    www.hartmann-technologies.net

    Model-based working

  • 8/12/2019 Hartmann - Model Basedworking

    2/22

    2

    hartmann technologies GmbH

    hartmann technologies GmbH page

    Number of colleagues: 22salaried staff

    10 software engineers

    7content developers

    3 customer support/schooling

    2 managing directors

    For test runs /quality assurance or with

    unique developmental tasks colleagues from

    theIngenieurgesellschaftHartmannmbHwillbe asked to help(60employees).

    Established in2009

    History of the modelbased work:

    1998bis2005collaboration with NemetschekAG

    20052012collaboration with RIBAG

    since 2010collaboration with Autodesk

  • 8/12/2019 Hartmann - Model Basedworking

    3/22

    3hartmann technologies GmbH page

    Scopeofservices:

    Participationinthedevelopmentofthesoftwareforthemodelbasedwork(RIB)

    Developmentofcontentproductsforthemodelbasedwork

    Development

    of

    software

    for

    the

    handling

    with

    BIM

    models

    DevelopmentofsoftwareforthequantitytakeoffaccordingtogermanVOB/englishSMM7/etc.

    Trainingandimplementationofthemodelbasedworkingmethodforthespecificfieldsof

    tendering,technicalpreparationofthebuildingsites,implementationplanningand

    executionofconstructionwork

    Products:

    ContentfortheworkwithRIBiTWO

    iceBIMconstruction

    iceBIMbuildingsite

    iceBIMplausibility

    iceBIMarchitecture

    Managingdirectors:

    Mr.Dipl.Ing.Dipl.Kaufm.RolfHartmann

    Mr.Dipl.Ing.MarkHeinisch

  • 8/12/2019 Hartmann - Model Basedworking

    4/22

    4

    Requirements to the model-based working

    Automated quantity takeoff according to SMM7

    for all

    the items of structure and finishings

    based onaintelligent3Dmodel

    If necessary:detailed working depth for the quantity takeoff,for example bill of quantitys inclusive metalwork,

    roofing,facade,doors and windows

    Effective work

    flow through the achievement of greater working

    speed

    compared with the classical hand

    measurement or halfautomated methods

    Integrated,continuous dataflow from the preliminary planning to the practice onthe building site and finally to

    the completion of the building

    Prefabricated intelligentcontent leads to the easyusage of the technology through guided assistants and

    graphical user interfaces

    hartmann technologies GmbH page

  • 8/12/2019 Hartmann - Model Basedworking

    5/22

    5model-based working page

    DefinitionBIM: To work with abuilding model with contained data.

    Modelbased working BIM

  • 8/12/2019 Hartmann - Model Basedworking

    6/22

    6model-based working page

  • 8/12/2019 Hartmann - Model Basedworking

    7/22

    7model-based working page

  • 8/12/2019 Hartmann - Model Basedworking

    8/22

    8model-based working page

  • 8/12/2019 Hartmann - Model Basedworking

    9/22

    9

    Workflow ice BIM architecture

    model-based working page

  • 8/12/2019 Hartmann - Model Basedworking

    10/22

    10

    ice BIM architecture.

    Claimmanagement for all

    crafts of structure and

    finishings

    Ability to filter and the base for the

    plausibility check

    Bidirectional connection

    between BOQand model

    Visualisation e.g.for

    meetings,subcontractors etc.

    Creation of craft plans for

    structure and finishings

    Creation of craft plans for structure and

    finishings

    Accounting /progress report

    for allcrafts of structure and

    finishings

    Cost control for allcrafts of

    structure and finishings

    respective data

    ice BIM architecture page

    Complete BOQwith accessibility to

    other calculationsoftware

    Calculation of quantities for allstructural

    and finishings crafts,technical building

    equipment, facade and structural

    engineering

    Bidirectional connection

    between structural and

    finishing crafts and model

    adaptive,intelligentand

    menuguided content

  • 8/12/2019 Hartmann - Model Basedworking

    11/22

    11

    Bidirectional connection

    between BOQand modelClaimmanagement

    for single crafts

    Filters

    Visualisation e.g.for

    meetings,

    subcontractors etc.

    Accounting /progress report

    for single crafts

    Cost control for single

    crafts respective data

    Creation of craft plans for

    structure and finishings

    Generalproject

    information

    ice BIM buildingsite.

    ice BIM buildingsite page

  • 8/12/2019 Hartmann - Model Basedworking

    12/22

    12

    Detection of wrong3Dmodels

    Assured quantity takeoff

    Automated calculation ofcharacteristics,like cubic footage,

    gross floor area,net floor ratio etc.

    Integratedviewer to show

    determined errors

    ice BIM plausibility.

    Ice BIM plausibility page

  • 8/12/2019 Hartmann - Model Basedworking

    13/22

    13model-based working page

  • 8/12/2019 Hartmann - Model Basedworking

    14/22

    14

    building project: central station Erfurt

    3-D models page

  • 8/12/2019 Hartmann - Model Basedworking

    15/22

    15

    building project: central station Erfurt

    3-D models page

  • 8/12/2019 Hartmann - Model Basedworking

    16/22

    16

    building project : office building Rttenscheider Tor Essen

    3-D models page

  • 8/12/2019 Hartmann - Model Basedworking

    17/22

    17

    building project : hotel- and commercial house

    3-D models page

  • 8/12/2019 Hartmann - Model Basedworking

    18/22

    18

    building project : Le flair construction site 6

    3-D models page

  • 8/12/2019 Hartmann - Model Basedworking

    19/22

    19

    building project : Le Flair construction site 7

    3-D models page

  • 8/12/2019 Hartmann - Model Basedworking

    20/22

    20

    building project : Marie-Elisabeth-Lders-house

    3-D models page

  • 8/12/2019 Hartmann - Model Basedworking

    21/22

    21

    building project : Baltic Sea hotel (in development)

    3-D models page

  • 8/12/2019 Hartmann - Model Basedworking

    22/22

    22

    building project : Residential complex Roggenstein

    3-D models page