehabilitation

RM of Wood Buffalo

$16.7 2011-2012 Nearing completion. E Construction.

Regional Municipality of Wood Buffalo

Gregoire East Sanitary Outfall Contract 2 (HDD Siphon)

RM of Wood Buffalo

$27.0 2011-2012 Completed. Direct Horizontal Drilling.

Regional Municipality of Wood Buffalo

Water Supply System Upgrading Contract 2

RM of Wood Buffalo (Anzac)

$9.8 2011-2012 Nearing completion. Nason Contracting Group Ltd.

Regional Municipality of Wood Buffalo

Lower Townsite West Loop Road Contract 2 (Prairie Loop Blvd)

RM of Wood Buffalo (Ft McMurray)

$6.5 Proposed

Regional Municipality of Wood Buffalo

Athabasca Water Treatment Plant Upgrades / Expansion

RM of Wood Buffalo (Ft McMurray)

$161.5 2010-2013 Under construction. Bird Construction.

Regional Municipality of Wood Buffalo

Lower Townsite Reservoir and Pump Station

RM of Wood Buffalo (Ft McMurray)

$12.2 2011-2012 Nearing completion. Nason Contracting Group.

Regional Municipality of Wood Buffalo

Parsons Development Area Water Transmission Main Phase 2

RM of Wood Buffalo (Ft McMurray)

$15.4 2011-2012 Completed. Site Energy Services Ltd.

Regional Municipality of Wood Buffalo

2011 Urban Infrastructure Rehabilitation Program Contract 2 (Thickwood Heights)

RM of Wood Buffalo (Ft McMurray)

$7.5 2011-2012 Completed. E Construction.

Regional Municipality of Wood Buffalo

Parsons Development Area Sewer Outfall

RM of Wood Buffalo (Ft McMurray)

$17.7 2011-2012 Nearing completion. Sureway Construction Management.

Regional Municipality of Wood Buffalo

Lower Townsite Redevelopment (Water Lines, Sewer Lines, Storm Lines, Surface Work)

RM of Wood Buffalo (Ft McMurray)

$60.0 2011-2013 Announced

Regional Municipality of Wood Buffalo

2011 Infrastructure Rehabilitation Program Contract 1 (Abasand Heights)

RM of Wood Buffalo (Ft McMurray)

$24.0 2011-2013 Under construction. Sprague Rosser Contracting.

Regional Municipality of Wood Buffalo

Saline Creek Water Supply Line Phase 4, King Street

RM of Wood Buffalo (Ft McMurray)

$6.9 2012 Announced. E Construction.

24April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 38: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Regional Municipality of Wood Buffalo

GATEWAY CROSSING AND POND RETAINING WALLS, PARSONS CREEK

RM of Wood Buffalo (Ft McMurray)

$9.0 2012-2013 Announced. Graham Construction.

Regional Municipality of Wood Buffalo

RCMP Holding Cell and Traffic Operations Facility

RM of Wood Buffalo (Ft McMurray)

$20.0 2012-2013 Announced

Regional Municipality of Wood Buffalo

Wastewater Treatment Plant Administration Services Building

RM of Wood Buffalo (Ft. McMurray

$7.4 2011-2012 Under construction. Chandos Construction.

Regional Municipality of Wood Buffalo

Saline Creek Supply Line, King St Booster to MacKenzie Reservoir

RM of Wood Buffalo (Ft. McMurray)

$27.0 2008-2012 Under construction. Tri - City Contracting.

Regional Municipality of Wood Buffalo

Saline Creek Outfall Sewer to Mills Ave

RM of Wood Buffalo (Ft. McMurray)

$18.9 2008-2012 Completed. Tri-City Contracting.

Regional Municipality of Wood Buffalo

Saline Creek Supply Line, Water Treatment Plant to King St Booster

RM of Wood Buffalo (Ft. McMurray)

$15.5 2010-2013 Under construction. E Construction.

Regional Municipality of Wood Buffalo

Saline Creek Contract 2 Water Supply and Distribution Main

RM of Wood Buffalo (Ft. McMurray)

$13.8 2011-2012 Under construction. Site Energy Services.

Regional Municipality of Wood Buffalo

Parsons Creek Onsite Water, Storm and Sanitary Trunks Phase 1B

RM of Wood Buffalo (Ft. McMurray)

$6.5 2011-2012 Nearing completion. BEL Contracting Ltd.

Saddle Hills County ADMINISTRATION COMPLEX and PUBLIC WORKS BUILDING

Sprit River $10.0 2012-2013 Under construction. Fillmore Construction Management.

Santas Anonymous / Christmas Bureau of Edmonton

Jerry Forbes Centre for Community Spirit

Edmonton $21.0 Proposed. Synergy Projects.

South Red Deer Regional Wastewater Commission

Wastewater Lift Station Olds $6.0 Proposed

25April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 39: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

South Red Deer Regional Wastewater Commission

Regional Wastewater Pipeline Olds to Red Deer $96.0 2009-2014 Under construction. Three phases: Innisfail - Penhold; Penhold - Red Deer; Olds - Innisfail. Olds - Innisfail section under construction 2012. Penhold - Red Deer to be built after the other two phases.

South Red Deer Regional Wastewater Commission (SRDRWC) / City of Red Deer

Wastewater Treatment Plant Upgrade Phase 4

Red Deer $80.0 2011-2012 Completed

Strathcona County Ardrossan Wastewater Line Strathcona County (Ardrossan)

$30.0 Proposed for 2012.

Strathcona County Rge Rd 220 Pave and Intersection Upgrade (Rge Rd 220 / Hwy 15)

Strathcona County (N from Hwy 15)

$18.0 2011-2012 Under construction. Carmacks Enterprises.

Strathcona County Firefighter Training Centre / Fire Station 6

Strathcona County (Sherwood Park)

$17.5 2011-2012 Under construction. Krawford Construction.

Strathcona County 'Sparta' Transit Terminal, near Baseline Rd (off Bethel Drive)

Strathcona County (Sherwood Park)

$20.4 2012-2013 Announced. Planned construction start mid - 2012. Project includes relocation of recycle centre.

Town of Banff Pedestrian Bridge Across Bow River Banff $5.7 Proposed

Town of Beaumont 50 Street Corridor Upgrades Zone 4 Beaumont $11.0 2011-2012 Nearing completion

Town of Beaumont / City of Edmonton

50 St Widening from SH625 to 41 Ave in Edmonton

Beaumont $40.0 2011-2012 Under construction

Town of Canmore COUGAR CREEK EROSION MITIGATION

Canmore $6.4 Proposed

Town of Canmore 2012 STREET REHABILITATION Canmore $7.8 Proposed

Town of Chestermere Sanitary Forcemain Chestermere $13.8 Proposed for 2012 or 2013.

Town of Chestermere Lift Station 13 (Sanitary Lift Station) Chestermere $9.0 Proposed for 2012 or 2013.

Town of Cochrane Centre Avenue Redevelopment Cochrane $9.0 Proposed for 2012 - 2014. See also Springwood Development project under Commercial / Retail

26April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 40: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Town of Crossfield Water Reservoir and Pump Station Crossfield $6.3 2011-2012 Under construction. Westpro Infrastructure.

Town of Didsbury Wastewater Lagoon Upgrade Didsbury $13.0 Proposed

Town of Drayton Valley New Water Treatment Plant Drayton Valley $20.5 Proposed. Possible joint project with Brazeau County?

Town of Drayton Valley Wastewater Treatment Facility Expansion

Drayton Valley $7.7 Proposed

Town of Edson West End Sewer Line Edson $6.5 Proposed for 2012

Town of Innisfail MAIN STREET RECONSTRUCTION PROJECT

Innisfail $8.0 2012-2014 Announced. Phase 1 AIC Construction.

Town of Lacombe Highway 2A Grade, Base and Pave Lacombe $19.3 2011-2012 Under construction. Border Paving.

Town of Okotoks Southridge Emergency Services Building

Okotoks $11.0 2011-2012 Under construction. Chandos Construction. RCMP, municipal enforcement and fire station.

Town of Peace River Shaftesbury Water Treatment Plant Upgrades (part of regional water system with MD of Northern Lights)

Peace River $22.0 2011-2012 Under construction. Sure - Form Construction. Regional system includes line to Dixonville, reservoir on West Hill.

Town of Strathmore NEW RESERVOIR AND PUMPING STATION (WILDFLOWER RESERVOIR)

Strathmore $7.0 Proposed for 2012. Planned construction start April.

Town of Strathmore Water Storage Facility Strathmore $10.0 Proposed

Town of Sylvan Lake Town Administration Building Sylvan Lake $7.2 2012-2013 Announced. Timcon Construction.

Town of Vauxhall / MD of Taber

Regional Water Treatment Plant and Pipework

MD of Taber $19.3 2011-2012 Nearing completion. Vauxhall to Enchant and Vauxhall to Hays. Pipeline LW Dennis Contracting. Water treatment plant Maple Reinders.

Town of Wetaskiwin 50 Ave (Main St) Makeover (Water / Sewer Lines and Streetscape) phases 1 and 2

Wetaskiwin $11.0 2012-2013 Announced. Phase 1 (48 St to 50 St) in 2012. Phase 2 (50 St to 53 St) in 2013. The remainder of downtown (47 St to 48 St and 53 St to 56 St) to be completed at a later date. Phase 1 Carmacks Enterprise.

Village of Longview Wastewater Lagoon MD of Foothills (Longview)

$5.5 2011-2012 Completed

27April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 41: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Vulcan County Water Treatment Plant Vulcan County (near Vulcan)

$6.7 Proposed for 2012.

Institutional *Procurement activities under direction of associated School Board

AgeCare Health Services Ltd.

'Walden Heights' Supportive Living Facility

Calgary $19.8 Proposed for 2011 - 2012

Alberta Advanced Education and Technology / University of Alberta

Edmonton Clinic North Building Edmonton $425.0 2008-2012 Completed. PCL Construction Management.

Alberta Education* Four High Schools across Alberta $96.8 2010-2012 Nearing completion. Clark Builders. Edmonton (Mother Margaret Mary Grades 10 - 12), Calgary (Northwest Grades 10 - 12), Spruce Grove (St. Peter the Apostle Grades 9 - 12) and Sherwood Park (Archbishop Jordan Grades 9 - 12).

Alberta Education* Modernization / Addition Bow Island $10.5 Proposed for 2012 - 2014. Bow Island Elementary (modernization) and Senator Gershaw (addition) schools.

Alberta Education* Lord Shaughnessy High School Modernization Phase 2

Calgary $7.1 2012 Under construction

Alberta Education* Modernization Cardston $16.4 Proposed for 2012 - 2014. Cardston Elementary.

Alberta Education* Modernization Claresholm $10.2 2012-2013 Under construction. Willow Creek Composite. Ward Bros Construction.

Alberta Education* New School (K to Grade 12) County of Camrose (Bawlf)

$14.4 Proposed for 2012 - 2014. Possible tender call for general contractor summer 2012.

Alberta Education* New School (K to Grade 12) Drumheller $13.5 2008-2012 Completed. St. Anthony's. CANA Construction.

Alberta Education* Modernization Phase 2 Edmonton $13.7 Proposed for 2012 - 2013. Strathcona HS and Forest Heights Elementary.

Alberta Education* New School (K to Grade 9) Gift Lake Metis Settlement

$15.3 Proposed for 2012 - 2014.

Alberta Education* New High School (Grades 9 to 12) Grande Prairie $41.6 Proposed for 2012 - 2014. Planned construction start spring 2012. Part of the Community Knowledge Campus.

28April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 42: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Alberta Education* High School (Grades 7 to 12) Jasper $17.4 Proposed for 2012 - 2014

Alberta Education* New Joint Francophone School (K to Grade 12)

Jasper $8.5 Proposed for 2012 - 2014.

Alberta Education* New High School (Grades 9 to 12) Lac la Biche $21.7 Proposed for 2012 - 2014

Alberta Education* Replacement School (Grades 5 to 9) Millet $7.4 2011-2012 Nearing completion. Griffiths - Scott Middle School.

Alberta Education* Replacement School (K to Grade 8) Mundare $7.0 Proposed for 2012 - 2013. Mundare School.

Alberta Education* Modernization Phase 3 (Fine Arts Area, Theatre, Gym and Career / Technology Studies Area)

Ponoka $6.0 Proposed for completion by 2013. Ponoka Composite.

Alberta Education* Modernization (Phases 1 and 2) Ponoka $11.0 2010-2012 Nearing completion. Ponoka Composite HS. Graham Construction.

Alberta Education* New School (K to Grade 6), Eagle Ridge

RM of Wood Buffalo (Ft McMurray)

$16.4 Proposed for 2012 - 2014. Walter / Gladys Hill Elementary.

Alberta Education* New School (K to Grade 6), Eagle Ridge

RM of Wood Buffalo (Ft McMurray)

$16.4 Proposed for 2012 - 2014. Blessed Kateri School.

Alberta Education* Modernization RM of Wood Buffalo (Ft McMurray)

$9.5 2012-2014 Announced. Fort McMurray Composite HS.

Alberta Education* Modernization St. Paul $8.1 2012-2013 Under construction. Racette Junior High School. Binder Construction.

Alberta Education* Modernization (previously listed as Renovations)

Trochu $11.7 Proposed for 2012 - 2013. Trochu Valley School.

Alberta Education* Replacement School (K to Grade 12) Two Hills $15.9 Proposed for 2012 - 2014.

Alberta Health and Wellness

Foothills Medical Centre Upgrade (McCaig Tower)

Calgary $550.6 2006-2014 Under construction. EllisDon Construction. Main tower complete. Hospital department renovations underway.

Alberta Health and Wellness / Covenant Health

EVANSTON CONTINUING CARE FACILITY (AGE IN PLACE)

Calgary $17.0 2012-2014 Announced

29April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 43: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Alberta Health Services ELEVATOR UPGRADES / MODERNIZATION

Edmonton $5.8 Proposed. Various sites.

Alberta Infrastructure Bow Island Health Centre Redevelopment (Emergency Dept Expansion / Renovation)

Bow Island $5.3 2011-2012 Under construction. Amron Construction.

Alberta Infrastructure Provincial Cancer Strategy Calgary Phase 1

Calgary $141.0 Proposed for 2012 - 2015.

Alberta Infrastructure South Health Campus, Calgary Calgary $1,310.0 2007-2012 Nearing completion. EllisDon Construction. Kasian Architecture.

Alberta Infrastructure Level 3 Neonatal Intensive Care Unit (NICU), Alberta Children's Hospital

Calgary $8.6 2012-2013 Announced

Alberta Infrastructure Peter Lougheed Centre, Women's Health and Vascular Surgery Facility

Calgary $36.3 2012-2015 Under construction. PCL Construction.

Alberta Infrastructure MODERNIZATION (NEW GYMNASIUM)

Carstairs $37.0 Proposed for 2012 - 2014. Hugh Sutherland School.

Alberta Infrastructure ALBERTA HOSPITAL EDMONTON RENOVATIONS (BUILDING 12)

Edmonton $15.0 Proposed

Alberta Infrastructure Edmonton Clinic South Building / Northern Alberta Urology Centre

Edmonton $484.0 2008-2012 Under construction. PCL Construction.

Alberta Infrastructure New Remand Facility Edmonton $568.6 2008-2012 Under construction. Stuart Olson Constructors.

Alberta Infrastructure Stollery Children's Hospital Emergency Dept Expansion

Edmonton $23.5 2010-2012 Completed. PCL Construction.

Alberta Infrastructure Alberta Hospital Edmonton Food Services Depot

Edmonton $7.0 2011-2012 Nearing completion. Johnston Builders.

Alberta Infrastructure Stollery Children's Hospital Surgical Suite Redevelopment and IMRI Renovations

Edmonton $33.7 2011-2015 Under construction. IMRI completed in 2011, surgical suite construction to start in 2012.

Alberta Infrastructure University of Alberta Endoscopy Relocation and Stollery Children's Hospital Pediatric Intensive Care Unit Expansion

Edmonton $15.4 2012-2013 Under construction. PCL Construction Management.

30April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 44: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Alberta Infrastructure Provincial Cancer Strategy Edmonton Phase 1

Edmonton $67.0 2012-2015 Announced

Alberta Infrastructure Edson Healthcare Centre Edson $108.0 2012-2014 Under construction. Stuart Olson Dominion Construction.

Alberta Infrastructure Fort Saskatchewan Community Hospital

Fort Saskatchewan

$87.0 2008-2012 Completed. EllisDon Construction.

Alberta Infrastructure Shields Health and Education Centre Grande Prairie $520.0 2011-2016 Under construction. Graham Construction. Includes cancer treatment centre.

Alberta Infrastructure New Roof Structure, Peace Wapiti Academy

Grande Prairie $5.0 2012 Announced. Planned construction start June 2012.

Alberta Infrastructure High Prairie Health Complex High Prairie $89.8 2011-2013 Under construction. Graham Construction.

Alberta Infrastructure Alterations Innisfail $8.0 Proposed. St Marguerite Bourgeoys School / John Wilson School.

Alberta Infrastructure Lethbridge - Chinook Regional Hospital Redevelopment

Lethbridge $112.7 2012-2015 Under construction. Stuart Olson Dominion Construction. Phase 1 from 2012 - 2015.

Alberta Infrastructure Lloydminster Continuing Care Project Lloydminster $34.2 2011-2014 Under construction. Pentagon Structures.

Alberta Infrastructure Medicine Hat Regional Hospital Redevelopment

Medicine Hat $199.8 2012-2015 Announced. Stuart Olson Dominion Construction.

Alberta Infrastructure Red Deer - Central Alberta Cancer Centre (CACC)

Red Deer $46.0 2010-2013 Under construction. Stuart Olson Dominion Construction.

Alberta Infrastructure Fort McMurray Continuing Care Centre, Parsons Creek

RM of Wood Buffalo (Ft McMurray)

$50.0 Proposed for 2012 - 2014.

Alberta Infrastructure Northern Lights Regional Health Centre Emergency and ICU Renovations

RM of Wood Buffalo (Ft McMurray)

$13.0 2011-2013 Under construction. Delnor Construction.

Alberta Infrastructure Strathcona Hospital Phases 1 and 2 Strathcona County (Sherwood Park)

$162.7 2010-2016 Under construction. EllisDon Construction. CASA House completed.

31April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 45: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Alberta Infrastructure / Alberta Health and Wellness

Glenrose Long Term Care Facility, New Transition and Continuing Care Facility

Edmonton $51.4 Proposed

Alberta Infrastructure / Alberta Sustainable Resource Development

Hinton Training Centre Addition / Alterations

Hinton $39.1 Proposed

Alberta Infrastructure* / B2L Partnership

Ten Schools (P3 Project) across Alberta $253.0 2010-2012 Nearing completion. Edmonton (three K to Grade 9), Calgary(Captain Nichola Goddard, Nose Creek School, Twelve Mile Coulee,Ted Harrison and one K to Grade 9), Okotoks (K to Grade 9) and Langdon (Sarah Thompson School, K to Grade 4).

Alberta Seniors / Smoky Lake Foundation

'Bar V Nock' SUPPORTIVE LIVING CENTRE

Smoky Lake $7.4 Proposed for 2012 - 2013

Alberta Seniors and Community Support / Bethany Care Society

Didsbury Long Term Care Centre Addition (Affordable Supportive Living Spaces)

Didsbury $26.5 Proposed for 2012 - 2013.

Alberta Seniors and Community Supports

Strathmore Continuing Care Strathmore $17.5 Proposed

Alberta Solicitor General and Public Security

Provincial Police and Peace Officer Training Centre

Fort MacLeod $122.4 2012-2014 Announced. Planned construction start June 2012.

All Saints Parish New Catholic Church Lethbridge $21.0 Proposed for 2013 - 2015. Consolidation of St. Basil's, Assumption and St. Patrick's parishes.

All Seniors Care Living Centres

'Laurel Heights' Retirement Residence

Edmonton $20.0 2010-2012 Nearing completion. Man - Shield Construction.

All Seniors Care Living Centres Inc.

AUBURN BAY SENIORS' RESIDENCE

Calgary $27.7 2012-2013 Announced

Beit Horim 'Our Parents Home' SUPPORTIVE LIVING SPACES

Edmonton $6.0 Proposed construction start summer 2012.

Bethany Care Society Affordable Housing Complex, Riverview Village

Calgary $11.0 2011-2013 Under construction (phase 1). Stuart Olson Dominion.

Bishop O'Byrne Housing for Seniors Association

'Columbus Village' Affordable Seniors Housing Facility

Calgary $11.6 2011-2012 Under construction. Chandos Construction.

32April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 46: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Bow Valley College Campus Redevelopment and Expansion

Calgary $193.0 2006-2012 Under construction. Stuart Olson Constructors.

Bow Valley Regional Housing

Bow River Lodge Redevelopment (Renovations and Addition)

Canmore $19.3 Proposed

Brenda Strafford Foundation

BOW VIEW MANOR ADDITION PHASE 2

Calgary $9.0 Proposed for 2012 - 2013.

Brenda Strafford Foundation

Bow View Manor Addition / Renovation

Calgary $18.0 2011-2012 Under construction. Dawson Wallace Construction.

Brenda Strafford Foundation

'Tudor Manor' Affordable Assisted Living Facility

Okotoks $15.3 2010-2012 Nearing completion. Medican Construction.

Calgary Urban Project Society (CUPS)

New Health and Education Facility Calgary $5.4 2011-2012 Under construction. Chandos Construction.

Carrington Communities Seniors Complex Rebuild after Fire Edmonton $10.0 2011-2012 Nearing completion

Chinese Christian Wing Kei Nursing Home Association

'Wing Kei' Supportive Living Facility Calgary $16.0 2012-2013 Announced. Bird Construction.

Choices in Community Living Inc.

'Copper Sky Lodge' Assisted Living Facility

Spruce Grove $28.0 2010-2012 Nearing completion. Krawford Construction.

Christenson Communities Ltd. / Good Samaritan Society

Royal Oak Village Seniors Housing Phases 2 and 3 (Phase 2 Life Lease, Phase 3 Designated Assisted Living)

Lacombe $16.8 2011-2012 Announced. Phase 2 (life lease) to follow phase 3.

City of Calgary New Downtown Library, East Village Calgary $225.0 Proposed

City of Edmonton Library Renovations / Expansion, Highlands

Edmonton $9.5 Proposed

City of Edmonton New Library plus Seniors Centre and Multicultural Facility, Mill Woods

Edmonton $30.0 Proposed. Planned completion in 2014.

City of Edmonton Jasper Place Library Renewal / Expansion

Edmonton $14.0 2011-2012 Nearing completion

Covenant Health 'Villa Marie' Designated Assisted Living Facility

Red Deer $25.0 Proposed for 2012.

33April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 47: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Fort Saskatchewan Foundation

New Seniors Lodge (Replacement for Turner Lodge)

Fort Saskatchewan

$18.0 Proposed. To be located on a portion of the 'old' hospital site.

Glenmore Christian Academy

Addition Calgary $5.0 2011-2012 Completed

Grant MacEwan University Centre for the Arts and Communications, Downtown Campus

Edmonton $90.0 Proposed for 2013 - 2015.

Intercare Corp Group Brentwood Care Centre Addition Calgary $12.6 Proposed

Keyano College Power Engineering / Process Operator Power Lab

RM of Wood Buffalo (Ft McMurray)

$20.0 2012-2014 Announced. PCL Constructors. Planned construction start spring 2012.

Lakeland College Power and Process Lab Upgrade / Expansion (previously called NE Wing Expansion)

Lloydminster $15.0 Proposed for completion by mid - 2013.

Lakeland Lodge and Housing Foundation

BONNYLODGE SENIORS FACILITY RENOVATIONS / UPGRADES PHASE 1

Bonnyville $10.0 Proposed for 2012 - 2014

LDS Church LDS Calgary Temple Calgary $24.5 2010-2012 Under construction

Medicine Hat College Cultural Centre Expansion Medicine Hat $6.4 Proposed

Mount Royal University 'The Bella Concert Hall' Conservatory of Music / Performance Hall

Calgary $73.0 2011-2013 Under construction

Penner Development Group

'Amica at Aspen Woods' Retirement Residence Phase 1

Calgary $25.0 Proposed for 2012 - 2013.

Penner Development Group / Oi Kwan Foundation

Oi Kwan Place Addition / Renovations

Calgary $22.1 2010-2012 Completed. Graham Construction.

Points West Living Cold Lake / Alberta Health Services

Supportive Living Facility Cold Lake $11.0 2011-2012 Under construction. Maclean Young Construction.

Points West Living Ltd. / Canalta

Continuing Care Facility (Affordable Supportive Living Spaces)

Stettler $8.8 2011-2012 Under construction

34April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 48: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Public Works and Government Services Canada

Bowden Institute Minimum Expansion (Programs Building, Family Visiting Unit)

Bowden $8.8 2011-2012 Completed. UPA / Concept A Joint Venture

Public Works and Government Services Canada

Bowden Institute Expansion (Minimum and Medium Security Housing Units)

Bowden $25.0 2011-2013 Under construction. Medium security unit Lear Construction Management.

Public Works and Government Services Canada

Drumheller Institute Expansion (Minimum Security Units)

Drumheller $10.8 2011-2013 Under construction. Dowland Contracting.

Public Works and Government Services Canada

Minimum Security Unit Expansion at Drumheller Institution

Drumheller $8.7 2012-2013 Announced. UPA Construction.

Public Works and Government Services Canada

Edmonton Maximum Security Institution Expansion

Edmonton $19.7 2011-2014 Under construction. Maple Reinders.

Public Works and Government Services Canada

EDMONTON INSTITUTE FOR WOMEN ADDITION (40 BED LIVING UNIT)

Edmonton $6.1 2012 Announced. Fillmore Construction.

Red Deer College Sports and Wellness Centre and Health Education Centre (Building Communities Through Learning Phase 2)

Red Deer $100.0 On hold

Rocky Senior Housing Council

Westview Lodge Replacement Facility

Rocky Mountain House

$10.0 2010-2012 Completed. Chandos Construction. Two phases.

Santos Property Inc. 'The Gardens at Highway 2' Assisted Living Facility Phase 1

Red Deer $23.0 On hold. Originally proposed for 2011 - 2012.

Silvera for Seniors (formerly Metropolitan Calgary Foundation Housing for Seniors)

GILCHRIST SENIORS HOUSING FACILITY REDEVELOPMENT

Calgary $20.0 Proposed

Southern Alberta Institute of Technology (SAIT)

BUILDING ALTERATIONS (THOMAS RILEY ADDITION)

Calgary $7.4 Proposed

Southern Alberta Institute of Technology (SAIT)

Trades and Technology Complex Calgary $445.0 2010-2012 Under construction. PCL Construction Management.

35April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 49: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Stoney Tribal Administration

Morley Community School Modernization (change from K to Grade 12 to Grades 4 to 12)

Stoney IR 142,143,144 (Morley)

$5.0 2012 Under construction. Krawford Construction.

The Bethany Group 'Bashaw Meadows' SUPPORTIVE LIVING FACILITY

Bashaw $5.4 2012 Under construction. Krawford Construction.

The University of Calgary Science Building 'A' Renovations / Remediation phase 2

Calgary $10.0 2011-2013 Under construction. EllisDon Construction.

The University of Calgary Wastewater Treatment Plant Calgary $16.0 2011-2013 Announced. Graham Construction.

Town of Jasper Library Renovation / Addition Jasper $7.2 2011-2013 Under construction. Delnor Construction.

University of Alberta Student Physical Activity and Wellness Centre

Edmonton $57.0 Proposed for 2012 - 2014.

University of Alberta Dentistry / Pharmacy Building Repurposing / Refurbishment

Edmonton $170.0 Proposed

University of Alberta South Campus (Balmoral Facility Renovation / Repurpose)

Edmonton $21.0 2011-2012 Under construction. Stuart Olson Dominion.

University of Alberta Devonian Botanic Garden Ecological Learning Centre

Parkland County $30.0 Proposed

University of Alberta / City of Camrose / Camrose County

Camrose Performing Arts Centre (CPAC), Augustana Campus

Camrose $11.5 Proposed. Fundraising underway.

University of Lethbridge 'Aperture Residential Park' Student Residences Phase 3 (Apartments)

Lethbridge $32.0 2011-2013 Under construction. Stuart Olson Dominion.

Vantage West Developments

'Sunrise Village 2' SUPPORTIVE LIVING SPACES

Olds $5.3 Proposed for 2012 - 2013.

Westlock Foundation Pembina Lodge Expansion Phase 1 Westlock $12.0 2011-2012 Nearing completion. Cormode and Dickson Construction.

Mining

Coalspur Mines Ltd. 'Vista' Thermal Coal Mine Yellowhead County (near Hinton)

$500.0 Proposed for 2013 - 2014, pending approvals. Application to be filed Q1 2012.

36April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 50: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Grande Cache Coal Corporation

Development of #8 Surface Mine and #12 South B2 Underground Mine

Grande Cache $180.0 2009-2012 Under construction. ERCB approval for #8 mine November 2009, #12 July 2011.

MAXIM Power Corp. Development of #14 Coal Mine Grande Cache $50.0 Proposed. ERCB approval October 2009.

Parsons Creek Aggregates

Parsons Creek Aggregates Limestone Quarry

RM of Wood Buffalo (N of Ft McMurray)

$30.0 Proposed for 2012 - 2013, pending approvals.

Oil & Gas

AltaGas Income Trust Harmattan Co - Stream Project Mountain View County (Harmattan complex)

$100.0 2011-2012 Announced. Cost range $100M to $120M. ERCB approval December 2010.

AltaGas Income Trust Natural Gas Processing Plant Saddle Hills County (Gordondale area)

$235.0 2011-2012 Under construction

Birchcliff Energy Ltd. 'Pouce Coupe South' Gas Plant Expansion Phase 3

northwestern Alberta

$66.0 2012 Under construction.

Free Energy International Inc.

Geothermal Plant Facility (1000kW) MD of Big Lakes $5.5 Proposed

Inclusive Energy Ltd. Liquids Storage Facility Yellowhead County (near Edson)

$40.0 Proposed

Parkland Fuel Corp. Installation of Rail Siding and Related Equipment

Bowden $21.0 2011-2012 Under construction (loading / unloading equipment). Rail siding installed.

Pembina Pipeline Corp. ETHYLENE STORAGE FACILITY CAVERN DEVELOPMENT

Fort Saskatchewan

$15.0 2012-2013 Announced

Pembina Pipeline Corp. Cutbank Complex Expansion (Musreau Gas Plant)

MD of Greenview $26.0 2011-2012 Announced. Pending approvals.

Pembina Pipeline Corp. UPGRADES TO TWO PUMP STATIONS

northwestern Alberta

$30.0 2012 Announced

Pembina Pipeline Corp. 'Resthaven' Plant Capacity Expansion

west central Alberta

$230.0 2012-2013 Announced

37April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 51: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Pembina Pipeline Corp. Truck Terminal Network Expansion western Alberta and BC

$35.0 Proposed for 2012.

Pembina Pipeline Corp. 'Saturn' Natural Gas Liquids Extraction Facility

Yellowhead County (Berland)

$200.0 2012-2013 Announced. Pending regulatory approvals.

Provident Energy Ltd. Natural Gas Storage Facility (Two Underground Caverns)

Sturgeon County (N of Fort Saskatchewan)

$77.0 2012 Announced

Royal Dutch Shell Liquified Natural Gas Facility, Jumping Pound Gas Processing Facility

MD of Rocky View (W of Calgary)

$50.0 Proposed for 2012 - 2013. Application filed.

Shell Canada Waterton Natural Gas Processing Plant

MD of Pincher Creek

$40.0 2011-2012 Completed

Sunshine Oilsands 'Muskwa' Heavy Oil Project Phase 1 MD of Opportunity $31.0 Proposed. Five phases in total.

Swan Hills Synfuels LP Coal Gasification Plant MD of Big Lakes (Swan Hills area)

$1,000.0 Proposed for 2013 - 2015. PCL Industrial Management (syngas processing facility).

Oil Sands

Alberta Oilsands Inc. 'Clearwater West' SAGD Production RM of Wood Buffalo (S of Ft McMurray)

$415.0 Proposed. Application filed January 2010.

Canadian Natural Resources Ltd. (CNRL)

'Horizon' Oil Sands Project Phases 3 and 4

RM of Wood Buffalo

$200.0 Proposed for 2012 - 2013. EPC Technip.

Canadian Natural Resources Ltd. (CNRL)

'Kirby South' In - Situ Oil Sands Project Phase 1

RM of Wood Buffalo

$1,250.0 2010-2013 Under construction. Application approved Q3 - 2010.

Canadian Natural Resources Ltd. (CNRL)

'Project Horizon' Mining and Drilling Project phase 2 / 3

RM of Wood Buffalo

$1,080.0 2012-2014 Announced. Approved Jan 2004. EPC Technip.EPC froth treatment plant SNC Lavalin.

Canadian Natural Resources Ltd. (CNRL)

KIRBY EXPANSION PHASE 1 OIL SANDS PROJECT (KIRBY NORTH PHASE 1 or KN1)

RM of Wood Buffalo (S of Conklin)

$1,200.0 Proposed for 2014 - 2015. Application filed December 2011.

Cenovus Energy Inc. Christina Lake Thermal Expansion Project Phases 1E, 1F and 1G

RM of Wood Buffalo (SE of Conklin)

$2,700.0 2012-2016 Under construction (phase E). Application approved April 2011. Estimated construction Phase 1E 2012 - 2014; Phase 1F 2012 - 2015; Phase 1G 2014 - 2016.

38April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 52: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Cenovus Energy Inc. 'Pelican Lake Grand Rapids' SAGD OIL SANDS PROJECT PHASE 1

MD of Opportunity $2,000.0 Proposed for 2014 - 2017. Application filed December 2011. Phase 2 2017 - 2021, phase 3 2020 - 2024.

Cenovus Energy Inc. 'Telephone Lake ' SAGD Project Phase 1 (Phase A)

RM of Wood Buffalo (E of Ft McKay)

$1,000.0 Proposed for 2014 - 2018. Owner expects construction start 2014, pending approvals.

Cenovus Energy Inc. / ConocoPhillips

'Foster Creek' Oil Sands Project Phases F, G and H

Lac la Biche County

$2,000.0 2012-2017 Announced. ERCB approval September 2010. Site preparation underway.

Cenovus Energy Inc. / ConocoPhillips

'Narrows Lake' In Situ Oil Sands Project using Solvents

RM of Wood Buffalo (E of Conklin)

$1,600.0 Proposed. Application filed early February.

Connacher Oil & Gas Ltd. 'Great Divide' SAGD Expansion Phase 1

RM of Wood Buffalo (S of Ft McMurray)

$600.0 Proposed for 2012 - 2013.

ConocoPhillips Canada / Total Canada

'Surmont Phase 2' Oil Sands Development

RM of Wood Buffalo

$2,000.0 2010-2015 Under construction. Bantrel Inc.

Cretaceous Oilsands Holdings Ltd. (previously listed under Dover Operating Corp. (/MacKay OPCO))

'MacKay River' Commercial Oil Sands Project Phase 1

RM of Wood Buffalo (W of Ft. McMurray)

$1,300.0 2012-2014 Announced. EP services for Central Plant SNC-Lavelin.

Devon Canada Corp. 'Walleye' Oil Sands Projects (SAGD) MD of Bonnyville (N of Barbara Lake)

$450.0 Proposed for 2013 - 2015, pending approvals.

Devon Canada Corp. 'Jackfish' Oil Sands Project Phase 3 RM of Wood Buffalo (SE of Conklin)

$1,300.0 2012-2014 Under construction. Application approved by ERCB November 2011.

Dover Operating Corp. (Dover OPCO)

'Dover' Commercial Oil Sands Project Phase 1

RM of Wood Buffalo

$2,500.0 2012-2014 Announced. Application filed February 2011. Five phases in total.

Enbridge Inc. Terminal Tankage (Storage Capacity) Expansion Phases 1 and 2

Strathcona County

$260.0 Proposed for 2012 - 2013, pending regulatory approval.

E-T Energy Ltd. 'Poplar Creek' Bitumen Extraction Project

RM of Wood Buffalo

$103.0 Proposed for 2011 - 2013. Planned construction start late 2011, pending regulatory approvals.

39April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 53: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Finning (Canada) Ltd. Service Facility RM of Wood Buffalo (Ft McKay)

$110.0 2011-2012 Under construction

Fort Hills Energy Corp. (Suncor Energy Inc. / Total SA / Teck Cominco)

'Fort Hills' Oil Sands Mine RM of Wood Buffalo

$9,600.0 Proposed. Corporate approval for construction expected by end of 2012. Planned to come onstream in 2016.

Grizzly Oil Sands (previously listed under Petrobank Energy and Resources)

'May River' Commercial Bitumen Project Phase 1

RM of Wood Buffalo (W of Conklin)

$250.0 Proposed. Application to be filed by Grizzly Oil Sands.

Grizzly Oil Sands ULC 'Algar Lake' SAGD Oil Sands Project Phase 1

RM of Wood Buffalo (SW of Ft McMurray)

$220.0 2012-2013 Under construction. SNC - Lavelin, Ledcor Alberta.

Harvest Operations Corp. 'BlackGold' Oil Sands Project Phase 2

RM of Wood Buffalo (SE of Conklin)

$540.0 Proposed for 2013 - 2015, pending approvals.

Harvest Operations Corp. 'BlackGold' In Situ Oil Sands Project Phase 1

RM of Wood Buffalo (SE of Conklin)

$300.0 2011-2012 Under construction. GS Engineering and Construction Corp.

Horizon North Logistics Inc.

Camp Construction Project northern Alberta $40.0 2012 Announced

Horizon North Logistics Inc.

OILS SANDS WORK CAMP RM of Wood Buffalo

$27.0 2012-2013 Announced

Husky Energy Inc. / BP PLC

'Sunrise Thermal Project' SAGD Oil Sands Project Phase 1

RM of Wood Buffalo (N of Ft McMurray)

$2,500.0 2011-2013 Under construction. SaipamSpA. Application approved. Corporate approval Nov 2010. WorleyParsons Canada EPC field facilities.

Imperial Oil Ltd. 'Nabiye' Oil Sands Project Phases 1 - 3

MD of Bonnyville (Cold Lake area)

$2,000.0 Proposed. Planned on - stream by 2015. Includes a 170MW cogen plant. Corporate approval February 2012.

Imperial Oil Ltd. 'Kearl Lake' Oil Sands Project Phase 2 of 2

RM of Wood Buffalo

$8,900.0 Proposed for completion by late 2015.

40April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 54: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Imperial Oil Resources / ExxonMobil Canada

'Kearl Lake' Oil Sands Mine Phase 1 of 2

RM of Wood Buffalo

$10,900.0 2009-2012 Under construction. Three production trains / phases in total. Application approved (both phases). AMEC (EPC). Fluor Corp infrastructure and facilities.

Ivanhoe Energy 'Tamarack' Bitumen Project Phase 1 RM of Wood Buffalo (near Ft McMurray)

$1,250.0 Proposed for 2012 - 2013. Application under review.

Japan Canada Oil Sands Limited (JACOS) / Nexen Inc.

Hangingstone SAGD Commercial Production Project

RM of Wood Buffalo (SW of Ft McMurray)

$1,200.0 Proposed. Application under review.

Kinder Morgan Canada Edmonton Terminal Storage Expansion

Strathcona County

$284.0 2012-2013 Announced

Laricina Energy Ltd. 'Saleski' Oil Sands Pilot Project Expansion

MD of Opportunity $400.0 Proposed for 2012 - 2014

Laricina Energy Ltd. 'Germain' Commercial Demonstration Project (Solvent - Cyclic SAGD) Phase 1

MD of Opportunity $250.0 2011-2013 Under construction

Laricina Energy Ltd. 'Germain' Commercial Demonstration Project Phase 2

MD of Opportunity (NW of Wabiskaw-Desmarais)

$1,100.0 Proposed for 2013 - 2015. Application for phases 2 to 4 filed November 2011.

MEG Energy Corp. In Situ Oil Sands Project Phase 2B RM of Wood Buffalo (Christina Lake)

$1,400.0 2011-2014 Under construction. Flint Energy Services Ltd. Corporate approval December 2010.

MEG Energy Corp. Christine Lake SAGD Project Phase 3

RM of Wood Buffalo (near Conklin)

$500.0 Proposed. ERCB approval January 2012.

MEG Energy Corp. Stonefell Terminal (Bitumen / Diluent Storage Facility)

Strathcona County

$150.0 2011-2013 Under construction

North West Redwater Partnership (Canadian Natural Resources Ltd. (CNRL) / North West Upgrading Inc.)

Bitumen Upgrader Phase 1 Sturgeon County (near Redwater)

$4,000.0 2012-2014 Announced. EPC SNC-Lavalin, PCL Industrial Management. Site preparation complete.

41April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 55: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Osum Oil Sands Corp. 'Taiga' Oil Sands Project MD of Bonnyville (N of Cold Lake)

$1,570.0 Proposed for 2013 - 2018. Application filed January 2010. Public hearing starts May 23, 2012 in Cold Lake.

Pengrowth Energy Trust SAGD Pilot Project, Lindbergh RM of Wood Buffalo

$50.0 2011-2012 Completed

Shell Canada Athabasca Oil Sands Project Debottleneck Phase 1

RM of Wood Buffalo / Strathcona County

$2,000.0 Proposed. Muskeg River Mine, Jackpine Mine and Scotford.

Shell Canada / Chevron / Marathon Oil

'Quest' Carbon Capture and Storage (CCS) Project

near Ft Saskatchewan to Thorhild Cty

$900.0 Proposed for 2012 - 2015. Pending corporate approval. Application filed November 2010. EPC capture facility Fluor. EP pipeline Tri - Ocean Engineering.

Shell Canada Ltd. 'Carmon Creek' Bitumen Project Northern Sunrise County (NE of Peace River)

$3,450.0 Proposed for 2011 - 2016. Two central processing facilities and three co-generation units.

SilverBirch Energy / Teck Resources Ltd.

'Equinox' Oil Sands Mine (Lease 14) RM of Wood Buffalo

$2,500.0 Proposed. Application filed with Frontier application in November 2011.

SilverBirch Energy / Teck Resources Ltd.

'Frontier' Oil Sands Mine Phases 1 and 2

RM of Wood Buffalo

$14,500.0 Proposed construction start phase 1 in 2016. Application filed November 2011. Approval expected in 2014 / 2015. Four phases in total.

Southern Pacific Resource Corp.

'McKay' SAGD Oil Sands Project Phase 1

RM of Wood Buffalo (N of Ft McMurray)

$415.0 2011-2012 Under construction. Application filed May 2009. Approval October 2010.

Southern Pacific Resource Corp.

'McKay' SAGD Project Phases 2A and 2B

RM of Wood Buffalo (NW of Ft McMurray)

$1,140.0 Proposed for 2013 - 2015 (phase 2A) and 2014 - 2016 (phase 2B). Application filed November 2011.

Suncor Energy Inc. North Steepbank Mine Extension RM of Wood Buffalo

$400.0 On hold, but planned in-operation late 2012. Application approved November 2006.

Suncor Energy Inc. 'Firebag' Oil Sands Project Phase 4 RM of Wood Buffalo

$2,000.0 2011-2013 Under construction. ERCB approval March 2010.

Suncor Energy Inc. / Total SA

'Voyageur' Oil Sands Third Upgrader (U3)

RM of Wood Buffalo

$11,600.0 2011-2016 Under construction. Project does not include bitumen feed to upgrader.

42April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 56: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Sunshine Oilsands 'West Ells' Oil Sands Project Phase 1 of 2

MD of Opportunity $385.0 2012-2013 Under construction

Syncrude Canada Ltd. Mature Fine Tailings Processing Plant (Demonstration Plant)

RM of Wood Buffalo

$25.0 Proposed for 2012 - 2014. Newalta Corporation.

Syncrude Canada Ltd. Composite Tailings Plant, Aurora North Mine Site

RM of Wood Buffalo

$300.0 2012-2013 Announced

Syncrude Canada Ltd. Two New Mine Trains, Mildred Lake Mine Site

RM of Wood Buffalo (N of Ft McMurray)

$3,600.0 Proposed for 2012 - 2014

Total E&P Canada Ltd. / Suncor Energy Inc.

Joslyn North Mine RM of Wood Buffalo

$8,900.0 Proposed for 2013 - 2017. ERCB conditional approval January 2011, federal approval December 2011. Corporate approval expected by end of 2012. FEED underway.

Value Creation Inc. 'TriStar' SAGD Pilot Project RM of Wood Buffalo (S of Ft McMurray)

$100.0 Proposed

Williams Canada Off - Gas Extraction Plant Modifications and Construction of De - Ethanizer

RM of Wood Buffalo and Redwater

$311.0 2012-2013 Announced

Other Industrial

Defence Construction Canada

Range Control Facility, CFB Suffield Cypress County $5.1 2011-2012 Completed. Wahl Construction.

Defence Construction Canada

Building 700 Office Building, CFB Edmonton

Edmonton $29.9 2011-2012 Under construction. Pentagon Structures Ltd.

Defence Construction Canada

Land Force Western Area Headquarters, CFB Edmonton

Edmonton $54.0 2011-2013 Under construction. Pentagon Structures Ltd.

Defence Construction Canada

Opposing Force Facility, CFB Wainwright

MD of Wainwright $14.8 2012 Under construction. KellerDenali Construction.

Defence Construction Canada

Vehicle Maintenance Facility Extension, CFB Wainwright

Wainwright $39.3 2011-2015 Under construction. Dowland Contracting Ltd.

43April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 57: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Public Works and Government Services Canada

Lethbridge Research Centre Building 102 Exterior Envelope Replacement

Lethbridge $8.9 2011-2013 Under construction. Chandos Construction.

TransAlta Corp. / TransCanada Pipelines Ltd.

'Project Pioneer' Carbon Capture and Storage (CCS) Project at Keephills

Parkland County (Keephills power plant)

$1,400.0 Proposed for 2012 - 2014. FEED underway.

Pipelines

Athabasca County Athabasca Regional Water Pipeline Athabasca County

$29.2 2011-2012 Under construction. Graham Design Builders A Joint Venture. From Boyle to Grassland / Wandering River.

Capital Region Northwest Water Services Commission

Water Pipeline Smoky Lake County

$12.0 Proposed

County of Newell RURAL POTABLE WATER SUPPLY County of Newell $51.0 2012 Under construction. Contract 2 Rosemary, Contract 3 Tilley, Contract 4 Rolling Hills.

County of St. Paul / Town of St. Paul / Town of Elk Point

Water Pipeline Cty of St. Paul (St. Paul to Elk Point)

$7.3 Proposed

Enbridge Inc. 'Athabasca' Pipeline Capacity Expansion

between Cold Lake and Hardisty

$185.0 Proposed for 2012 - 2013.

Enbridge Inc. 'Waupisoo' Pipeline Expansion Edmonton to Ft McMurray

$400.0 2011-2012 Under construction

Enbridge Inc. 'Wood Buffalo' Crude Oil Pipeline RM of Wood Buffalo

$370.0 2011-2013 Under construction

Enbridge Inc. 'Norealis' Bitumen Pipeline, Husky Sunrise to Cheecham Terminal

RM of Wood Buffalo

$475.0 2011-2013 Under construction

Enbridge Inc. 'Woodland' Pipeline Extension RM of Wood Buffalo (Cheecham) to Edmonton

$50.0 Proposed for 2012 - 2014. Public hearing starts June 12.

Enbridge Inc. 'Athabasca' Oil Pipeline Expansion RM of Wood Buffalo to Hardisty

$1,200.0 Proposed for 2014 - 2015. ERCB application to be filed spring 2012.

44April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 58: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Enbridge Pipelines Inc. 'Woodland' Bitumen Pipeline RM of Wood Buffalo (Kearl to Cheecham Terminal)

$100.0 2011-2012 Under construction

Enbridge Pipelines Inc. 'Northern Gateway' Bitumen and Condensate Pipelines (Alberta portion)

RM of Wood Buffalo to Alberta / BC border

$1,579.0 Proposed for 2014 - 2015. Application filed May 2010. Construction cost entire pipeline (Alberta and BC) $5.5 billion.

Enhance Energy Inc. CO2 Pipeline (Alberta Carbon Trunk Line)

near Edmonton to Camrose and Lacombe Counties

$600.0 2012-2014 Announced. Revised application submitted to ERCB November 2010.

Inter Pipeline Fund 'Polaris Pipeline' Expansion / Extension of Existing Diluent Pipeline

Edmonton area to Kearl Lake oilsands project

$135.0 2010-2012 Under construction

Kneehill County Sunnyslope WSA Water Distribution System

Kneehill County $8.7 2011-2012 Nearing completion. Chinook Pipeline.

Mountain View Regional Water Services Commission

Water Line Twinning Innisfail to Olds $26.0 2010- Under construction (Phase 1 completed).

Northern Sunrise County Regional Water System Phase 2A (Water Lines and Fill Stations)

Northern Sunrise County (St. Isadore and Nampa)

$9.0 2011-2012 Nearing completion. Glen Armstrong Construction.

NOVA Gas Transmission Ltd.

Northwest Mainline Expansion Mackenzie Cty (SW of Rainbow Lake)

$324.0 Proposed. Kyklo Creek, Timberwolf and Cranberry pipeline sections. NEB approval February 2012.

NOVA Gas Transmission Ltd.

Leismer to Kettle River Crossover Project

RM of Wood Buffalo

$157.0 Proposed for 2012 - 2013. Pending approvals. NEB public hearing starts May 8, 2012 at location to be determined.

Pembina Pipeline Corp. Willesden Green Pipeline Expansion, Trunk Line Improvements and Debottlenecking

across Alberta $40.0 2011-2012 Under construction

Pembina Pipeline Corp. Pipeline Debottleneck and Construction of Truck Terminals

central Alberta $11.0 2011-2012 Under construction

45April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 59: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Pembina Pipeline Corp. Drayton Valley Trunk Line Extension central Alberta $6.0 2011-2012 Completed

Pembina Pipeline Corp. CRUDE OIL AND CONDENSATE CAPACITY EXPANSION, PEACE PIPELINE

northwestern Alberta

$30.0 2012-2013 Announced. Pending approvals.

Pembina Pipeline Corp. Capacity Increase on Peace and Northern Pipelines

NW Alberta / BC $100.0 2012-2013 Announced. Five new pump stations and upgrades to five others.

Plains Midstream Canada (Plains)

'Rainbow Pipeline II' Butane and Condensate Pipeline

Northern Sunrise County to Strathcona County

$200.0 Proposed for 2012 - 2013.

Rocky View County Water Pipeline from Graham Reservoir to Conrich

Rocky View County

$25.0 Proposed

Swan Hills Synfuels Synthetic Gas Pipeline Swan Hills to Whitecourt

$50.0 Proposed for 2013 - 2015

Williams Energy 'Boreal' Natural Gas Liquids (NGL) Pipeline

Fort McMurray to Redwater

$283.0 2010-2012 Completed. Willbros Canada. $US.

Power

Alberta Electric System Operator (AESO)

Rebuild of Electricity Infrastructure Drayton Valley, Wabamun, Edson, Hinton

$30.0 2010-2013 Under construction

Alberta Electric System Operator (AESO)

Transmission Reinforcement, Hanna Region

east central Alberta

$1,000.0 Proposed. Stage 1 to be in service in 2012, stage 2 in service by 2017.

Alberta Electric System Operator (AESO)

Transmission Line Rebuild (138kV) Wetaskiwin to Didsbury

$60.0 Proposed. Project includes new substation near Didsbury and upgrades to Ponoka substation

Alberta Electric Systems Operator (AESO)

Transmission System Upgrade central Alberta $206.0 Proposed. New substations near Didsbury, Ponoka and Innisfail, substation upgrades Benalto and west Lacombe.

Alberta Wind Energy Corp.

'Oldman River' Wind Farm (50MW) MD of Pincher Creek (NE of Pincher Creek)

$47.0 Proposed. Pending completion of transmission line Pincher Creek to Lethbridge.

46April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 60: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Alberta Wind Energy Corp. / Mainstream Canada

'Oldman 2' Wind Farm (46MW) MD of Pincher Creek (NE of Pincher Creek)

$120.0 2012-2013 Announced. Planned construction start fall 2012.

Alberta Wind Energy Corp. / Mainstream Renewable Power

Two Wind Generation Projects (350MW total)

southern Alberta $840.0 Proposed. Windy Point (62MW, planned construction start 2012) and Waterton Colony.

AltaLink Management Ltd. Yellowhead area Reinforcement (Infrastructure Upgrades)

Brazeau and Yellowhead Counties

$127.0 2011-2012 Completed

AltaLink Management Ltd. Four Stage Transmission Upgrade, Red Deer Region

central Alberta $204.0 Proposed to start construction in summer 2013, pending approvals.

AltaLink Management Ltd. Transmission Line 666L County of Newell (W of Brooks)

$8.0 2011-2012 Completed. AUC approval January 2011.

AltaLink Management Ltd. Western Alberta Transmission Line (500kV)

Edmonton to Calgary

$1,100.0 Proposed. Application filed March 2011. Public hearing Red Deer June 11 at Holiday Inn 67 St.

AltaLink Management Ltd. South Foothills Transmission Project (240kV)

Fort Macleod to High River

$345.0 Proposed construction start summer 2012, pending approvals.

AltaLink Management Ltd. Russell 632S Substation MD of Pincher Creek

$17.2 2011-2012 Nearing completion. AUC approval January 2011.

AltaLink Management Ltd. Transmission Line (240kV) and 'Chapel Rock' Substation

MD of Pincher Creek (Pincher Creek to Lundbreck)

$300.0 Proposed. Application to be filed in 2012.

AltaLink Management Ltd. Transmission Line (240kV), Cassils to Bowmanton

southeastern Alberta

$407.0 2011-2014 Under construction. Route to go north of Lake Newell.

AltaLink Management Ltd. Electrical Substation Strathcona County (near Twp Rd 544)

$16.0 Proposed. AUC approval November 2011.

AltaLink Management Ltd. (formerly listed under Naturener Energy Canada)

East Palliser Transmission Line Cypress County $100.0 Proposed to start in 2012, pending approvals.

47April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 61: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

ATCO Electric Ltd. Eastern Alberta Transmission Line (500kV)

Edmonton to Calgary

$1,650.0 Proposed for 2012 - 2014. Public hearing Brooks July 23, Forestburg July 24, Camrose July 25 - 26, Stettler July 30.

BluEarth Renewables 'Bull Creek' WIND FARM (110MW) MD of Wainwright $160.0 Proposed for 2013.

Capital Power Corp. 'Halkirk' Wind Farm phase 1 (150MW)

Paintearth County (near Halkirk)

$357.0 2012-2013 Announced. RES Canada. Anticipated construction start phase 1 spring 2012.

City of Medicine Hat Concentrating Solar Thermal Energy Demonstration Project

Medicine Hat $9.0 Proposed for 2011 - 2012

Enbridge Inc. Montana - Alberta Transmission Line (230MW)

Lethbridge to Great Falls

$213.0 2009-2012 Under construction. Rocky Mountain Contractors (EPC).

ENMAX Energy Corp. 'Bonnybrook Energy Centre' Power Plant (165MW)

Calgary $200.0 Proposed. Pending approvals. Planned in - service 2014.

ENMAX Energy Corp. 'Shepard Energy Centre' Natural Gas Fired Generating Plant (800MW)

Calgary $1,300.0 2011-2015 Under construction. Kiewit Energy Canada Corp. / Black & Veatch Canada Corp. AUC conditional approval October 2010.

EPCOR Distribution and Transmission / AltaLink Management Ltd.

'Heartland' Transmission Line (500kV)

Wabamun to Ind Heartland NE of Fort Saskatchewan

$582.0 2012-2013 Announced. Alberta Utilities Commission (AUC) approval November 2011.

Greengate Power Corp. 'Blackspring Ridge' Wind Power Project (300MW) Phase 1

Vulcan County (near Carmangay)

$700.0 2012-2013 Announced. Planned construction start spring 2012.

MAXIM Power Corp. Gas Fired Electric Plant (190MW) Lamont County (NE of Bruderheim)

$140.0 Proposed for 2012 - 2013. To be built next to existing Deerland substation.

MAXIM Power Corp. 'Milner Expansion' Coal - Fired Generating Plant (500MW)

MD of Greenview (near Grande Cache)

$1,400.0 Proposed for 2012 - 2014. AUC approval July 2011. Construction start pending announcement of federal greenhouse gas legislation.

Naturener Energy Canada 'Prairie Home' Wind Farm Phase 2 (89 MW)

County of Warner $100.0 Proposed for 2012

48April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 62: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Naturener Energy Canada 'Wild Rose' Wind Farm (200MW) Phase 1

Cypress County (S of Irvine)

$400.0 Proposed for 2012 - 2013. AUC approval October 2010. East Palliser Transmission Line approved March 2012.

Naturener Energy Canada 'Wild Rose' Wind Farm Phase 2 (162MW)

Cypress County (S of Medicine Hat)

$410.0 Proposed. Planned to be in - service in 2012.

Nexen / Joss Power 'Hand Hills' Wind Farm (78MW) Starland County (E of Delia)

$200.0 Proposed

NRGreen Power CHICKADEE CREEK GENERATING STATION (14MW)

Woodlands County

$64.0 2012-2013 Announced

Otoka Energy Corp. Waste to Energy Gasification Plant (25MW)

Brazeau County (near Drayton Valley)

$100.0 Proposed. Three phases. Pending approvals.

Plasco Energy Group / Central Waste Management Commission

Plasma Gasification Plant (waste - to - energy conversion)

Red Deer County (Horn Hill Waste Transfer Site)

$93.0 Project cancelled. Originally proposed for 2012 - 2013.

Swan Hills Synfuels Power Generation Plant (300MW) Swan Hills / Whitecourt area

$500.0 Proposed for 2013 - 2015. .

TransAlta Pocaterra Hydro Facility Upgrades (Penstock Replacement)

Kananaskis Country (Peter Lougheed Prov Park)

$20.0 Proposed for 2011 - 2012

Residential

26th Avenue River Investments Inc.

'The River' CONDOMINIUM BUILDING

Calgary $130.0 Proposed for 2012 - 2014. Planned construction start spring 2012.

Acclaim Condominium Management

'Bella Vista' Condo Building Repairs Calgary $7.0 2011-2012 Under construction

Alberta Infrastructure New Lieutenant Governor's Residence

Edmonton $5.0 Proposed

All Seniors Care Living Centres

RETIREMENT RESIDENCE, LEWIS ESTATES

Edmonton $20.0 2011-2012 Under construction.

49April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 63: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Alpha Anderson Joint Venture

'Big Lake Pointe' Affordable Housing Project

St. Albert $6.8 2011-2013 Under construction

Anthem Riverfront Land Holdings

'Waterfront' Condominiums (Three Towers and Five Podiums) plus Townhouses

Calgary $750.0 On indefinite hold (site 3). EllisDon Construction.

Asset Builders Corp. Row Housing Complex Sylvan Lake $6.2 2011- Under construction

Avalon Central Alberta 'Verde in Clearview Ridge' Townhouse Development

Red Deer $35.0 2011-2013 Under construction

Battistella Developments 'Pixel' Apartment Building Calgary $12.0 2012-2014 Under construction

BCM Homes 'The Corners I' CONDO TOWER, THE QUARTERS

Edmonton $80.0 Proposed for 2012 - 2015.

Bentall Kennedy Canada LP

'Royal View East' Condo Apartment Building

Calgary $16.0 Proposed. In preliminary design.

Bethany Care Group 'Mikkelsen House' Apartment Building Phase 2

Calgary $7.1 Proposed

Bosa Development / Embassy Development

'Evolution' Residential / Retail Complex (Three Towers), East Village

Calgary $300.0 Proposed. Construction of three towers over five to seven years. First condo tower (FUSE) 2012 - 2013, with possible construction start summer 2012.

Broadstreet Properties Ltd.

'Merecroft Gardens' Apartment Buildings (4)

Edmonton $14.7 2011-2012 Under construction

Brookfield Homes 'Mosaic Cranston' Townhouses Calgary $20.0 2010-2012 Under construction

Brookfield Homes 'Mosaic Mirage' Townhouse Development

Calgary $40.0 2011-2013 Under construction

Bucci Developments 'Next' Apartment Condominiums Calgary $18.6 2011-2013 Under construction

Bucci Developments 'Tribeca' CONDO APARTMENT BUILDING

Calgary $11.5 2012-2013 Under construction. Chandos Construction.

CAIRN Corporation 'Cairn on the Boulevard' Affordable Housing Project

Grande Prairie $14.0 2011-2013 Under construction

Calgary Dream Centre Returning Home Three Calgary $5.0 Proposed

50April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 64: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Calgary Homeless Foundation

Home Construction Project Calgary $24.0 Proposed

Calgary Homeless Foundation

'Lodging House' Affordable Housing Project

Calgary $10.8 Proposed. May be three or four buildings.

Cardel Lifestyles 'Cranston Place' Apartment Building 1

Calgary $7.1 Proposed

Carlisle Group 'Glenbow Place' Condo Apartment Complex (Three Buildings)

Cochrane $25.0 Proposed

Carrington Properties ltd. Apartment Building 'B', Ambleside Edmonton $9.4 2011-2012 Under construction

Century Group Lands Corp.

'Liberty Junction' Apartments and Town House Complex

Red Deer County $41.5 On hold until spring 2012 (Phase 1).

Christenson Developments / Western Asset Management Group (WAM)

'Centre in the Park' Housing / Retail / Commercial Development

Strathcona County (Sherwood Park)

$230.0 2006-2012 Nearing completion. Can-Der Construction.

Cidex Developments 'Treo Beacon Heights' Apartment Building 4

Calgary $6.3 Proposed

Cidex Developments 'Treo Beacon Heights' Apartment Buildings 2 and 3

Calgary $6.4 Proposed

City of Calgary Crescent Heights Affordable Housing Project

Calgary $6.7 Proposed

City of Calgary Parkdale Affordable Housing Project Calgary $6.0 Proposed

City of Calgary The Bridges Phase 2 Site 15 Affordable Housing Project (Mcpherson Place)

Calgary $18.5 2011-2013 Under construction

City of Edmonton 'Station Pointe Greens' Residential Co - operative (Four Buildings)

Edmonton $65.0 Proposed.

City of Edmonton / Metis Capital Housing Corp. / Canadian Paraplegic Assn / Boyle Street Community League

Boyle Renaissance Project Phase 2: Affordable Seniors Housing

Edmonton $22.0 2012-2013 Under construction. Clark Builders.

51April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 65: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Clay Cup Developments Residential Complex Innisfail $8.0 Proposed. Planned start spring / summer 2012.

Cold Lake Affordable Housing Society (CLAHS)

Apartment Complex Cold Lake $5.5 On hold

Cove Properties Ltd. 'Nuera 2' Apartment Building Calgary $31.0 Proposed for 2012 - 2013

Cove Properties Ltd. 'Monarch at Mackenzie' Condo Apartment Building Phase 2

Calgary $7.4 2011-2012 Under construction

Cove Properties Ltd. 'Monarch at Mackenzie Towne' Condo Apartments Phase 3

Calgary $7.2 2011-2013 Under construction

Devonian Properties 'Longboat Landing' Townhouses and Apartments

RM of Wood Buffalo (Ft McMurray)

$560.0 Proposed (phase 2 and phase 4 onwards). Earthworks and deep services anticipated to be completed by early 2013.

Devonian Properties 'Longboat Landing' Earthworks and Deep Services

RM of Wood Buffalo (Ft McMurray)

$90.0 2010-2012 Under construction

Dragonfly Cohousing Co - Housing Project Calgary $12.0 2012-2013 Proposed

Edmonton YMCA Boyle Renaissance Phase 1 --'Welcome Village' Affordable Housing and Community Centre

Edmonton $42.2 2010-2012 Nearing completion. Clark Builders.

Evolution by Greenboro 'Valour Park' Townhouse Complex Calgary $5.0 Proposed

Evolution by Greenboro 'Valour Park' Townhouses Phase 2 Calgary $8.3 Proposed

Evolution by Greenboro 'Origins at Cranston' Apartment Condominium Building

Calgary $5.6 2011-2012 Under construction

Fort McMurray Family Crisis Society

Apartment Building RM of Wood Buffalo (Ft. McMurray)

$50.0 Proposed. Fundraising underway.

GEF Seniors Housing (formerly Greater Edmonton Foundation)

'Ottewell Terrace' Seniors Affordable Housing (Apartments)

Edmonton $8.1 2012-2013 Announced. Possible tender call May.

Grosvenor Canada Ltd. 'Drake' Apartment Building Calgary $12.0 2011-2013 Under construction

52April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 66: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Habitat for Humanity / Trico Homes

Townhouses Calgary $24.9 Proposed

Homes by Avi Apartment Building Calgary $10.9 Proposed

Horizon Housing Society Affordable Housing Calgary $9.0 Proposed

Hunter Residential Developments

'Coventry Station' Multifamily Development (Townhouses and Apartments)

Calgary $10.0 2011-2012 Under construction

Inner City Housing Society Multi - Family Housing Project, Parkdale / 82 St

Edmonton $8.0 2011-2012 Under construction. Chandos Construction.

Jarvis Bay Developments 'The Savanna' Condominium Complex

Sylvan Lake $20.0 Proposed. Scope of work revised.

Kanas Corporation Lumino Building C Condo Apartment Building

Calgary $9.0 Proposed for 2012 - 2013.

Kanas Corporation Lumino Building B Apartment Building

Calgary $14.8 2011-2012 Under construction

Keynote Development Corp.

'Keynote Urban Village' Residential Tower Two

Calgary $37.3 2011-2013 Under construction. CANA Management.

Laebon Developments Ltd.

Three Apartment Buildings, Timberlea

Red Deer $25.0 2011- Proposed. First building 2011 - 2012.

Lake Placid Developments 'Centuria on the Park' Condo Apartments

Calgary $27.0 Proposed

Lamb Development Corp. / Fortress Real Capital

Condominium Building Calgary $62.0 Proposed

Lions Club of Calgary / Bethany Care Society

'Lions Village' Seniors Apartment Building

Calgary $20.0 2011-2013 Under construction. Centron Construction.

Luxe Developments 'Vida' Condominium Apartment Building

Calgary $6.3 2010-2012 Completed

Mustard Seed Ministry 'The Seed' Affordable Housing Tower (Apartment Building)

Calgary $60.0 2011-2012 Under construction. Clark Builders.

53April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 67: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

North Peace Housing Foundation

Seniors Affordable Housing Project, West Hill

Peace River $8.7 Proposed for 2012 - 2013

Pioneer Housing Foundation

'Silver Birch Court' Community Housing (Affordable Housing)

Strathcona County (Sherwood Park)

$12.0 2012-2013 Under construction. Krawford Construction.

Piper Creek Foundation 'Sandpiper' Seniors Apartment Building

Red Deer $7.9 2011-2012 Under construction

Pointe of View Developments

'Indigo Sky' Condo Apartment Building

Calgary $20.3 2011-2012 Under construction

ProCura Real Estate Services

'Mayfair Village' North (Second) Tower

Edmonton $100.0 Proposed construction start in 2012. Clark Builders.

ProCura Real Estate Services

'Azure on the Park' Condo Complex Phase 1

Edmonton $6.5 Proposed.

ProCura Real Estate Services

'Mayfair Village' Highrise Apartment Complex phase 1 (South Tower)

Edmonton $56.5 2010-2012 Completed. Clark Builders.

Qualex - Landmark Group 'Calla' Apartment Building Calgary $27.7 2011-2013 Under construction

Regency Developments Apartment Building, Westmount Edmonton $11.0 2011-2012 Announced. Pagnotta Industries.

Remington Development 'Quarry Park' Apartment Building Calgary $18.6 Proposed

Slave Lake Equities 'Cornerstones Apartments' Affordable Housing Project

Slave Lake $9.8 2011-2012 Under construction. Nova Builders Inc.

Statesman Group 'Groves of Varsity' Apartment Building (Building 2 Phase 1)

Calgary $22.8 Proposed

Statesman Group of Companies

'Riverside Quays' Condo Apartments and Townhouses Phase 4

Calgary $18.0 On hold

Statesman Group of Companies

'Riverside Quays' Condominium Apartments Phase 5

Calgary $28.0 On hold

Statesman Group of Companies

'Landings at Cougar Ridge' Townhouse Development

Calgary $30.0 2011-2012 Under construction

Stonecroft Properties 'Auburn Bay' APARTMENT BUILDING

Calgary $7.5 Proposed. Highview Construction.

54April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 68: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Stonecroft Properties Copperfield Building 4 Calgary $5.0 Proposed

Stonecroft Properties 'Highland Park' Apartment Building Calgary $12.0 2011-2012 Under construction

Stony Community Villas Ltd.

Affordable Housing Project Stony Plain $8.6 Proposed

Streetside Development Townhouses and Condo Apartments Calgary $28.0 2011-2013 Under construction

Streetside Development Corp.

'Perfect Fit' Condominium Apartment Building

Calgary $12.5 Proposed. In redesign

Streetside Development Corp.

'St. Johns 10th Street' Condominium Apartment Building

Calgary $26.0 2011-2013 Under construction

The Redekop Group 'Gala in Applewood' Apartment Building 'B'

Calgary $14.0 Proposed

Town of Lloydminster / Libbie Young Centre

Supportive Living Units and Community Centre

Lloydminster $5.0 2011-2012 Completed. Fillmore Construction Management.

Trueman Homes APARTMENT BUILDING Calgary $6.3 Proposed

Trueman Homes Apartment Building Calgary $7.4 Proposed

Trueman Homes Apartment Building Calgary $6.7 2011-2013 Under construction

Urban Avi 'The Block' Apartment Building Calgary $10.9 Proposed

Urban Landmarks 'The Britnell' Apartments (Two Buildings)

Edmonton $20.5 On hold. Urban Landmarks.

Valour Place Society 'Valour Place' Apartment Housing for Military during Rehabilitation / Treatment

Edmonton $10.0 2011-2012 Nearing completion

Walton Development 'Skyview' Multi - Residential Building 4

Calgary $7.4 Proposed

Walton Development 'Skyview' Multi - Residential Building 2

Calgary $6.7 Proposed

Westcorp Inc. 'London at Heritage Station' Condominium Towers

Calgary $200.0 2006- On hold. Towers 1 and 2 completed. To be built in stages.

55April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 69: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

WestCreek Developments 'Valmont' Residential Complex Calgary $8.2 Proposed

Telecommunications

City of Grande Prairie Outdoor Wireless Network Initiative Grande Prairie $6.0 Proposed for 2012

Tourism/Recreation

BCP Construction Hotel Blackfalds $7.5 On hold

Bearspaw - Glendale Community Association

Sports Facility Rocky View County (Bearspaw)

$6.0 Proposed for 2012 - 2013. Phased development.

Calgary Exhibition and Stampede

'Agrium Western Event Centre' Agriculture Arena and Exhibit Hall

Calgary $65.0 Proposed for 2012 - 2014. Part of Stampede Park $400M expansion.

Calgary Winter Club Phase 1 - Addition Calgary $14.0 2011-2012 Completed. Chandos Construction.

Calgary Winter Lacrosse Association

LACROSSE COMPLEX Calgary $6.5 Proposed. To be built in two phases.

Cantos Music Foundation King Edward Hotel Redevelopment and Cantos at the King Eddy National Music Centre

Calgary $110.5 Proposed to start construction in 2012. CANA Construction. Museum, recording studio and music centre.

Carlson Hotels Radisson Calgary Airport East Hotel and Conference Centre, near Calgary Airport

Calgary $19.0 2011-2012 Completed

Chinatown and Little Italy Business Association

Museum and Cultural Heritage Centre

Edmonton $6.0 Proposed

City of Airdrie Genesis Place Phase 3 (Twin Ice Arena, Meeting and Multi-Use Space)

Airdrie $18.0 2012-2013 Announced. Planned construction start April 2012.

City of Calgary Brighton Athletic Park (four multi - purpose fields)

Calgary $14.6 Proposed for 2012 - 2014.

City of Calgary Devonian Gardens Renovation Phase 2

Calgary $37.0 2009-2012 Under construction. Project will be completed as a continuation of Phase 1.

56April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 70: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

City of Calgary / Nose Creek Sports and Recreation Asoociation

'Cardel Place' Recreation Facility Expansion

Calgary $50.0 Proposed

City of Calgary / Seton Sport Recreation Culture and Wellness Society

Recreation Centre, Seton Calgary $70.0 Proposed

City of Cold Lake Cold Lake Energy Centre Phase 2 (Community Event Centre)

Cold Lake $20.0 2010-2012 Under construction. Scott Builders.

City of Cold Lake Community Event Centre Phase 1 at the Energy Centre

Cold Lake $15.3 2010-2012 Nearing completion. Scott Builders. Stage 1 is the hockey rink. Stages 2 / 3 second hockey rink and additional facilities. Estimated cost phases 1 and 2 range $20M to $25M.

City of Edmonton New Abbotsfield Recreation Centre Edmonton $5.5 Proposed

City of Edmonton Natural Swimming Pool, Borden Park Edmonton $14.5 Proposed

City of Edmonton Education Centre, Valley Zoo Edmonton $10.0 Proposed for completion in 2013.

City of Edmonton Seat Replacement, Commonwealth Stadium

Edmonton $12.0 Proposed for 2012 - 2013.

City of Edmonton Riverside, Rundle and Victoria Golf Course Redevelopment

Edmonton $30.0 Proposed for 2012 - 2014.

City of Edmonton North Centre Community Recreation Centre, Commonwealth Stadium

Edmonton $95.0 2009-2012 Completed. Clark Builders.

City of Edmonton New Park Pavilions for Mill Woods Sports Park, John Fry Sports Park, Victoria Park, Castle Downs District Park and Borden Park

Edmonton $13.2 2011-2013 Announced. Tender for Borden Park pavilion closes April 12.

City of Edmonton Multi - Purpose Facility, Clareview Edmonton $93.0 2011-2013 Under construction. Clark Builders. Renovation / expansion of Clareview Twin Arenas, plus new library and High School Completion centre.

City of Edmonton Recreation Centre / Library, Meadows

Edmonton $88.8 2011-2014 Under construction. PCL Construction Management.

City of Edmonton Valley Zoo Entrance and Wander Path Project (Four Structures)

Edmonton $23.5 2012-2013 Under construction. Stuart Olson Dominion Construction.

57April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 71: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

City of Edmonton / River Valley Alliance

Funicular (Gondola System), 104 St into River Valley

Edmonton $34.0 Proposed

City of Edmonton / River Valley Alliance

Centennial Footbridge, Terwilligar Edmonton $24.0 Proposed

City of Edmonton / The Katz Group of Companies / WAM Development Group

Entertainment and Sports Venue (Downtown Hockey Arena)

Edmonton $450.0 Proposed. Project manager (arena portion) ICON Venues Group. Approved by city council October 2011.

City of Edmonton / Whitemud Equine Learning Centre

New Facility, Whitemud Equine Centre

Edmonton $15.0 Proposed. Two riding arenas, new barns, classrooms, multi - use areas.

City of Fort Saskatchewan Jubilee Recreation Centre Renovations

Fort Saskatchewan

$7.0 Proposed. To be undertaken after Sportsplex renovations.

City of Grande Prairie Prairie Art Gallery Restoration Grande Prairie $10.0 2010-2012 Completed. Chandos Construction.

City of Lethbridge North Lethbridge Regional Park Lethbridge $15.0 Proposed for 2014 - 2017, pending approvals. Estimated cost range $15M to $20M.

City of Lethbridge ENMAX Centre Renovations / Expansion

Lethbridge $33.7 2009-2012 Nearing completion. Ward Bros Construction.

City of Lethbridge Community Arts Centre Lethbridge $20.7 2011-2013 Under construction. Dawson Wallace Construction.

City of Lethbridge Two Sheet Ice Arena plus Curling Rink, West Lethbridge

Lethbridge $38.0 2013-2015 Announced

City of Medicine Hat Regional Event Centre, Box Springs Business Park

Medicine Hat $89.8 Proposed.

City of Medicine Hat Family Leisure Centre Improvements / Enhancements

Medicine Hat $36.0 Proposed for inclusion in 2012 - 2014 budget.

City of Wetaskiwin / County of Wetaskiwin

Wetaskiwin Regional Aquatics Centre

Wetaskiwin $19.8 2012-2013 Under construction. PCL Construction.

Clearwater County Multi - Use Trail Clearwater County (Rocky Mtn House to Nordegg)

$6.8 Proposed

58April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 72: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

County of Grande Prairie Regional Sportsplex (Twin Ice Arena and Soccer Pitch)

County of Grande Prairie (Clairmont)

$29.2 2011-2012 Under construction. Kaldon Construction.

Edmonton Korean Community Centre Foundation

Multicultural Centre, Ellerslie Edmonton $5.6 2012 Under construction. Chandos Construction.

Edmonton Space and Science Foundation

TELUS WORLD OF SCIENCE EXPANSION PHASE 1

Edmonton $7.0 2012 Under construction. Chandos Construction

Grant MacEwan University Pool Renovations Edmonton $5.0 Proposed for 2012.

Innoka Point Resort Corp. Innoka Resort Canmore $15.0 On hold. Phased development (five buildings).Originally planned for 2010 - 2012.

Kids Cancer Care Foundation of Alberta (KCCFA)

Upgrades to Camp Kindle Mountain View County (near Water Valley)

$8.0 2011-2012 Nearing completion. CANA Construction.

Mayfield Hospitality Hotel and Convention Centre Medicine Hat $25.0 Proposed. Contingent on Regional Event Centre.

MD of Foothills Heritage Heights Multipurpose Arena MD of Foothills (De Winton)

$6.0 2012-2013 Announced. Planned construction start June.

MD of Foothills / Town of Okotoks

REGIONAL FIELD HOUSE MD of Foothills (near Aldersyde)

$16.0 Proposed

Nova Builders 'Nova' Hotel Edmonton $8.5 2011-2012 Completed. Nova Builders.

Olds Agricultural Society Gateway Centre Facility Mountain View County (jct Hwy 2/Hwy 27)

$50.0 Proposed. Plan includes hotel, convention centre, racino (racetrack and casino).

Parks Canada Infrastructure Upgrades Banff National Park

$9.7 Proposed. Projects include Cave and Basin parking lot, roadwork in Banff, washrooms at C&B and Johnston Canyon, improvements to Banff Museum exterior, Sulphur Mtn boardwalk repairs.

Parks Canada Cave and Basin National Historic Site Renewal

Banff National Park (Banff)

$8.9 2012 Under construction. Hurst Construction Management. Visitors pavilion Chandos Construction.

Parks Foundation Calgary Perimeter Pathway System (Calgary Greenway)

Calgary $50.0 2010-2014 Under construction. Phase 1 (Airport Tr to 17 Ave SE) completed.

59April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 73: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Pipestone Creek Dinosaur Bed Project Committee

Philip J. Currie Dinosaur Museum Wembley $30.0 2012-2013 Announced. PCL Construction. Planned construction start May 2012. Construction start dependent on funding.

Platinum Investments 'Courtyard by Marriott' HOTEL, EDMONTON INTERNATIONAL AIRPORT

Leduc County $29.0 2011-2012 Under construction

Pomeroy Group / Olds College

Hotel at Olds College (Part of Canadian Institute for Rural Entrepreneurship)

Olds $12.0 2011-2013 Under construction. Construction suspended til spring 2012.

Prestige Capital (previously listed as Hilton Hotels)

Homewood Suites Extended Stay Hotel

Calgary $11.2 2012-2013 Under construction. Aman Construction. Part of Calgary Airport Village by Hilton.

Province of Alberta New Royal Alberta Museum, Downtown

Edmonton $340.5 2012-2016 Announced. Ledcor Design - Build (Alberta) Inc.

Pumphouse Theatre Theatre Expansion Phase 1 Calgary $10.5 On hold

Red Deer Curling Centre MODERNIZATION / ADDITION Red Deer $7.4 2012 Under construction

Regional Municipality of Wood Buffalo

Anzac Multi - Use Leisure Facility and Community Park

RM of Wood Buffalo (Anzac)

$24.0 Proposed for 2012 - 2013.

Regional Municipality of Wood Buffalo

MacDonald Island Park Expansion (Sports Park Development)

RM of Wood Buffalo (Ft McMurray)

$55.0 Proposed

Regional Municipality of Wood Buffalo

Performing Arts Centre, MacDonald Island Park

RM of Wood Buffalo (Ft McMurray)

$10.0 Proposed. Feasibility study to be done.

Regional Municipality of Wood Buffalo

Athletic Field, Timberlea High School Site

RM of Wood Buffalo (Ft McMurray)

$15.0 2011-2012 Completed. Wilco Contractors NW.

River Valley Alliance North Saskatchewan River Valley Trail Phase 1

Devon to Fort Saskatchewan

$110.0 Proposed

Temple REIT Refurbishment of Capri Centre as Sheraton Hotel

Red Deer $8.0 2011-2012 Completed

60April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 74: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Project Sector/Company Name

ProjectDescription

ProjectLocation

Cost in $ Millions

ConstructionSchedule Remarks

Totem Development Group (previously listed as Totem Golf Ltd.)

Best Western Hotel Sundre $8.0 2011-2012 Under construction. Chandos Construction.

Town of Beaumont Centre Communautaire Beaumont Community Centre (CCBCC)

Beaumont $8.5 Proposed for 2012 - 2013.

Town of Beaverlodge New Indoor Pool / Community Centre Beaverlodge $11.6 2010-2012 Completed

Town of Blackfalds Fieldhouse (Recreation Facility) Blackfalds $18.0 Proposed for 2012 - 2014. Pending funding.

Town of Canmore Multiplex Canmore $31.4 2011-2012 Under construction. Graham Construction and Engineering. Will include library, daycare, aquatics facility, climbing wall, retail space, administration space and community space.

Town of Cochrane New Aquatic Facility at Spray Lake Sawmills Family Sports Centre

Cochrane $26.0 Proposed. Feasibility study completed.

Town of Edson Fieldhouse Edson $14.0 Proposed. Addition to existing Leisure Centre

Town of High River New Recreation Facility (Fieldhouse Attached to Recplex)

High River $8.0 Proposed. Request for prequalifications closes April 5.

Town of Westlock / Westlock County

Westlock 'Spirit Centre' Sports Complex

Westlock $15.5 2010-2012 Completed. Brenex Construction.

Trestle Creek Golf Resort RV Resort, Recreation Centre, Equine Centre, Sports Park and 27 Hole Golf Course

Parkland County $30.0 2010-2014 Under construction. Construction schedule is for golf course. First nine holes to be completed spring 2012, second nine to be ready 2014.

Tri Village Developments Ltd.

Holiday Inn Express and Suites Hotel Spruce Grove $30.0 Proposed for 2012 - 2013. Project also includes two restaurants, retail area and professional building.

Ukrainian Canadian Archives and Museum of Alberta

Pendennis Hotel / Brighton Block Renovation into Ukrainian Canadian Musem (Phase 1)

Edmonton $10.4 2012-2013 Announced

United Horsemen of Alberta

Horse Racing Complex Phase 1 Rocky View County (near Balzac)

$35.0 Proposed

61April 02, 2012 Alberta Treasury Board and Enterprise

New projects are shown in upper case in the Project Description column

Page 75: Inventory of Major Alberta Projects€¦ · In March 2012 the value of the Inventory of Major Alberta Projects was $189.2 billion, up from $185.3 billion in March 2011. The current

Alberta Treasury Board and Enterprise 4th Floor Commerce Place 10155-102 Street Edmonton, AB T5J 4L6 Canada Telephone: 780.427.6787 Fax: 780.422.0061

Website:www.albertacanada.com

You can access the Inventory of Major Alberta Projects and the following related department publications on the Internet at: http://albertacanada.com/about-alberta/statistics-and-publications.html : ♦ Alberta Oil Sands Industry Quarterly Update ♦ Monthly Economic Review ♦ Highlights of the Alberta Economy ♦ Facts on Alberta ♦ Alberta Natural Gas Industry Quarterly Update