DBS3900 V100R009C00 Installation Guide Issue 03 Date 2014-08-30 HUAWEI TECHNOLOGIES CO., LTD.

Installation Guide DBS3900

Embed Size (px)

DESCRIPTION

DBS3900

Citation preview

  • DBS3900V100R009C00

    Installation Guide

    Issue 03Date 2014-08-30

    HUAWEI TECHNOLOGIES CO., LTD.

  • Copyright Huawei Technologies Co., Ltd. 2014. All rights reserved.No part of this document may be reproduced or transmitted in any form or by any means without prior writtenconsent of Huawei Technologies Co., Ltd. Trademarks and Permissions

    and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.All other trademarks and trade names mentioned in this document are the property of their respective holders. NoticeThe purchased products, services and features are stipulated by the contract made between Huawei and thecustomer. All or part of the products, services and features described in this document may not be within thepurchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,and recommendations in this document are provided "AS IS" without warranties, guarantees or representationsof any kind, either express or implied.

    The information in this document is subject to change without notice. Every effort has been made in thepreparation of this document to ensure accuracy of the contents, but all statements, information, andrecommendations in this document do not constitute a warranty of any kind, express or implied. Huawei Technologies Co., Ltd.Address: Huawei Industrial Base

    Bantian, LonggangShenzhen 518129People's Republic of China

    Website: http://www.huawei.comEmail: [email protected]

    Issue 03 (2014-08-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    i

  • About This Document

    PurposeThis document describes how to install the cabinets, boards, modules, and cables for theDBS3900 in indoor and outdoor scenarios. It also provides checklists for the hardwareinstallation.The exteriors of components or cables in this document are for reference only. The actualexteriors may be different.

    NOTE

    For details about the LampSite solution, see LampSite Installation Guide.

    Product VersionThe following table lists the product versions related to this document.

    Product Name Solution Version Product VersionDBS3900 l SRAN9.0

    l GBSS16.0l RAN16.0l eRAN7.0l eRAN TDD 7.0

    V100R009C00

    Intended AudienceThis document is intended for:Base station installation engineers

    Organization1 Changes in DBS3900 Installation Guide

    DBS3900Installation Guide About This Document

    Issue 03 (2014-08-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    ii

  • This chapter describes the changes in DBS3900 Installation Guide.2 Installation PreparationsThis chapter lists the tools and instruments that must be obtained before the installation. It alsospecifies the skills that the onsite personnel must have.3 Installation ScenariosA DBS3900 mainly consists of the BBU and RRUs. With RRUs remotely installed, the DBS3900can be deployed indoors and outdoors. If a DBS3900 is installed outdoors with AC or DC powersupply, the BBU can be installed in an outdoor APM30H, TMC11H, TP48600A-H17B1(shortened to TP48600A in this document), or OMB. If a DBS3900 is installed indoors with ACor DC power supply, the BBU can be installed in an IMB03, a 19-inch rack, or directly installedon the wall.4 Unpacking CheckUnpack and check the delivered equipment to ensure that all the materials are included and intact.5 Obtaining the ESNThe electronic serial number (ESN) is a unique identifier of a NE. Record the ESN of the basestation before the installation for future commissioning.6 Outdoor AC Scenario Where the BBU Is Installed in an APM30H (Ver.D)This chapter describes the process for installing cabinets, optional and mandatory componentsin the cabinets, and related cables of a DBS3900 in an outdoor DC scenario. In this scenario,the BBU is installed in an APM30H (Ver.D).7 Indoor DC Scenario Where the BBU Is Installed Indoors and an Outdoor APM30H(Ver.D) Supplies Power to RRUsThis chapter describes the process for installing cabinets, optional and mandatory componentsin the cabinets, and related cables of a DBS3900 in an indoor DC scenario. In this scenario, theBBU is installed indoors and an outdoor APM30H (Ver.D) supplies power to RRUs.8 Outdoor DC Scenario Where the BBU Is Installed in a TMC11H (Ver.D)This chapter describes the process for installing cabinets, optional and mandatory componentsin the cabinets, and related cables of a DBS3900 in an outdoor DC scenario. In this scenario,the BBU is installed in a TMC11H(Ver.D).9 Outdoor AC Scenario Where the BBU Is Installed in an APM30H (Ver.C)This chapter describes the process for installing cabinets, optional and mandatory componentsin the cabinets, and related cables of a DBS3900 in an outdoor AC scenario. In this scenario,the BBU is installed in an APM30H (Ver.C).10 Indoor DC Scenario Where the BBU Is Installed Indoors and an Outdoor APM30H(Ver.C) Supplies Power to RRUsThis chapter describes the process for installing cabinets, optional and mandatory componentsin the cabinets, and related cables of a DBS3900 in an indoor DC scenario. In this scenario, theBBU is installed indoors and an APM30H (Ver.C) supplies power to RRUs.11 Outdoor DC Scenario Where the BBU Is Installed in a TMC11H (Ver.C)

    DBS3900Installation Guide About This Document

    Issue 03 (2014-08-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    iii

  • This chapter describes the process for installing cabinets, optional and mandatory componentsin the cabinets, and related cables of a DBS3900 in an outdoor DC scenario. In this scenario,the BBU is installed in a TMC11H (Ver.C).12 Outdoor AC Scenario Where the BBU Is Installed in an APM30H (Ver.B)This chapter describes the process for installing cabinets, optional and mandatory componentsin the cabinets, and related cables of a DBS3900 in an outdoor AC scenario. In this scenario,the BBU is installed in an APM30H (Ver.B).13 Outdoor DC Scenario Where the BBU Is Installed in a +24 V DC APM30H (Ver.B)This chapter describes the process for installing cabinets, optional and mandatory componentsin the cabinets, and related cables of a DBS3900 in an outdoor +24 V DC scenario. In thisscenario, the BBU is installed in an APM30H (Ver.B).14 Indoor DC Scenario Where the BBU Is Installed Indoors and an Outdoor APM30H(Ver.B) Supplies Power to RRUsThis chapter describes the process for installing cabinets, optional and mandatory componentsin the cabinets, and related cables of a DBS3900 in an indoor DC scenario. In this scenario, theBBU is installed indoors and an APM30H (Ver.B) supplies power to RRUs.15 Outdoor DC Scenario Where the BBU Is Installed in a TMC11H (Ver.B)This chapter describes the process for installing cabinets, optional and mandatory componentsin the cabinets, and related cables of a DBS3900 in an outdoor DC scenario. In this scenario,the BBU is installed in a TMC11H (Ver.B).16 Outdoor Scenario Where the BBU Is Installed in an OMB (Ver.C)This section describes the process for installing an OMB (Ver.C), components in the OMB(Ver.C), and related cables of a DBS3900 in an outdoor scenario. In this scenario, the BBU isinstalled in an OMB (Ver.C).17 Outdoor Scenario Where the BBU Is Installed in an OMBA BBU can be installed in an OMB in outdoor AC and DC scenarios. This section describes theprocess for installing an OMB, components in the OMB, and related cables.18 Indoor DC Scenario Where the BBU Is Installed on a WallThis chapter describes the process for installing a BBU, DCDU-03B, DCDU-11B, orDCDU-12B, and related cables in an indoor wall-mounted scenario.19 Indoor DC Scenario Where the BBU Is Installed in a 19-Inch RackThis chapter describes the process for installing components and related cables when the BBUis installed in an indoor 19-inch rack.20 Indoor Scenario Where the BBU Is Installed in an IMB03This chapter describes the process for installing an IMB03, components in the IMB03, andrelated cables of a DBS3900 in an indoor scenario. In this scenario, the BBU is installed in anIMB03.21 Outdoor AC Scenario Where the BBU Is Installed in a TP48600AThis chapter describes the process for installing components in a TP48600A and related cablesof a DBS3900 in an outdoor AC scenario. In this scenario, the BBU is installed in a TP48600A.

    DBS3900Installation Guide About This Document

    Issue 03 (2014-08-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    iv

  • 22 Indoor DC Scenario Where the BBU Is Installed in an IBC10This section describes the procedure for installing the cabinet, components, and cables in a DCscenario where BBUs are installed in an IBC10.

    ConventionsSymbol ConventionsThe symbols that may be found in this document are defined as follows.

    Symbol DescriptionIndicates an imminently hazardous situation which, if notavoided, will result in death or serious injury.

    Indicates a potentially hazardous situation which, if notavoided, could result in death or serious injury.

    Indicates a potentially hazardous situation which, if notavoided, may result in minor or moderate injury.

    Indicates a potentially hazardous situation which, if notavoided, could result in equipment damage, data loss,performance deterioration, or unanticipated results.NOTICE is used to address practices not related to personalinjury.Calls attention to important information, best practices andtips.NOTE is used to address information not related to personalinjury, equipment damage, and environment deterioration.

    General ConventionsThe general conventions that may be found in this document are defined as follows.

    Convention DescriptionTimes New Roman Normal paragraphs are in Times New Roman.Boldface Names of files, directories, folders, and users are in

    boldface. For example, log in as user root.Italic Book titles are in italics.Courier New Examples of information displayed on the screen are in

    Courier New.

    DBS3900Installation Guide About This Document

    Issue 03 (2014-08-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    v

  • Command ConventionsThe command conventions that may be found in this document are defined as follows.

    Convention DescriptionBoldface The keywords of a command line are in boldface.Italic Command arguments are in italics.[ ] Items (keywords or arguments) in brackets [ ] are optional.{ x | y | ... } Optional items are grouped in braces and separated by

    vertical bars. One item is selected.[ x | y | ... ] Optional items are grouped in brackets and separated by

    vertical bars. One item is selected or no item is selected.{ x | y | ... }* Optional items are grouped in braces and separated by

    vertical bars. A minimum of one item or a maximum of allitems can be selected.

    [ x | y | ... ]* Optional items are grouped in brackets and separated byvertical bars. Several items or no item can be selected.

    GUI ConventionsThe GUI conventions that may be found in this document are defined as follows.

    Convention DescriptionBoldface Buttons, menus, parameters, tabs, window, and dialog titles

    are in boldface. For example, click OK.> Multi-level menus are in boldface and separated by the ">"

    signs. For example, choose File > Create > Folder.

    Keyboard OperationsThe keyboard operations that may be found in this document are defined as follows.

    Format DescriptionKey Press the key. For example, press Enter and press Tab.Key 1+Key 2 Press the keys concurrently. For example, pressing Ctrl+Alt

    +A means the three keys should be pressed concurrently.Key 1, Key 2 Press the keys in turn. For example, pressing Alt, A means

    the two keys should be pressed in turn.

    DBS3900Installation Guide About This Document

    Issue 03 (2014-08-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    vi

  • Mouse OperationsThe mouse operations that may be found in this document are defined as follows.

    Action DescriptionClick Select and release the primary mouse button without moving

    the pointer.Double-click Press the primary mouse button twice continuously and

    quickly without moving the pointer.Drag Press and hold the primary mouse button and move the

    pointer to a certain position.

    DBS3900Installation Guide About This Document

    Issue 03 (2014-08-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    vii

  • Contents

    About This Document.....................................................................................................................ii1 Changes in DBS3900 Installation Guide..................................................................................12 Installation Preparations..............................................................................................................42.1 Documents......................................................................................................................................................................52.2 Tools and Instruments....................................................................................................................................................52.3 Requirements for Onsite Personnel................................................................................................................................63 Installation Scenarios...................................................................................................................73.1 Outdoor Installation Scenarios with AC Power Supply.................................................................................................83.2 Outdoor Installation Scenarios with DC Power Supply...............................................................................................393.3 Indoor Installation Scenarios with AC Power Supply..................................................................................................463.4 Indoor Installation Scenarios with DC Power Supply..................................................................................................484 Unpacking Check........................................................................................................................535 Obtaining the ESN......................................................................................................................556 Outdoor AC Scenario Where the BBU Is Installed in an APM30H (Ver.D)....................576.1 Installation Clearance Requirements............................................................................................................................596.2 Installation Process.......................................................................................................................................................636.3 Installing a Cabinet.......................................................................................................................................................646.3.1 Installing a Cabinet on a Concrete Floor...................................................................................................................646.3.2 Installing the Cabinet on a Pole.................................................................................................................................816.3.3 Installing the Cabinet on a Wall................................................................................................................................856.4 Installing the ODM06D or OFD06...............................................................................................................................916.4.1 Installing an ODM06D/OFD06 on a Pole.................................................................................................................916.4.2 Installing the ODM06D/OFD06 on the Mounting Frame.........................................................................................936.5 Configuring the PGND Cable and Equipotential Cable for a Cabinet.......................................................................1036.6 Installing the PGND Cable for an ODM06D.............................................................................................................1096.7 Installing Mandatory Components.............................................................................................................................1116.7.1 Installing the BBU...................................................................................................................................................1116.7.2 Installing the SLPU as a Transmission Signal Protection Unit...............................................................................1176.8 Installing Optional Modules and Their Cables...........................................................................................................1186.8.1 Installing the SLPU as a Monitoring Signal Protection Unit..................................................................................119

    DBS3900Installation Guide Contents

    Issue 03 (2014-08-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    viii

  • 6.8.2 Installing the SOU...................................................................................................................................................1236.8.3 Installing the AC Heater..........................................................................................................................................1256.8.4 Installing the EMUA/EMUB in the APM30H........................................................................................................1296.8.5 Installing the DCDU-12B........................................................................................................................................1346.8.6 Installing the GPS Surge Protector..........................................................................................................................1406.8.7 Installing the DDF...................................................................................................................................................1456.8.8 Installing storage batteries.......................................................................................................................................1486.8.9 Installing an HAU01A-01.......................................................................................................................................1556.9 Installing Cables.........................................................................................................................................................1646.9.1 Cabling Requirements.............................................................................................................................................1646.9.2 Cable Holes..............................................................................................................................................................1706.9.3 Installing Power Cables...........................................................................................................................................1776.9.4 Installing Transmission Cables................................................................................................................................2176.9.5 Installing Signal Cables...........................................................................................................................................2266.9.6 Installing CPRI Fiber Optic Cables in Case of Less than or Equal to 12 RRUs.....................................................2496.9.7 Installing CPRI Fiber Optic Cables in Case of More Than 12 RRUs.....................................................................2526.10 Installation Checklist................................................................................................................................................2596.11 Powering On a Base Station.....................................................................................................................................2616.12 Subsequent Operations.............................................................................................................................................2676.12.1 Sealing the Cable Holes.........................................................................................................................................2686.12.2 Repainting..............................................................................................................................................................2737 Indoor DC Scenario Where the BBU Is Installed Indoors and an Outdoor APM30H(Ver.D) Supplies Power to RRUs.............................................................................................. 2767.1 Installation Clearance Requirements..........................................................................................................................2787.2 Installation Process.....................................................................................................................................................2827.3 Installing a Cabinet.....................................................................................................................................................2837.3.1 Installing a Cabinet on a Concrete Floor.................................................................................................................2837.3.2 Installing the Cabinet on a Pole...............................................................................................................................2927.3.3 Installing the Cabinet on a Wall..............................................................................................................................2967.4 Installing a PGND Cable............................................................................................................................................3017.5 Installing the SLPU as a Monitoring Signal Protection Unit.....................................................................................3037.6 Installing Cables.........................................................................................................................................................3057.6.1 Cable Holes..............................................................................................................................................................3057.6.2 Cabling Requirements.............................................................................................................................................3117.6.3 Installing Input Power Cables for the APM30H.....................................................................................................3187.6.4 Installing RRU Power Cables..................................................................................................................................3217.6.5 Installing an RRU Monitoring Signal Cable...........................................................................................................3237.6.6 Installing the CMUEA-SLPU Surge Protection Monitoring Cable........................................................................3267.6.7 Installing a BBU Alarm Cable.................................................................................................................................3277.7 Installation Checklist..................................................................................................................................................3287.8 Powering On a Base Station.......................................................................................................................................331

    DBS3900Installation Guide Contents

    Issue 03 (2014-08-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    ix

  • 7.9 Subsequent Operations...............................................................................................................................................3357.9.1 Sealing the Cable Holes...........................................................................................................................................3367.9.2 Repainting................................................................................................................................................................3418 Outdoor DC Scenario Where the BBU Is Installed in a TMC11H (Ver.D)....................3448.1 Installation Clearance Requirements..........................................................................................................................3468.2 Installation Process.....................................................................................................................................................3508.3 Installing a Cabinet.....................................................................................................................................................3518.3.1 Installing a Cabinet on a Concrete Floor.................................................................................................................3518.3.2 Installing the Cabinet on a Pole...............................................................................................................................3608.3.3 Installing the Cabinet on a Wall..............................................................................................................................3648.4 Installing a PGND Cable and an Equipotential Cable................................................................................................3698.5 Installing Mandatory Components.............................................................................................................................3728.5.1 Installing the BBU...................................................................................................................................................3728.5.2 Installing the SLPU as a Transmission Signal Protection Unit...............................................................................3788.6 Installing Optional Modules and Their Cables...........................................................................................................3798.6.1 Installing the SLPU as a Monitoring Signal Protection Unit..................................................................................3808.6.2 Installing the DCDU-12B........................................................................................................................................3848.6.3 Installing the AC Heater..........................................................................................................................................3908.6.4 Installing the EMUA/EMUB in the TMC11H........................................................................................................3958.6.5 Installing the GPS Surge Protector..........................................................................................................................4008.6.6 Installing the DDF...................................................................................................................................................4058.7 Installing Cables.........................................................................................................................................................4088.7.1 Cabling Requirements.............................................................................................................................................4088.7.2 Cable Holes..............................................................................................................................................................4158.7.3 Installing Power Cables...........................................................................................................................................4228.7.4 Installing Transmission Cables................................................................................................................................4348.7.5 (Optional) Installing Inter-BBU Signal Cables.......................................................................................................4438.7.6 Installing the Monitoring Signal Cables in a DBS3900 Expanded from 1 TMC11H to 2 TMC11Hs....................4478.7.7 Installing a BBU Alarm Cable.................................................................................................................................4498.7.8 Installing CPRI Fiber Optic Cables.........................................................................................................................4508.8 Installation Checklist..................................................................................................................................................4528.9 Powering On a Base Station.......................................................................................................................................4558.10 Subsequent Operations.............................................................................................................................................4598.10.1 Sealing the Cable Holes.........................................................................................................................................4598.10.2 Repainting..............................................................................................................................................................4649 Outdoor AC Scenario Where the BBU Is Installed in an APM30H (Ver.C)...................4679.1 Installation Clearance Requirements..........................................................................................................................4699.2 Installation Process.....................................................................................................................................................4739.3 Installing a Cabinet.....................................................................................................................................................4749.3.1 Installing a Cabinet on a Concrete Floor.................................................................................................................4749.3.2 Installing the Cabinet on a Pole...............................................................................................................................485

    DBS3900Installation Guide Contents

    Issue 03 (2014-08-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    x

  • 9.3.3 Installing the Cabinet on a Wall..............................................................................................................................4899.4 Configuring the PGND Cable and Equipotential Cable for a Cabinet.......................................................................4959.5 Installing Mandatory Components.............................................................................................................................5019.5.1 Installing the BBU...................................................................................................................................................5019.5.2 Installing the SLPU as a Transmission Signal Protection Unit...............................................................................5079.6 Installing Optional Modules and Their Cables...........................................................................................................5089.6.1 Installing the SLPU as a Monitoring Signal Protection Unit..................................................................................5099.6.2 Installing the SOU...................................................................................................................................................5139.6.3 Installing the AC Heater..........................................................................................................................................5159.6.4 Installing the EMUA/EMUB in the APM30H........................................................................................................5199.6.5 Installing the GPS Surge Protector..........................................................................................................................5249.6.6 Installing the Storage Batteries................................................................................................................................5299.7 Installing Cables.........................................................................................................................................................5339.7.1 Cabling Requirements.............................................................................................................................................5349.7.2 Installing Cable Outlet Modules .............................................................................................................................5409.7.3 Installing Power Cables...........................................................................................................................................5439.7.4 Installing Transmission Cables................................................................................................................................5719.7.5 Installing Signal Cables...........................................................................................................................................5809.7.6 Installing CPRI Fiber Optic Cables.........................................................................................................................6079.8 Installation Checklist..................................................................................................................................................6099.9 Powering On a Base Station.......................................................................................................................................6129.10 Subsequent Operations.............................................................................................................................................6189.10.1 Seal the Cable Holes on the Base..........................................................................................................................6199.10.2 Repainting..............................................................................................................................................................62010 Indoor DC Scenario Where the BBU Is Installed Indoors and an Outdoor APM30H(Ver.C) Supplies Power to RRUs...............................................................................................62210.1 Installation Clearance Requirements........................................................................................................................62410.2 Installation Process...................................................................................................................................................62810.3 Installing a Cabinet...................................................................................................................................................62910.3.1 Installing a Cabinet on a Concrete Floor...............................................................................................................62910.3.2 Installing the Cabinet on a Pole.............................................................................................................................63810.3.3 Installing the Cabinet on a Wall............................................................................................................................64210.4 Installing a PGND Cable..........................................................................................................................................64710.5 Installing the SLPU as a Monitoring Signal Protection Unit...................................................................................64910.6 Installing Cables.......................................................................................................................................................65110.6.1 Cabling Requirements...........................................................................................................................................65110.6.2 Installing Input Power Cables for the APM30H...................................................................................................65710.6.3 Installing RRU Power Cables................................................................................................................................66110.6.4 Installing an RRU Monitoring Signal Cable.........................................................................................................66610.6.5 Installing a BBU Alarm Cable...............................................................................................................................66910.6.6 Installing a CMUE-SLPU Surge Protection Transfer Cable.................................................................................670

    DBS3900Installation Guide Contents

    Issue 03 (2014-08-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    xi

  • 10.7 Installation Checklist................................................................................................................................................67110.8 Powering On a Base Station.....................................................................................................................................67410.9 Subsequent Operations.............................................................................................................................................67810.9.1 Seal the Cable Holes on the Base..........................................................................................................................67910.9.2 Repainting..............................................................................................................................................................68011 Outdoor DC Scenario Where the BBU Is Installed in a TMC11H (Ver.C)...................68211.1 Installation Clearance Requirements........................................................................................................................68411.2 Installation Process...................................................................................................................................................68811.3 Installing a Cabinet...................................................................................................................................................68911.3.1 Installing a Cabinet on a Concrete Floor...............................................................................................................68911.3.2 Installing the Cabinet on a Pole.............................................................................................................................69811.3.3 Installing the Cabinet on a Wall............................................................................................................................70211.4 Installing a PGND Cable and an Equipotential Cable..............................................................................................70711.5 Installing Mandatory Components...........................................................................................................................71011.5.1 Installing the BBU.................................................................................................................................................71011.5.2 Installing the SLPU as a Transmission Signal Protection Unit.............................................................................71611.6 Installing Optional Modules and Their Cables.........................................................................................................71711.6.1 Installing the SLPU as a Monitoring Signal Protection Unit................................................................................71811.6.2 Installing the AC Heater........................................................................................................................................72211.6.3 Installing the EMUA/EMUB in the TMC11H......................................................................................................72611.6.4 Installing the GPS Surge Protector........................................................................................................................73111.7 Installing Cables.......................................................................................................................................................73611.7.1 Cabling Requirements...........................................................................................................................................73611.7.2 Installing Cable Outlet Modules ...........................................................................................................................74311.7.3 Installing Power Cables.........................................................................................................................................74611.7.4 Installing Transmission Cables..............................................................................................................................75811.7.5 Installing a BBU Alarm Cable...............................................................................................................................76711.7.6 (Optional) Installing Inter-BBU Signal Cables.....................................................................................................76711.7.7 Installing the Monitoring Signal Cables in a DBS3900 Expanded from 1 TMC11H to 2 TMC11Hs..................77111.7.8 Installing CPRI Fiber Optic Cables.......................................................................................................................77311.8 Installation Checklist................................................................................................................................................77511.9 Powering On a Base Station.....................................................................................................................................77811.10 Subsequent Operations...........................................................................................................................................78211.10.1 Seal the Cable Holes on the Base........................................................................................................................78211.10.2 Repainting............................................................................................................................................................78412 Outdoor AC Scenario Where the BBU Is Installed in an APM30H (Ver.B).................78612.1 Installation Clearance Requirements........................................................................................................................78812.2 Installation Process...................................................................................................................................................79212.3 Installing a Cabinet...................................................................................................................................................79312.3.1 Installing a Cabinet on a Concrete Floor...............................................................................................................79312.3.2 Installing the Cabinet on a Pole.............................................................................................................................804

    DBS3900Installation Guide Contents

    Issue 03 (2014-08-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    xii

  • 12.3.3 Installing the Cabinet on a Wall............................................................................................................................80812.4 Configuring the PGND Cable and Equipotential Cable for a Cabinet.....................................................................81412.5 Installing Mandatory Components...........................................................................................................................82012.5.1 Installing the BBU.................................................................................................................................................82012.5.2 Installing the SLPU as a Transmission Signal Protection Unit.............................................................................82612.6 Installing Optional Modules and Their Cables.........................................................................................................82712.6.1 Installing the SLPU as a Monitoring Signal Protection Unit................................................................................82812.6.2 Installing the SOU.................................................................................................................................................83212.6.3 Installing the AC Heater........................................................................................................................................83412.6.4 Installing the EMUA/EMUB in the APM30H......................................................................................................83812.6.5 Installing the GPS Surge Protector........................................................................................................................84312.6.6 Installing the Storage Batteries..............................................................................................................................84812.7 Installing Cables.......................................................................................................................................................85212.7.1 Cabling Requirements...........................................................................................................................................85312.7.2 Installing Cable Outlet Modules ...........................................................................................................................85912.7.3 Installing Power Cables.........................................................................................................................................86212.7.4 Installing Transmission Cables..............................................................................................................................89012.7.5 Installing Signal Cables.........................................................................................................................................89912.7.6 Installing CPRI Fiber Optic Cables.......................................................................................................................92812.8 Installation Checklist................................................................................................................................................93012.9 Powering On a Base Station.....................................................................................................................................93312.10 Subsequent Operations...........................................................................................................................................93912.10.1 Seal the Cable Holes on the Base........................................................................................................................94012.10.2 Repainting............................................................................................................................................................94113 Outdoor DC Scenario Where the BBU Is Installed in a +24 V DC APM30H (Ver.B)..........................................................................................................................................................94313.1 Installation Clearance Requirements........................................................................................................................94513.2 Installation Process...................................................................................................................................................94913.3 Installing a Cabinet...................................................................................................................................................95013.3.1 Installing a Cabinet on a Concrete Floor...............................................................................................................95013.3.2 Installing the Cabinet on a Pole.............................................................................................................................96113.3.3 Installing the Cabinet on a Wall............................................................................................................................96513.4 Configuring the PGND Cable and Equipotential Cable for a Cabinet.....................................................................97113.5 Installing Mandatory Components...........................................................................................................................97713.5.1 Installing the BBU.................................................................................................................................................97713.5.2 Installing the SLPU as a Transmission Signal Protection Unit.............................................................................98313.6 Installing Optional Modules and Their Cables.........................................................................................................98413.6.1 Installing the SLPU as a Monitoring Signal Protection Unit................................................................................98513.6.2 Installing the EMUA/EMUB in the APM30H......................................................................................................98913.6.3 Installing the GPS Surge Protector........................................................................................................................99513.7 Installing Cables.....................................................................................................................................................1000

    DBS3900Installation Guide Contents

    Issue 03 (2014-08-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    xiii

  • 13.7.1 Cabling Requirements.........................................................................................................................................100013.7.2 Installing Cable Outlet Modules .........................................................................................................................100713.7.3 Installing Power Cables.......................................................................................................................................101013.7.4 Installing Transmission Cables............................................................................................................................102013.7.5 (Optional) Installing Inter-BBU Signal Cables...................................................................................................102913.7.6 Installing a PSU Monitoring Signal Cable and a PSU In-Position Signal Cable................................................103213.7.7 Installing a BBU Alarm Cable.............................................................................................................................103313.7.8 Installing CPRI Fiber Optic Cables.....................................................................................................................103413.8 Installation Checklist..............................................................................................................................................103613.9 Powering On a Base Station...................................................................................................................................103913.10 Subsequent Operations.........................................................................................................................................104213.10.1 Seal the Cable Holes on the Base......................................................................................................................104213.10.2 Repainting..........................................................................................................................................................104414 Indoor DC Scenario Where the BBU Is Installed Indoors and an Outdoor APM30H(Ver.B) Supplies Power to RRUs.............................................................................................104614.1 Installation Clearance Requirements......................................................................................................................104814.2 Installation Process.................................................................................................................................................105214.3 Installing a Cabinet.................................................................................................................................................105314.3.1 Installing a Cabinet on a Concrete Floor.............................................................................................................105314.3.2 Installing the Cabinet on a Pole...........................................................................................................................106214.3.3 Installing the Cabinet on a Wall..........................................................................................................................106614.4 Installing a PGND Cable........................................................................................................................................107114.5 Installing the SLPU as a Monitoring Signal Protection Unit.................................................................................107314.6 Installing Cables.....................................................................................................................................................107514.6.1 Cabling Requirements.........................................................................................................................................107514.6.2 Installing Input Power Cables for the APM30H.................................................................................................108114.6.3 Installing RRU Power Cables..............................................................................................................................108514.6.4 Installing an RRU Monitoring Signal Cable.......................................................................................................109014.6.5 Installing a CMUA-SLPU Surge Protection Monitoring Cable..........................................................................109314.6.6 Installing a BBU Alarm Cable.............................................................................................................................109414.7 Installation Checklist..............................................................................................................................................109514.8 Powering On a Base Station...................................................................................................................................109814.9 Subsequent Operations...........................................................................................................................................110214.9.1 Seal the Cable Holes on the Base........................................................................................................................110314.9.2 Repainting............................................................................................................................................................110415 Outdoor DC Scenario Where the BBU Is Installed in a TMC11H (Ver.B).................110615.1 Installation Clearance Requirements......................................................................................................................110815.2 Installation Process.................................................................................................................................................111215.3 Installing a Cabinet.................................................................................................................................................111315.3.1 Installing a Cabinet on a Concrete Floor.............................................................................................................111315.3.2 Installing the Cabinet on a Pole...........................................................................................................................1122

    DBS3900Installation Guide Contents

    Issue 03 (2014-08-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    xiv

  • 15.3.3 Installing the Cabinet on a Wall..........................................................................................................................112615.4 Installing a PGND Cable and an Equipotential Cable............................................................................................113115.5 Installing Mandatory Components.........................................................................................................................113415.5.1 Installing the BBU...............................................................................................................................................113415.5.2 Installing the SLPU as a Transmission Signal Protection Unit...........................................................................114015.6 Installing Optional Modules and Their Cables.......................................................................................................114115.6.1 Installing the SLPU as a Monitoring Signal Protection Unit..............................................................................114215.6.2 Installing the AC Heater......................................................................................................................................114615.6.3 Installing the EMUA/EMUB in the TMC11H....................................................................................................115015.6.4 Installing the GPS Surge Protector......................................................................................................................115515.7 Installing Cables.....................................................................................................................................................116015.7.1 Cabling Requirements.........................................................................................................................................116015.7.2 Installing Cable Outlet Modules .........................................................................................................................116715.7.3 Installing Power Cables.......................................................................................................................................117015.7.4 Installing Transmission Cables............................................................................................................................118215.7.5 (Optional) Installing Inter-BBU Signal Cables...................................................................................................119115.7.6 Installing the Monitoring Signal Cables in a DBS3900 Expanded from 1 TMC11H to 2 TMC11Hs................119415.7.7 Installing a BBU Alarm Cable.............................................................................................................................119615.7.8 Installing CPRI Fiber Optic Cables.....................................................................................................................119715.8 Installation Checklist..............................................................................................................................................119915.9 Powering On a Base Station...................................................................................................................................120215.10 Subsequent Operations.........................................................................................................................................120615.10.1 Seal the Cable Holes on the Base......................................................................................................................120615.10.2 Repainting..........................................................................................................................................................120816 Outdoor Scenario Where the BBU Is Installed in an OMB (Ver.C).............................121016.1 Installation Clearance Requirements......................................................................................................................121216.2 Installation Process.................................................................................................................................................121316.3 Installing an OMB..................................................................................................................................................121516.3.1 Installing an OMB on a Pole...............................................................................................................................121516.3.2 Installing an OMB on a Wall...............................................................................................................................121816.4 Installing the BBU..................................................................................................................................................122116.5 Installing the GPS Surge Protector.........................................................................................................................122716.6 Installing Cables.....................................................................................................................................................123116.6.1 Cabling Requirements.........................................................................................................................................123116.6.2 Installing Cable Outlet Modules..........................................................................................................................123716.6.3 Installing a PGND Cable.....................................................................................................................................124016.6.4 Installing Power Cables.......................................................................................................................................124216.6.5 Installing Transmission Cables............................................................................................................................124816.6.6 Installing an HEUB-BBU Monitoring Signal Cable...........................................................................................125316.6.7 Installing a BBU Alarm Cable.............................................................................................................................125316.6.8 Installing CPRI Fiber Optic Cables.....................................................................................................................1254

    DBS3900Installation Guide Contents

    Issue 03 (2014-08-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    xv

  • 16.7 Installation Checklist..............................................................................................................................................125616.8 Powering On a Base Station...................................................................................................................................126016.9 Repainting...............................................................................................................................................................126417 Outdoor Scenario Where the BBU Is Installed in an OMB...........................................126717.1 Installation Clearance Requirements......................................................................................................................126917.2 Installation Process.................................................................................................................................................127017.3 Installing an OMB..................................................................................................................................................127217.3.1 Installing an OMB on a Pole...............................................................................................................................127217.3.2 Installing an OMB on a Wall...............................................................................................................................127517.4 Installing the BBU..................................................................................................................................................127817.5 Installing Cables.....................................................................................................................................................128417.5.1 Cabling Requirements.........................................................................................................................................128417.5.2 Installing Cable Outlet Modules..........................................................................................................................129017.5.3 Installing a PGND Cable.....................................................................................................................................129317.5.4 Installing Power Cables.......................................................................................................................................129417.5.5 Installing Transmission Cables............................................................................................................................130317.5.6 Installing an HEUA-BBU Monitoring Signal Cable...........................................................................................131117.5.7 Installing a BBU Alarm Cable.............................................................................................................................131217.5.8 Installing CPRI Fiber Optic Cables.....................................................................................................................131317.5.9 (Optional) Installing the GPS Clock Signal Cable..............................................................................................131517.6 Installation Checklist..............................................................................................................................................131817.7 Powering On a Base Station...................................................................................................................................132117.8 Repainting...............................................................................................................................................................132618 Indoor DC Scenario Where the BBU Is Installed on a Wall..........................................132918.1 Installation Clearance Requirements......................................................................................................................133018.2 Installation Process.................................................................................................................................................133118.3 Installing Components on a Wall...........................................................................................................................133318.3.1 Installing the BBU...............................................................................................................................................133318.3.2 Installing the DCDU............................................................................................................................................133618.4 Installing Cables.....................................................................................................................................................133918.4.1 Cabling Requirements.........................................................................................................................................133918.4.2 Installing a PGND Cable.....................................................................................................................................134618.4.3 Installing Power Cables.......................................................................................................................................134918.4.4 Installing Transmission Cables............................................................................................................................135918.4.5 (Optional) Installing Inter-BBU Signal Cables...................................................................................................136218.4.6 (Optional) Installing an EMUA/EMUB Monitoring Signal Cable.....................................................................136518.4.7 Installing a BBU Alarm Cable.............................................................................................................................136618.4.8 Installing CPRI Fiber Optic Cables.....................................................................................................................136718.4.9 (Optional) Installing the GPS Clock Signal Cable..............................................................................................136918.5 Installation Checklist..............................................................................................................................................137218.6 Powering On a Base Station...................................................................................................................................1375

    DBS3900Installation Guide Contents

    Issue 03 (2014-08-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    xvi

  • 19 Indoor DC Scenario Where the BBU Is Installed in a 19-Inch Rack...........................137919.1 Installation Clearance Requirements......................................................................................................................138019.2 Installation Process.................................................................................................................................................138019.3 Installing Components............................................................................................................................................138119.3.1 Installing the BBU...............................................................................................................................................138219.3.2 Installing a DCDU...............................................................................................................................................138719.3.3 (Optional) Installing a WGRU............................................................................................................................138919.4 Installing Cables.....................................................................................................................................................139419.4.1 Cabling Requirements.........................................................................................................................................139419.4.2 Installing a PGND Cable for the DCDU.............................................................................................................140019.4.3 Installing Power Cables.......................................................................................................................................140219.4.4 Installing Transmission Cables............................................................................................................................141219.4.5 (Optional) Installing Inter-BBU Signal Cables...................................................................................................141519.4.6 (Optional) Installing an EMUA/EMUB Monitoring Signal Cable.....................................................................141819.4.7 Installing a BBU Alarm Cable.............................................................................................................................141919.4.8 Installing CPRI Fiber Optic Cables.....................................................................................................................142019.5 Installation Checklist..............................................................................................................................................142219.6 Powering On a Base Station...................................................................................................................................142520 Indoor Scenario Where the BBU Is Installed in an IMB03............................................143020.1 Installation Clearance Requirements......................................................................................................................143120.1.1 Installation Clearances for a Wall-mounted IMB03............................................................................................143120.1.2 Installation Clearances for an IMB03 Mounted on an IFS06..............................................................................143320.2 Installation Process.................................................................................................................................................143520.3 Installing the IMB03...............................................................................................................................................143620.3.1 Installing an IMB03 on a Wall............................................................................................................................143720.3.2 Installing an IMB03 on an IFS06........................................................................................................................144820.4 Installing Components in the IMB03.....................................................................................................................145720.4.1 Installing the BBU...............................................................................................................................................145720.4.2 Installing the Power Equipment..........................................................................................................................146320.5 Installing Cables.....................................................................................................................................................146420.5.1 Cabling Requirements.........................................................................................................................................146420.5.2 Cable Installation Process....................................................................................................................................147120.5.3 Removing the protective plates at the bottom of the IMB03..............................................................................147220.5.4 Installing a PGND Cable.....................................................................................................................................147320.5.5 Installing Power Cables.......................................................................................................................................147620.5.6 Installing Transmission Cables............................................................................................................................149220.5.7 Installing a BBU Alarm Cable.............................................................................................................................149520.5.8 Installing CPRI Fiber Optic Cables.....................................................................................................................149620.5.9 Installing a Monitoring Signal Cable for the Power Equipment.........................................................................149820.6 IMB03 Hardware Installation Checklist.................................................................................................................150020.7 Powering On a Base Station...................................................................................................................................1500

    DBS3900Installation Guide Contents

    Issue 03 (2014-08-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    xvii

  • 20.8 Installing the Cover Plate of the IMB03 Subrack...................................................................................................150521 Outdoor AC Scenario Where the BBU Is Installed in a TP48600A..............................150721.1 Installation Process.................................................................................................................................................150921.2 Installing a PGND Cable and an Equipotential Cable............................................................................................151121.3 Installing Mandatory Components.........................................................................................................................151421.3.1 Installing the BBU...............................................................................................................................................151421.3.2 Installing the SLPU as a Transmission Signal Protection Unit...........................................................................152021.4 Installing Optional Modules and Their Cables.......................................................................................................152121.4.1 Installing the SLPU as a Monitoring Signal Protection Unit..............................................................................152221.4.2 Installing the EMUA/EMUB...............................................................................................................................152521.4.3 Installing the GPS Surge Protector......................................................................................................................153221.4.4 Installing a DCDU...............................................................................................................................................153621.4.5 Installing Storage Batteries in the IBBS700D or IBBS700T..............................................................................154021.4.6 Installing Storage Batteries in the IBBS300D or IBBS300T..............................................................................154221.5 Installing Cables.....................................................................................................................................................154521.5.1 Cabling Requirements.........................................................................................................................................154521.5.2 Routing Cables Out of a Cabinet.........................................................................................................................155221.5.3 Installing Power Cables.......................................................................................................................................155421.5.4 Installing Transmission Cables............................................................................................................................157721.5.5 Installing Signal Cables.......................................................................................................................................158621.5.6 Installing CPRI Fiber Optic Cables.....................................................................................................................159521.6 Installation Checklist..............................................................................................................................................159721.7 Powering On a Base Station...................................................................................................................................160021.8 Subsequent Operations...........................................................................................................................................160521.8.1 Sealing the Cable Holes on the Base...................................................................................................................160521.8.2 Repainting............................................................................................................................................................160622 Indoor DC Scenario Where the BBU Is Installed in an IBC10......................................160922.1 Installation Clearance Requirements......................................................................................................................161122.2 Installation Process.................................................................................................................................................161122.3 Installing a Cabinet.................................................................................................................................................161222.3.1 Installing a Cabinet on a Concrete Floor (Using Expansion Bolt Assemblies)...................................................161322.3.2 Installing a Cabinet on an ESD Floor..................................................................................................................161722.4 Installing a PGND Cable........................................................................................................................................162322.5 Pre-routing CPRI Fiber Optic Cables.....................................................................................................................162522.6 Installing Components............................................................................................................................................162622.6.1 Installing a USU..................................................................................................................................................162722.6.2 Installing a BBU..................................................................................................................................................162922.6.3 Installing Boards in a BBU..................................................................................................................................163122.7 Installing Cables.....................................................................................................................................................163322.7.1 Cabling Requirements.........................................................................................................................................163322.7.2 Cable Outlets.......................................................................................................................................................1640

    DBS3900Installation Guide Contents

    Issue 03 (2014-08-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    xviii

  • 22.7.3 Installing DCDU-12C power cables....................................................................................................................164122.7.4 Installing USU Power Cables..............................................................................................................................164322.7.5 Installing BBU Power Cables..............................................................................................................................164522.7.6 (Optional) Installing BBU Alarm Cables............................................................................................................164722.7.7 Installing a Monitoring Signal Cable for a Fan Assembly..................................................................................165022.7.8 (Optional) Installing Interconnection Cables......................................................................................................165022.7.9 Installing FE/GE Ethernet cables........................................................................................................................165522.7.10 Installing FE/GE Fiber Optic Cables.................................................................................................................165722.7.11 Installing CPRI Fiber Optic Cables...................................................................................................................166022.8 Installation Checklist..............................................................................................................................................166322.9 Powering On a Base Station...................................................................................................................................1665

    DBS3900Installation Guide Contents

    Issue 03 (2014-08-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    xix

  • 1 Changes in DBS3900 Installation GuideThis chapter describes the changes in DBS3900 Installation Guide.

    03 (2014-08-30)This is the fifth official release.Compared with issue 02 (2014-07-30), this issue includes the following new information:l Installing Storage Batteries in the IBBS300D/IBBS300Tl Installing an HAU01A-01 in the IBBS300Dl Installing Power Cables from the APM30H to the IBBS300D or IBBS300T

    (APM:IBBS = 1:2)l Scenario of 1 APM30H+2 IBBS300Ds/IBBS300Ts and Its Expansion ScenarioCompared with issue 02 (2014-07-30), this issue incorporates the following changes:

    Topic Change Descriptionl Installing the Basel Installing the Cabinet

    on a Basel Stacking Two Cabinetsl 6.9.2 Cable Holes

    Added descriptions of IBBS300D/IBBS300T.

    Compared with issue 02 (2014-07-30), no information is deleted from this issue.

    02 (2014-07-30)This is the second official release.Compared with issue 01 (2014-04-30), no information is added or deleted.Compared with issue 01 (2014-04-30), this issue incorporates the following changes:

    DBS3900Installation Guide 1 Changes in DBS3900 Installation Guide

    Issue 03 (2014-08-30) Huawei Proprietary and ConfidentialCopyright Huawei Technologies Co., Ltd.

    1

  • Topic Change DescriptionInstalling the Base Modified drill holes with a depth ranging

    from 52 mm (1.94 in.) to 60 mm (2.36 in.) toa depth ranging from 55 mm (2.05 in.) to 60mm (2.36 in.).

    01 (2014-04-30)This is the first official release.Compared with issue Draft C (2014-03-26), no information is changed.

    Draft C (2014-03-26)This is a draft.Compared with issue Draft B (2014-02-28), no information is changed or deleted.Compared with issue Draft B (2014-02-28), this issue includes the following new information:l 22 Indoor DC Scenario Where the BBU Is Installed in an IBC10 and it's child topics.

    Draft B (2014-02-28)This is a draft.Compared with issue Draft A (2014-01-20), no information is added or deleted.Compared with issue Draft A (2014-01-20), this issue incorporates the following changes:

    Topic Change DescriptionAbout This Document Added the description of the LampSite

    solution.Powering On a Base Station (Outdoor ACScenario Where the BBU Is Installed in anAPM30H (Ver.D))

    Added descriptions of the status of theindicators for CPRI ports.

    Powering On a Base Station (OutdoorScenario Where the BBU Is Installed in anOMB (Ver.C))Powering On a Base Station (OutdoorScenario Where the BBU Is Installed in anOMB)Powering On a Base Station (Indoor DCScenario Where the BBU Is Ins