IEM Daily Field Report Prepared By: John Bruscella IEM Representative Page 1 of 4 Signed In Signed Out Southwest Brooklyn Marine Transfer Station 1824 Shore Parkway Brooklyn, New York 11214 Date: May 17, 2016 Inspector: John Bruscella Location / Description: Project #: URLI1401 Site Time: 0655 to 1530 Assigned by: SPD Day Weather General Site Conditions Monday Thursday Clear Snow Warm Clear Tuesday Friday Overcast Windy Hot Muddy Wednesday Rain Cold Temperature Range: 57 ºF to 64 ºF General Contractor: Prismatic Development Corporation (PDC) Construction Manager: URS / LiRo G/C Name: Richard Tonnensen CM Name: Michael Balarezo / Michael Pokorny S/C&S/C Supervisor: NA CM Phone #: 917-983-5608 / 917-983-5616 Equipment and Machinery in Use (1) : Crane(s) Elevating Work Platforms Forklift with extendable arm (Lull) Pile Driver Water Tank Truck (1) List of equipment and machinery is based on field observations and is not inclusive of every equipment and machinery that may have been present at the site. Personnel on Site (1) : Personnel Organization Personnel Organization Personnel PDC Michael Balarezo URS / LiRo Erdal Gurten Greeley and Hanson Mike Pokorny URS / LiRo Robert Amrhein Certified Safety Nabil Saadi URS / LiRo Nelson Mendez EnTech Roberto Vazquez URS / LiRo Anthony Controneo Total Safety Consultant Victor Bogatyrev URS / LiRo Personnel AEL, Presco, Giaquinto, Solar Inc., Stonebridge, Blue Diamond, Soil Solutions, Olympic Plumbing, National Fireproofing Tom Karas URS / LiRo Andrew Port Louis Berger (1) List of personnel on site is based on field observations and is not inclusive of every personnel that may have been present at the site. Observations: Time Stamp Details Time On Site: 6:55 am 6:55 am Four air monitoring stations were set up at perimeter locations specified by the CM, forming a quadrangle around the anticipated work area. According to EnTech, air monitoring is occurring at the four air monitoring stations beginning at 6:30 am. The air monitoring station locations are depicted on the Sketch. 7:00 am to 3:15 pm GC installing wooden forms around columns on the deck of the main building in the central section of the site. GC installing and removing wooden forms from around shear walls in eastern section of the site.

IEM Daily Field Report - New York · 5/17/2016  · Day / Date: Tuesday / May 17, 2016 Client: URS / LiRo H2M Project No.: URLI1401 Prepared By: John Bruscella IEM Representative

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: IEM Daily Field Report - New York · 5/17/2016  · Day / Date: Tuesday / May 17, 2016 Client: URS / LiRo H2M Project No.: URLI1401 Prepared By: John Bruscella IEM Representative

IEM Daily Field Report

Prepared By: John Bruscella IEM Representative

Page 1 of 4

Signed In Signed Out Southwest Brooklyn Marine Transfer Station

1824 Shore Parkway Brooklyn, New York 11214

Date: May 17, 2016 Inspector: John Bruscella Location /

Description:

Project #: URLI1401 Site Time: 0655 to 1530 Assigned by: SPD

Day Weather General Site Conditions

Monday Thursday Clear Snow Warm Clear

Tuesday Friday Overcast Windy Hot Muddy

Wednesday Rain Cold Temperature Range: 57 ºF to 64 ºF

General Contractor: Prismatic Development Corporation (PDC) Construction Manager: URS / LiRo

G/C Name: Richard Tonnensen CM Name: Michael Balarezo / Michael Pokorny

S/C&S/C Supervisor: NA CM Phone #: 917-983-5608 / 917-983-5616

Equipment and Machinery in Use(1):

Crane(s)

Elevating Work Platforms

Forklift with extendable arm (Lull)

Pile Driver

Water Tank Truck (1) List of equipment and machinery is based on field observations and is not inclusive of every equipment and machinery that may have been present at the site.

Personnel on Site(1):

Personnel Organization Personnel Organization

Personnel PDC Michael Balarezo URS / LiRo

Erdal Gurten Greeley and Hanson Mike Pokorny URS / LiRo

Robert Amrhein Certified Safety Nabil Saadi URS / LiRo

Nelson Mendez EnTech Roberto Vazquez URS / LiRo

Anthony Controneo Total Safety Consultant Victor Bogatyrev URS / LiRo

Personnel AEL, Presco, Giaquinto, Solar Inc.,

Stonebridge, Blue Diamond, Soil Solutions, Olympic Plumbing, National Fireproofing

Tom Karas URS / LiRo

Andrew Port Louis Berger

(1) List of personnel on site is based on field observations and is not inclusive of every personnel that may have been present at the site.

Observations:

Time Stamp Details

Time On Site: 6:55 am

6:55 am Four air monitoring stations were set up at perimeter locations specified by the CM, forming a quadrangle around the anticipated work area. According to EnTech, air monitoring is occurring at the four air monitoring stations beginning at 6:30 am. The air monitoring station locations are depicted on the Sketch.

7:00 am to 3:15 pm GC installing wooden forms around columns on the deck of the main building in the central section of the site. GC installing and removing wooden forms from around shear walls in eastern section of the site.

Page 2: IEM Daily Field Report - New York · 5/17/2016  · Day / Date: Tuesday / May 17, 2016 Client: URS / LiRo H2M Project No.: URLI1401 Prepared By: John Bruscella IEM Representative

Day / Date: Tuesday / May 17, 2016 Client: URS / LiRo H2M Project No.: URLI1401

Prepared By: John Bruscella IEM Representative

Page 2 of 4

7:20 am to 3:15 pm

Stonebridge utilizing two cranes to erect structural steel in the western and central sections of the concrete foundation slab. Stonebridge utilizing elevating work platforms to install structural steel after being erected. Stonebridge welding structural steel in the western and southern sections of the site. Stonebridge fastening metal sheets onto the roof of the main building in the central section of the site.

7:00 am to 3:15 pm Presco bending rebar on the ramp in the northern section of the site and installing rebar on the second floor deck of the main building on the central portion of the site. Lull forklift utilized to move rebar.

7:00 am to 3:00 pm Solar installing conduit on the second floor of the main building on the concrete foundation slab.

7:00 am to 3:00 pm Olympic Plumbing installing drainage plumbing in the northern portion of the concrete foundation slab.

7:00 am to 3:00 pm Giaquinto building interior cinder block walls for the main building in the northern section of the concrete foundation slab. Cement mixing and concrete block cutting in the northeastern section of the concrete foundation slab. Giaquinto utilizing a Lull forklift to move materials around the site.

7:00 am to 3:00 pm Blue Diamond installing duct work throughout the first floor of the main building on the concrete slab in the northern section of the site.

7:00 am to 12:00 pm Soil Solutions welding and driving piles in the eastern section of the site.

7:00 am to 2:00 pm GC installing foam insulation on the northern external wall of the main building.

7:30 am to 10:00 am GC applying waterproofing paint to the external masonry in the northwestern portion of the site.

8:00 am to 10:00 am Flatbed truck and trailer carrying scaffolding enters the site through the gate and Stabilized Construction Entrance on 25th Avenue. Lull forklift utilized to unload scaffolding in the eastern section of the site.

9:30 am to 10:00 am & 12:00 pm to 12:30 pm

Site work stops for a work break.

3:30 pm Site work stops for the day. EnTech removes air monitoring stations.

Time Off-Site: 3:30 pm

General Observations:

According to EnTech, particulate matter and total organic vapors were not detected at concentrations greater than the action levels. The GC was observed implementing dust suppression at the site by wetting down the ground surface with water from the water tank truck at 7:30 am and 10:50 am.

Issues discussed this date with Construction Manager: None.

Persons Contacted: N/A

Status: N/A

Notes: N/A

Page 3: IEM Daily Field Report - New York · 5/17/2016  · Day / Date: Tuesday / May 17, 2016 Client: URS / LiRo H2M Project No.: URLI1401 Prepared By: John Bruscella IEM Representative

IEM Daily Field Report

SKETCH

Prepared By: John Bruscella IEM Representative

Page 3 of 4

Approximate Location of Air Monitoring Stations B3.

Approximate Location of Air Monitoring Stations B2.

Approximate Location of Air Monitoring Stations B1.

Approximate Location of Air Monitoring Stations B4.

Approximate location of interior cinder block wall installation

Approximate location of structural steel installation

Approximate location of pile driving

Approximate location of waterproofing

Approximate location of insulation installation

Page 4: IEM Daily Field Report - New York · 5/17/2016  · Day / Date: Tuesday / May 17, 2016 Client: URS / LiRo H2M Project No.: URLI1401 Prepared By: John Bruscella IEM Representative

IEM Daily Field Report

PHOTOGRAPH LOG

Prepared By: John Bruscella IEM Representative

Page 4 of 4