Implementation Success Through Coordination Jon Tree Director of Industry Affairs Jeppesen
ICAO PBN Symposium Workshop - Operations 17 October 2012 Montreal, Canada
Jeppesen Proprietary - Copyright © 2011Jeppesen. All rights reserved.
Stakeholder Involvement
The key element in collaboration Requires close coordination Effective communication is essential Educational process throughout Defined goals and results driven Sharing of different perspectives Transparency at all levels Proactive integration Excellence in Program Management
Evolving effort Be prepared and open to changes
Focused - share information/ideas
2
Jeppesen Proprietary - Copyright © 2011Jeppesen. All rights reserved.
Jeppesen/Boeing Global Effort for PBN
Regionally based initiatives Use of global standards Procedure design team in Atlanta, GA Support Jeppesen/DEN, FRA and Regional Offices Boeing/SEA and Regional Offices Globally
Ongoing efforts: China North America Asia/Russia and CIS Europe Australia/New Zealand Latin America
3
R
R
2 RNP
2 RNP
2 RNP
2 RNP
STEP 2:Locate Turn Center
STEP 1:
SegmentInitialFix
a=Rb=R+(2xRNP)c=R-(2xRNP)
SegmentTerminating
Fix
STEP 3
STEP 4
STEP 5
a
b
c
Tangent Points
Tangent Points
Apply para 2-2
Jeppesen Proprietary - Copyright © 2011Jeppesen. All rights reserved.
4
Flight Procedure Design Service Provider
Quality Assurance Processes Independent review of procedures Ground validation Criteria verification Determine level of safety impact Develop safety documentation Flight validation Data verification Conduct continuous maintenance Conduct periodic reviews
Training Use of validated systems and tools Official State approvals
Jeppesen Proprietary - Copyright © 2011Jeppesen. All rights reserved.
Indonesia
5
Jeppesen Proprietary - Copyright © 2011Jeppesen. All rights reserved.
Indonesia
Goals: Enhance safety Decrease flight track miles Improve Maximum Gross Takeoff Weight for departures
Challenging environment: Ongoing improvements to infrastructure Restricted airspace nearby Obstacle data limited and out of date
Lion Air flight crews professional and knowledgeable Jeppesen familiarization training provided to ATC Successfully delivered 8 approach procedures, including
charting and printing Key element was coordination with all stakeholders: Lion Air,
DGCA of Indonesia, ATC, Boeing, Jeppesen 6
Jeppesen Proprietary - Copyright © 2011Jeppesen. All rights reserved.
7
RNP Approach Procedures – Manado (MDC)
7
Jeppesen Proprietary - Copyright © 2011Jeppesen. All rights reserved.
RNP Approach Procedures – Ambon (AMQ)
8
Jeppesen Proprietary - Copyright © 2011Jeppesen. All rights reserved.
Panama
Goals: Enhance safety Decrease flight track miles and improve operational efficiencies Technological improvements at the airports
8 procedures at Tocumen and 2 at Balboa, including charting and coding ATC and flight crew training provided Close coordination among all stakeholders on planning and
procedure design Copa Airlines Panamanian DGAC Air Traffic Control Boeing and Jeppesen
9
Jeppesen Proprietary - Copyright © 2011Jeppesen. All rights reserved.
Panama
RNAV (RNP) procedures Tocumen (PTY)
10
Balboa (BLB)
Jeppesen Proprietary - Copyright © 2011Jeppesen. All rights reserved.
United States Airport
Partnered with the FAA in conceptual design of RNAV/RNP procedures at a major airport Constituent airlines desire to benefit from PBN
Safety and efficiency improvements Desire to realize benefits of equipage investments
Jeppesen provided PD drafting assistance to the FAA Coded for flight simulator use Close coordination with ATM units Actively engaged 10 airlines Accumulated valuable input from operators and ATC
Collaboration critical in gaining approval for continued development of actual procedures Operations begin 3 Dec 2012
11
Jeppesen Proprietary - Copyright © 2011Jeppesen. All rights reserved.
12
Effective collaboration is crucial to PBN success All stakeholders engaged in early stages Effective communication Transparency Flexibility Proactive integration Excellence in program management
In Summary