66

IAEI EASTERN SECTION

Embed Size (px)

DESCRIPTION

IAEI EASTERN SECTION. REVIEW OF CODE BREAKFAST QUESTIONS Brought to you by fellow members who attended the Section Meeting. UNDERGROUND WIRING. Do the requirements of 310.10(C) apply to underground communication wires and cables entering buildings?. UNDERGROUND WIRING. - PowerPoint PPT Presentation

Citation preview

Page 1: IAEI EASTERN SECTION
Page 2: IAEI EASTERN SECTION
Page 3: IAEI EASTERN SECTION
Page 4: IAEI EASTERN SECTION
Page 5: IAEI EASTERN SECTION
Page 6: IAEI EASTERN SECTION
Page 7: IAEI EASTERN SECTION
Page 8: IAEI EASTERN SECTION
Page 9: IAEI EASTERN SECTION
Page 10: IAEI EASTERN SECTION
Page 11: IAEI EASTERN SECTION
Page 12: IAEI EASTERN SECTION
Page 13: IAEI EASTERN SECTION
Page 14: IAEI EASTERN SECTION
Page 15: IAEI EASTERN SECTION
Page 16: IAEI EASTERN SECTION
Page 17: IAEI EASTERN SECTION
Page 18: IAEI EASTERN SECTION
Page 19: IAEI EASTERN SECTION
Page 20: IAEI EASTERN SECTION
Page 21: IAEI EASTERN SECTION
Page 22: IAEI EASTERN SECTION
Page 23: IAEI EASTERN SECTION
Page 24: IAEI EASTERN SECTION
Page 25: IAEI EASTERN SECTION
Page 26: IAEI EASTERN SECTION
Page 27: IAEI EASTERN SECTION
Page 28: IAEI EASTERN SECTION

Question - In health care facilities is ground fault protection for operation of service and feeder disconnecting means required to be fully selective such that the feeder device but not the service device shall open on ground faults on the load side of the feeder device. Is a six cycle minimum separation between service and feeder ground fault tripping bands required?

Page 29: IAEI EASTERN SECTION

First part – Yes, 2 levels of ground fault (service main and branch) are required in a health care facility. This requirement makes sure that the main does not open in the event of a ground fault downstream of a feeder device. This minimizes the disruption to critical circuits in a health care facility.

Page 30: IAEI EASTERN SECTION

Second part – Maybe. The 2011 NEC was changed to recognize the fact that newer solid state tripping devices do not require the 6 cycle separation for coordination required by older analog devices. However, the manufacturer and the device trip curves still needs to be consulted in case the tolerances still require that separation for coordination.

New solid state breaker on left. Old ground fault relay on right.

Page 31: IAEI EASTERN SECTION

New device ground fault trip curve, narrow band, can be coordinated without 6 cycle separation.

Old device ground fault trip curve, wide band, not as accurate, 6 cycle separation for coordination required

Page 32: IAEI EASTERN SECTION
Page 33: IAEI EASTERN SECTION
Page 34: IAEI EASTERN SECTION
Page 35: IAEI EASTERN SECTION
Page 36: IAEI EASTERN SECTION
Page 37: IAEI EASTERN SECTION
Page 38: IAEI EASTERN SECTION
Page 39: IAEI EASTERN SECTION
Page 40: IAEI EASTERN SECTION
Page 41: IAEI EASTERN SECTION
Page 42: IAEI EASTERN SECTION
Page 43: IAEI EASTERN SECTION
Page 44: IAEI EASTERN SECTION
Page 45: IAEI EASTERN SECTION
Page 46: IAEI EASTERN SECTION
Page 47: IAEI EASTERN SECTION
Page 48: IAEI EASTERN SECTION
Page 49: IAEI EASTERN SECTION
Page 50: IAEI EASTERN SECTION
Page 51: IAEI EASTERN SECTION
Page 52: IAEI EASTERN SECTION
Page 53: IAEI EASTERN SECTION
Page 54: IAEI EASTERN SECTION
Page 55: IAEI EASTERN SECTION
Page 56: IAEI EASTERN SECTION
Page 57: IAEI EASTERN SECTION
Page 58: IAEI EASTERN SECTION
Page 59: IAEI EASTERN SECTION
Page 60: IAEI EASTERN SECTION
Page 61: IAEI EASTERN SECTION
Page 62: IAEI EASTERN SECTION
Page 63: IAEI EASTERN SECTION
Page 64: IAEI EASTERN SECTION
Page 65: IAEI EASTERN SECTION
Page 66: IAEI EASTERN SECTION