Product & Supply Chain Improvement
IAQG Council Moscow, Russia
23 May 2013
Content: • Team Composition • PSCI Strategic Objectives • SCMH Status
o Introduction to SCMH and Content o Writing Team Progress o SCMH Hit Counter and Survey Results o How to access the SCMH
• Status of PSCI 2013 Tactical Objectives • Summary & Support Needed
Page 2
Product & Supply Chain Improvement Team composition:
Sector Leaders • Bernard Lauras (Airbus) • Dale Gordon (Aerojet) • Christian Buck (Safran) • Deborah Oberhausen (UTC) • Motoko Iwadare (MHI) interim
• Until Shuji Komori (FHI) is replaced
Page 3
IAQG Contractors • Darryl Hue • Susan Parsons
International Leader • Bernard Lauras (Airbus)
No change
Product & Supply Chain Improvement strategic objectives
• Reduce the number of customer specific requirements flowed to the supply chain
• Increase confidence that being 9100 series certified will improve quality and delivery performance and reduce surveillance costs
Page 4
Focus on “How” through SCMH
91XX Requirements
91xx 9131
9103 9102
SCMH Guidance material, tools, training
Includes
Providing guidance material and best practices on how to meet requirements and
achieve objectives
Inputs for new revision of 91XX
Page 5
SCMH Project Status
Recently Published/Updated (since last IAQG meeting) • Chapter 1: Sales, Master Scheduling & Sequencing Overview
(additional material completing existing one) – Nov 12
• Chapter 3: 9115 Software Guidance Material (three additional sub-sections completing existing material) – Dec 12
• Chapter 7: Managing Product and Process Variation in Support of 9103 Guidance Material – Updated Oct 12
• Chapter 11: Delivery Metrics Definition Guidance (New section) – Nov 12
Page 6
SCMH Project Status
Active projects, publication prior to next IAQG meeting • Chapter 5: Planning of Product Realization (possible delay) • Chapter 8: Advanced Product Quality Planning “APQP”
• Chapter 10: Counterfeit and Suspect Unapproved Parts Prevention
• Chapter 11: Process Mapping - VSM based
Page 7
Appendices 10. Customer Support (Control of service
operations)
4. Suppliers sourcing selection & approval
2. Contract Requirements & Flow Down
5. Plant, material, skills, capacity planning &
scheduling
6. Order Management and logistic (Internal & external)
1. Sales, Master Scheduling & Sequencing
3. Design & Development
7. Manufacturing and Inspection
8. Supplier operational management and product
validation
9. Control of non conformities, corrective and
preventive actions
• Requirements & Flow Down Templates
• Contractual Requirements Review & Management Guidance
• Supplier Selection and Capability Assessment
• Product Performance Detailed Assessment Checklists
• 9100 Rev C Deployment Support
• People Capability PCAP 001 • Link to ICOP Overview • 9100/SSCA/PPDAC
Comparison
• 9103 Material for Key Characteristics
• 9102 Material for First Article Inspection
• Foreign Object Debris (FOD)
• Notification of Change Tool • Supplier Quality Mgt Basics • Sub-tier Supplier Control
Management
• Root Cause Analysis & Problem Solving
• Control of non conformities
• Order Management and logistic
• Work Transfer • Configuration Mgmt • Risk Management • Delivery Metrics Definition
• Master Scheduling
Work In Progress Available
• Planning of Product Realization
• Preventive Action
• Counterfeit & Suspect Unapproved Parts
• Special Requirements & Critical Items
• Software Guidance (9115) • Quality Aspects of New
Product Development
Future
• Process Mapping (VSM Based)
• APQP
Page 8
SCMH Hit Counter (May data)
• 68,753 visitors (since start of tracking) - 14,873 since Fall 2012 IAQG Meeting – Doubled from previous 6 months.
• Downloads since Fall IAQG meeting
- 12,760+ avg. per month – Stable
Page 9
SCMH Survey Results 903 as of May 2013 (263 since Sept. 2012)
• 92 % Users found the SCMH “Very Useful”/”Useful” • 81% are “likely”/”very likely” to use the information in
company procedures • 71% are “likely”/”very likely” to share or use the material
with their suppliers • 82% find the SCMH “Easy”/”Very Easy” to navigate. • 94% of users will recommend the SCMH to others
Slight Increase Page 10
SCMH Chapter Hits – May 2013
• Hits are heavier where more and new material exists, i.e. Training, Forms & Checklists
September 2012
May 2013
Ch.1 Schedule
8% Ch.2 Contract
8%
Ch.3 Design 10%
Ch.4 Sourcing 9%
Ch.5 Plan 2%
Ch.6 Order 2%
Ch.7 MFG. 15%
Ch.8 Supplier
10%
Ch.9 Non Conf. 9%
Ch.10 Support 1%
Ch.11 Business 19%
Appendix 7%
Page 11
Sample SCMH Survey Comments • Happy Customers
• “thank you team IAQG” Feb 2013 • “This is a very excellent hand book with clarity for
performance of the QMS” Dec 2012 • “As a registrar AEA Lead Auditor, I can influence and recommend the
use of the handbook by the client to assist them in process improvement.” Dec 2012
• Recommendations • “Less color or printer friendly format. Everything is very nicely done,
thank you.” Nov 2012 • “more languages like Spanish or French” Jan 2013 • “Chapter 5 & 6 examples would be helpful” Jan 2013
Page 12
Page 13
How to access SCMH ?
www.iaqg.org
Page 14
How to access SCMH ?
Direct access to SCMH page:
www.iaqg.org/SCMH
How to access SCMH ?
Page 15
Detailed content and direct access to procedures, training presentations, templates, forms, etc
How to access SCMH ?
Page 16
Ask questions, comment on content, etc. Don’t forget to give your name if you expect an answer!
2013 Objectives Status
PSCI Define a way of working to support new 9100 revision (provide recommendations about future content). Target End Feb 13 Provide first inputs to Requirement stream: Target: July 13
PSCI Publish 4 new SCMH sections
PSCI Identify better process to select future SCMH sections (based on need / added value for the industry, level of available supports, etc): Target date: Montreal IAQG
PSCI
Review mechanism to identify if and how to subcontract SCMH related activities (step approach based on value / availabilities of resources and S/C costs): Target date: First ideas Moscow IAQG, completed Montreal IAQG
PSCI Launch SCMH webinar awareness pilots and propose plan for further development based on users feedback: Target Montreal IAQG
2013 Tactical Objectives Product Supply Chain Improvement
Page 17
On plan
Off plan, but recoverable
Off plan, not recoverable
Legend
Propose improvement of 9100 to Reqts stream • Actions agreed in Moscow F2F mtg
• Map existing SCMH Sub Chapters to associated 9100 chapter • Identify ISO (non bold) and 9100 (bold) requirements • Identify if missing requirements and/or need to clarify/complement 9100
content
• Topics already identified as potentially to be amended in the standard:
Page 18
• Work transfer • FOD • Counterfeit/unapproved parts • Scrapping • Requirements flow down and
compliance verification • APQP/PPAP
• Configuration management • Project management for
small companies • Qualification / Competencies
(evaluation and management of competencies
A. Collect SCMH topics of interest 1. Send letter once a year to members requesting topics of interest
(Identify current topics for awareness) 2. Update existing SCMH survey by adding specific question
regarding new potential topics of interest, rationales, and point of contact if volunteering to support.
3. Add a survey paragraph to the IAQG newsletter.
B. Validate future projects 1. SCMH team to analyze survey results and propose topics 2. Prioritize projects, evaluate added value vs efforts required to
produce, and clarify scope for those selected 3. Share the selected topics with the SWG prior to launch.
C. Promote the Project within Sectors and IAQG community to populate project team and launch with adequate support
Identify process to better select future SCMH sections
Page 19
• Basic rules: • No contractor to lead project team • Contractors to be used only when determined to be
necessary by SCMH team (facilitate, edit, collaborate, advise, etc.).
• All contractors to have a statement of work for each project
• Exceptions to be limited to the minimum and to be managed on case by case basis
Review mechanism to identify if and how to subcontract SCMH related activities
Page 20
• Scope: Webinars (or SCMH Awareness Forum Discussion • Format: 1 hour
• 10min: Overall presentation of SCMH • 50 min: Zoom on one section (5 to 10 pages presentation
and open discussion) • First pilots prior to Montreal
• Sub-tier Supplier Management • FOD
Launch SCMH webinar awareness pilots and propose plan for further development
Page 21
• Improve method for gathering data from SCMH users • First time visitors • First download of a SCMH material (requiring e-mail
address registration) • Asking few questions about industry, business, how got
knowledge of SCMH, etc. • Allowing generating e-mail listing of users
• Improve reporting to IAQG and sectors on status and content of projects
Need to continuously improve alignment between SCMH content and industry expectations/added value
Page 22
Summary and support Needed • SCMH usage is increasing with increased satisfaction from
users • SCMH material development continues • Help us to reinforce the SCMH by providing direct support • Express your ideas regarding content and volunteer on
future projects • Communicate awareness of the SCMH throughout your
companies and your supply chain! • Use the SCMH Survey and provide feedback
• PSCI team aligning its activities to the new IAQG strategy in coordination to other streams
Page 23
Questions ?