IET 120 CONSTRUCTION PROJECT Name:Kissimmee Rice

IET 120 Construction Project

  • Upload
    elsa

  • View
    27

  • Download
    4

Embed Size (px)

DESCRIPTION

IET 120 Construction Project. Name:Kissimmee Rice. Dwelling. Number of Floors. Square Footage. Square footage of each floor Level 1 and Level Two 2,209 Each Square footage total Total 2,209x2 4,418. Location. Building Materials. Cinder Blocks (recyclables) - PowerPoint PPT Presentation

Citation preview

Page 1: IET 120 Construction Project

IET 120CONSTRUCTION PROJECTName:Kissimmee Rice

Page 2: IET 120 Construction Project

Dwelling

Number of Floors

Page 3: IET 120 Construction Project

Square Footage

Square footage of each floor Level 1 and Level Two

2,209 Each

Square footage total Total 2,209x2

4,418

Page 4: IET 120 Construction Project

Location

Page 5: IET 120 Construction Project

Building Materials

Cinder Blocks (recyclables) Skylights (natural light and heat) Energy efficient appliances (save electric

and less water consumption)

Page 6: IET 120 Construction Project

Floor Plan Layout

I chose this layout because I thought that this would give each person plenty of personal space, plus two common room for gathering. And two kitchens so that everyone will have plenty of room.

Page 7: IET 120 Construction Project

Timeline

Week Action1 Getting land and approvals2 Site Work3-6 Foundation7-11 Rough Carpentry12-13 Concrete Slabs13-15 HVAC15-18 Plumbing19-22 Electrical23-25 Roofing 26-30 Exterior Finishings31-35 Floor Finishings35-39 Paint40-42 Interior Work (Light Fixtures, Mirrors, etc)43-47 Cleaning

Page 8: IET 120 Construction Project

Conclusion

I learned that building an establishment is a lot more work than just picking one out, and saying, “I want this one!” This has taught me that there is a lot of money in build supplies and laborers; and that labor is typically a lot more expensive then anything else in the house.