    HierarchyHierarchy of of Public Investments in TurkeyPublic Investments in Turkey

    Action Plan of 60Action Plan of 60 ththTurkish GovernmentTurkish Government

    Medium Term Invest.Medium Term Invest.Program (2010Program (2010 --2012)2012)

    Strategic Plan ofStrategic Plan of MoTMoT(2009(2009--2013)2013)

    Strategic Plan of TCDDStrategic Plan of TCDD(2010(2010--2014)2014)

    9. Development Plan of9. Development Plan of

    Turkey (2007Turkey (2007

    --2013)2013)

    3 Year Investment3 Year InvestmentProgram ofProgram of MoTMoT

    3 Year Investment3 Year InvestmentProgram of TCDDProgram of TCDD

  • 8/8/2019 HSR in Turkey

    2/27

    Prepared by State Planning Organisation,Prepared by State Planning Organisation,

    Approved by Grand National Assembly, Approved by Grand National Assembly,Sets the vision of Turkey,Sets the vision of Turkey,States macroeconomic projections and targets,States macroeconomic projections and targets,

    Defines the strategy to reach targets in line withDefines the strategy to reach targets in line withEU accession process.EU accession process.

    99 thth Development PlanDevelopment Plan

    (2007(2007 --2013)2013)

    Passenger transportation with highspeed train will be started on the core network consisting of the stanbul-Ankara-Sivas, Ankara-Afyon- zmir and

    Ankara-Konya corridors.

  • 8/8/2019 HSR in Turkey

    3/27

    Prepared for 3 years,Prepared for 3 years,

    Sets the vision of Sets the vision of MoTMoT,,Defines tangible targets,Defines tangible targets,

    Assign investment projects to specific targets Assign investment projects to specific targets

    Strategic Plan of Strategic Plan of

    Ministry of TransportMinistry of Transport

    In order to increase number of railway passengers

    by 50%,1.503 km new high speed train lines will be built on the Bulgarian Border- stanbul-Ankara-Sivas,Ankara-Afyon- zmir and Ankara-Konya corridors.

  • 8/8/2019 HSR in Turkey

    4/27

    Reference Documents forReference Documents for

    High Speed Railway PlanningHigh Speed Railway Planning

    Strategy for TransportStrategy for TransportMaster PlanMaster Plan

    1010thth Transport ForumTransport Forum

    Transport InfrastructureTransport InfrastructureNeeds AssessmentNeeds Assessment

    Study (TINA)Study (TINA)

  • 8/8/2019 HSR in Turkey

    5/27

    Strategy for Transport Master PlanStrategy for Transport Master Plan

    Prepared by Istanbul Technical University,Prepared by Istanbul Technical University, Very detailed study (13 working groups, 32 Very detailed study (13 working groups, 32

    academicians and 30 advisors)academicians and 30 advisors) Analyses current situations of transport modes, Analyses current situations of transport modes,Depicts problems and solutions,Depicts problems and solutions,Sets out strategy and provides inventory forSets out strategy and provides inventory forpreparation of the transport master plan.preparation of the transport master plan.

    The most suitable line for high speed railway is Ankara-Istanbul line. Moreover, new high speed railway investments should be placed on the east-west corridor for the integration with TEN-T network.

  • 8/8/2019 HSR in Turkey

    6/27

    Proposed EastProposed East --West HSR CorridorWest HSR Corridor

  • 8/8/2019 HSR in Turkey

    7/27

    1010 thth Transport ForumTransport Forum

    Sep 27Sep 27

    Oct 01 2009Oct 01 2009

    Established by law as a national platform,Established by law as a national platform,

    Aim is Aim is to debate and set the strategic goals forto debate and set the strategic goals forthe Ministry of Transport,the Ministry of Transport,Special interest was given to 2023 targets,Special interest was given to 2023 targets,24 workshops carried out for 6 transport modes,24 workshops carried out for 6 transport modes,Senior representatives from governments,Senior representatives from governments,

    industry, civil societies and scientificindustry, civil societies and scientificcommunities participated.communities participated.

  • 8/8/2019 HSR in Turkey

    8/27

    8 /53 8

    KrklareliPityon

    M a n d r

    a

    U z u n k

    p r

    e h l i v

    a n k y

    Adapazar

    Band rma

    Balkesir

    Manisa

    Denizli

    Z o n g u l d a k

    MALATYA

    Alayunt

    K t a h

    y a

    M e y d a n e k b e z

    KONYA

    Karaman

    KAYSERElaz

    MuTatvan Van

    Kapky

    Diyarbakr Kurtalan

    GaziantepMardin NusaybinNarl

    Kahramanmara

    Mersin

    ankr

    Samsun

    AmasyaKars

    ErzurumErzincanIrmak

    Polatl

    Van Gl

    S T A N B U L

    e r k e

    z k y

    ( S i r k

    e c i )

    B u r d u r

    I s p a r t a

    skenderun

    Aydn

    Batman

    zmitKarabk

    Uak

    Yerky

    Divrii

    SVAS

    ADANA

    ANKARA

    AFYONZMR

    Aliaa

    Kapkule

    Yozgat

    BURSAOSMANEL

    ANTALYA

    ESKEHR

    Tiflis

    KerkkMusul

    Ba dad

    Halep

    8

    5th TARGETTo finish ongoing high speed rail lines (1.311 km)until 2012.

    HEDEF 2023

    HSR LINES LENGTHAnkara - stanbul 533 km

    Ankara - Konya 212 km

    Ankara - Sivas 460 km

    Bursa - Osmaneli 106 km

    TOTAL 1.311 km

    TARGETS for 2023

    : CONVANTIONAL LINES

    : HIGH SPEED LINES

  • 8/8/2019 HSR in Turkey

    9/27

    KapkuleKrklareli

    U z u n k

    p r

    P e h l i

    v a n k y

    Arifiye Adapazar

    Band rma

    Balkesir

    Manisa

    Denizli

    MALATYA

    Eskiehir

    Alayunt

    K t a h

    y a T a

    v a n l

    F e v z i p a a

    Konya

    Karaman

    Ulukla

    KayseriMu Tatvan Van

    Kapky

    Yolat

    DiyarbakrKurtalan

    GaziantepMardin

    NusaybinNarl

    K.mara

    Mersin Yenice

    ankr

    S a m

    s u n

    aramba

    G e l e

    m e n

    Amasya

    Hanl Bostan kaya

    etinkaya

    Kars

    ErzurumIrmak

    Van Gl

    Ortaklar

    Ske

    Tire

    demi

    S t l a B u r d u r

    I s p a r t a

    K a r a k

    u y u

    Eirdir

    MenemenTorbal

    skenderun

    Aydn

    Turhal

    Uak

    Horasan

    Divrii

    ADANA

    SVAS

    Zonguldak

    ANKARA

    ZMR

    ErzincanSincan

    YozgatYerky

    Yldzeli

    AFYON

    Polatl

    nn

    OsmaneliBursa

    obanbey

    Karkam

    O s m a n i y e

    K m r l e r

    Antalya

    Palu

    orum

    Bingl

    Gllk

    STANBUL e

    r k e z k

    y

    T e k i r

    d a

    H.PaaRota Havza

    Nide

    zmit D e r i n c e

    Halep

    Batum

    KerkkMusul

    BULGARSTAN

    YUNANSTAN

    GRCSTAN

    ERMENSTAN

    NAHVAN

    RAN

    IRAKSURYE

    andarl

    HopaSarp n

    y e

    F a t s a ldr

    Trabzon

    Aralk

    Cizre

    .Urfa

    Manavgat

    Aksaray

    Nevehir

    Ereli

    Bart n

    Karasu

    Alanya

    6th TARGET To complete core high speed rail network(6.792 km) until 2023.

    TARGETS for 2023

    : CONVANTIONAL LINES

    : HIGH SPEED LINES

  • 8/8/2019 HSR in Turkey

    10/27

    Transport Infrastructure NeTransport Infrastructure Ne ee ds Assessmentds Assessment

    Study (TINA Study (TINA , 2007, 2007 ))

    FFundedunded by European Unionby European Union ,,

    Carried out by TINA ViennaCarried out by TINA Vienna

    GmbhGmbh

    ,,

    Objectives are:Objectives are:to develop a multito develop a multi --modal transport network modal transport network

    (Core Network) to extend the European(Core Network) to extend the EuropeanUnion's TENUnion's TEN --T into Turkey,T into Turkey,preparation of a traffic forecast with a timepreparation of a traffic forecast with a time

    horizon until 2020,horizon until 2020,assessment of the projects on the coreassessment of the projects on the corenetwork,network,

    set up a GIS data management system.set up a GIS data management system.

  • 8/8/2019 HSR in Turkey

    11/27

  • 8/8/2019 HSR in Turkey

    12/27

    TraTra ffic Forecast inffic Forecast in

    HSR Feasibility StudiesHSR Feasibility Studies

    Existing passenger traffic is obtained from traffic counts orExisting passenger traffic is obtained from traffic counts orstatistics for road, rail and air transport.statistics for road, rail and air transport.

    Diverted traffic values are calculated through Value of Diverted traffic values are calculated through Value of Time analysis.Time analysis.Generated traffic are calculated as a percentage of Generated traffic are calculated as a percentage of diverted traffic.diverted traffic.Demographic factors such as population, GDP, vehicleDemographic factors such as population, GDP, vehicleownership and past traffic increase rates areownership and past traffic increase rates are analyzedanalyzedand necessary correlation coefficients are obtainedand necessary correlation coefficients are obtained ..

    Then, future traffic increase rates are calculated throughThen, future traffic increase rates are calculated throughcomputer models based oncomputer models based oncorrelation coefficients,correlation coefficients,UN forecast values for population increase rates,UN forecast values for population increase rates,

    European GDP increase rates foreseen,European GDP increase rates foreseen,

  • 8/8/2019 HSR in Turkey

    13/27

    TraTra ffic Forecast inffic Forecast in TINA TINA

    Based on traffic flows between domestic zones,Based on traffic flows between domestic zones,Base year (2004) data taken from available observed dataBase year (2004) data taken from available observed dataor simulated when necessaryor simulated when necessary ,,1 socio1 socio --economic scenario and 3 infrastructure scenarioseconomic scenario and 3 infrastructure scenarioswere defined for 2020,were defined for 2020,To generate passenger forecasts, base year O/D matrixTo generate passenger forecasts, base year O/D matrix

    was adjusted based on forecasts of sociowas adjusted based on forecasts of socio --economic andeconomic anddemographic conditions at the regional level,demographic conditions at the regional level,Then, generalized travel costs were adjusted based on theThen, generalized travel costs were adjusted based on the

    assumed changes to the networks and other levelassumed changes to the networks and other level --of of --service components,service components,Resulting passenger O/D matrices were assigned to the 3Resulting passenger O/D matrices were assigned to the 3different networks scenarios.different networks scenarios.Results of the forecasts were used to assess Core Network.Results of the forecasts were used to assess Core Network.

  • 8/8/2019 HSR in Turkey

    14/27

    SocioSocio --Economic ScenarioEconomic Scenario

    ~Population~~Population~Population growth rate between 1995 and 2004 wasPopulation growth rate between 1995 and 2004 wasalmost 2%,almost 2%,

    Population growth was assumed to continue as seen inPopulation growth was assumed to continue as seen inthe table below,the table below,Resulting population estimation for Turkey was 86 millionResulting population estimation for Turkey was 86 millionin 2020 and 93 million in 2030.in 2020 and 93 million in 2030.

  • 8/8/2019 HSR in Turkey

    15/27

    SocioSocio --Economic ScenarioEconomic Scenario

    ~GDP and Car Ownership~~GDP and Car Ownership~

    TurkeyTurkey s GDP increased almost 10% in 2004, 5.9% in 2003s GDP increased almost 10% in 2004, 5.9% in 2003and 7.8% in 2002.and 7.8% in 2002.

    The rate of 6% was chosen based on this trend, inThe rate of 6% was chosen based on this trend, inconsistent with OECD forecasts.consistent with OECD forecasts.To estimate car ownership rate, a logistic model was usedTo estimate car ownership rate, a logistic model was usedwith saturation around 700 cars per 1000 inhabitants,with saturation around 700 cars per 1000 inhabitants,The model projectedThe model projected a very significant increase froma very significant increase from80/1000 in 2004 to 600/1000 in 2030.80/1000 in 2004 to 600/1000 in 2030.

  • 8/8/2019 HSR in Turkey

    16/27

    Traffic Analysis ZonesTraffic Analysis Zones

  • 8/8/2019 HSR in Turkey

    17/27

    Passenger Transport ModellingPassenger Transport Modelling

    Classical four stage modeling was used:Classical four stage modeling was used:trip generation,trip generation,trip distribution,trip distribution,modal split,modal split,traffic assignmenttraffic assignment

    Considered modes for passenger transport modelingConsidered modes for passenger transport modelingwere road (subgroups: bus and car), rail and air.were road (subgroups: bus and car), rail and air.The trip purposes for segmentation of the demand sideThe trip purposes for segmentation of the demand sidewere business trips, holiday trips and private trips.were business trips, holiday trips and private trips.

  • 8/8/2019 HSR in Turkey

    18/27

    Trip GenerationTrip Generation

    Numbers of trips per trip purpose were estimated forNumbers of trips per trip purpose were estimated foreach traffic zone from available data,each traffic zone from available data,

    Number of inhabitants by gender and age classes, carNumber of inhabitants by gender and age classes, carownership, employment and regional economicownership, employment and regional economicperformance were used to determine the tripsperformance were used to determine the tripsgenerated in a region.generated in a region.

    The trip purposes for segmentation of the demand sideThe trip purposes for segmentation of the demand sidewere business trips, holiday trips and private trips.were business trips, holiday trips and private trips.

  • 8/8/2019 HSR in Turkey

    19/27

    Trip GenerationTrip Generation

    To calculate generated tripsTo calculate generated trips category analysiscategory analysis approachapproach waswas incorporatedincorporated ,,

    Equation used for trip generation is:Equation used for trip generation is:

    There were 81 zones, 18 age groups, 3 trip purposesThere were 81 zones, 18 age groups, 3 trip purposesand 2 gender groups. Data taken from census stats.and 2 gender groups. Data taken from census stats.There was noThere was no data on longdata on long --distance mobility behavior.distance mobility behavior.Therefore, studies of West European countries wereTherefore, studies of West European countries weretransferred to Turkey.transferred to Turkey.To decrease errors,To decrease errors, Turkish urban travel studies andTurkish urban travel studies andregional GDP valuesregional GDP values used to adjust the trip frequencyused to adjust the trip frequency

    per regionper region

  • 8/8/2019 HSR in Turkey

    20/27

    Trip GenerationTrip Generation

    NonNon --linear Adjustment of Trip Demand between rich and poor Regionslinear Adjustment of Trip Demand between rich and poor Regions

  • 8/8/2019 HSR in Turkey

    21/27

    Average Trip Rates Average Trip Rates

    Average trip rates for inter Average trip rates for inter --regional tripsregional trips

    These values refer to round trips,These values refer to round trips,Only motorized interOnly motorized inter --regional trips,regional trips,The applied trip rates vary considerably between richThe applied trip rates vary considerably between richand poor regionsand poor regions

  • 8/8/2019 HSR in Turkey

    22/27

  • 8/8/2019 HSR in Turkey

    23/27

    Calculation of Attracted TripsCalculation of Attracted Trips Attractiveness of region j is determined for a specific trip pur Attractiveness of region j is determined for a specific trip pur pose ppose p(e.g. business) and the relating structural variable (e.g. GDP,(e.g. business) and the relating structural variable (e.g. GDP, numbernumberof inhabitants) using the following equation:of inhabitants) using the following equation:

    If more than one structural data variable is applied for one purIf more than one structural data variable is applied for one pur pose,pose,the attractiveness of a region j for trip purpose p is given bythe attractiveness of a region j for trip purpose p is given by followingfollowingequation:equation:

    To take into account some of the interTo take into account some of the inter --regional trips remainregional trips remain caughtcaught inside in large traffic cells, an additional adjustment was perf inside in large traffic cells, an additional adjustment was perf ormed:ormed:

  • 8/8/2019 HSR in Turkey

    24/27

    Trip DistributionTrip Distribution

    In this step,In this step, a certain share of thea certain share of the trips estimated in onetrips estimated in oneregion was distributedregion was distributed to other regions.to other regions.To do this, the attractiveness of a region was quantifiedTo do this, the attractiveness of a region was quantifiedby taking into considerationby taking into consideration mainly sociomainly socio --economic andeconomic andtourismtourism --related information.related information.Considering attractiveness of a destination and travelConsidering attractiveness of a destination and travelimpedances between regions (monetary costs of aimpedances between regions (monetary costs of a

    journey, travel time), the trips generated within an origin journey, travel time), the trips generated within an originregion are distributed to destination regionsregion are distributed to destination regionsThus,Thus, an O/D matrix was generated which contains thean O/D matrix was generated which contains thepassenger volumes between an origin region and apassenger volumes between an origin region and a

    destination region.destination region.

  • 8/8/2019 HSR in Turkey

    25/27

    Modal SplitModal Split

    In this step,In this step, a certain share of thea certain share of the trips estimated in onetrips estimated in oneregion was distributedregion was distributed to other regions.to other regions.To do this, the attractiveness of a region was quantifiedTo do this, the attractiveness of a region was quantifiedby taking into considerationby taking into consideration mainly sociomainly socio --economic andeconomic andtourismtourism --related information.related information.Considering attractiveness of a destination and travelConsidering attractiveness of a destination and travelimpedances between regions (monetary costs of aimpedances between regions (monetary costs of a

    journey, travel time), the trips generated within an origin journey, travel time), the trips generated within an originregion are distributed to destination regionsregion are distributed to destination regionsThus,Thus, an O/D matrix was generated which contains thean O/D matrix was generated which contains thepassenger volumes between an origin region and apassenger volumes between an origin region and a

    destination region.destination region.

  • 8/8/2019 HSR in Turkey

    26/27

    Traffic AssignmentTraffic Assignment

    In this step,In this step, a certain share of thea certain share of the trips estimated in onetrips estimated in oneregion was distributedregion was distributed to other regions.to other regions.To do this, the attractiveness of a region was quantifiedTo do this, the attractiveness of a region was quantifiedby taking into considerationby taking into consideration mainly sociomainly socio --economic andeconomic andtourismtourism --related information.related information.Considering attractiveness of a destination and travelConsidering attractiveness of a destination and travelimpedances between regions (monetary costs of aimpedances between regions (monetary costs of a

    journey, travel time), the trips generated within an origin journey, travel time), the trips generated within an originregion are distributed to destination regionsregion are distributed to destination regionsThus,Thus, an O/D matrix was generated which contains thean O/D matrix was generated which contains thepassenger volumes between an origin region and apassenger volumes between an origin region and a

    destination region.destination region.

  • 8/8/2019 HSR in Turkey

    27/27

    TraTra ffic Forecast Resultsffic Forecast Results