United States Air Force Reserve I n t e g r i t y - S e r v i c e - E x c e l l e n c e
1
Colonel Roy Agustin, FSAME
HQ AFRC Civil Engineer 19 Jun 2013
Air Force Reserve Command
Installations & Mission
Support
1
2
Viable & relevant capabilities enabling Global Vigilance, Reach & Power
Developing & sustaining our Air Force Reserve missions & Airmen
Posturing for the future
Overview
Force Provider
Air Reserve Team
48.6K Traditional Reservists
10.4K Air Reserve Techs
9.0K IMAs
2.9K Active Guard Reserve
4.0K Civil Service
0.3K Active Duty HQ Mgmt
0.1K ANG
3 33 f l y i ng w i ngs , 12 f l y i ng g r oups , 1 space w i ng
65%
TRs
14%
ARTs
12%
IMAs
4%
AGRs
5%
Civilian 0.5%
AD & ANG
4
Aerial Spray 100% Theater Airlift 21%
Weather Reconnaissance 100% Pilot Training 19%
Port Mortuary Affairs 63% In-flight Refueling 18%
Aeromedical Evacuation 60% Air Ops Center 15%
Flight Inspection 50% AWACS 15%
Aerial Port 47% CE Prime BEEF 15%
Strategic Airlift 40% EOD 15%
CE RED HORSE 27% Personnel Recovery 15%
Aerial Fire Fighting 25% Security Forces 12%
Bomber 21% Space Operations 12%
Reserve Total Force Contributions
Prime BEEF Capabilities
Barksdale AFB
Nellis AFB
JB Charleston Luke AFB
Scott AFB
Dover AFB
Westover ARB
Duke Field
Travis AFB
JB McGuire/Dix/Lakehurst
Dobbins ARB
Homestead ARB JB San Antonio (Lackland)
March ARB
Hill AFB
JB Lewis-McChord
JB Andrews
Peterson AFB
Seymour-Johnson AFB
Whiteman AFB
Niagara Falls IAP
Grissom ARB
NAS Fort Worth JRB (Carswell)
Minn-St Paul IAP
6
Prime BEEF Locations
Black - 4 AF, RED - 10 AF, Blue - 22 AF
Beale AFB
Wright-Patterson AFB
Tinker AFB
JB Elmendorf-Richardson
JB Pearl Harbor-Hickam
McConnell AFB
Keesler AFB
Maxwell AFB
Pittsburg ARS
Youngstown ARS
30 CES & 4 CEFs encompassing 13 AF specialites
622 Civil Engineer Group
583 RHS
Beale AFB
555 RHS
Nellis AFB
307 RHS
Barksdale AFB
556 RHS
Hurlburt AFB
622 CEG
ECS-TCC
& FSCTC
622 CEF
Dobbins ARB
922 CEF
March ARB
567 RHS
Seymour
Johnson AFB
560 RHS
JB Charleston
822 CEF
Carswell JRB
3 RED HORSE Squadrons,12 S-Teams & 2 Training Centers
8
“Air bases are a determining factor in the success of air ops. The two-legged stool of men & planes would topple over without this equally important third leg.”
General of the Air Force Henry H. “Hap” Arnold
Installations enable AF capabilities
Enable air, space, cyberspace superiority
Assure cyberspace access & dominance
Host robust C2 networks
Serve as power projection platforms—
garrison & expeditionary
Provide infrastructure necessary to hold
targets at risk globally
Facilitate partnerships w/ allies & developing
nations by basing US forces forward
Enabling Global Vigilance, Reach & Power
Host & Tenant Installations
9
9 Host installations – 57 Tenant Locations/Ranges
Alaska
Hawaii
Guam
4AF
ARPC
22AF
HQ AFRC
10AF
O ver 21 , 000 ac r es
Near l y 3 , 000 f ac i l i t i es
$6 . 13B p l an t rep l aceme nt va l ue
Current Mission MILCON Funding vs. Requirements
0
20
40
60
80
100
120
President’s Budget
Requirement
Congressional Inserts
Congressional Programmatic Plus Up
$ M Appropriated Programmed
As of 11 Jun 13 10
FY12-14 MILCON Projects
11
Charleston AFB SC
FY12 TFI RED HORSE Sq
March ARB CA
FY12 Control Tower / Base Ops
FY14 Deploy Process Terminal
Niagara Falls ARS NY
*FY12 Vehicle Maintenance
FY13 C-130 Simulator
Whiteman AFB MO
*FY12 Logistics Readiness Sq
11 Ensuring our Installations are Ready, Capable & Viable
Tinker AFB OK
FY14 Air Control Gp Sq Ops
Homestead ARB FL
**FY12 F-16 Simulator Addition
**FY13 Live Ordnance Load Area
FY14 Entry Control Gate
McConnell AFB KS
**FY12 Medical Admin
Hill AFB UT
**FY12 Fire Station
Naval AS Ft Worth JRB TX
**FY13 F-16 Simulator Addition
Legend
* Prior year savings reprogrammed
replace storm damaged facilities
** P-341 MILCON
DLA MILCON at AFRC Installations
FY12 Westover Hydrant Fuel System Project
Replaces existing hydrant fuel system
New 2,400 gpm Type III system with 14 outlets, fill stand with
canopy, & 2 each 5,000 barrel above ground JP8 storage tanks
with containment
Awarded 28 May 13
FY13 Grissom Hydrant Fuel System Project
Construct 16 outlet Type III jet fuel (JP-8) hydrant system with
two 3,500-barrel operating fuel tanks, pump house, hydrant hose
truck checkout station, & fill stand at airfield
Also replace transfer pipeline, pump house, 4-position off-load
facility, & 2-position fill stand at bulk fuel storage area
Awaiting Award Jul/Aug 13
12 Ensuring our Installations are Ready, Capable & Viable
44 Projects, $447.5M Current Mission
3 Projects, $6.4M, New Mission
Representative Projects
Future MILCON Projects
13
Base State Title
Robins GA AFRC CONSOLIDATED MISSION COMPLEX - PH 1, 2 & 3
Hickam HI CONSOLIDATED TRAINING FACILITY
Westover MA MAINTENANCE SHOP COMPLEX
Seymour Johnson NC TANKER PARKING APRON EXPANSION
Youngstown OH INDOOR SMALL ARMS FIRING RANGE
Tinker OK AIR CONTROL GROUP SQUADRON OPERATIONS
Davis Monthan AZ RESCUE SQUADRON OPERATIONS
Lackland TX MEDICAL TRAINING ANNEX TO CLINIC
Dobbins GA FIRE STATION AND SECURITY COMPLEX
Keesler MS AEROMEDICAL STAGING SQUADRON
Ensuring our Installations are Ready, Capable & Viable
14
Effectively & efficiently meets AF, AFMC & AFRC needs
Saves WR-ALC MILCON by reusing vacated facilities
Reduces AFRC footprint—9 buildings to 1
Future AFRC Consolidated
Mission Complex
14
Ph 1
Ph 2 Ph 3
DRTC
Duck Lake
Clinic
Phases II & III
Phase I
FSRM Project Funding Profile
15
FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13
PB 21.5 23.1 53.2 57.3 48.7 57.5 45.7 47.2
Actual 118.2 96.2 108.6 177.9 224.4 194.1 205 126
0
50
100
150
200
250
$M
Planned
Leverage O&M Facilities Sustainment, Restoration & Modernization
(FSRM) to Recapitalize, Retain/Sustain & Reduce
FY12 FSRM vs Historical Funding
0
25
50
75
100
Host Tenant P
erc
en
t F
un
din
g
FY08 FY09 FY10 FY11 FY12
FSRM Host Vs Tenant Funding
Energy Infrastr Airfield Msn Spt Design Demo QoL
FY08 0 42 17.2 35 5.5 0 2.7
FY09 0 56.3 20.7 69 9.8 2.8 17.3
FY10 2 35.6 23.6 110.5 28.7 4.9 19.2
FY11 2.7 35.4 29.4 96.5 14.6 1.5 13.6
FY12 2.5 19.6 29.5 146.8 7.2 0.2 6.2
0
20
40
60
80
100
120
140
160
$ M
illio
n
FSRM Funding By Category
16 Energy improvements included in major facility renovations
FY12/Projected FY13 O&M FSRM
Facility Project Totals ($M by State)
17
16.1/
9.8
4.1/9.4
3.3/1.5 0.9/1.5
2.7/1.2
0.1/
0.7
37.7/
19.9
18.1/
11.0
AK 0/0.8
HI 3.4/0.5
0.3/0.6
1.0/
7.4
17.3/1.4
0.2/
1.4
1.2/2.6
8.2/
5.7
1.7/
5.4 16.2/0.9
3.4/6.1
18.6/2.9
6.2/
2.6
1.3/1.6
24.6/
14.5
1.5/3.5
12.8/
11.3
2.2/2.2
What we’re buying: beddowns/TFI $14M; airfields $27M;
renovations $31M; infrastructure $37M; & mission support $31M
Host Installation
0/0.4
0.2/0.1
1.0/0
18
Energy Program
Prior Investments in Energy Projects
NRG Projects for 2011- $ 2.7M
NRG Projects for 2012 - $2.5M
NRG Projects for 2013- $ 2.5M
FY14 planned investment in Energy Projects
$5.5M in energy projects under O&M (Grissom, March, Niagara &
Westover)
$3.5M in Energy projects under NRG (Dobbins, Grissom,
Homestead, Niagara, March, Westover & Youngstown)
The Air Force spent over $10 billion on energy in 2012; Jet fuel accounted
for 86% of energy used by the Air Force
Energy Reduction Prediction FY 13 1st Qtr
Goal: 30% reduction in energy use per SF at AF installations by 2015
Metric: 3% / yr increased energy efficiency from a 2003 baseline
Outcome: Achieve EISA, EPAct, EO & OSD mandated goals7
GOOD
19
0
0.1
0.2
0.3
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Pe
rce
nt
Re
du
ctio
n
Energy Intensity (MBTU/SF)
AFRC Energy Intensity Reduction Percentage
Actua
Goal
Forecast
NRG
E.O.13423 Water Reduction Status FY 13 1st Qtr
Goal: 16% reduction in water use per SF at AF installations by 2015
Metric: 2%/yr increased water efficiency from a 2007 baseline
Outcome: Achieve EO & OSD mandated goals
GOOD
20
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
2007 2008 2009 2010 2011 2012 2013 2014 2015
Pe
rce
nt
Re
du
ctio
n Water Intensity
(MGal/SF)
AFRC Water Intensity Reduction Percentage
Actual Goal
Forecast
Environmental Programs
Compliance Pollution
Prevention Conservation
FY11 Oblig 9.3 0.3 0.4
FY12 Oblig 7.8 0.3 0.4
FY13 PB 7.8 0.3 0.4
0
1
2
3
4
5
6
7
8
9
10
$ M
illio
n
21
Dissemination of Information
22
Request for Information (RFI)
Sources Sought Synopsis
Pre-solicitation Notices
Award Notices
Requests for Quotes/Proposals
Government-wide Point of Entry (GPE)
http://www/fedbizopps.gov
http://www.ebuy.gsa.gov
Total contracting obligations: FY10 $256M; FY11 $268M; FY12 $265M
Contracting Execution
Host Base $ Awarded
23
0
25
50
75
100
125
CAR DOB GRI HOM MAR MSP NIA PIT WES YOU A7KA
$ M
illio
ns FY10
FY11
FY12
$120M
$96M
$59M
Sequestration expected to reduce year end contracting surge
capacity
MILCON Execution
Corps of Engineers
24 Louisville District is AFRC’s primary USACE Program Manager
Sequestration
Service contract efficiencies
Uncertain future Force Structure
Reducing excess infrastructure—20/20 by 2020, FOCUS, FTF
New Airfield Damage Repair CONOPS
25
Posturing for the Future
Questions?
26