Hersonissos Municipality SEAP

Dr. Maria Symeonidou-Sideris

Planning, Development & Internal Audit Department

EU Projects Unit

www.hersonisos.grHersonissos Municipality SEAP,

Maria Symeonidou16/05/2012, Sofia 1

Page 2: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

Hersonissos-Location

Centrally at the island of Crete

Adjacent to Heraklion Municipality

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

2

Page 3: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

3

Page 4: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

Hersonissos data facts

Population

25.003 inhabitants (2001).

27.080 inhabitants (2011), plus 25.257 temporarily residing during the tourist

period, total 52.337.

Dynamic population increase

1991-2001 28,4% & 2001-2011 8,3%.

Income increment per tax payer

2004-2005: 20,64% & 2008-2009: 0,15%

Average income for 2009 was 22.000 euros

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

4

Page 5: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

5

Page 6: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

6

Page 7: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

Tourism Activity 24,7% of hotels in Crete 72,8% of hotels in Heraklion prefecture 55,8% of Apartments / Traditional Hotels/ Camping

in Heraklion Prefecture 31,3% of hotel beds in Crete 32,5% of Apartments / Traditional Hotels/ Camping

in Heraklion Prefecture beds 36% of Heraklion airport total arrivals Total arrivals for 2009 reached 700.000 and

overnight stays 5.370.000

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

7

Page 8: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

8

Page 9: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

Local Authority’s Vision in Hersonissos

The Local Authority’s vision - as is documented at the “Hersonissos Business Plan 2011-2014”, is the Municipality’s Projection as a Financial, Touristic and Cultural development center, by adopting and implementing fundamental principles of sustainable development

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

9

Page 10: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

How will we achieve our goals

• Clear Vision• Planning• Evaluation• Environmental Protection• Networking, since cities are so different as similar

are their problems!!!

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

10

Page 11: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

Covenant of Mayors

• Adhesion: 18th April 2011• Target 20-20-20• SEAP• Activities’ Reports• Energy Days• Awareness

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

11

Page 12: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

Benefits of Joining the Covenant of Mayors network

• Active demonstration to fight climate change• Energy Efficiency• Energy Operations Management• Networking• Eco-nomy and Eco-logy

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

12

Page 13: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

The long road….to SEAP submission

1. Setting up of administrative structures and personnel allocation

2. Baseline Year Emissions3. Define measurable and specific actions for

CO2 emissions reduction by 2020.

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

13

Page 14: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

1. Organisational structures / personnel allocation

• Steering Committee • 7 Work Teams

CoM Workgroup Technical Services Environmental Directorate Water & Sewage Waste Management Co-operating Organisations-Bodies-Academia Private Sector / Services Sector

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

14

Page 15: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

+ Pros

• Strong Political Commitment • Enthusiasm and willingness

from part of the personnel• Support from Organisations,

Academic Institutions, Third Sector Professionals

- Cons

• Lack of human resources (all people involved are part-time)

• Part of personnel reluctant to get involved as the network is fairly new and they need to be informed and trained in depth

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

15

1. Organisational structures / personnel allocation

Page 16: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

Regional Energy Agency of Crete

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

16

ΠΕΡΙΦΕΡΕΙΑ ΚΡΗΤΗΣ

ΕΝΕΡΓΕΙΑΚΟ ΚΕΝΤΡΟ

Page 17: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

2. Base line Year 2010 Data Collection

• Schools• Municipal Buildings• Public Lighting• Housing Sector• Services Sector – Hotels• Water & Sewage Municipal Company• Waste Management Company

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

17

Page 18: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

+ Pros

• Municipal data are accurate and real

• Data provided by Municipal Companies and Hotels

- Cons

• Not available reliable data for earlier years

• Data from Public Electricity not in e-format (780 electric power installations)

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

18

2. Base line Year 2010 Data Collection

Page 19: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

Hotels

HOTELS

Municipal Energy Efficiency Award

Financial Incentive under thought (given the circumstances)

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

19

Page 20: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

3. Plan Specific and Measurable Actions until 2020

• Administrative Measures• Public Buildings

↗ Demonstration Projects↘ Intervention Projects•Public Lighting•Municipal Vehicle Fleet•Water & Sewage, Waste Management

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

20

Page 21: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

+ Pros• Actions within specific time-

frame• Proper Municipal Funding

Planning

- Cons• Drastic reduction of central

government funding for Local Authorities

• Stringent Austerity measures result in lack of income for Local Authorities

• Need for specialised personnel to support planned actions

• Need of continuous education of involved personnel

• Central Government energy decision making

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

21

3. Plan Specific and Measurable Actions until 2020

Page 22: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

Raise Awareness

• Involvement of third sector• Citizens involvement• Schools and Young generation

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

22

Page 23: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

Schools Project

•Project Elaboration / Part of the Curriculum•Junior Energy Inspectors in Action•1st Grade, Junior High School in Gouves•School Year 2012-2013, in all 7 Senior High Schools of the Municipality

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

23

Page 24: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

Junior Energy Inspectors in Action

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

24

Page 25: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

Junior Energy Inspectors in Action

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

25

Page 26: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

Junior Energy Inspectors in Action

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

26

Page 27: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

Junior Energy Inspectors in Action

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

27

Page 28: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

28

Page 29: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

Junior Energy Inspectors in Action

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

29

Page 30: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

Junior Energy Inspectors in Action

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

30

Page 31: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

Youth in Action 2007-2013

• “Youth in Action” exchange programme “eArth” in Gangi, Italy

• “Youth in Action” exchange programme “Minimum Energy-Maximum Power” in Antalya, Turkey

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

31

Page 32: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

Funding Instruments

SECTOR

•Energy Efficiency•Environment•Research•Infrastructure•Awareness-Education•Citizens Exchanges•National Funding•Cross-Border

FUNDING TOOL

•EEEF, IEE, Elena etc•Life+•FP7•JESSICA•LLL•Youth in Action•Ministry of Environment•Greece-Cyprus, ENPI, MED, SEE

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

32

Page 33: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

Solar-Powered Street Lighting in Anissaras-Hersonissos

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

33

Page 34: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

Hersonissos SEAP so far…..

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

34

όλη μας: 2010-2020

Η

Page 35: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

SEAP Team

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

35

«Preservation and proper management of resources, is one of the major scopes of the Municipal Authority of Hersonissos. We promote viable solutions at local level targeting climatic changes in order to protect the environment»

Mayor, Mr. Zacharias Doxastakis

«For many years we have been living under the belief that Earth has an unlimited capacity to withstand human activity. Lately, we realized that Earth’s capacity is restricted. We have to do our best to fully reverse our course ».

Fani Anastasiou, Chemist MSc, Environmental Consultant for CoM

Page 36: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

SEAP Team

16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou

36

«Structure of modern society and economy impose a new model of financial growth, with its epicenter on people and the environment»

Manos Michelekakis, EconomistM.A. , MSc honors, Ph.D. cand.  

Return back to our “grass-root” values with simultaneous employment of modern technology, is the only way to invert the environmental effects that our generation and the previous one have created. We can thus create a world worth living for the generations to come.

Manolis Tzompanakis, IT Specialist for the Covenant of Mayors  

Page 37: Hersonissos Municipality SEAP Dr. Maria Symeonidou-Sideris Planning, Development & Internal Audit Department EU Projects Unit  Hersonissos

ContactMaria Symeonidou-Sideris, MSc, PhDMunicipality of Hersonissos Town Hall, “Covenant of Mayors” Work GroupGournes, [email protected]@hersonisos.grwww.hersonisos.grTel:+30 2813 404661

«Promotion of environmental-friendly policies and citizens’ attitude change, are of great importance for achieving the “Covenant of Mayors” scopes»

•  16/05/2012, Sofia Hersonissos Municipality SEAP, Maria Symeonidou