1
Mission Crical Proof of Concept with HPE Superdome X and SQL Server Prerequisites Are you facing any of the following issues: Peak performance issues High availability for mission crical applicaons Constrained virtualizaon Data science performance - integrated R Highly transaconal, mission crical systems -- Query Store -- improving query tuning The latest versions of SQL Server now offer never before seen enhancements to query tuning, scalability, end user reporng and predicve analycs. • Rack space and power capacity to support the new hardware POC hardware needs to be installed and configured with appropriate network and storage (lead me for POC hardware request is expected to be 3 weeks) Workload traces which can be replayed. We need workload traces of the current environment. We need to understand to the specific goals they are seeking to achieve (e.g. long running job, business pain points, normalized database reporng, memory pressure in reporng, high transacon processing count). • Development environment deployed and ready for development o Tools installed: SQL Server Management Studio and Visual Studio Access to source code repository locaon for soluon arfacts Access to infrastructure and applicaons in scope Network account with access to SQL Server and other applicable plaorms Workspace idenfied for Pragmac Works consultant when onsite VPN access to network or equivalent to support remote development To learn more about how Pragmac Works and HPE can help you bring your SQL Server performance to the next level, contact [email protected]. Architectural Design Session for POC Determine workload(s) to analyze • Capture the workload Establish exisng baselines Finalize POC implementaon Plan for next 2 weeks Configure Server Week 1: Review Soluon. Finalize Scope Move your mission crical systems to top of the line HPE Superdome X hardware with SQL Server Enterprise for superior performance and scale. Week 2: Move Soluon to New Plaorm/Restore Database Move data to SDX • Working through discovery implementaon Baseline, compare, tune, implement best pracces Week 3: Documenng Findings and Review of Findings Document findings and results Next Steps document Review of findings and next steps

HPE Superdome X and SQL Server

Embed Size (px)

Citation preview

Page 1: HPE Superdome X and SQL Server

Mission Critical Proof of Concept with HPE Superdome X and SQL Server

Prerequisites

Are you facing any of the following issues:

• Peak performance issues

• High availability for mission critical applications

• Constrained virtualization

• Data science performance - integrated R

• Highly transactional, mission critical systems -- Query Store -- improving query tuning

The latest versions of SQL Server now offer never before seen enhancements to query tuning, scalability, end user reporting and predictive analytics.

• Rack space and power capacity to support the new hardware• POC hardware needs to be installed and configured with appropriate network and storage (lead time for POC hardware request is expected to be 3 weeks)• Workload traces which can be replayed. We need workload traces of the current environment. We need to understand to the specific goals they are seeking to achieve (e.g. long running job, business pain points, normalized database reporting, memory pressure in reporting, high transaction processing count).• Development environment deployed and ready for development o Tools installed: SQL Server Management Studio and Visual Studio• Access to source code repository location for solution artifacts• Access to infrastructure and applications in scope• Network account with access to SQL Server and other applicable platforms• Workspace identified for Pragmatic Works consultant when onsite• VPN access to network or equivalent to support remote development

To learn more about how Pragmatic Works and HPE can help you bring your SQL Server performance to the next level, contact [email protected].

• Architectural Design Session for

POC

• Determine workload(s) to analyze

• Capture the workload

• Establish existing baselines

• Finalize POC implementation Plan

for next 2 weeks

• Configure Server

Week 1: Review Solution. Finalize Scope

Move your mission critical systems to top of the line HPE Superdome X hardware with SQL Server Enterprise for superior performance and scale.

Week 2: Move Solution to New Platform/Restore Database

• Move data to SDX

• Working through discovery

implementation

• Baseline, compare, tune,

implement best practices

Week 3: Documenting Findings and Review of Findings

• Document findings and results

• Next Steps document

• Review of findings and next steps