4
 to 29,000 heavy truck  journey s on local roads  to 6+ years of 24 hour heavy construction in residential area  to £70-£80 permanent increase in annual water bills MEMBER OF PARLIAMENT FOR CHELSEA & FULHAM GREG HANDS M.P . HELP  STOP THE  SUPER SEWER

Help stop the Super Sewer

Embed Size (px)

Citation preview

Page 1: Help stop the Super Sewer

8/3/2019 Help stop the Super Sewer

http://slidepdf.com/reader/full/help-stop-the-super-sewer 1/4

Page 2: Help stop the Super Sewer

8/3/2019 Help stop the Super Sewer

http://slidepdf.com/reader/full/help-stop-the-super-sewer 2/4

Thames Water has announced

that Carnwath Road in Fulham

is its preferred Super Sewer

construction site in west

London.

The Thames Tunnel, or Super

Sewer, as it has become

known, would stretch 20 miles

along the route of the Thames,

from Hammersmith to

Greenwich. It is a major

infrastructure project subjectto a special planning process

and, ultimately, Government

approval. The estimated costs

have risen steadily and are

now £4.1 billion, which would

be met through a

permanent increase to

water bills of at least

 £70-80 per year.

Thames Water originally

identified Barn Elms in

Richmond as its

preferred ‘main bore’

site. However, it has now

decided to name

Carnwath Road as its

western choice instead.

Work would also occur in

Chelsea at both Cremorne

Gardens and the Royal

Hospital.

Pr  po  e   24 h   c  ns   uc    i     i  

WHY THE SUPER SEWER ISBAD FOR CHELSEA & FULHAM

Re  i  n   i  h  u  n  

G e   H n d  M.P.  i    i  h  t  

h    T h   e  Wa     ’     

c  n s   u c   i     i     i    r   n  e  

   e  i   n   i     r      e .

Page 3: Help stop the Super Sewer

8/3/2019 Help stop the Super Sewer

http://slidepdf.com/reader/full/help-stop-the-super-sewer 3/4

Thames Water is consulting on using a site on CarnwathRoad, Fulham, surrounded by residential properties for

their Super Sewer. That would mean 6+ years of 24-hour

construction misery, 29,000 extra heavy lorry movements

through Chelsea and Fulham as well as a permanent

increase of at least £70-£80 on your annual water bill.

The consultation runs until 10th February 2012, and it is

essential that as many local residents and organisations

respond as possible. The online response form can be

found at: www.thamestunnelconsultation.co.uk. Please

copy Greg Hands M.P. into your responses (details right).

Together we can still make Thames Water think again

about using Carnwath Road, which would be a disaster

for residents in Fulham, Chelsea and beyond.

 YOU MUST TAKE PART INCONSULTATION TO STOP SUPER SEWER CHAOS INCHELSEA & FULHAM

G e    n  e c  t   T h   e 

Wa     ’ c  n   l  t a   i   

   i  e .

G e   c   p  i    n   a   n s  

    S    S     i   H&F  C   n   Le a   , C   S     G   h  l     n  Ki   M l   h  u    M.

Page 4: Help stop the Super Sewer

8/3/2019 Help stop the Super Sewer

http://slidepdf.com/reader/full/help-stop-the-super-sewer 4/4

    Please

return

this form

to:

LET GREG HANDS M.P. KNOW YOUR VI

Please continue on separate paper if required.

Are you in favour of Thames Water’s Thames

Tideway Tunnel project (Super Sewer)

J YES J NO J DON’T KNOW

If yes, do you support the use of Carnwath Road,

as a major construction site for the sewer?

J YES J NO J DON’T KNOW

Please use this space to let Greg know any other views you have on the Super Sewer.

Nam

Addre

 

ema

YOUR D