Hazards Identification & Risk Assessment (HIRA) and On-site & Off-site Emergency
management Plans
Dr. R. Dubey - DMI
• New concept and thought is required • Monitoring and implementation is also required• Knowledge dissemination is also required in a new
way For all above new tools, are required:
- Application of IT- Involvement of like minded institutions and persons- Networking for enrichment of the concepts
• OSHAS 18001 describes the HIRA and total emergency management
• Manufactures, Storage and Import of Hazardous Chemicals (MS&IHC) Rules 1989
• Schedule 11 and 12 (On-site & Off-site Emergency management Plans )
• Clear approach and evaluation is missing
Hazard Ident. / Risk Assess. Procedure
HAZARD IDENTIFICATION METHODS:
- Process hazard checklist - Hazard survey: DOW index - HAZOP hazard & operability study - Safety review
System description
Hazard identification
Scenario identification
Accidentprobability
Accidentconsequences
Risk determination
risk &hazard
acceptable?
Modify design
Accept systemY
NEXTREMES:
- Low probability - Minimal consequences
RISK ASSESSMENT: - What can go wrong & how ? - What are the chances ? - Consequences ?
Lets think
Answer
???
????
??????
• Conclusion- Not a single answer- Encouragement for those
willing to do honest efforts in risk reduction by doing HIRA and application in total emergency management planning
- Constitution of Task Force in next few workshop for building www.hrdp-idrm.in