35
HUDSON RIVER PARK GANSEVOORT PENINSULA DESIGN UPDATE | JANUARY 08, 2020 GANSEVOORT PENINSULA | HUDSON RIVER PARK, NY 07.24.2019 | FIELD OPERATIONS

HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

HUDSON RIVER PARKGANSEVOORTPENINSULA DESIGN UPDATE | JANUARY 08, 2020

gansevoort peninsula | hudson river park, ny 07.24.2019 | Field operations

Page 2: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

gansevoort peninsula | hudson river park, ny 01.08.2020 | Field operations

ANALYSIS

03/06/19

COMMUNITY BOARD MEETING

03/26/19

COMMUNITY INPUT WORKSHOP 2

07/24/19

PRESENTATION AND DISCUSSION

09/10/2019

PRESENTATION AND DISCUSSION

01/08/2020

PRESENTATION AND DISCUSSION

CONSTRUCTION START - fALL 2020

COMPLETION - 2022

EARLY SPRING

fINAL DESIGN

CONCEPT DESIGN

SCHEMATIC DESIGN

DESIGN DEVELOPMENT

WHERE WE ARE

Page 3: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

CONCEPT SKETCH

IN-WATER HABITAT

INTERTIDAL HABITAT

ENGAGE THE RIVER

UPLAND BEACH

PASSIVE RECREATION

VARIED EDGES

ACTIVE RECREATION

Page 4: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

CONCEPT PLAN_CB2 MEETING_09/10/19

CB 2 COMMENTS:

• INCORPORATE fITNESS EqUIPMENT

• MAKE SOUTHERN EDGE MORE OPEN AND ENGAGING

• RESILIENCY APPROACH

KAYAKING COMMUNITY COMMENTS:

• ADD LEDGES fOR LANDING AND LAUNCHING KAYAKS

• ExPLORE SOfTER RAMP MATERIALS

Page 5: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

M&O + RESTROOMS

BALLfIELD13TH AVE PROMENADE

OYSTER CAGES & REEf BALLS

RIVER GYM

UPLAND BEACH

LAWN LEDGE

DOG RUN

NORTH NOOKS

HUDSON BALCONY KAYAK ACCESS

BEACH WALK

SOUTH EDGE ACCESS

PINE GROVE

SALT MARSH

CONCESSION

SITE PLAN & PROGRAMS

Page 6: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

SITE AERIAL

Page 7: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

NORTHERN NOOKS, SALT MARSH, & DOG RUN

Page 8: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

RIVER GYM

RIVER GYM

Page 9: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

RIVER GYM

Page 10: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

RIVER GYM

Page 11: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

13TH AVE PROMENADE

Page 12: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

13TH AVE LOUNGES

Page 13: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

13TH AVE PICNIC GROVE

Page 14: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

HUDSON BALCONY

Page 15: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

gansevoort peninsula | hudson river park, ny 01.08.2020 | Field operations

SOUTHERN EDGE UPDATES

Page 16: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

SOUTHERN EDGE - 09/10/19

Page 17: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

SOUTHERN EDGE - UPDATE

Page 18: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

SOUTHERN EDGE fROM PROMENADE - 09/10/19

Page 19: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

SOUTHERN EDGE fROM PROMENADE - UPDATE

Page 20: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

KAYAK ACCESS SECTION

Page 21: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

KAYAK LANDING - 09/10/19

KAYAK LANDING - UPDATE

Page 22: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

SOUTH EDGE @ HIGH TIDE

Page 23: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

SOUTH EDGE @ MID TIDE

Page 24: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

SOUTH EDGE @ LOW TIDE

Page 25: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

gansevoort peninsula | hudson river park, ny 01.08.2020 | Field operations

RESILIENCY UPDATES

Page 26: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

[x.xx] - ExISTING GRADEx.xx - PROPOSED GRADE - RAIN GARDENS

GRADING PLAN

[x.xx] - ExISTING GRADEx.xx - PROPOSED GRADE - RAIN GARDENS

100 YR STORM ELEV = +13.00’

Page 27: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

[x.xx] - ExISTING GRADEx.xx - PROPOSED GRADE

- RETAINING EDGE

GRADING PLAN - ELEVATED BALLfIELD

Page 28: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

gansevoort peninsula | hudson river park, ny 01.08.2020 | Field operations

ARCHITECTURE UPDATES

Page 29: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

Canopy cuts referencingGordon Matta Clark for daylight

Cast-in-place concrete

Sedum roof

Concrete structural wall

Perforated shingle rainscreen

Accent color cladding

Hanging plants

Oyster aggregate concrete

or

+

+

2GANSEVOORT PENINSULAnARCHITECTS

COMMUNITY BOARDDESIGN DEVELOPMENTJanuary 8th, 2020

PORCH CONCEPT

Page 30: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

3GANSEVOORT PENINSULAnARCHITECTS

COMMUNITY BOARDDESIGN DEVELOPMENTJanuary 8th, 2020

69'-3"

VOLUME 1VOLUME 2

VOLUME 3

WC MALE(212 SF)

JANITOR(30 SF)

STAFF ROOM /OFFICE (246 SF)

WC FEMALE(212 SF)

ELEC. ROOM(113 SF)

MECH. & PLUM.ROOM (137 SF)

M&O STORAGE(1250 SF)

M&O YARD(1130 SF)

KITCHEN &SERVICE (428 SF)

MEP(95 SF)

TRASH(57 SF)

DRINKINGFOUNTAIN

UTILITYHUB YARD

UTILITY HUB(EXISTING, NIC.)

35'-0" 29'-7"26'-7"64'-3"

34'-2"29'-6"

20'-0

"

25'-0

"

41'-6

"37

'-0"

32'-4

"

7'-0"

15'-0

"12

'-4"

9'-0"

17'-6"

33'-0"

15°

7'-3"

7'-6"

+10.50'FFE

+10.70'FFE

+10.50'FFE

+10.00'FFE

+10.00'FFE

+13.40'FFE

+13.40'FFE

+13.40'FFE

+6.00'FFE

+10.60'

+10.20'9'-0"

9'-0"

FIRST FLOOR PLAN

12.11.19

0 10' 20'1/16" = 1' N

69'-3"

VOLUME 1VOLUME 2

VOLUME 3

WC MALE(212 SF)

JANITOR(30 SF)

STAFF ROOM/OFFICE (246 SF)

WC FEMALE(212 SF)

ELEC. ROOM(113 SF)

MECH. & PLUM.ROOM (137 SF)

M&O STORAGE(1250 SF)

M&O YARD(1130 SF)

KITCHEN &SERVICE (428 SF)

MEP(95 SF)

TRASH(57 SF)

DRINKINGFOUNTAIN

UTILITYHUB YARD

UTILITY HUB(EXISTING, NIC.)

35'-0" 29'-7"26'-7"64'-3"

34'-2"29'-6"

20'-0

"

25'-0

"

41'-6

"37

'-0"

32'-4

"

7'-0"

15'-0

"12

'-4"

9'-0"

17'-6"

33'-0"

15°

9'-11

"5'-

2"

+10.50'FFE

+10.70'FFE

+10.50'FFE

+10.00'FFE

+10.00'FFE

+13.40'FFE

+13.40'FFE

+13.40'FFE

+6.00'FFE

+10.60'

+10.20'9'-0"

9'-0"

FIRST FLOOR PLAN

12.11.19

0 10' 20'1/16" = 1' N

FLOOR PLAN

Page 31: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

4GANSEVOORT PENINSULAnARCHITECTS

COMMUNITY BOARDDESIGN DEVELOPMENTJanuary 8th, 2020

View of western porch to ballfield

PARK COMFORT STATION

Page 32: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

5GANSEVOORT PENINSULAnARCHITECTS

COMMUNITY BOARDDESIGN DEVELOPMENTJanuary 8th, 2020

PARK COMFORT STATION

View of public WC entry wall

Page 33: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

6GANSEVOORT PENINSULAnARCHITECTS

COMMUNITY BOARDDESIGN DEVELOPMENTJanuary 8th, 2020

PARK COMFORT STATION

View of public gateway to ballfield

Page 34: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

7GANSEVOORT PENINSULAnARCHITECTS

COMMUNITY BOARDDESIGN DEVELOPMENTJanuary 8th, 2020

VOLUME 1VOLUME 2

VOLUME 3

UTILITY HUB(EXISTING, NIC.)

ROOF PLAN

12.11.19

0 10' 20'1/16" = 1' N

VOLUME 1VOLUME 2

VOLUME 3

UTILITY HUB(EXISTING, NIC.)

ROOF PLAN

12.11.19

0 10' 20'1/16" = 1' N

69'-3"

VOLUME 1VOLUME 2

VOLUME 3

WC MALE(212 SF)

JANITOR(30 SF)

STAFF ROOM/OFFICE (246 SF)

WC FEMALE(212 SF)

ELEC. ROOM(113 SF)

MECH. & PLUM.ROOM (137 SF)

M&O STORAGE(1250 SF)

M&O YARD(1130 SF)

KITCHEN &SERVICE (428 SF)

MEP(95 SF)

TRASH(57 SF)

DRINKINGFOUNTAIN

UTILITYHUB YARD

UTILITY HUB(EXISTING, NIC.)

35'-0" 29'-7"26'-7"64'-3"

34'-2"29'-6"

20'-0

"

25'-0

"

41'-6

"37

'-0"

32'-4

"

7'-0"

15'-0

"12

'-4"

9'-0"

17'-6"

33'-0"

15°

9'-11

"5'-

2"

+10.50'FFE

+10.70'FFE

+10.50'FFE

+10.00'FFE

+10.00'FFE

+13.40'FFE

+13.40'FFE

+13.40'FFE

+6.00'FFE

+10.60'

+10.20'9'-0"

9'-0"

FIRST FLOOR PLAN

12.11.19

0 10' 20'1/16" = 1' N

GREEN ROOF & SUSTAINABILITY

CANOPY DRAINS TO GREEN ROOFAS NATURAL WATER RETENTION SYSTEM

GREEN ROOF AREA2,645 SF

Page 35: HUDSON RIVER PARK GANSEVOORT PENINSULA · presentation and discussion 09/10/2019 presentation and discussion 01/08/2020 presentation and discussion construction start - fall 2020

8GANSEVOORT PENINSULAnARCHITECTS

COMMUNITY BOARDDESIGN DEVELOPMENTJanuary 8th, 2020

FLOOD PROOFING

FFE +10'FFE +10.5'

M&O STORAGE ELECTRICALROOM FEMALE WC

FFE +10'

+2'-0" (+27'-6")TOP OF CANOPY+12'-2" (+25'-6")RIDGE OF M&O VOLUME

+3'-4" (+13'-4")D.F.E.

+4'-0" (+10'-0")M&O STORAGE FFE

+0'-0" (+6'-0")UTILITY HUB (NIC)

3'-4"

Metal raised deck andstair at Design FloodElevation (13'-4") formechanical equip.

+9.8'-10.7'

Deployable floodbarriers to doors.

Deployable floodbarriers to doors.

MECHANICALROOM

FFE +10.5' FFE +10.5' +10.5'-10.7'+10.5'-10.7'

+2'-0" (+27'-6")TOP OF CANOPY+12'-2" (+25'-6")RIDGE OF VOLUME

+2'-7 5/8" (+13'-4")D.F.E.

+0'-0" (+6'-0")UTILITY HUB (NIC)

+4'-0" (+10'-0")M&O STORAGE FFE

CONCESSIONMEP

KITCHEN& SERVICE

Sanitary ventilation pipe,see plumbing drawings

Date:

Revision

Contract No. Cxxxx

Approved by:

Scale:

Drawn by:

DrawingTitle:

Key Plan

DateNo.

Sheet No.

Seal

Commissioner,Mitchell J. Silver

Commissioner,Basil Seggos

Parks & RecreationCity of New York

Environmental ConservationNew York State Department of

Manhattan Borough President

Bill de Blasio

Recreation and Historic Preservation

Governor, State of New York

The Honorable

Vice Chair,Hudson River Park Trust

Commissioner,

Hudson River Park TrustPresident & CEO,

Erik Kulleseid

New York State Office of Parks,

Madelyn Wils

Hudson River Park Trust

Gale A. Brewer

Diana L. Taylor

Justin Sadrian

Chair,

The HonorableAndrew Cuomo

The Honorable

Mayor, City of New York

RIVERHUDSON

PARK

475 10th Avenue, 9th Fl, New York, NY 10017James Corner Field Operations

GansevoortPeninsula

Segment 5

Cxxxx

100% SCHEMATIC DESIGN

Philip Habib & Associates102 Madison Ave, New York, NY 10016

Silman32 Old Slip, 10th Fl, New York, NY 10005

eDesign Dynamics402 West 40th St, New York, NY 10018

TMS Waterfront181 Westchester Ave, Port Chester, NY 10573

Horton Lees Brogden Lighting Design338 East 32nd st, 11th Fl, New York, NY 10016

Altieri Sebor Wieber LLC31 Knight St, Norwalk, CT 06851

Holmes Keough Associates526 East 20th St, Suite 4D, New York, NY 10009

Craul Land Scientist Inc2505, Buchenhorst Rd, State College, PA 16801

Plus Group32 Broadway, Suite 1601, New York, NY 10004

KS Engineers494 Broad Street, 4th Fl, Newark, NJ 07102

CAS Group LLC2219 Sawdust Rd, Suite 1603, The Woodlands, TX 77380

Dharam Consulting1719 Chestnut St, #300, Philadelphia, PA 19103

Northern Designs LLC2089 Hartford Turnpike, North Haven, CT 06473

Langan360 West 31st St, 8th Fl, New York, NY 10001

nArchitects68 Jay St, #317, New York, NY 11201

50% Schematic Design09.13.191

100% Schematic Design09.27.192

A-3011/4" = 1'

BUILDING LONGSECTION

Sep. 26, 2019

MH

LM

01 LONG SECTION1/4" = 1'-0"

FFE +10'FFE +10.5'

M&O STORAGE ELECTRICALROOM FEMALE WC

FFE +10'

+2'-0" (+27'-6")TOP OF CANOPY+12'-2" (+25'-6")RIDGE OF M&O VOLUME

+3'-4" (+13'-4")D.F.E.

+4'-0" (+10'-0")M&O STORAGE FFE

+0'-0" (+6'-0")UTILITY HUB (NIC)

3'-4"

Metal raised deck andstair at Design FloodElevation (13'-4") formechanical equip.

+9.8'-10.7'

Deployable floodbarriers to doors.

Deployable floodbarriers to doors.

MECHANICALROOM

FFE +10.5' FFE +10.5' +10.5'-10.7'+10.5'-10.7'

+2'-0" (+27'-6")TOP OF CANOPY+12'-2" (+25'-6")RIDGE OF VOLUME

+2'-7 5/8" (+13'-4")D.F.E.

+0'-0" (+6'-0")UTILITY HUB (NIC)

+4'-0" (+10'-0")M&O STORAGE FFE

CONCESSIONMEP

KITCHEN& SERVICE

Sanitary ventilation pipe,see plumbing drawings

Date:

Revision

Contract No. Cxxxx

Approved by:

Scale:

Drawn by:

DrawingTitle:

Key Plan

DateNo.

Sheet No.

Seal

Commissioner,Mitchell J. Silver

Commissioner,Basil Seggos

Parks & RecreationCity of New York

Environmental ConservationNew York State Department of

Manhattan Borough President

Bill de Blasio

Recreation and Historic Preservation

Governor, State of New York

The Honorable

Vice Chair,Hudson River Park Trust

Commissioner,

Hudson River Park TrustPresident & CEO,

Erik Kulleseid

New York State Office of Parks,

Madelyn Wils

Hudson River Park Trust

Gale A. Brewer

Diana L. Taylor

Justin Sadrian

Chair,

The HonorableAndrew Cuomo

The Honorable

Mayor, City of New York

RIVERHUDSON

PARK

475 10th Avenue, 9th Fl, New York, NY 10017James Corner Field Operations

GansevoortPeninsula

Segment 5

Cxxxx

100% SCHEMATIC DESIGN

Philip Habib & Associates102 Madison Ave, New York, NY 10016

Silman32 Old Slip, 10th Fl, New York, NY 10005

eDesign Dynamics402 West 40th St, New York, NY 10018

TMS Waterfront181 Westchester Ave, Port Chester, NY 10573

Horton Lees Brogden Lighting Design338 East 32nd st, 11th Fl, New York, NY 10016

Altieri Sebor Wieber LLC31 Knight St, Norwalk, CT 06851

Holmes Keough Associates526 East 20th St, Suite 4D, New York, NY 10009

Craul Land Scientist Inc2505, Buchenhorst Rd, State College, PA 16801

Plus Group32 Broadway, Suite 1601, New York, NY 10004

KS Engineers494 Broad Street, 4th Fl, Newark, NJ 07102

CAS Group LLC2219 Sawdust Rd, Suite 1603, The Woodlands, TX 77380

Dharam Consulting1719 Chestnut St, #300, Philadelphia, PA 19103

Northern Designs LLC2089 Hartford Turnpike, North Haven, CT 06473

Langan360 West 31st St, 8th Fl, New York, NY 10001

nArchitects68 Jay St, #317, New York, NY 11201

50% Schematic Design09.13.191

100% Schematic Design09.27.192

A-3011/4" = 1'

BUILDING LONGSECTION

Sep. 26, 2019

MH

LM

01 LONG SECTION1/4" = 1'-0"

M&O flood proofing section