Intelligent Transportation Systems (ITS). CEE 320 Steve Muench. Outline. Need for traffic solutions Possible solutions Intelligent Transportation Systems. Road Use Growth. From the Bureau of Transportation Statistics, National Transportation Statistics 2003. - PowerPoint PPT Presentation
Citation preview
CE
E 3
20S
pri
ng
200
7Intelligent Transportation Systems
(ITS)
CEE 320Steve Muench
CE
E 3
20S
pri
ng
200
7
Outline
• Need for traffic solutions• Possible solutions• Intelligent Transportation Systems
CE
E 3
20S
pri
ng
200
7
Road Use Growth
From the Bureau of Transportation Statistics, National Transportation Statistics 2003
CE
E 3
20S
pri
ng
200
7
Changes in Congested Peak-Period Travel
Change in Congested Peak-Period Travel (1982-2000)
20
30
40
50
60
70
80
90
100
1982 1990 1994 2000
Year
Per
cent
of
Pea
k-P
erio
d T
rave
l in
Con
gest
ion
Los Angeles, CA
Seattle-Everett, WA
Boston, MA
Denver, CO
New York, NY-Northeastern, NJ
CE
E 3
20S
pri
ng
200
7
Problems Caused by Congestion
• Increased…– Travel time– Travel cost– Air pollution– Accident risk
CE
E 3
20S
pri
ng
200
7
Options
• Construct new roads– Covered in geometric design– Not likely to happen on a large scale
• Reduce Traffic– Travel demand management– Alternative transportation
• Increase existing infrastructure capacity– Uses intelligent transportation systems (ITS)
CE
E 3
20S
pri
ng
200
7
Construction Is Part of the Solution
CE
E 3
20S
pri
ng
200
7
Option 1: Construction
Highway Construction Cost Sampling
Project Total Cost Lane-Miles
Cost per
Lane-Mile
Route 3, North Boston $395.0 million 42 $9.4 million
I-4 Tampa to Orlando $403.0 million 73 $5.5 million
I-5 Oregon $30.0 million 5.16 $5.8 million
US 26 Sunset Hwy. Oregon $10.6 million 2.24 $4.8 million
US 12 near Walla Walla River $36.4 million 25 $1.5 million
US 101 on Olympic Peninsula $1.8 million 0.8 $2.2 million
General ConclusionHighways cost $1 to $10 million per lane-mile to build
San Francisco’s Embarcadero Freeway: Removed 1991
CE
E 3
20S
pri
ng
200
7
Option 2: Alternative Transport
But significant new rail capacity will face the same hurdles as new highway capacity.
CE
E 3
20S
pri
ng
200
7
Sounder Commuter Rail
• Tacoma-Seattle– Began 2000– 4 trips each way daily
• Everett-Seattle– Began 2003– 2 trips each way daily
New Slide
CE
E 3
20S
pri
ng
200
7New Slide
CE
E 3
20S
pri
ng
200
7
Seattle-Everett Interurban Railway Co. (1907)
Asahel Curtis Photo Company Collection, University of Washington Digital Collection
New Slide
CE
E 3
20S
pri
ng
200
7
Sounder vs. Interurban
Sounder Interurban
Tacoma service 2000 – present 1902 – 1928
Everett service 2003 – present 1910 – 1939
One-way trip time 52 – 58 minutes 70 – 100 minutes
Daily departures from Seattle 6 37
Number of stops 9 30
Top speed 80 mph 60 mph
One-way fare $3.00-$4.00 $0.60inflation adjusted: $12.00
Hauled freight? No Yes
Owner Sound Transit Puget Sound Energy
New Slide
CE
E 3
20S
pri
ng
200
7
Option 2: Alternative Transport
SkyTran: Personal MagLev Transporter
CE
E 3
20S
pri
ng
200
7
Option 3: Increase Existing Infrastructure Capacity
• An alternative to expensive new highway construction is the implementation of strategies that promote more efficient utilization of transportation infrastructures.
• These strategies are known as the Intelligent Transportation Systems (ITS), which aims to reduce travel time, ease delay and congestion, improve safety, and reduce pollutant emissions
CE
E 3
20S
pri
ng
200
7
Hig
hw
ay C
apac
ity
Full Capacity
How Much Capacity Is There?
CE
E 3
20S
pri
ng
200
7
Incidents: more delay is caused by incidents thanby recurring peak period congestion.H
igh
way
Cap
acit
y
Remaining Effective Capacity
How Much Capacity Is There?
Incidents can comprise 50% of peak period congestion.1 min delay in clearance = 4 to 5 min of traffic backup.
CE
E 3
20S
pri
ng
200
7
Work zones: major cost is delay imparted to the traveler
Incidents: more delay is caused by incidents thanby recurring peak period congestion.H
igh
way
Cap
acit
y
Remaining Effective Capacity
How Much Capacity Is There?
Caltrans reports 20% of freeway centerline miles are under construction.
CE
E 3
20S
pri
ng
200
7
Work zones: major cost is delay imparted to the traveler
Incidents: more delay is caused by incidents thanby recurring peak period congestion.H
igh
way
Cap
acit
y
Remaining Effective Capacity
How Much Capacity Is There?
Weather: Snow, fog, rain can all restrict capacity
75% of NHS is subject to snow & 100% is subject to rain.
CE
E 3
20S
pri
ng
200
7
Work zones: major cost is delay imparted to the traveler
Incidents: more delay is caused by incidents thanby recurring peak period congestion.H
igh
way
Cap
acit
y
Remaining Effective Capacity
How Much Capacity Is There?
Weather: Snow, fog, rain can all restrict capacity
Special events and disasters further restrict capacity
Periodic events can cause further restrict capacity.
CE
E 3
20S
pri
ng
200
7
Work zones: major cost is delay imparted to the traveler
Incidents: more delay is caused by incidents thanby recurring peak period congestion.H
igh
way
Cap
acit
y
Remaining Effective Capacity
How Much Capacity Is There?
Weather: Snow, fog, rain can all restrict capacity
Special events and disasters further restrict capacity
CE
E 3
20S
pri
ng
200
7
Hig
hw
ay C
apac
ity
Remaining Effective Capacity
How Much Capacity Is There?
ITS
CE
E 3
20S
pri
ng
200
7
Five Primary Functional Areas of ITS
• Advanced Traffic Management Systems (ATMS)• Advanced Traveler Information Systems (ATIS)• Commercial Vehicle Operations (CVO)• Advanced Public Transportation Systems (APTS)• Advanced Vehicle Control Systems (AVCS)
CE
E 3
20S
pri
ng
200
7
Advanced Traffic Management Systems
Photo from the Human-Computer Interaction Lab: University of Maryland
CE
E 3
20S
pri
ng
200
7
WSDOT Traffic Systems Management Center
CE
E 3
20S
pri
ng
200
7
WSDOT Traffic Systems Management Center
CE
E 3
20S
pri
ng
200
7
WSDOT Traffic Systems Management Center
CE
E 3
20S
pri
ng
200
7
ATMS: Snoqualmie Pass
CE
E 3
20S
pri
ng
200
7
Advanced Traveler Information Systems
CE
E 3
20S
pri
ng
200
7
ATIS: trafficgauge
htt
p:/
/ww
w.t
raffi
cgau
ge.c
om
/in
dex.h
tml
CE
E 3
20S
pri
ng
200
7
WAP Traffic
www.wiresoft.net/traffic/seattle
CE
E 3
20S
pri
ng
200
7
ATIS: Traffic Cameras
CE
E 3
20S
pri
ng
200
7
Commercial Vehicle Operations
• Apply, pay for and receive permits, registrations, and licenses electronically
• Share of common trucking data across agencies • Exchange information electronically with
roadside enforcement personnel• Electronic “screening” of trucks for safety or
other regulatory violations• Share information across state lines and with
Federal information systems
CE
E 3
20S
pri
ng
200
7
CVO: Weigh-In-Motion System
CE
E 3
20S
pri
ng
200
7
Advanced Public Transportation Systems
CE
E 3
20S
pri
ng
200
7
An Example of APTS
http://busview.its.washington.edu/busview_launch.jsp?maps=gif
CE
E 3
20S
pri
ng
200
7
APTS: Bus Signal Priority
CE
E 3
20S
pri
ng
200
7
Advanced Vehicle Control Systems
Intelligent Cruise Control (ICC)
System
Lexus LS430/460, ES-350Benz S-Class, E55, AMG, CLS, SL, CLAcura RLAudi A6, A8, Q7Cadillac DTS, STS, XLRHonda LegendInfinity M, Q45Jaguar XK-RBMW 3, 5, 7 SeriesNisan PrimeraRange Rover SportToyota Sienna XLE, AvalonVolkswagon Phaeton, PassatRenault Vel SatisVolvo S80
New Slide
CE
E 3
20S
pri
ng
200
7
VW and Google Earth
CE
E 3
20S
pri
ng
200
7
CE
E 3
20S
pri
ng
200
7
Windows Live Local Street Level